Boiler Maintenance &
Safeties
Boiler Maintenance
What is the need to maintain a boiler?
How do we maintain a boiler?
The Need:
1.To ensure 100% safe to operate the boiler.
2.To ensure 100% availability for the Production
Requirement.
3.To ensure the boiler runs at its Best efficiency.
4.To ensure the operation to be cost effective.
How do we maintain a boiler?
How……………
Requirements
1.Corrects Inputs
a.Quality of Water-Feed water & Boiler Water
b.Quality of Fuel
c.Input Voltage
2.Quality of Combustion
3.Operation
a.Right Manpower(Certified Operator)
b.Good Engineering Practices-Regular Servicing,Log book etc.
Feed Water Quality
BFW NORMS AS PER IS 10392-1982.
Parameter 0-20
(kg/cm2
)
20-40
(kg/cm2
)
Purpose
pH 8.5-9.5 8.5-9.5 Corrosion Control
Oxygen ND ND Pitting Control
Total Hardness <10 ND Scaling Control
Organics ND ND Foam Control
Boiler Water Quality
Parameter 0-20
(kg/cm2
)
20-40
(kg/cm2
)
Purpose
pH 11-12 11-12 Corrosion
Total Hardness ND ND Scale
Total Alkalinity (20% of TDS) 700 400 Foam
Phenolphthalin Alkalinity (10%
of TDS)
350 200 Foam
Silica (40% Caustic Alkaly) 140 80 Scale
TDS 3500 2000 Corrosion
Phosphates 20-40 10-30 Corrosion
Sulphite 30-50 20-40 Oxygen
Hydrazine 0.1 0.1-0.5 Oxygen
BOILER WATER NORMS AS PER IS 10392-1982
Heavy scales formed in
Water tubes in a water tube Boiler.
Caused due to very high
Hardness
Leads to damage of the
tubes
Effects of Bad water Quality
Effects of Bad water Quality
Oxygen pitting marks on the
tube surface in a Fire tube Boiler
Dosing System
 It is a requirement to maintain the Feed
water qualities,mainly to take care of
the following.
a.Oxygen Scavenger.
b.ph Booster
c.Corrosion Inhibitor (Antiscalant)
Different Kinds of Fuels
Solid Fuels:
Husk,coal,Wood,Groundnutshell,Bagasse,
Briquettes, De oiled Cake etc.
Liquid Fuels:
Furnace Oil, LDO,HSD,LSHS etc
Gaseous Fuels:
Natural Gas, Bio gas, Hydrogen Gas etc.
Fuel Major Properties
1.Calorific Value
2.Moisture
3.Sulphur
4.Ash content
5.Free of unwanted solid impurities
Typical Composition of Fuel
Fuels C H2 S N O2 H2O ASH NCV
Husk 36.14 3.7 0.08 0.46 29.34 8.92 19.4 3100
Coal 44.03 3.1 0.32 0.82 4.77 3.84 43.13 3800
wood 45.6 3.96 0.07 0.45 37.45 9.33 3.14 4400
Furnace
Oil 84 11 3.5- - 1 0.5 9650
HSD 85.5 14 0.5- - - - 10500
Natural
Gas 66 23 - - - 1.5- 8850
Combustion
3 T’s of Combustion
1.Time-Residense time of the fuel to burn.
2.Temperature-The Fuel needs to be fired at the right
temperature.
3.Turbulance-For the better mixing & Combustion.
Indicators of Good Combustion
1.O2 level will be 3-4 %
2.CO2 will be 12-13%
3.Flue gas temperature-180 to 230DegC (Desirable)
To Achieve the 3T’s of Combustion
Solid Fuel:
1.Fuel Size.
2.Bed Particle size(For FBC)
3.Proportionate Combustion Air.
4.Furnace pressure.(-2 to -5mm of Water Column)
5.FurnaceTemperature.
6.Secondary Air for the Volatiles.
Liquid & Gas Fuel:
1.Free of Impurities.(Proper Filteration system)
2.Fuel temperature(Oil)
3.Fuel Pressure(Oil)
4.Proper Atomisation of the fuel(Pressure Jet,SAB,Rotary Cup-Oil)
5.Proportionate Combustion Air.
Efficiencies
1.Combustion Efficiency-It is the efficiency of the
Burner/Furnace to burn the fuel effectively.
2.Thermal Efficiency-It is efficiency of the heat transfer in
the Boiler.
3.Overall System Efficiency-It is the system efficiency of
the boiler (which will be equal to the Fuel to Steam Ratio).
For every 1% of increase in Efficiency will save more than
1% of the Fuel Quantity.
On commercial side,for a 5TPH FBC boiler,will have a
savings of app Rs.3.6L per year.
(Considering Husk@Rs.3000/Ton with GCV of
3100Kcal/Kg)
Safeties in Boiler
1.Mechanical Safety (Solid,Oil,Gas)
a.Safety Valve
b.Fusible Plug.
c.Explosion Proof Door
2.Electrical Safety
Electrical Safeties Oil Gas Solid
Low Water Level YES YES YES
Flame Failue YES YES NO
Boiler Steam Pressure High YES YES YES
Combustion Air pressure Low YES YES NO
Flue gas temperature High YES YES YES
Fuel oil Temperature Low YES NO NO
Inlet Gas Pressure High NO YES NO
VPS(Valve Proving System) NO YES NO
Furnace Temperature High NO NO YES
Furnace Pressure High NO NO YES
Good Engineering Practice
1.Qualified/Certified Operator.
2.Maintenance.
3.Data Management-History Card, Logbook etc
4.House keeping.
MAINTENANCE OF OIL
FIRED BOILERS
1.Check feed water quality.
2.Give blow down at regular intervals ( approx. twice in a
shift ).
3.Blow down the Mobrey level switch and gauge glass.
4.Clean the gauge glass externally.
5.Clean the fuel filters and strainers.
6.Drain slightly the oil line bucket filter.
7.Nozzle cleaning.
Daily Maintenance
1.Check the working of low level & extra low level alarm by
reducing the water level.
2.Ensure proper lubrication of all moving parts.
3.Clean the flame sensor and viewing glass.
4.Check the conditions of door seals.
5.Check that there are no variations in the fuel pressure as
compared with that at commissioning time.
Weekly Maintenance
1.Clean electrical contacts of all relays and tighten loose
connections if any. Rough emery paper should not be used
