SlideShare ist ein Scribd-Unternehmen logo
1 von 18
Downloaden Sie, um offline zu lesen
A Brief introduction of current
issues in Capital Budgeting
Raman Kumar Sahu ,Nishant Rishav
CIL Guideline for Selection of
Projects
 IRR >= 12% at 85% capacity
utilization
 NPV >=0 at discounting rate =12%
What is IRR and NPV ?
 Internal Rate of Return (IRR) is
defined as the discounting rate at
which NPV of all cashflows is equal to
zero.
 Net Present Value(NPV)can be
defined as the difference between the
present value of all cash inflows and
the present value of all cash outflows.
Case Study : Actual data
EXAMPLE 1
PERIOD CASHFLOW1 CASHFLOW2
0 -100 -100
1 82 10
2 23 10
3 10 10
4 5 20
5 5 50
6 10 120
IRR 18% 18%
PROFIT 35 120
MIRR@8%,8% 11% 16%
compunding period RATE of reinvestment FV for CF1 FV for CF2
5 8% 120.4849023 14.69328077
4 8% 31.29124608 13.6048896
3 8% 12.59712 12.59712
2 8% 5.832 23.328
1 8% 5.4 54
0 8% 10 120
total FV 185.6052684 238.2232904
EXAMPLE 2
EXAMPLE 3
Multiple IRRs !
NPV vs Discount rate
Multiple IRR values
•2110.10%
•19.98%
•1.09%
Moreover, NPV is negative between
discounting rates 1.09% -19.98%.
Multiple IRRs !
Multiple IRR values
•1018.60%
•11.66%
•0.75%
Moreover, NPV is negative between
discounting rates 0.75% -11.66%.
NPV vs Discount rate
NPV vs Discount rate
HIRING OPTION DEPARTMENTAL OPTION
NPV at 12% 142550.89 Cr 157845.26 Cr
IRR 26.15 % 25.92 %
Back to Basics
 One of the most fundamental concepts in
finance is that money has a time value.
 A Rupee today is worth more than a
Rupee tomorrow.
 The reason is straightforward,ie, a Rupee
that you receive today can be used for
creating a value of more than a Rupee at
some future time.
NPV
•Net Present Value (NPV) is the difference between the ‘present
value’ of cash inflows and the ‘present value’ of cash outflows.
•NPV is used in capital budgeting to analyze the profitability of a
projected investment or project.
NPV = -C0 + C1/(1+r) + C2/(1+r)2 – C3/(1+r)3 + C4/(1+r)4 + C5/(1+r)5
where , Discounting all the cash flows at r % per annum.
Similarly, FV= C5 + C4(1+r) –C3(1+r)2 +C2(1+r)3 + C1(1+r)4 - C0 (1+r)5
Future value of all cash flows at the end of 5th year at r% per annum.
IRR
 IRR is the discounting rate for which NPV is equal to zero.
 Lets equate the expression for NPV to zero.
NPV = -C0 + C1/(1+r) + C2/(1+r)2 – C3/(1+r)3 + C4/(1+r)4 + C5/(1+r)5 =0
Rearranging the terms of the above equation gives us an equation of
form:
a0 + a1(1+r) -a2(1+r)2 +a3(1+r)3 + a4(1+r)4 - a5(1+r)5 =0
This is an equation of fifth order therefore can have a maximum number
of 5 real roots, hence a maximum of 5 IRRs possible.
• MS Excel returns only one positive value of IRR, hence sometimes the
other possible IRR values are left unreported in project reports.
Limitations of IRR
The first main issue with IRR is that multiple solutions can be
found for the same project.
The second problem is that the assumption that positive cash
flows are reinvested at the IRR gives an over-optimistic picture.
Often the option having lower IRR value has greater NPV at
12% discounting rate .
MIRR
 An improvement over the concept of IRR
 Modified internal rate of return is a solution to the shortcomings of
internal rate of return as a project evaluation technique.
 There are two major disadvantages of IRR.
 One is Multiple IRR and the other one is the impractical assumption
of reinvesting positive cash flows at the rate of project IRR.
 Modified internal rate of return (MIRR) assumes that positive cash
flows are reinvested at the firm's cost of capital, and the initial
outlays are financed at the firm's financing cost. By contrast, the
traditional IRR assumes the cash flow from a project are reinvested
at the IRR.
 FV of all inflows at reinvestment rate = (PV of all outflows at
finance rate)(1+MIRR)n
 In case of IRR, reinvestment rate and finance rate are same as IRR.
FV of all inflows at IRR rate = (PV of all outflows at IRR
rate)(1+IRR)n

