SlideShare ist ein Scribd-Unternehmen logo
1 von 22
Downloaden Sie, um offline zu lesen
11 June 2017
1
Environmentally Sustainable Development (ESD) Consultant,
Building System and Diagnostics| BSD Pte Ltd.
Presented by :
Building Performance Simulation as a tool
to achieve building energy efficiency
Wah Wah Myint Thu
Agenda
Why Conducting Simulation
Limitation of simulation
Different Types of Simulation
Energy Modelling
Energy modelling Green
Mark requirements
Case Studies
11 June 2017
2
Objectives
To understand
Building energy modelling and its use
Software tools – their structures, solutions method and features
Energy modelling methodologies
WhyConductingSimulation
Buildings account for LARGEST 48% of all energy consumption &
greenhouse gas emissions
To reduce building energy usage
Analyze impacts of changes
Reduce time and expense
Answer “What if…”
Provides comprehensive data not easily obtainable from
experimental tests
Allow alternatives to be studied before optimum designs are
confirmed
11 June 2017
3
LimitationofSimulation
Hardware – High performance machine
Software – High license fee, simulation type dependent
Know-how …… Garbage in, Garbage out
DifferentTypesofSimulation
Airflow (Ventilation) Simulation – CFD Simulation
Solar and Daylight Simulation
Thermal Simulation
Energy Modeling
11 June 2017
4
What is Building Energy Model
• A computer model to simulate the way a building consumes
energy to meet the demands of services to maintain the
temperature, humidity within the building.
• It provides users with the key performance indicators of
demand, energy use, space conditions and costs
EnergyModelling
Why is Building Energy Model Important?
• Buildings consume roughly one-third of all the energy
consumed nationally every year - Singapore
– Much of this energy is consumed maintaining the thermal conditions
inside the building and lighting.
• Simulation can play a significant role in reducing the energy
consumption of buildings.
– Answers “What if…” on Scientific Basis
– Provides comprehensive data not easily obtainable from
experimental tests
– Allows alternatives to be studied before optimum designs are
confirmed
– Reduce time and expense
EnergyModelling
11 June 2017
5
When Should I start?
early, early, early
“When just 1% of a project’s up front cost are spent….
Up to 70% of its life-cycle costs may already be committed.”
EnergyModelling
EnergyModelling
•Climatic analysis;
•Identify strategies;
•Goal setting
Pre-Design
Schematic Design
Design Development
Construction/ O&M
•Shape, Massing, Building Envelope;
•Daylighting, HVAC options;
•Load reduction iterations
•HVAC systems comparisons;
•Fine-tune details – system optimization
•Calibrate model;
•Troubleshoot operation;
•Measurement and verification
Energy Model as a Design Tool
11 June 2017
6
Understand the Loads
EnergyModelling
Building loads:
Solar heat gains
Human
Lighting
Equipment
Receptacle
Infiltration
Others
Understand the Loads : Solar Heat Gains
EnergyModelling
SUN
Solar Reflection
Solar Radiation
Heat Conduction
through Opaque
Heat Conduction
through Glass
ETTV = 12 (1-WWR)Uw + 3.4 (WWR)Uf + 211(WWR)(CF)(SC)
11 June 2017
7
Understand the Loads : Human (sensible heat + latent heat)
EnergyModelling
Understand the Loads : Artificial Lighting
EnergyModelling
Energy Efficient Light + Fixtures + Control (Motion Detector, Timer)
11 June 2017
8
Understand the Loads : Receptacle or Plug Loads
EnergyModelling
Receptacle loads
Understand the Loads : Fresh Air/ Outdoor Air Rate
EnergyModelling
Type l/s/m2 l/s/person Occupancy Density
m2/person
Offices 0.6 5.5 10.0
Restaurants 3.4 5.1 1.5
Shops,
supermarkets
& department
stores
1.1 5.5 5.0
Lobbies &
corridors
0.3 3.3 25
Theatres/
cinemas
2.0 3.0 1.5
11 June 2017
9
Understand the Loads :
Commercial Office Building Distribution
EnergyModelling
Solar heat gains
Human
Lighting
Receptacle