for cleaning contacts.
2.Check water pump gaskets and non-return valve.
3.Lubricate the modulation motor linkages.
4.Clean the burner nozzle and ignition electrodes.
5.Check and clean, if necessary, the furnace.
Monthly Maintenance
Quarterly Maintenance
1.Clean blower fan blades.
2.Drain and clean water service /
deaerator tank and fill it with soft / DM
water.
3.Clean the fuel filters / strainers.
4.Drain and clean fuel service tank.
5.Open and clean out doors of boiler and
super heater. Remove collected soot
deposits.
Half Yearly Maintenance
1.Check all valves for leakage; lap them if found
leaking.
2.Lubricate bearings of water pumps.
3.Check the sealing of Manhole head holes, and
clean out door of smoke box.
4.Clean the inner and outer face of the sight
glass.
NOTE :Under no circumstances should a door be
left with gas leak around the seal as this would
damage the door.
Yearly Maintenance
1.Clean the smoke tubes with the help of wire brush.
2.Clean the combustion chamber of boiler and, super
heater. However quality of fuel and burner efficiency
will determine the frequency of cleaning this.
3.Lubricate the motors. Burner should be over hauled
at least once a year & regulated to ensure perfect
combustion.
4.Check the door refractory for any damage. Repair
as necessary.
5.Clean the water side of the boiler thoroughly. De-
scaling, if required, should be carried out as given in
the section on “De-scaling”.
Maintenance of Oil fired Boiler
1.Modulation assembly and damper
servicing.
2.Burner assembly, nozzle & flame sensor
cleaning.
3.Fuel pumps alignment.
4.FO day tank and feed water tank
cleaning.
5.All fuel & water line filters and strainers
cleaning.
6.Monitoring O2% & CO2%.
7.All safety interlocks checking.
8.Cleaning of Fire tubes.
MAINTENANCE OF SOLID
FUEL FIRED BOILERS
Daily Maintenance
1.Check softness of water by carrying out Q-test as
described in Operation section of manual.
2.Give blow down at regular intervals depending on
the feed water analysis.
3.Blow down the Mobrey Level Switch.
4.Blow down the gauge glasses.
5.Check fly ash and ensure timely ash removal.
Weekly Maintenance
1.Regenerate water softener, more than once a week, if
found necessary, depending on the quality of raw water. In
some cases, even daily regeneration may be necessary.
2.Check the working of feed water pre-heater/deaerator
tank, if provided.
3.Ensure that the gauge glasses are clean from inside and
outside so that the water level is clearly visible in the gauge
glasses.
4.Check the working of Mobrey Level Switch. Ensure that
the minimum and maximum water levels are properly
controlled.
1.Check the working of Low water cut off switch mounted on
the boiler. Open the boiler blow down valve. When the
water level reaches approximate 20 mm in the gauge glass,
there should be an audio-visual alarm.
2.Check the working of safety valves. Close the main steam
stop valve and other valves of the boiler and allows the steam
pressure to increase. The safety valves should open at the set
pressure and the steam pressure on the boiler should drop on
opening of the safety valves.
3.Check, if necessary and tighten all the foundation bolts
Weekly Maintenance
Monthly Maintenance
1.Drain the soft water service tank. Clean it from
inside and refill it with soft water.
2.Tighten stuffing box of water pump, if necessary.
3.Clean silver contacts of relays with carbon tetra
chloride or with paper, if required. Rough emery paper
should never be used.
4.Tighten screws connecting wires to terminal strips,
various relays, motors, controls, etc.
5.Ease the steam safety valves and reset.
6.Check and replace oil in gear boxes.
7.Check the condition of grate bars and replace
damaged ones if any.
8.Clean the Fire tubes.
Quarterly Maintenance
1.Drain and clean the feed water storage tank.
2.Clean the ID and FD fan blades.
3.Lubricate the bearings of water pump, ID and FD
fans.
4.Check Fuel Size as per Boiler requirement
5.Check Fuel feeding system
6.Check Sand/Bed Material Size (FBC)
7.Check the condition of the bed air nozzles for over
heating (FBC).
Half yearly Maintenance
1.Check the condition of refractory wall of the
combustion chamber.
2.Check all valves for leakage and lap them, if
necessary, with lapping paste.
3.Check the ducts and other joints for infiltration
of fresh air.
4.Check the quantity of resin inside the water
softener and top it up, if necessary. (Reason for
loss of resin is the carry-over of resin with back
wash water hence due care should be taken while
backwashes).
Yearly Maintenance
1.Check and repair the insulation lining of boiler, if required.
2.Clean various tanks and paint them.
3.Clean inside of the flue gas outlet.
4.Grease electric motors.
5.Check the membrane panel, it’s headers and tubes from
outside for cleanliness and clean if necessary.
6.Check the boiler tubes for cleanliness from inside and de-
scale if required. Descaling to be done chemically.
7.Carry out hydraulic test.
8.Check the condition of impellers and replace them if