Concepts of MIRR
Financerate 10%
Reinvestmentrate 10%
12.72%
Year Cashflow PV FV
0 -325000 -325000
1 87000 105270
2 -10000 -8264
3 372000 372000 PV 333264
-333264 477270 FV 477270
MIRRcalculatedfromexcelfunction
Thecalculationisasolutiontotwomajorproblemsthatexistwith
thepopularIRRcalculation.
1.ThefirstmainproblemwithIRRisthatmultiplesolutionscanbe
foundforthesameproject.
2.Thesecondproblemisthattheassumptionthatpositivecash
flowsarereinvestedattheIRRisconsideredimpracticalinpractice.
WiththeMIRR,onlyasinglesolutionexistsforagivenproject,and
reinvestmentrateofpositivecashflowsismuchmorevalidin
practice.
Final Comments
 MIRR presents a more realistic picture
of the project than IRR
 IRR should never be used in isolation
to determine the financial viability of
the project.
 IRR should be used in conjuction with
NPV.
Brief introduction to capital budgeting techniques and issues

Weitere ähnliche Inhalte

Was ist angesagt?

Risk & return cf presentaion
Risk & return cf presentaionRisk & return cf presentaion
Risk & return cf presentaionRizwan Ashraf
 
Corporate finance book_ppt_y_hj_rkrjg2g
Corporate finance book_ppt_y_hj_rkrjg2gCorporate finance book_ppt_y_hj_rkrjg2g
Corporate finance book_ppt_y_hj_rkrjg2gPartha Das
 
Hull White model presentation
Hull White model presentationHull White model presentation
Hull White model presentationStephan Chang
 
Time Value Of Money -Finance
Time Value Of Money -FinanceTime Value Of Money -Finance
Time Value Of Money -FinanceZoha Qureshi
 
Capital Structure
Capital StructureCapital Structure
Capital Structureyashpal01
 
International cost of capital
International cost of capitalInternational cost of capital
International cost of capitalFuturum2
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgetingankyta89
 
Chapter 12.Risk and Return
Chapter 12.Risk and ReturnChapter 12.Risk and Return
Chapter 12.Risk and ReturnZahraMirzayeva
 
Interest Rate Risk And Management
Interest Rate Risk And ManagementInterest Rate Risk And Management
Interest Rate Risk And Managementcatelong
 
Interest rate derivatives
Interest rate derivativesInterest rate derivatives
Interest rate derivativesIndia Forex
 
Cost of capital, Cost of debt, Cost of equity, Cost of preference shares, Wei...
Cost of capital, Cost of debt, Cost of equity, Cost of preference shares, Wei...Cost of capital, Cost of debt, Cost of equity, Cost of preference shares, Wei...
Cost of capital, Cost of debt, Cost of equity, Cost of preference shares, Wei...Dayana Mastura FCCA CA
 

Was ist angesagt? (20)

Risk & return cf presentaion
Risk & return cf presentaionRisk & return cf presentaion
Risk & return cf presentaion
 
Corporate finance book_ppt_y_hj_rkrjg2g
Corporate finance book_ppt_y_hj_rkrjg2gCorporate finance book_ppt_y_hj_rkrjg2g
Corporate finance book_ppt_y_hj_rkrjg2g
 
Npv profile
Npv profileNpv profile
Npv profile
 
Capital budgeting problems
Capital budgeting problemsCapital budgeting problems
Capital budgeting problems
 
Hull White model presentation
Hull White model presentationHull White model presentation
Hull White model presentation
 
Time Value Of Money -Finance
Time Value Of Money -FinanceTime Value Of Money -Finance
Time Value Of Money -Finance
 
Capital Structure
Capital StructureCapital Structure
Capital Structure
 
Internal rate of return
Internal rate of returnInternal rate of return
Internal rate of return
 
