24. Epstein's Rehabilitation Plan 24
Parking Facility Benefits
• Consolidation of 5 parking facilities into 1
• Improved traffic flow
• Convenient and user friendly
– Bright and open
– High ceilings
– Simple circulation
• LEED Certified
– Environmentally sensitive
• Energy efficient
• Storm water management
• Health benefits to occupants and environment
33. Epstein's Rehabilitation Plan 33
PLAN ALTERATIONS BASED UPON
PLANNING BOARD COMMENTS
Building Proposed Revised
Maple Avenue Lot 36 Condominium flats 20 Townhomes in Colonial style
Building A 7 Stories, 84 units total
6 Stories, with a 4 unit penthouse,
77 units total
Building A
20’ Setback to 7th floor
(from edge of building)
39’ Setback to penthouses
(from edge of building)
Building B 7 Stories, 138 rental units total
6 Stories with 10 unit penthouse,
129 units (option to go rental
or condo)
Building B
No setback on 7th story (Market
Street façade)
27’ setback to penthouse
(Market Street façade)
Market Street Setback (Retail) 8’ +/- 10’
Building C 20 Rental lofts
Up to 36 Condo lofts with
Shapsis Property
Building C 72’ height of loft building Up to 62’ height of loft building
Parking Garage Precast finish (DeHart) Free-standing architectural facade
41. Epstein's Rehabilitation Plan 41
Existing “Slot”
Existing “Slot”Existing and Proposed “Connector” Entrance on Market Street
Existing and Proposed “Connector” Entrance on Bank Street