Ventilation
Other
EnergyModelling
Strategies towards Low Energy Building:
Take Advantage of Climate
• Solar exposure
• Daylighting
• Natural Ventilation
Optimize Systems
• Lightings – Lighting Power Density, Lighting control
• HVAC – Air-side, water-side Systems
Use on-site Energy System
• Renewable energy – PV, Solar thermal
• Combined Heat and Power
11 June 2017
10
EnergyModelling
Energy Software Structure:
Building Data
Pre-processor
Loads Engine
Systems Engine
Plant Engine
Economics Engine
Post-processor
Results
Weather Data
Loads engine
• Calculates heating and cooling loads for each space
taking account of weather and building use
schedules.
• For each period simulated, a heat balance of space
surfaces and room air is performed.
Systems engine
• Based on the system described for building model,
calculates the energy and utilities demand to
satisfy the space loads computed in Loads Engine
Plant engine
• Calculates the central plant energy needed to
supply the utilities demand computed in Systems.
Economics engine
• Calculates the energy cost
• Calculates cost benefit of various building systems
design
Energy Model Design Phase
Understand Weather
Thermal Comfort
(with CFD)
Thermal Model Façade Design
Building Mass Design
Energy Model Lighting Design
Equipment Sizing
Air-Side System
Water-Side System
Building Direction
External Wall Design
Window Wall Ratio
Window Design
Shading Design
Width-Depth Ratio
Layout Design
Peak Load Profile
Cooling Load Distribution
M&E Equip Selection
System Configuration
M&E Equip Selection
System Configuration
Renewable Potential
Others
Operation Phase
Passive Design
-BuildingLoad
Active Design
-Building Energy
- Energy Cost
- Payback Period
Assist Verification Figure out actual operative problems
Test the different control strategy
Operation Period
Building Retrofit Calibrated Model Lighting and Facade
Air-Side System
Water-Side System
Retrofit
-Building Energy
- Energy Cost
- Payback Period
Research Study
EnergyModelling
11 June 2017
11
EnergyModelling
Energy Modelling Green Mark Requirement
Green Mark Non-Residential New Buildings v4.1
Green Mark New Healthcare Facilities v1.0
Green Mark New Data Centres v1.1
Green Mark NRB: 2015
EnergyModelling
Green Mark Energy Modelling
-Framework & Methodologies
• Models
– Reference Model
– Proposed Model
• Reference model: Building that complies to all minimum
requirements prescribes in codes and standards.
• Proposed model: Building that being designed for – more
than meets code requirements, incorporating innovative
energy efficient systems.
11 June 2017
12
EnergyModelling
Green Mark Energy Modelling
-Framework & Methodologies
Compliance with Singapore Standards
• SS530:2014 – Energy efficiency standard for building services
and equipment. (replace SS530: 2006)
• SS553:2015 -Code of Practice for Air-conditioning and
mechanical ventilation in buildings. (replace SS553:2009 )
• SS531:2013 Part 1: 2006 - Code of Practice for Lighting of work
places (replace SS531:2006 )
• ETTV requirements: Guidelines on Envelope Thermal Transfer
Value for Buildings.
Others references: ASHRAE std 90.1, std 62.1
EnergyModelling
Green Mark Energy Modelling
-Framework & Methodologies
Compliance with Singapore Standards
• SS530:2014 – Energy efficiency standard for building services
and equipment. (replace SS530: 2006)
• SS553:2015 -Code of Practice for Air-conditioning and
mechanical ventilation in buildings. (replace SS553:2009 )
• SS531:2013 Part 1: 2006 - Code of Practice for Lighting of work
places (replace SS531:2006 )
• ETTV requirements: Guidelines on Envelope Thermal Transfer
Value for Buildings.
Others references: ASHRAE std 90.1, std 62.1
11 June 2017
13
EnergyModelling
Green Mark Energy Modelling – Software Selection
• The software must be able to model the
thermal performance of buildings in a multi-
zone format and calculate the building’s total