CAPITAL BUDGETING TECHNIQUES
CAPITAL BUDGETING TECHNIQUESCAPITAL BUDGETING TECHNIQUES
CAPITAL BUDGETING TECHNIQUES
 
Cost of Capital
Cost of CapitalCost of Capital
Cost of Capital
 
International cost of capital
International cost of capitalInternational cost of capital
International cost of capital
 
BONDS, BOND VALUATION, AND INTEREST RATES
BONDS, BOND VALUATION, AND INTEREST RATESBONDS, BOND VALUATION, AND INTEREST RATES
BONDS, BOND VALUATION, AND INTEREST RATES
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Chapter 12.Risk and Return
Chapter 12.Risk and ReturnChapter 12.Risk and Return
Chapter 12.Risk and Return
 
fii
fiifii
fii
 
Interest Rate Risk And Management
Interest Rate Risk And ManagementInterest Rate Risk And Management
Interest Rate Risk And Management
 
Internal Rate of Return
Internal Rate of ReturnInternal Rate of Return
Internal Rate of Return
 
Interest rate derivatives
Interest rate derivativesInterest rate derivatives
Interest rate derivatives
 
Financial management
Financial managementFinancial management
Financial management
 
Cost of capital, Cost of debt, Cost of equity, Cost of preference shares, Wei...
Cost of capital, Cost of debt, Cost of equity, Cost of preference shares, Wei...Cost of capital, Cost of debt, Cost of equity, Cost of preference shares, Wei...
Cost of capital, Cost of debt, Cost of equity, Cost of preference shares, Wei...
 

Ähnlich wie Brief introduction to capital budgeting techniques and issues

Discounted measures
Discounted measures Discounted measures
Discounted measures Huma Ilyas
 
Chapter8 investmentcriteria
Chapter8 investmentcriteriaChapter8 investmentcriteria
Chapter8 investmentcriteriaAKSHAYA0000
 
Relationship between IRR & NPV
Relationship between IRR & NPVRelationship between IRR & NPV
Relationship between IRR & NPVZeeshan Ali
 
economy Chapter5_by louy Al hami
economy Chapter5_by louy Al hami economy Chapter5_by louy Al hami
economy Chapter5_by louy Al hami Louy Alhamy
 
THAI MUSIC-Mariestela e
THAI MUSIC-Mariestela eTHAI MUSIC-Mariestela e
THAI MUSIC-Mariestela eMj Rufin
 
THE BASICS OF CAPITAL BUDGETING
THE BASICS OF CAPITAL BUDGETINGTHE BASICS OF CAPITAL BUDGETING
THE BASICS OF CAPITAL BUDGETINGKhiemmy dela Torre
 
Comparison of NPV IRR and Profitability Index.pdf
Comparison of NPV IRR and Profitability Index.pdfComparison of NPV IRR and Profitability Index.pdf
Comparison of NPV IRR and Profitability Index.pdfjaneguinumtad3
 
Discounted cash flow applications
Discounted cash flow applicationsDiscounted cash flow applications
Discounted cash flow applicationsYinka Daramola
 
Capital Budgeting : capital budgeting decision
Capital Budgeting : capital budgeting decisionCapital Budgeting : capital budgeting decision
Capital Budgeting : capital budgeting decisionRavindra Nath Shukla
 
Risk In Capital Budgeting
Risk In Capital BudgetingRisk In Capital Budgeting
Risk In Capital BudgetingNoman
 
CAPITAL BUDGETING DECISIONS.ppt
CAPITAL BUDGETING DECISIONS.pptCAPITAL BUDGETING DECISIONS.ppt
CAPITAL BUDGETING DECISIONS.pptDr.K.Sivaperumal
 
Need a one response for each discussion post in 50 to 75 words.docx
Need a one response for each discussion post in 50 to 75 words.docxNeed a one response for each discussion post in 50 to 75 words.docx
Need a one response for each discussion post in 50 to 75 words.docxgemaherd
 
Capital Budgeting Decisions
Capital Budgeting DecisionsCapital Budgeting Decisions
Capital Budgeting DecisionsPANKAJ PANDEY
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgetingshagun jain
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgetingKhalid Aziz
 
Financial Management Slides Ch 13
Financial Management Slides Ch 13Financial Management Slides Ch 13
Financial Management Slides Ch 13Sayyed Naveed Ali
 