necessary.
1.Cleaning of tube internal in Flue Gas Side with wire brush
2.Cleaning of Pressure Part in the water side by De scaling.
3.Check All Rotary equipment’s like Blower, Fans For
Vibration/Erosion/Balancing
4.Check Air / Flue Gas Duct leakages and arrest the leakages if
any
5.Furnace Refractory visual check & Flame test to identify
refractory leaks.
6.Check all Rotary Air Lock Valves (RAV) for Air ingress. Blade wear
out
7.Check Air Pre-heater Tubes for leaks & Chocking
8.Check Dust Collector internals like vanes, tubes for any erosion
9.Check Water Pre Heater for leaks & chocking
10.Check Grate bars /Bed Nozzle for damages
11.Check fire doors for damages
12.Check Smoke tube Spiral & sleeve condition.
13.Check ID fan impeller for erosion
FLUE GAS CIRCUIT
Data Management
1.Log Book
2.History Card
3.Spares Inventory.
4.Calibration Data of Instruments.
5.Fuel Analysis Reports.
6.Water Analysis Reports.
7.Maintenance Records.
8.IBR Certificates.
9,Boiler Drawings
SPECIAL SERVICES PROVIDED BY
THERMAX FOR BOILERS & HEATERS
1.DIAGNOTHERM
2.RLA (Remaining Life Assessment)
3.SERVICE PLUS (Annual Service Contracts)
4.SMART SERVE
DIAGNOTHERM
1.It is a comprehensive health check up study for
boilers & heaters which are in operation for longer
duration & needs expertise advice for safe & healthy
operation.
2.In depth log book study for 3- 6 month operation of
equipment.
3.Detailed check of safeties & interlocks
4.Efficiency check of the equipment as applicable.
5.Find out improvement areas which can either make
operation safe or help improve fuel efficiency
6.Detailed report with recommendation
RLA (Remaining Life Assessment)
 It is detailed scientific study for assessing the
existing condition & life of a boiler / heater &
hence confirming its safe operation in future.
 Also Life Extension Program of an equipment
as it follows a scientific procedure to identify
any flaws developed in an equipment &
suggesting the remedies for the same.
Methodology of RLA
1.Destructive & Non Destructive Tests.
2.Metallurgical Tests.
3.Review of Operational parameters.
4.Review of Water treatment records.
5.Final assessment.
6.Suggestions for Repairs/revamp / replacement &
redesign for safe operation of equipment's as well
as for efficiency enhancement.
Snapshots of the activity
Dye Penetration test
Snapshots of the activity
Ultrasonic Flaw Detection
Snapshots of the activity
THICKNESS MEASUREMENT
Hardness Testing
Snapshots of the activity
Snapshots of the activity
Magnetic Particle Inspection
In-situ Metallography
Snapshots of the activity
METALLOGRAPHY-
1.Metallography of materials is useful in
predicting the internal degradation of
material affecting it’s properties.
2.The tool determines abuse of overheating
& damage received ,
Snapshots of the activity
Snapshots of the activity
Remote Field Electromagnetic Test
BENEFITS OF RLA
1.Extends the safe life of unit & gives
confidence to the user for safe usage of
boilers.
2.Refreshes & renovates the boiler to
ensure minimum interruption to process.
3.Develops program for planned
replacement of boiler parts & minimize
production loss.
We offer our services for …
1.Small & Medium, Shell & Coil type IBR
/ Non IBR boilers – Capacity 50 Kg/hr to
30000 Kg/ hr.
2.Thermic fluid Heaters – 0.01 to 20
MKcal / hr
3.Pressure Vessels
4.Economizers & Super heaters
5.Pipelines
6.Heat Exchangers
Who does the Life Assessment / Condition
Assessment
1.Qualified & Competent team driven by
competent and experienced Metallurgist with vast
exposure to Indian/International Boiler & Heater
field.
2.Certified Level 2/3 technicians/Inspectors to
carry out/supervise NDT Tests -
Dye Penetrant Test
Magnetic Particle Inspection
In situ Metallography
Ultrasonic Thickness measurement
Corrosion Assessment
Boroscopic inspection
SERVICE PLUS (Annual Service Contracts)
1.It is a special service package offered
byThermax for up time of utility equipment’s
such as boilers / heaters to get the consistent
output at desired efficiency.
2.It is a flexible package & offers various services
based on the type & capacity of equipment,
automation, combustion system, etc installed on
the equipment.
BENEFITS FOR SERVICE PLUS
1.It consists of Preventive maintenance visits &
Overhauling visits to guide on healthy and safe
operation of the Unit.
2.Flue gas analysis for O2, CO2 & CO contents
and Excess Air.
3.Performance load trail.
4.Efficiency Trial Reports as per BS 845 Part I.
Suggestions for efficiency improvements.
SMART SERVE
1.Highly experience service when needed
2.Assist in restarting old equipment
3.Specialized services to ensure your boiler & heater
get professional service hands & you want quality
services .
4.When your boiler / heater has major breakdown &
you don’t know how to repair / rectify the problem.
Want to find the root cause of failure through FTA &
take corrective action.
5.Fuel conversion jobs & re commissioning.
WITH BEST COMPLIMENTS
FROM
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to BoilersSATYAKAM MOHAPATRA
 