energy consumption over a continuous 12-
months period.
• The software must be tested by a recognized
institution in accordance to the Standard
Method of Test for the Evaluation of Building
Energy Analysis Computer Programs -
ANSI/ASHRAE STD 140 or other international
equivalent, such as IEA HVAC BESTEST.
EnergyModelling
Green Mark Energy Modelling – Software Selection
• DOE-2*
• Energy-10
• EnergyPlus*
• eQUEST*
• HAP (E-20)
• Note: * Free software
• IES VE
• PowerDOE
• TAS
• TRACE
• TRNSYS
• VisualDOE 4.1
11 June 2017
14
EnergyModelling
Green Mark Energy Modelling - Methodology
Create massing model
Layout, shape, size,
orientation
Define roof, windows,
floors, openings,
shading, walls, etc
U-value, color,
dimensions,
transmission, etc
Define zones having
different ACMV
For each zone, define
heat loads, lighting
systems, operating
schedules, etc
EnergyModelling
Green Mark Energy Modelling - Methodology
Define ACMV
details for each
zone
COP, flow rates, set-points, etc
for pumps, fans, dehumidifiers,
chillers, etc
Local weather data
files
Run simulation
Peak load, Part load, Annual
power consumption data
Sensors & other efficient
features may reduce
operating times, energy
consumptions
11 June 2017
15
EnergyModelling
Green Mark Energy Modelling - Methodology
Extract relevant data from the building plans or other
project documentations as inputs for Proposed Model.
• Building design layout in terms of shape, size and
orientation.
• Materials for walls, windows, roofs, floors, doors and
permanent shading devices.
• Internal loads such as levels and schedules for occupancy,
lighting systems, equipment, appliances and machinery
within the building.
• HVAC equipment, controls and other associated
components selected for use in the building.
EnergyModelling
Green Mark Energy Modelling - Methodology
• Perform hourly simulation for proposed model.
• Compute the overall energy consumption of the model, using
the building envelope and all energy-consuming equipment
that are selected during the design stage.
• These include chillers, air handling systems, plant equipment,
and non-HVAC systems such as lightings, lifts, escalators, and
receptacle loads from equipment.
11 June 2017
16
EnergyModelling
Green Mark Energy Modelling - Methodology
Extract relevant data from the Codes and Singapore
standards or other project documentations as inputs for
reference model.
• Building design layout in terms of shape, size and
orientation.
• Materials for walls, windows, roofs, floors, doors and
permanent shading devices.
• Internal loads such as levels and schedules for occupancy,
lighting systems, equipment, appliances and machinery
within the building.
• HVAC equipment, controls and other associated
components selected for use in the building.
EnergyModelling
Green Mark Energy Modelling - Methodology
• Perform hourly simulation for reference model.
• Compute the overall energy consumption of the model, using
the building envelope and all energy-consuming equipment
that are selected during the design stage.
• Compare the overall energy consumption of the Reference
Model against the Proposed Model.
11 June 2017
17
EnergyModelling
Green Mark Energy Modelling - Methodology
Completed Building
Compile monthly whole-building energy use utility data for 12
months.
Reference building model
Revise schedules and occupancy data
Simulate annual energy consumption and compare with actual
performance
Explain any difference
EnergyModelling
Case Study – Tampines Grande
Proposed Erection of 2 Blocks of 8-Storey Office Building with One Level of Basement Carpark on
HDB Land Parcel P15 Lot 2559K Mk 29 at Tampines Grande (Tampines Planning Area)
11 June 2017
18
EnergyModelling
Level 1
Case Study – Tampines Grande, Singapore
EnergyModelling
Case Study – Tampines Grande, Singapore
Level 2
11 June 2017
19
EnergyModelling