Captial bugting
Captial bugtingCaptial bugting
Captial bugting3prem
 
Capital Budgeting Rules 04
Capital Budgeting Rules 04Capital Budgeting Rules 04
Capital Budgeting Rules 04rajeevgupta
 

Ähnlich wie Brief introduction to capital budgeting techniques and issues (20)

Discounted measures
Discounted measures Discounted measures
Discounted measures
 
Chapter8 investmentcriteria
Chapter8 investmentcriteriaChapter8 investmentcriteria
Chapter8 investmentcriteria
 
Relationship between IRR & NPV
Relationship between IRR & NPVRelationship between IRR & NPV
Relationship between IRR & NPV
 
economy Chapter5_by louy Al hami
economy Chapter5_by louy Al hami economy Chapter5_by louy Al hami
economy Chapter5_by louy Al hami
 
THAI MUSIC-Mariestela e
THAI MUSIC-Mariestela eTHAI MUSIC-Mariestela e
THAI MUSIC-Mariestela e
 
THE BASICS OF CAPITAL BUDGETING
THE BASICS OF CAPITAL BUDGETINGTHE BASICS OF CAPITAL BUDGETING
THE BASICS OF CAPITAL BUDGETING
 
Comparison of NPV IRR and Profitability Index.pdf
Comparison of NPV IRR and Profitability Index.pdfComparison of NPV IRR and Profitability Index.pdf
Comparison of NPV IRR and Profitability Index.pdf
 
Discounted cash flow applications
Discounted cash flow applicationsDiscounted cash flow applications
Discounted cash flow applications
 
Capital budegeting-p pt
Capital budegeting-p ptCapital budegeting-p pt
Capital budegeting-p pt
 
Capital Budgeting : capital budgeting decision
Capital Budgeting : capital budgeting decisionCapital Budgeting : capital budgeting decision
Capital Budgeting : capital budgeting decision
 
Risk In Capital Budgeting
Risk In Capital BudgetingRisk In Capital Budgeting
Risk In Capital Budgeting
 
CAPITAL BUDGETING DECISIONS.ppt
CAPITAL BUDGETING DECISIONS.pptCAPITAL BUDGETING DECISIONS.ppt
CAPITAL BUDGETING DECISIONS.ppt
 
Need a one response for each discussion post in 50 to 75 words.docx
Need a one response for each discussion post in 50 to 75 words.docxNeed a one response for each discussion post in 50 to 75 words.docx
Need a one response for each discussion post in 50 to 75 words.docx
 
Capital Budgeting Decisions
Capital Budgeting DecisionsCapital Budgeting Decisions
Capital Budgeting Decisions
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Cooperate finance
Cooperate financeCooperate finance
Cooperate finance
 
Financial Management Slides Ch 13
Financial Management Slides Ch 13Financial Management Slides Ch 13
Financial Management Slides Ch 13
 
Captial bugting
Captial bugtingCaptial bugting
Captial bugting
 
Capital Budgeting Rules 04
Capital Budgeting Rules 04Capital Budgeting Rules 04
Capital Budgeting Rules 04
 

