The document provides information about Myanmar professional engineers (PEs) registered in Singapore, the relevant authorities they work with, and the submission requirements and processes for each authority. It lists 9 Myanmar PEs practicing in Singapore and their registration numbers. The main authorities discussed are the Building and Construction Authority (BCA), Singapore Civil Defence Force (SCDF), National Environment Agency (NEA), Public Utilities Board (PUB), and City Gas. For each authority, it outlines the typical submission requirements, including plans, calculations, and documentation needed. It also discusses the planning and coordination required before submissions.
5. List of Myanmar PE in Singapore
Ko Lu Min Thet – PE No - 4314 (Mechanical)
Ko Aung Kyaw Moe - PE No - 4538 (Civil)
Ko Kyaw Hein - PE No – 4552 (Mechanical)
Ko Aung Kywe Nyunt - PE No – 4554 (Mechanical)
Ko Thwin Zaw Toe - PE No - 4656 (Mechanical)
Ko Thein Kyaw - PE No - 4722 (Mechanical)
Ko Nay Myo Oo - PE No - 4809_ (Mechanical)
Ko Tin Tun - PE No – 4827 (Mechanical)
Ko Soe Moe Zin - PE No - 4831 ( Civil)
6. BUILDING CONSTRUCTION AUTHORITY ( BCA )
SINGAPORE CIVIL DEFENCE FORCE ( SCDF )
NATIONAL ENVIRONMENT AGENCY ( NEA )
PUBLIC UTILITIES BOARD (PUB)
CITY GAS
7. Building Construction Authority
(BCA)
Calculate ETTV/RETV and endorse for Architect Building
Plan Submission
Submission to BCA on Green Mark Compliance
Calculate Air Conditioning System Total System Design
Efficiency and Endorse for Green Mark compliance
submission
Note : Refer below link on ETTV calculation guide line from
BCA
http://www.bca.gov.sg/PerformanceBased/others/ETTV.pdf
8. What is ETTV ?
What is RETV ?
Why We Need to Calculate ?
10. ETTV/RETV value
ETTV = Envelop Thermal Transfer Value
Commercial /Institutional Building such as
Office
Hotel
Retail Mall,
Factory
ETTV value = 50 W/M2
RETV = Residential Envelop Thermal Transfer Value
All Residential Building having GFA 2000 m2 shall
comply with RETV value of 25 W/M2
11. Quick Glance on ETTV calculation
- Heat Gain Through External Wall and Window
- Heat Conduction Through Opaque Wall
- Heat Conduction Through Glass Window
- Solar Radiation Through Glass Window
12. How We Calculate ? What we need
to know ?
Building Orientations
Air Conditioning Area
Wall area
Glass Area
Wall / Glass properties
Shading Treatment
27. Submission To BCA on Green Mark
Compliance
Architect
Mechanical Engineer
Electrical Engineer
Civil Engineer
28. Green Mark Rating
Compliance / certified level - 50 to < 75
Gold Level - 75 to < 85
Gold Plus Level - 85 to < 90
Platinum Level - 90 and above
29. The assessment criteria cover the
following key areas
Energy Efficiency
Water Efficiency
Environmental Protection
Indoor Environmental Quality
Other Green Features and Innovation
45. I, Thu Ya Win Tin
A1445-01254-2012cooling system and instrumentation details provided for the project BP reference:
1234.7
Project Reference No. *
(eg A00001-00001-2012)
Submission Type (BP or As-built) *
Project Description *
Unitary Systems
Total Air-con areas m2
Section B1 :
60.15
71.48
99.04
171.34
Expected operating cooling load
Expected peak cooling load
Design Installed Capacity
Cooling load (in W/m2
)
(i.e. cooling load over air-con areas)
Tons
0.702Design System efficiency * see note
Brand Mitsubishi
* Note : Please take note of the following
1) For water-cooled VRV system, kW/ton include cooling tower fan power.
2) For water-cooled package system, kW/ton include cooling tower fan power and exclude indoor fan
power.