Case Study – Tampines Grande, Singapore
Typical Floor
L3-L8
EnergyModelling
Case Study – Tampines Grande, Singapore
Simulation Inputs – Building Envelope (example)
BUILDING ELEMENT REFERENCE MODEL PROPOSED MODEL
Wall Construction Glass, Air gap, cement plaster, light
weight wall, Rockwool insulation,
Alum Cladding; U = 2.72 W/m2K
Glass, Air gap, cement plaster, light
weight wall, Rockwool insulation,
Alum Cladding, U = 0.83 W/m2K;
south façade U=0.54 W/m2K
Windows Same as Proposed Model
12mm Single glaze U = 4.1, SC =
0.7
Double glaze U = 1.7, SC = 0.32
Skylight Same as Proposed Model RC slab
Floor
Medium construction, U = 0.8
W/m2K
RC roof , U = 0.49 W/m2K
Roof Same as Proposed Model 0.54
Window to Wall
Ratio (WWR)
ETTV = 50 W/m2 ETTV = 39.5 W/m2
11 June 2017
20
EnergyModelling
Case Study – Tampines Grande, Singapore
Simulation Inputs – Lighting Power Budget (example)
BUILDING ELEMENT REFERENCE MODEL PROPOSED MODEL
Lighting Power Density
(W/m2)
Office = 15 W/m2
Circulation = 10 W/m2
Main Lobby = 10 W/m2
Mgt Office = 15 W/m2
Restaurant = 15 W/m2
Retail = 25 W/m2
Stairs = 6 W/m2
Car Park = 5 W/m2
Utilities = 10 W/m2
Toilet = 10 W/m2
Office = 10 W/m2
Circulation = 8 W/m2
Main Lobby = 10 W/m2
Mgt Office = 10 W/m2
Restaurant = 15 W/m2
Retail = 25 W/m2
Stairs = 4 W/m2
Car Park = 3 W/m2
Utilities = 10 W/m2
Toilet = 10 W/m2
EnergyModelling
Case Study – Tampines Grande, Singapore
Simulation Inputs – ACMV (example)
BUILDING ELEMENTS REFERENCE MODEL PROPOSED MODEL
AHU Fan Properties AHU VAV Fan with 0.67 W/cmh AHU Fan with average 0.36W/cmh
Central Plant Efficiency Auto-sizing based on peak load
CHW pump = 0.053 kW/ton
CW pump = 0.057 kW/ton
Cooling Tower = 0.059 kW/ton
2 x 600 Rton Cent Chillers, COP = 7.25
2 x 300 Rton Screw Chillers, COP = 6.94
CHW pump = 0.04 kW/ton
CW pump = 0.03 kW/ton
Cooling Tower = 0.03 kW/ton
HVAC Circulation
Properties
CHW pump 2.85 (l/m)/ikW, head: 25 m
CHW pump efficiency = 51.93 x 94.2
CW pump 3.23 (l/m)/ikW, head: 15m
CW pump efficiency = 29.2 x 93.2
CHW pump 2.85 (l/m)/ikW, head: 25 m
CHW pump efficiency = 89.42 x 94.5
CW pump 3.23 (l/m)/ikW, head: 15 m
CW pump efficiency = 85.19 x 93.9
11 June 2017
21
EnergyModelling
Case Study – Tampines Grande, Singapore
Simulation Inputs – ACMV (example)
BASE : Building Design to comply with Code of Practices & BCA Approved
documents.
ECM1 :Improve ETTV from 50 W/m2 to 39 W/m2
ECM 2:Select T5 lighting solution that reduces 30% from BASE case.
ECM3 : Improve air ventilation efficiency by 45% from BASE case.
ECM4 : Chilled water plant Optimization and efficiency improvement by 25%.
ECM5 : Incorporate motion sensor & CO2 sensor in building design.
ECM6 : Introduce perimeter lighting control with photo sensor.
ECM7 : Energy Efficient AC VVVF lift & escalator with slow down feature.
ECM8 : Incorporate energy recovery solution for fresh air pre-cool AHU
ECM9 : Integrate Solar Photovoltaic Panel at roof top of development.
EnergyModelling
Case Study – Tampines Grande, Singapore
Simulation Inputs – ACMV (example)
Annual Energy Consumption Comparison for ECMs
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
Base ECM 1 ECM 2 ECM 3 ECM 4 ECM 5 ECM 6 ECM 7 ECM 8 ECM 9 ECMs
Electricity (MWh)
Lift & Escalator
Ventilation Fan
Air Con
Receptacle
Lighting
33 %
2%
11% 14%
24% 26% 27%
28% 30% 33%
11 June 2017
22
Conclusion
• A building’s in-use performance may be predicted even before it is
built.
• Predicting its performance then allows us to decide if changes are
needed and what should be changed.
• Simulations are better used as a design tool than as a verification
tool.
Its cheaper to simulateIts cheaper to simulateIts cheaper to simulateIts cheaper to simulate
than to build the wrong buildingthan to build the wrong buildingthan to build the wrong buildingthan to build the wrong building
THANK YOU
For Inquiries, please email to
wahwah@bsd.com.sg
44