Boilers and its types & components
Boilers and its types & componentsBoilers and its types & components
Boilers and its types & componentsYoga Sathish
 
Boiler – fundamentals and best practices
Boiler – fundamentals and best practicesBoiler – fundamentals and best practices
Boiler – fundamentals and best practicesBassem Eleaba, MEng
 
High pressure boiler
High pressure boilerHigh pressure boiler
High pressure boilerRahul Rathod
 
V 1 presentation on safety aspects of lpg handling and storage
V 1 presentation on safety aspects of lpg handling  and storageV 1 presentation on safety aspects of lpg handling  and storage
V 1 presentation on safety aspects of lpg handling and storageImran Bokhari
 
Steam distribution system, utilization and design
Steam distribution system, utilization and designSteam distribution system, utilization and design
Steam distribution system, utilization and designAzmir Latif Beg
 
DESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZERDESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZERGopi Chand
 
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdownCfbc boiler startup and shutdown
Cfbc boiler startup and shutdownAshvani Shukla
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heaterSHIVAJI CHOUDHURY
 
Screw Air Compressors
Screw Air CompressorsScrew Air Compressors
Screw Air Compressorsksatm
 
Thermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency ImprovementThermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency ImprovementAnkur Gaikwad
 
Boiler Maintenance.pptx
Boiler Maintenance.pptxBoiler Maintenance.pptx
Boiler Maintenance.pptxSahalSachu
 
Relief and safety valves for thermal power plants
Relief and safety valves for thermal power plantsRelief and safety valves for thermal power plants
Relief and safety valves for thermal power plantsSHIVAJI CHOUDHURY
 
Steam distribution system by Varun Pratap Singh
Steam distribution system by Varun Pratap SinghSteam distribution system by Varun Pratap Singh
Steam distribution system by Varun Pratap SinghVarun Pratap Singh
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trialNagesh H
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesBoben Anto Chemmannoor
 

Was ist angesagt? (20)

A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to Boilers
 
Boilers and its types & components
Boilers and its types & componentsBoilers and its types & components
Boilers and its types & components
 
Boiler – fundamentals and best practices
Boiler – fundamentals and best practicesBoiler – fundamentals and best practices
Boiler – fundamentals and best practices
 
High pressure boiler
High pressure boilerHigh pressure boiler
High pressure boiler
 
V 1 presentation on safety aspects of lpg handling and storage
V 1 presentation on safety aspects of lpg handling  and storageV 1 presentation on safety aspects of lpg handling  and storage
V 1 presentation on safety aspects of lpg handling and storage
 
Steam distribution system, utilization and design
Steam distribution system, utilization and designSteam distribution system, utilization and design
Steam distribution system, utilization and design
 
Steam generator part 2
Steam generator part 2Steam generator part 2
Steam generator part 2
 
DESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZERDESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZER
 
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdownCfbc boiler startup and shutdown
Cfbc boiler startup and shutdown
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heater
 
Screw Air Compressors
Screw Air CompressorsScrew Air Compressors
Screw Air Compressors
 
Thermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency ImprovementThermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency Improvement
 
Boiler Maintenance.pptx
Boiler Maintenance.pptxBoiler Maintenance.pptx
Boiler Maintenance.pptx
 
Steam leakage
Steam leakageSteam leakage
Steam leakage
 
Relief and safety valves for thermal power plants
Relief and safety valves for thermal power plantsRelief and safety valves for thermal power plants
Relief and safety valves for thermal power plants
 
Steam distribution system by Varun Pratap Singh
Steam distribution system by Varun Pratap SinghSteam distribution system by Varun Pratap Singh
Steam distribution system by Varun Pratap Singh
 
Boiler
BoilerBoiler
Boiler
 
Presentation on CFBC Boilers
Presentation on CFBC BoilersPresentation on CFBC Boilers
Presentation on CFBC Boilers
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
 

Andere mochten auch (16)

Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Standard erection manual (pressure parts)
Standard erection manual (pressure parts)
 
Erectn n commisioning
Erectn n commisioningErectn n commisioning
Erectn n commisioning
 
Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)
 
Safe Operation and Explosions in Boilers
Safe Operation and Explosions in BoilersSafe Operation and Explosions in Boilers
Safe Operation and Explosions in Boilers
 
Valves used in industry
Valves used in industryValves used in industry
Valves used in industry
 
A CASE STUDY OF THE BOILER ACCIDENT, Process Safety Management System
A CASE STUDY OF THE BOILER ACCIDENT, Process Safety Management SystemA CASE STUDY OF THE BOILER ACCIDENT, Process Safety Management System
A CASE STUDY OF THE BOILER ACCIDENT, Process Safety Management System
 
Matematica slides tx2
Matematica slides tx2Matematica slides tx2
Matematica slides tx2
 
Dcs operator training
Dcs operator trainingDcs operator training
Dcs operator training
 
107 basic instrumentation
107 basic instrumentation 107 basic instrumentation
107 basic instrumentation
 
Boiler explosion at exxon mobil singapore
Boiler explosion at exxon mobil singaporeBoiler explosion at exxon mobil singapore
Boiler explosion at exxon mobil singapore
 
Caldeiras
CaldeirasCaldeiras
Caldeiras
 
Dcs course
Dcs courseDcs course
Dcs course
 
Practical Distributed Control Systems (DCS) for Engineers and Technicians
Practical Distributed Control Systems (DCS) for Engineers and TechniciansPractical Distributed Control Systems (DCS) for Engineers and Technicians
Practical Distributed Control Systems (DCS) for Engineers and Technicians
 
Basic instrumentation
Basic instrumentationBasic instrumentation
Basic instrumentation
 
Basics Of Instrumentation
Basics Of InstrumentationBasics Of Instrumentation
Basics Of Instrumentation
 
Distributed Control System Basics
Distributed Control System BasicsDistributed Control System Basics
Distributed Control System Basics
 

Ähnlich wie Boiler Maintenance & Safety

Training on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdfTraining on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdfMadan Karki
 
Evaluation of a Boiler performance
Evaluation of a Boiler performanceEvaluation of a Boiler performance
Evaluation of a Boiler performanceHashim Hasnain Hadi
 
Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTCRohit Dave
 
Astm method for distillation of petroleum products at atmospheric pressure
Astm  method for distillation of petroleum products at atmospheric pressureAstm  method for distillation of petroleum products at atmospheric pressure
Astm method for distillation of petroleum products at atmospheric pressureStudent
 
ASTM Distillation D86: A Standard Test Method for Distillation of Petroleum P...
ASTM Distillation D86: A Standard Test Method for Distillation of Petroleum P...ASTM Distillation D86: A Standard Test Method for Distillation of Petroleum P...
ASTM Distillation D86: A Standard Test Method for Distillation of Petroleum P...IRJESJOURNAL
 