Attached Documentary Evidences
(1) Calculation showing the overall improvement in
equipment efficiency of air-conditioning plants which
include the design cooling profile showing the peak
load condition and the most frequently occuring part
load condition
(refer to worked example in Code)
(2) Technical product information of these equipment
Air-Conditioning System Information
For Air-Cooled Chilled Water Plant / Unitary Air-Conditioners
General Information
A1445-01254-2012
BP
Proposed Erection Of A 11-Storey Multi-User Factory
Building With Basement Carpark involving Additions And
Alterations To An Existing Part Single/Part 3-Storey
Factory On Lot 03445C MK 07 At 55A Tuas South Avenue
1 (Tuas Planning Area)
Section B :
Tons
Tons
kW/ton
W/m2
attached information in support of my declaration of Design System Efficiency (DSE) of the buliding
the Practitioner for the Mechanical Works submit the
Section B2 :
Unitary Systems
Name and Address of Professional Firm:
33 Ubi Avenue 3 #06-69, Vertex,
Singapore 408868
Hpx Consulting Engineers Thu Ya Win Tin
Name and Signature of Practitioner for Mechanical Works:
20-Nov-14
6741 3070
thuya@hpxce.com.sg
Date:
Tel No:
Email Address :
46. Singapore Civil Defense Force
Air Conditioning and Mechanical Ventilation System
Fire Protection System
- Automatic Fire Sprinkler System
- Automatic Fire Alarm System
- Emergency Voice Communication
- Dry/Wet Rising Main, Fire Hydrant and Hosereel
System
47. What we need before
submission to SCDF ?
Architectural Building Plan approval from
SCDF
Applicant Authorization Letter
50. How do we submit to SCDF ?
Though Via E-Cornet
If you have internet access, you can submit
from anywhere, but , you need to have
Token for digital signature and encryption
62. At The Building TOP ( BCC ) stage
Developer / Owner need to Appoint – Registered
Inspector ( PE – Mech ) to inspect the fire safety plan
as per approved plan and relevant authority guideline.
Registered Inspector cannot be from Designed QP
firm.
If everything are in order , RI (M&E) will issue Form to
be submitted to SCDF for fire safety certificate.
SCDF may either conduct random inspection or issue
TFP/FSC.
random or issue TFP/FSC.
63.
64. National Environmental Agency
Sanitary System
+ Application for Clearance Certificate for Sanitary
Work
+ Application for connection to Public Men Hole
+ Completion of connection to Public Men Hole
+ Get As-built drawing and confirmation of
completion of sanitary work from Licensed Plumber
+ Submission for Completion of Sanitary work
65. Planning and Coordination Before Submission
Get SIP from Architect and discuss with project team
on proposed last IC to Men hole connection
Discuss with project team on following issues,
Sanitary Stack Pipes
Internal Sanitary drain line
Internal IC location
Sump Pump Location (if any)
Detention/Retention Tank (if any)
Ejector Location (if any)
Grease Trap Location (if any)
66.
67.
68.
69.
70.
71.
72.
73. Submission to PUB water
department
Application to get approval from PUB on Potable water
submission
Completion of plumbing work and getting ready for
water turn on
Submit Certificate of Completion of Plumbing Work
and arrange for water turn on
74. Planning and Coordination Before Submission
Get SIP from Architect and discuss with project team
on proposed main water incoming location, Bulk
meter and valve chamber location
Discuss with project team on following issues,
Domestic Water Transfer Tank and pump rooms
Domestic Water Storage Tank and Booster Pump
System
Location of Plumbing riser and Sub-meters
Hot water system (if any)
85. Submission to City Gas
Application for Gas supply and connection –
natural gas / Town gas
Town gas for residential and commercial project
Natural gas for industrial project , depending on
availability
86. Planning and Coordination Before
Submission
Purchase Gas Plan from City Gas to get information on Gas
Main Pipe Location
Discuss with City Gas on availability of gas supply
Discuss with Client and Project Team
Get estimated connection charges from Gas Retailer (City Gas)
Coordinate with City Gas on incoming main pipe location and
gas services inlet valve location
Discuss with project team on gas pipe riser location and
internal pipe dropper location
95. Q & A
My email – thuya.tin@surbanajurong.com
HP : +959799684001 (Myanmar)
96. I wish our new government will able
to successfully implement an E-
government system which is most
likely will be transparent and
accountable.
Thank you again.