Weitere ähnliche Inhalte

Was ist angesagt?

150312 updating history_deep_retrofits
150312 updating history_deep_retrofits150312 updating history_deep_retrofits
150312 updating history_deep_retrofitsmelanie_bissonnette
 
SESG Seminar Presentation
SESG Seminar PresentationSESG Seminar Presentation
SESG Seminar PresentationIES VE
 
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research OutlookModelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research OutlookIES VE
 
04.15.15 energy design assistance program tracker 2
04.15.15 energy design assistance program tracker 204.15.15 energy design assistance program tracker 2
04.15.15 energy design assistance program tracker 2melanie_bissonnette
 
3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_trainingmelanie_bissonnette
 
Comparisons of building energy simulation softwares
Comparisons of building energy simulation softwaresComparisons of building energy simulation softwares
Comparisons of building energy simulation softwaresZheng Yang
 
summary_analytical-services_yr_052314
summary_analytical-services_yr_052314summary_analytical-services_yr_052314
summary_analytical-services_yr_052314Lynn Schroeder P.E.
 
Building Grid Resilience
Building Grid ResilienceBuilding Grid Resilience
Building Grid ResilienceAdvisian
 
Daimler Trucks of North America
Daimler Trucks of North AmericaDaimler Trucks of North America
Daimler Trucks of North Americaenergytrustor
 
Advisian dynamic process simulation capability june 2019
Advisian dynamic process simulation capability june 2019Advisian dynamic process simulation capability june 2019
Advisian dynamic process simulation capability june 2019Advisian
 
Evaluating AERMOD and Wind Tunnel Derived Equivalent Building Dimensions
Evaluating AERMOD and Wind Tunnel Derived Equivalent Building DimensionsEvaluating AERMOD and Wind Tunnel Derived Equivalent Building Dimensions
Evaluating AERMOD and Wind Tunnel Derived Equivalent Building DimensionsSergio A. Guerra
 
HE-Design-Project-2016
HE-Design-Project-2016HE-Design-Project-2016
HE-Design-Project-2016Giankarl Bogle
 
State of the art review and recent development of the glycol dehydration faci...
State of the art review and recent development of the glycol dehydration faci...State of the art review and recent development of the glycol dehydration faci...
State of the art review and recent development of the glycol dehydration faci...Alberto Alva-Argaez
 
2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water SupplyAlliance To Save Energy
 
Probabilistic & Source Characterization Techniques in AERMOD Compliance
Probabilistic & Source Characterization Techniques in AERMOD ComplianceProbabilistic & Source Characterization Techniques in AERMOD Compliance
Probabilistic & Source Characterization Techniques in AERMOD ComplianceSergio A. Guerra
 
Optimisation of geothermal systems
Optimisation of geothermal systemsOptimisation of geothermal systems
Optimisation of geothermal systemsMartin Preene
 
Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...
Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...
Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...Sergio A. Guerra
 

Was ist angesagt? (20)

150312 updating history_deep_retrofits
150312 updating history_deep_retrofits150312 updating history_deep_retrofits
150312 updating history_deep_retrofits
 
SESG Seminar Presentation
SESG Seminar PresentationSESG Seminar Presentation
SESG Seminar Presentation
 
equest ppt
equest pptequest ppt
equest ppt
 
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research OutlookModelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
 
04.15.15 energy design assistance program tracker 2
04.15.15 energy design assistance program tracker 204.15.15 energy design assistance program tracker 2
04.15.15 energy design assistance program tracker 2
 
3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training
 
Besf building renewal_021815
Besf building renewal_021815Besf building renewal_021815
Besf building renewal_021815
 
Comparisons of building energy simulation softwares
Comparisons of building energy simulation softwaresComparisons of building energy simulation softwares
Comparisons of building energy simulation softwares
 
summary_analytical-services_yr_052314
summary_analytical-services_yr_052314summary_analytical-services_yr_052314
summary_analytical-services_yr_052314
 
Building Grid Resilience
Building Grid ResilienceBuilding Grid Resilience
Building Grid Resilience
 
Daimler Trucks of North America
Daimler Trucks of North AmericaDaimler Trucks of North America
Daimler Trucks of North America
 
Advisian dynamic process simulation capability june 2019
Advisian dynamic process simulation capability june 2019Advisian dynamic process simulation capability june 2019
Advisian dynamic process simulation capability june 2019
 