2212208 distillation-of-herbs
2212208 distillation-of-herbs2212208 distillation-of-herbs
2212208 distillation-of-herbsHassan325
 
How to Maintain Your Temperature Calibration Equipment Webinar
How to Maintain Your Temperature Calibration Equipment WebinarHow to Maintain Your Temperature Calibration Equipment Webinar
How to Maintain Your Temperature Calibration Equipment WebinarTranscat
 
Energy Saving Tips For Steam Boiler - Thermodyne Boilers
Energy Saving Tips For Steam Boiler - Thermodyne BoilersEnergy Saving Tips For Steam Boiler - Thermodyne Boilers
Energy Saving Tips For Steam Boiler - Thermodyne BoilersThermodyne Engineering systems
 
Energy conversion engineering lab manual full
Energy conversion engineering lab manual fullEnergy conversion engineering lab manual full
Energy conversion engineering lab manual fullFarhan8885
 
Maintenance and inspection_of_transformer
Maintenance and inspection_of_transformerMaintenance and inspection_of_transformer
Maintenance and inspection_of_transformerSomkene Mbakwe
 
A guide for firetube boiler testes
A guide for firetube boiler   testesA guide for firetube boiler   testes
A guide for firetube boiler testesederpitapeva
 

Ähnlich wie Boiler Maintenance & Safety (20)

Training on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdfTraining on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdf
 
Evaluation of a Boiler performance
Evaluation of a Boiler performanceEvaluation of a Boiler performance
Evaluation of a Boiler performance
 
Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTC
 
Efficient steam systems - Generation to WHR
Efficient steam systems - Generation to WHREfficient steam systems - Generation to WHR
Efficient steam systems - Generation to WHR
 
TR OverHauling PPT
TR OverHauling PPTTR OverHauling PPT
TR OverHauling PPT
 
Astm method for distillation of petroleum products at atmospheric pressure
Astm  method for distillation of petroleum products at atmospheric pressureAstm  method for distillation of petroleum products at atmospheric pressure
Astm method for distillation of petroleum products at atmospheric pressure
 
Presentation of industrial pharmacy 2
Presentation of industrial pharmacy 2Presentation of industrial pharmacy 2
Presentation of industrial pharmacy 2
 
Boiler operation (2)
Boiler operation (2)Boiler operation (2)
Boiler operation (2)
 
ASTM Distillation D86: A Standard Test Method for Distillation of Petroleum P...
ASTM Distillation D86: A Standard Test Method for Distillation of Petroleum P...ASTM Distillation D86: A Standard Test Method for Distillation of Petroleum P...
ASTM Distillation D86: A Standard Test Method for Distillation of Petroleum P...
 
Presentation On Boiler Analysis
Presentation On Boiler AnalysisPresentation On Boiler Analysis
Presentation On Boiler Analysis
 
2212208 distillation-of-herbs
2212208 distillation-of-herbs2212208 distillation-of-herbs
2212208 distillation-of-herbs
 
4 ch1
4 ch14 ch1
4 ch1
 
Presentation of industrial pharmacy 2
Presentation  of industrial pharmacy 2Presentation  of industrial pharmacy 2
Presentation of industrial pharmacy 2
 
How to Maintain Your Temperature Calibration Equipment Webinar
How to Maintain Your Temperature Calibration Equipment WebinarHow to Maintain Your Temperature Calibration Equipment Webinar
How to Maintain Your Temperature Calibration Equipment Webinar
 
flash point
flash pointflash point
flash point
 
Reactor Design
Reactor DesignReactor Design
Reactor Design
 
Energy Saving Tips For Steam Boiler - Thermodyne Boilers
Energy Saving Tips For Steam Boiler - Thermodyne BoilersEnergy Saving Tips For Steam Boiler - Thermodyne Boilers
Energy Saving Tips For Steam Boiler - Thermodyne Boilers
 
Energy conversion engineering lab manual full
Energy conversion engineering lab manual fullEnergy conversion engineering lab manual full
Energy conversion engineering lab manual full
 
Maintenance and inspection_of_transformer
Maintenance and inspection_of_transformerMaintenance and inspection_of_transformer
Maintenance and inspection_of_transformer
 
A guide for firetube boiler testes
A guide for firetube boiler   testesA guide for firetube boiler   testes
A guide for firetube boiler testes
 

Mehr von National Productivity Council, Hyderabad, India

Mehr von National Productivity Council, Hyderabad, India (13)

Boiler Water Treatment -
Boiler Water Treatment - Boiler Water Treatment -
Boiler Water Treatment -
 
Efficient Steam Systems -
Efficient Steam Systems -Efficient Steam Systems -
Efficient Steam Systems -
 
New Technologies in Process Heating
New Technologies in Process HeatingNew Technologies in Process Heating
New Technologies in Process Heating
 
Boiler Water Treatment for LP,MP and HP Boiler
Boiler Water Treatment for LP,MP and HP BoilerBoiler Water Treatment for LP,MP and HP Boiler
Boiler Water Treatment for LP,MP and HP Boiler
 
Case Studies on CFBC Boilers
Case Studies on CFBC BoilersCase Studies on CFBC Boilers
Case Studies on CFBC Boilers
 
Boiler Performance Monitoring
Boiler Performance MonitoringBoiler Performance Monitoring
Boiler Performance Monitoring
 
CFBC Boiler vs Pulverized Fired Boiler
CFBC Boiler vs Pulverized Fired BoilerCFBC Boiler vs Pulverized Fired Boiler
CFBC Boiler vs Pulverized Fired Boiler
 
Boiler Superheater Design Modification
Boiler Superheater Design ModificationBoiler Superheater Design Modification
Boiler Superheater Design Modification
 
Developments in Industrial Boilers, WHR and Power Boilers
Developments in Industrial Boilers, WHR and Power BoilersDevelopments in Industrial Boilers, WHR and Power Boilers
Developments in Industrial Boilers, WHR and Power Boilers
 