Brief introduction to capital budgeting techniques and issues

  • 1. A Brief introduction of current issues in Capital Budgeting Raman Kumar Sahu ,Nishant Rishav
  • 2. CIL Guideline for Selection of Projects  IRR >= 12% at 85% capacity utilization  NPV >=0 at discounting rate =12%
  • 3. What is IRR and NPV ?  Internal Rate of Return (IRR) is defined as the discounting rate at which NPV of all cashflows is equal to zero.  Net Present Value(NPV)can be defined as the difference between the present value of all cash inflows and the present value of all cash outflows.
  • 4. Case Study : Actual data
  • 6. PERIOD CASHFLOW1 CASHFLOW2 0 -100 -100 1 82 10 2 23 10 3 10 10 4 5 20 5 5 50 6 10 120 IRR 18% 18% PROFIT 35 120 MIRR@8%,8% 11% 16% compunding period RATE of reinvestment FV for CF1 FV for CF2 5 8% 120.4849023 14.69328077 4 8% 31.29124608 13.6048896 3 8% 12.59712 12.59712 2 8% 5.832 23.328 1 8% 5.4 54 0 8% 10 120 total FV 185.6052684 238.2232904 EXAMPLE 2
  • 8. Multiple IRRs ! NPV vs Discount rate Multiple IRR values •2110.10% •19.98% •1.09% Moreover, NPV is negative between discounting rates 1.09% -19.98%.
  • 9. Multiple IRRs ! Multiple IRR values •1018.60% •11.66% •0.75% Moreover, NPV is negative between discounting rates 0.75% -11.66%. NPV vs Discount rate
  • 10. NPV vs Discount rate HIRING OPTION DEPARTMENTAL OPTION NPV at 12% 142550.89 Cr 157845.26 Cr IRR 26.15 % 25.92 %
  • 11. Back to Basics  One of the most fundamental concepts in finance is that money has a time value.  A Rupee today is worth more than a Rupee tomorrow.  The reason is straightforward,ie, a Rupee that you receive today can be used for creating a value of more than a Rupee at some future time.
  • 12. NPV •Net Present Value (NPV) is the difference between the ‘present value’ of cash inflows and the ‘present value’ of cash outflows. •NPV is used in capital budgeting to analyze the profitability of a projected investment or project. NPV = -C0 + C1/(1+r) + C2/(1+r)2 – C3/(1+r)3 + C4/(1+r)4 + C5/(1+r)5 where , Discounting all the cash flows at r % per annum. Similarly, FV= C5 + C4(1+r) –C3(1+r)2 +C2(1+r)3 + C1(1+r)4 - C0 (1+r)5 Future value of all cash flows at the end of 5th year at r% per annum.
  • 13. IRR  IRR is the discounting rate for which NPV is equal to zero.  Lets equate the expression for NPV to zero. NPV = -C0 + C1/(1+r) + C2/(1+r)2 – C3/(1+r)3 + C4/(1+r)4 + C5/(1+r)5 =0 Rearranging the terms of the above equation gives us an equation of form: a0 + a1(1+r) -a2(1+r)2 +a3(1+r)3 + a4(1+r)4 - a5(1+r)5 =0 This is an equation of fifth order therefore can have a maximum number of 5 real roots, hence a maximum of 5 IRRs possible. • MS Excel returns only one positive value of IRR, hence sometimes the other possible IRR values are left unreported in project reports.
  • 14. Limitations of IRR The first main issue with IRR is that multiple solutions can be found for the same project. The second problem is that the assumption that positive cash flows are reinvested at the IRR gives an over-optimistic picture. Often the option having lower IRR value has greater NPV at 12% discounting rate .
  • 15. MIRR  An improvement over the concept of IRR  Modified internal rate of return is a solution to the shortcomings of internal rate of return as a project evaluation technique.  There are two major disadvantages of IRR.  One is Multiple IRR and the other one is the impractical assumption of reinvesting positive cash flows at the rate of project IRR.  Modified internal rate of return (MIRR) assumes that positive cash flows are reinvested at the firm's cost of capital, and the initial outlays are financed at the firm's financing cost. By contrast, the traditional IRR assumes the cash flow from a project are reinvested at the IRR.  FV of all inflows at reinvestment rate = (PV of all outflows at finance rate)(1+MIRR)n  In case of IRR, reinvestment rate and finance rate are same as IRR. FV of all inflows at IRR rate = (PV of all outflows at IRR rate)(1+IRR)n 
  • 16. Concepts of MIRR Financerate 10% Reinvestmentrate 10% 12.72% Year Cashflow PV FV 0 -325000 -325000 1 87000 105270 2 -10000 -8264 3 372000 372000 PV 333264 -333264 477270 FV 477270 MIRRcalculatedfromexcelfunction Thecalculationisasolutiontotwomajorproblemsthatexistwith thepopularIRRcalculation. 1.ThefirstmainproblemwithIRRisthatmultiplesolutionscanbe foundforthesameproject. 2.Thesecondproblemisthattheassumptionthatpositivecash flowsarereinvestedattheIRRisconsideredimpracticalinpractice. WiththeMIRR,onlyasinglesolutionexistsforagivenproject,and reinvestmentrateofpositivecashflowsismuchmorevalidin practice.
  • 17. Final Comments  MIRR presents a more realistic picture of the project than IRR  IRR should never be used in isolation to determine the financial viability of the project.  IRR should be used in conjuction with NPV.