Evaluating AERMOD and Wind Tunnel Derived Equivalent Building Dimensions
Evaluating AERMOD and Wind Tunnel Derived Equivalent Building DimensionsEvaluating AERMOD and Wind Tunnel Derived Equivalent Building Dimensions
Evaluating AERMOD and Wind Tunnel Derived Equivalent Building Dimensions
 
HE-Design-Project-2016
HE-Design-Project-2016HE-Design-Project-2016
HE-Design-Project-2016
 
State of the art review and recent development of the glycol dehydration faci...
State of the art review and recent development of the glycol dehydration faci...State of the art review and recent development of the glycol dehydration faci...
State of the art review and recent development of the glycol dehydration faci...
 
2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply
 
Probabilistic & Source Characterization Techniques in AERMOD Compliance
Probabilistic & Source Characterization Techniques in AERMOD ComplianceProbabilistic & Source Characterization Techniques in AERMOD Compliance
Probabilistic & Source Characterization Techniques in AERMOD Compliance
 
Ecbc session 3
Ecbc session 3Ecbc session 3
Ecbc session 3
 
Optimisation of geothermal systems
Optimisation of geothermal systemsOptimisation of geothermal systems
Optimisation of geothermal systems
 
Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...
Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...
Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...
 

Ähnlich wie Mechanical Engineering Seminar 2017_1

Green Building Awareness HVAC
Green Building Awareness HVAC Green Building Awareness HVAC
Green Building Awareness HVAC AKSHAY SHARMA
 
Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...
Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...
Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...YRG sustainability
 
EINSTEIN Project Overview
EINSTEIN Project OverviewEINSTEIN Project Overview
EINSTEIN Project OverviewIES VE
 
Integrated Design
Integrated DesignIntegrated Design
Integrated Designbsvr
 
Lecture 11 computer simulation in buildings
Lecture 11 computer simulation in buildingsLecture 11 computer simulation in buildings
Lecture 11 computer simulation in buildingsNedhal Al-Tamimi
 
Net Zero - TSA presentation
Net Zero - TSA presentationNet Zero - TSA presentation
Net Zero - TSA presentationPeter Hoffmann
 
Energy simulation & analysis of two residential buildings
Energy simulation & analysis of two residential buildingsEnergy simulation & analysis of two residential buildings
Energy simulation & analysis of two residential buildingschirag aggarwal
 
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...SimScale
 
energysimulation01-170601095924.pdf
energysimulation01-170601095924.pdfenergysimulation01-170601095924.pdf
energysimulation01-170601095924.pdfShree Sowmya Chinta
 
2011 expo-smart grn-energy
2011 expo-smart grn-energy2011 expo-smart grn-energy
2011 expo-smart grn-energyEllieNowels
 
Project proposal Research.pptx
Project proposal Research.pptxProject proposal Research.pptx
Project proposal Research.pptxDorjiWangchuk67
 
John Rizzo 2013 masccc
John Rizzo 2013 mascccJohn Rizzo 2013 masccc
John Rizzo 2013 mascccGWT
 
US Department of Energy's Uniform Methods Project
US Department of Energy's Uniform Methods ProjectUS Department of Energy's Uniform Methods Project
US Department of Energy's Uniform Methods ProjectLeonardo ENERGY
 
Lebd crit 1 (final version)
Lebd crit 1 (final version)Lebd crit 1 (final version)
Lebd crit 1 (final version)Jonathan Donnard
 

Ähnlich wie Mechanical Engineering Seminar 2017_1 (20)

Green Building Awareness HVAC
Green Building Awareness HVAC Green Building Awareness HVAC
Green Building Awareness HVAC
 
Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...
Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...
Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...
 