Indigenization of Russian Make WHR by Vizag Steel
Indigenization of Russian Make WHR by Vizag SteelIndigenization of Russian Make WHR by Vizag Steel
Indigenization of Russian Make WHR by Vizag Steel
 
Online Efficiency Monitoring and Diagnostics in Coal Fired Boiler
Online Efficiency Monitoring and Diagnostics in Coal Fired BoilerOnline Efficiency Monitoring and Diagnostics in Coal Fired Boiler
Online Efficiency Monitoring and Diagnostics in Coal Fired Boiler
 
Optimizing Combustion using a Flue Gas Analyser
Optimizing Combustion using a Flue Gas AnalyserOptimizing Combustion using a Flue Gas Analyser
Optimizing Combustion using a Flue Gas Analyser
 
Minimum Energy Performance Standards for Boilers in India
Minimum Energy Performance Standards for Boilers in IndiaMinimum Energy Performance Standards for Boilers in India
Minimum Energy Performance Standards for Boilers in India
 

Kürzlich hochgeladen

Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 

Kürzlich hochgeladen (20)

Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 

Boiler Maintenance & Safety

  • 1. Sustainable Solution Provider in Energy & Environment welcomes you to National Workshop on Operation & Maintenance NPC,VIZAG
  • 3. Boiler Maintenance What is the need to maintain a boiler? How do we maintain a boiler? The Need: 1.To ensure 100% safe to operate the boiler. 2.To ensure 100% availability for the Production Requirement. 3.To ensure the boiler runs at its Best efficiency. 4.To ensure the operation to be cost effective.
  • 4. How do we maintain a boiler? How…………… Requirements 1.Corrects Inputs a.Quality of Water-Feed water & Boiler Water b.Quality of Fuel c.Input Voltage 2.Quality of Combustion 3.Operation a.Right Manpower(Certified Operator) b.Good Engineering Practices-Regular Servicing,Log book etc.
  • 5. Feed Water Quality BFW NORMS AS PER IS 10392-1982. Parameter 0-20 (kg/cm2 ) 20-40 (kg/cm2 ) Purpose pH 8.5-9.5 8.5-9.5 Corrosion Control Oxygen ND ND Pitting Control Total Hardness <10 ND Scaling Control Organics ND ND Foam Control
  • 6. Boiler Water Quality Parameter 0-20 (kg/cm2 ) 20-40 (kg/cm2 ) Purpose pH 11-12 11-12 Corrosion Total Hardness ND ND Scale Total Alkalinity (20% of TDS) 700 400 Foam Phenolphthalin Alkalinity (10% of TDS) 350 200 Foam Silica (40% Caustic Alkaly) 140 80 Scale TDS 3500 2000 Corrosion Phosphates 20-40 10-30 Corrosion Sulphite 30-50 20-40 Oxygen Hydrazine 0.1 0.1-0.5 Oxygen BOILER WATER NORMS AS PER IS 10392-1982
  • 7. Heavy scales formed in Water tubes in a water tube Boiler. Caused due to very high Hardness Leads to damage of the tubes Effects of Bad water Quality
  • 8. Effects of Bad water Quality Oxygen pitting marks on the tube surface in a Fire tube Boiler
  • 9. Dosing System  It is a requirement to maintain the Feed water qualities,mainly to take care of the following. a.Oxygen Scavenger. b.ph Booster c.Corrosion Inhibitor (Antiscalant)
  • 10. Different Kinds of Fuels Solid Fuels: Husk,coal,Wood,Groundnutshell,Bagasse, Briquettes, De oiled Cake etc. Liquid Fuels: Furnace Oil, LDO,HSD,LSHS etc Gaseous Fuels: Natural Gas, Bio gas, Hydrogen Gas etc.
  • 11. Fuel Major Properties 1.Calorific Value 2.Moisture 3.Sulphur 4.Ash content 5.Free of unwanted solid impurities
  • 12. Typical Composition of Fuel Fuels C H2 S N O2 H2O ASH NCV Husk 36.14 3.7 0.08 0.46 29.34 8.92 19.4 3100 Coal 44.03 3.1 0.32 0.82 4.77 3.84 43.13 3800 wood 45.6 3.96 0.07 0.45 37.45 9.33 3.14 4400 Furnace Oil 84 11 3.5- - 1 0.5 9650 HSD 85.5 14 0.5- - - - 10500 Natural Gas 66 23 - - - 1.5- 8850
  • 13. Combustion 3 T’s of Combustion 1.Time-Residense time of the fuel to burn. 2.Temperature-The Fuel needs to be fired at the right temperature. 3.Turbulance-For the better mixing & Combustion. Indicators of Good Combustion 1.O2 level will be 3-4 % 2.CO2 will be 12-13% 3.Flue gas temperature-180 to 230DegC (Desirable)
  • 14. To Achieve the 3T’s of Combustion Solid Fuel: 1.Fuel Size. 2.Bed Particle size(For FBC) 3.Proportionate Combustion Air. 4.Furnace pressure.(-2 to -5mm of Water Column) 5.FurnaceTemperature. 6.Secondary Air for the Volatiles. Liquid & Gas Fuel: 1.Free of Impurities.(Proper Filteration system) 2.Fuel temperature(Oil) 3.Fuel Pressure(Oil) 4.Proper Atomisation of the fuel(Pressure Jet,SAB,Rotary Cup-Oil) 5.Proportionate Combustion Air.
  • 15. Efficiencies 1.Combustion Efficiency-It is the efficiency of the Burner/Furnace to burn the fuel effectively. 2.Thermal Efficiency-It is efficiency of the heat transfer in the Boiler. 3.Overall System Efficiency-It is the system efficiency of the boiler (which will be equal to the Fuel to Steam Ratio). For every 1% of increase in Efficiency will save more than 1% of the Fuel Quantity. On commercial side,for a 5TPH FBC boiler,will have a savings of app Rs.3.6L per year. (Considering Husk@Rs.3000/Ton with GCV of 3100Kcal/Kg)
  • 16. Safeties in Boiler 1.Mechanical Safety (Solid,Oil,Gas) a.Safety Valve b.Fusible Plug. c.Explosion Proof Door 2.Electrical Safety Electrical Safeties Oil Gas Solid Low Water Level YES YES YES Flame Failue YES YES NO Boiler Steam Pressure High YES YES YES Combustion Air pressure Low YES YES NO Flue gas temperature High YES YES YES Fuel oil Temperature Low YES NO NO Inlet Gas Pressure High NO YES NO VPS(Valve Proving System) NO YES NO Furnace Temperature High NO NO YES Furnace Pressure High NO NO YES
  • 17. Good Engineering Practice 1.Qualified/Certified Operator. 2.Maintenance. 3.Data Management-History Card, Logbook etc 4.House keeping.
  • 19. 1.Check feed water quality. 2.Give blow down at regular intervals ( approx. twice in a shift ). 3.Blow down the Mobrey level switch and gauge glass. 4.Clean the gauge glass externally. 5.Clean the fuel filters and strainers. 6.Drain slightly the oil line bucket filter. 7.Nozzle cleaning. Daily Maintenance
  • 20. 1.Check the working of low level & extra low level alarm by reducing the water level. 2.Ensure proper lubrication of all moving parts. 3.Clean the flame sensor and viewing glass. 4.Check the conditions of door seals. 5.Check that there are no variations in the fuel pressure as compared with that at commissioning time. Weekly Maintenance
  • 21. 1.Clean electrical contacts of all relays and tighten loose connections if any. Rough emery paper should not be used for cleaning contacts. 2.Check water pump gaskets and non-return valve. 3.Lubricate the modulation motor linkages. 4.Clean the burner nozzle and ignition electrodes. 5.Check and clean, if necessary, the furnace. Monthly Maintenance
  • 22. Quarterly Maintenance 1.Clean blower fan blades. 2.Drain and clean water service / deaerator tank and fill it with soft / DM water. 3.Clean the fuel filters / strainers. 4.Drain and clean fuel service tank. 5.Open and clean out doors of boiler and super heater. Remove collected soot deposits.
  • 23. Half Yearly Maintenance 1.Check all valves for leakage; lap them if found leaking. 2.Lubricate bearings of water pumps. 3.Check the sealing of Manhole head holes, and clean out door of smoke box. 4.Clean the inner and outer face of the sight glass. NOTE :Under no circumstances should a door be left with gas leak around the seal as this would damage the door.
  • 24. Yearly Maintenance 1.Clean the smoke tubes with the help of wire brush. 2.Clean the combustion chamber of boiler and, super heater. However quality of fuel and burner efficiency will determine the frequency of cleaning this. 3.Lubricate the motors. Burner should be over hauled at least once a year & regulated to ensure perfect combustion. 4.Check the door refractory for any damage. Repair as necessary. 5.Clean the water side of the boiler thoroughly. De- scaling, if required, should be carried out as given in the section on “De-scaling”.
  • 25. Maintenance of Oil fired Boiler 1.Modulation assembly and damper servicing. 2.Burner assembly, nozzle & flame sensor cleaning. 3.Fuel pumps alignment. 4.FO day tank and feed water tank cleaning. 5.All fuel & water line filters and strainers cleaning. 6.Monitoring O2% & CO2%. 7.All safety interlocks checking. 8.Cleaning of Fire tubes.
  • 26. MAINTENANCE OF SOLID FUEL FIRED BOILERS
  • 27. Daily Maintenance 1.Check softness of water by carrying out Q-test as described in Operation section of manual. 2.Give blow down at regular intervals depending on the feed water analysis. 3.Blow down the Mobrey Level Switch. 4.Blow down the gauge glasses. 5.Check fly ash and ensure timely ash removal.
  • 28. Weekly Maintenance 1.Regenerate water softener, more than once a week, if found necessary, depending on the quality of raw water. In some cases, even daily regeneration may be necessary. 2.Check the working of feed water pre-heater/deaerator tank, if provided. 3.Ensure that the gauge glasses are clean from inside and outside so that the water level is clearly visible in the gauge glasses. 4.Check the working of Mobrey Level Switch. Ensure that the minimum and maximum water levels are properly controlled.
  • 29. 1.Check the working of Low water cut off switch mounted on the boiler. Open the boiler blow down valve. When the water level reaches approximate 20 mm in the gauge glass, there should be an audio-visual alarm. 2.Check the working of safety valves. Close the main steam stop valve and other valves of the boiler and allows the steam pressure to increase. The safety valves should open at the set pressure and the steam pressure on the boiler should drop on opening of the safety valves. 3.Check, if necessary and tighten all the foundation bolts Weekly Maintenance
  • 30. Monthly Maintenance 1.Drain the soft water service tank. Clean it from inside and refill it with soft water. 2.Tighten stuffing box of water pump, if necessary. 3.Clean silver contacts of relays with carbon tetra chloride or with paper, if required. Rough emery paper should never be used. 4.Tighten screws connecting wires to terminal strips, various relays, motors, controls, etc. 5.Ease the steam safety valves and reset. 6.Check and replace oil in gear boxes. 7.Check the condition of grate bars and replace damaged ones if any. 8.Clean the Fire tubes.
  • 31. Quarterly Maintenance 1.Drain and clean the feed water storage tank. 2.Clean the ID and FD fan blades. 3.Lubricate the bearings of water pump, ID and FD fans. 4.Check Fuel Size as per Boiler requirement 5.Check Fuel feeding system 6.Check Sand/Bed Material Size (FBC) 7.Check the condition of the bed air nozzles for over heating (FBC).
  • 32. Half yearly Maintenance 1.Check the condition of refractory wall of the combustion chamber. 2.Check all valves for leakage and lap them, if necessary, with lapping paste. 3.Check the ducts and other joints for infiltration of fresh air. 4.Check the quantity of resin inside the water softener and top it up, if necessary. (Reason for loss of resin is the carry-over of resin with back wash water hence due care should be taken while backwashes).