EINSTEIN Project Overview
EINSTEIN Project OverviewEINSTEIN Project Overview
EINSTEIN Project Overview
 
Integrated Design
Integrated DesignIntegrated Design
Integrated Design
 
Eco Engineering and Energy Solutions EcoSol
Eco Engineering and Energy Solutions EcoSolEco Engineering and Energy Solutions EcoSol
Eco Engineering and Energy Solutions EcoSol
 
Lecture 11 computer simulation in buildings
Lecture 11 computer simulation in buildingsLecture 11 computer simulation in buildings
Lecture 11 computer simulation in buildings
 
Net Zero - TSA presentation
Net Zero - TSA presentationNet Zero - TSA presentation
Net Zero - TSA presentation
 
Submission#19614_Final
Submission#19614_FinalSubmission#19614_Final
Submission#19614_Final
 
Energy simulation & analysis of two residential buildings
Energy simulation & analysis of two residential buildingsEnergy simulation & analysis of two residential buildings
Energy simulation & analysis of two residential buildings
 
VTT wind and solar innovation activities and offering, Matti Paljakka VTT
VTT wind and solar innovation activities and offering, Matti Paljakka VTTVTT wind and solar innovation activities and offering, Matti Paljakka VTT
VTT wind and solar innovation activities and offering, Matti Paljakka VTT
 
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...
 
energysimulation01-170601095924.pdf
energysimulation01-170601095924.pdfenergysimulation01-170601095924.pdf
energysimulation01-170601095924.pdf
 
Energy simulation & analysis
Energy simulation & analysisEnergy simulation & analysis
Energy simulation & analysis
 
2011 expo-smart grn-energy
2011 expo-smart grn-energy2011 expo-smart grn-energy
2011 expo-smart grn-energy
 
Project proposal Research.pptx
Project proposal Research.pptxProject proposal Research.pptx
Project proposal Research.pptx
 
O2ne draft white
O2ne draft whiteO2ne draft white
O2ne draft white
 
John Rizzo 2013 masccc
John Rizzo 2013 mascccJohn Rizzo 2013 masccc
John Rizzo 2013 masccc
 
Non residential building energy Mamagment
Non residential building energy MamagmentNon residential building energy Mamagment
Non residential building energy Mamagment
 
US Department of Energy's Uniform Methods Project
US Department of Energy's Uniform Methods ProjectUS Department of Energy's Uniform Methods Project
US Department of Energy's Uniform Methods Project
 
Lebd crit 1 (final version)
Lebd crit 1 (final version)Lebd crit 1 (final version)
Lebd crit 1 (final version)
 

Mehr von Nicholas Naing

Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Nicholas Naing
 
Business opportunities at Myanmar
Business opportunities at Myanmar Business opportunities at Myanmar
Business opportunities at Myanmar Nicholas Naing
 
Introduction to Myanmar
Introduction to Myanmar Introduction to Myanmar
Introduction to Myanmar Nicholas Naing
 
Protection Systems for Power generators
Protection Systems for Power generators Protection Systems for Power generators
Protection Systems for Power generators Nicholas Naing
 
Generator protection system by Nicholas Naing
Generator protection system by Nicholas NaingGenerator protection system by Nicholas Naing
Generator protection system by Nicholas NaingNicholas Naing
 
Generator protection system by nicholas naing
Generator protection system by nicholas naingGenerator protection system by nicholas naing
Generator protection system by nicholas naingNicholas Naing
 

Mehr von Nicholas Naing (6)

Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3
 
Business opportunities at Myanmar
Business opportunities at Myanmar Business opportunities at Myanmar
Business opportunities at Myanmar
 
Introduction to Myanmar
Introduction to Myanmar Introduction to Myanmar
Introduction to Myanmar
 
Protection Systems for Power generators
Protection Systems for Power generators Protection Systems for Power generators
Protection Systems for Power generators
 
Generator protection system by Nicholas Naing
Generator protection system by Nicholas NaingGenerator protection system by Nicholas Naing
Generator protection system by Nicholas Naing
 
Generator protection system by nicholas naing
Generator protection system by nicholas naingGenerator protection system by nicholas naing
Generator protection system by nicholas naing
 

Kürzlich hochgeladen

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptbibisarnayak0
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxNiranjanYadav41
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxachiever3003
 

Kürzlich hochgeladen (20)

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.ppt
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptx
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptx
 