  • 33. Yearly Maintenance 1.Check and repair the insulation lining of boiler, if required. 2.Clean various tanks and paint them. 3.Clean inside of the flue gas outlet. 4.Grease electric motors. 5.Check the membrane panel, it’s headers and tubes from outside for cleanliness and clean if necessary. 6.Check the boiler tubes for cleanliness from inside and de- scale if required. Descaling to be done chemically. 7.Carry out hydraulic test. 8.Check the condition of impellers and replace them if necessary.
  • 34. 1.Cleaning of tube internal in Flue Gas Side with wire brush 2.Cleaning of Pressure Part in the water side by De scaling. 3.Check All Rotary equipment’s like Blower, Fans For Vibration/Erosion/Balancing 4.Check Air / Flue Gas Duct leakages and arrest the leakages if any 5.Furnace Refractory visual check & Flame test to identify refractory leaks. 6.Check all Rotary Air Lock Valves (RAV) for Air ingress. Blade wear out 7.Check Air Pre-heater Tubes for leaks & Chocking 8.Check Dust Collector internals like vanes, tubes for any erosion 9.Check Water Pre Heater for leaks & chocking 10.Check Grate bars /Bed Nozzle for damages 11.Check fire doors for damages 12.Check Smoke tube Spiral & sleeve condition. 13.Check ID fan impeller for erosion FLUE GAS CIRCUIT
  • 35. Data Management 1.Log Book 2.History Card 3.Spares Inventory. 4.Calibration Data of Instruments. 5.Fuel Analysis Reports. 6.Water Analysis Reports. 7.Maintenance Records. 8.IBR Certificates. 9,Boiler Drawings
  • 36. SPECIAL SERVICES PROVIDED BY THERMAX FOR BOILERS & HEATERS 1.DIAGNOTHERM 2.RLA (Remaining Life Assessment) 3.SERVICE PLUS (Annual Service Contracts) 4.SMART SERVE
  • 37. DIAGNOTHERM 1.It is a comprehensive health check up study for boilers & heaters which are in operation for longer duration & needs expertise advice for safe & healthy operation. 2.In depth log book study for 3- 6 month operation of equipment. 3.Detailed check of safeties & interlocks 4.Efficiency check of the equipment as applicable. 5.Find out improvement areas which can either make operation safe or help improve fuel efficiency 6.Detailed report with recommendation
  • 38. RLA (Remaining Life Assessment)  It is detailed scientific study for assessing the existing condition & life of a boiler / heater & hence confirming its safe operation in future.  Also Life Extension Program of an equipment as it follows a scientific procedure to identify any flaws developed in an equipment & suggesting the remedies for the same.
  • 39. Methodology of RLA 1.Destructive & Non Destructive Tests. 2.Metallurgical Tests. 3.Review of Operational parameters. 4.Review of Water treatment records. 5.Final assessment. 6.Suggestions for Repairs/revamp / replacement & redesign for safe operation of equipment's as well as for efficiency enhancement.
  • 40. Snapshots of the activity Dye Penetration test
  • 41. Snapshots of the activity Ultrasonic Flaw Detection
  • 42. Snapshots of the activity THICKNESS MEASUREMENT
  • 44. Snapshots of the activity Magnetic Particle Inspection
  • 46. METALLOGRAPHY- 1.Metallography of materials is useful in predicting the internal degradation of material affecting it’s properties. 2.The tool determines abuse of overheating & damage received , Snapshots of the activity
  • 47. Snapshots of the activity Remote Field Electromagnetic Test
  • 48. BENEFITS OF RLA 1.Extends the safe life of unit & gives confidence to the user for safe usage of boilers. 2.Refreshes & renovates the boiler to ensure minimum interruption to process. 3.Develops program for planned replacement of boiler parts & minimize production loss.
  • 49. We offer our services for … 1.Small & Medium, Shell & Coil type IBR / Non IBR boilers – Capacity 50 Kg/hr to 30000 Kg/ hr. 2.Thermic fluid Heaters – 0.01 to 20 MKcal / hr 3.Pressure Vessels 4.Economizers & Super heaters 5.Pipelines 6.Heat Exchangers
  • 50. Who does the Life Assessment / Condition Assessment 1.Qualified & Competent team driven by competent and experienced Metallurgist with vast exposure to Indian/International Boiler & Heater field. 2.Certified Level 2/3 technicians/Inspectors to carry out/supervise NDT Tests - Dye Penetrant Test Magnetic Particle Inspection In situ Metallography Ultrasonic Thickness measurement Corrosion Assessment Boroscopic inspection
  • 51. SERVICE PLUS (Annual Service Contracts) 1.It is a special service package offered byThermax for up time of utility equipment’s such as boilers / heaters to get the consistent output at desired efficiency. 2.It is a flexible package & offers various services based on the type & capacity of equipment, automation, combustion system, etc installed on the equipment.
  • 52. BENEFITS FOR SERVICE PLUS 1.It consists of Preventive maintenance visits & Overhauling visits to guide on healthy and safe operation of the Unit. 2.Flue gas analysis for O2, CO2 & CO contents and Excess Air. 3.Performance load trail. 4.Efficiency Trial Reports as per BS 845 Part I. Suggestions for efficiency improvements.
  • 53. SMART SERVE 1.Highly experience service when needed 2.Assist in restarting old equipment 3.Specialized services to ensure your boiler & heater get professional service hands & you want quality services . 4.When your boiler / heater has major breakdown & you don’t know how to repair / rectify the problem. Want to find the root cause of failure through FTA & take corrective action. 5.Fuel conversion jobs & re commissioning.