Mechanical Engineering Seminar 2017_1

  • 1. 11 June 2017 1 Environmentally Sustainable Development (ESD) Consultant, Building System and Diagnostics| BSD Pte Ltd. Presented by : Building Performance Simulation as a tool to achieve building energy efficiency Wah Wah Myint Thu Agenda Why Conducting Simulation Limitation of simulation Different Types of Simulation Energy Modelling Energy modelling Green Mark requirements Case Studies
  • 2. 11 June 2017 2 Objectives To understand Building energy modelling and its use Software tools – their structures, solutions method and features Energy modelling methodologies WhyConductingSimulation Buildings account for LARGEST 48% of all energy consumption & greenhouse gas emissions To reduce building energy usage Analyze impacts of changes Reduce time and expense Answer “What if…” Provides comprehensive data not easily obtainable from experimental tests Allow alternatives to be studied before optimum designs are confirmed
  • 3. 11 June 2017 3 LimitationofSimulation Hardware – High performance machine Software – High license fee, simulation type dependent Know-how …… Garbage in, Garbage out DifferentTypesofSimulation Airflow (Ventilation) Simulation – CFD Simulation Solar and Daylight Simulation Thermal Simulation Energy Modeling
  • 4. 11 June 2017 4 What is Building Energy Model • A computer model to simulate the way a building consumes energy to meet the demands of services to maintain the temperature, humidity within the building. • It provides users with the key performance indicators of demand, energy use, space conditions and costs EnergyModelling Why is Building Energy Model Important? • Buildings consume roughly one-third of all the energy consumed nationally every year - Singapore – Much of this energy is consumed maintaining the thermal conditions inside the building and lighting. • Simulation can play a significant role in reducing the energy consumption of buildings. – Answers “What if…” on Scientific Basis – Provides comprehensive data not easily obtainable from experimental tests – Allows alternatives to be studied before optimum designs are confirmed – Reduce time and expense EnergyModelling
  • 5. 11 June 2017 5 When Should I start? early, early, early “When just 1% of a project’s up front cost are spent…. Up to 70% of its life-cycle costs may already be committed.” EnergyModelling EnergyModelling •Climatic analysis; •Identify strategies; •Goal setting Pre-Design Schematic Design Design Development Construction/ O&M •Shape, Massing, Building Envelope; •Daylighting, HVAC options; •Load reduction iterations •HVAC systems comparisons; •Fine-tune details – system optimization •Calibrate model; •Troubleshoot operation; •Measurement and verification Energy Model as a Design Tool
  • 6. 11 June 2017 6 Understand the Loads EnergyModelling Building loads: Solar heat gains Human Lighting Equipment Receptacle Infiltration Others Understand the Loads : Solar Heat Gains EnergyModelling SUN Solar Reflection Solar Radiation Heat Conduction through Opaque Heat Conduction through Glass ETTV = 12 (1-WWR)Uw + 3.4 (WWR)Uf + 211(WWR)(CF)(SC)
  • 7. 11 June 2017 7 Understand the Loads : Human (sensible heat + latent heat) EnergyModelling Understand the Loads : Artificial Lighting EnergyModelling Energy Efficient Light + Fixtures + Control (Motion Detector, Timer)
  • 8. 11 June 2017 8 Understand the Loads : Receptacle or Plug Loads EnergyModelling Receptacle loads Understand the Loads : Fresh Air/ Outdoor Air Rate EnergyModelling Type l/s/m2 l/s/person Occupancy Density m2/person Offices 0.6 5.5 10.0 Restaurants 3.4 5.1 1.5 Shops, supermarkets & department stores 1.1 5.5 5.0 Lobbies & corridors 0.3 3.3 25 Theatres/ cinemas 2.0 3.0 1.5
  • 9. 11 June 2017 9 Understand the Loads : Commercial Office Building Distribution EnergyModelling Solar heat gains Human Lighting Receptacle Ventilation Other EnergyModelling Strategies towards Low Energy Building: Take Advantage of Climate • Solar exposure • Daylighting • Natural Ventilation Optimize Systems • Lightings – Lighting Power Density, Lighting control • HVAC – Air-side, water-side Systems Use on-site Energy System • Renewable energy – PV, Solar thermal • Combined Heat and Power
  • 10. 11 June 2017 10 EnergyModelling Energy Software Structure: Building Data Pre-processor Loads Engine Systems Engine Plant Engine Economics Engine Post-processor Results Weather Data Loads engine • Calculates heating and cooling loads for each space taking account of weather and building use schedules. • For each period simulated, a heat balance of space surfaces and room air is performed. Systems engine • Based on the system described for building model, calculates the energy and utilities demand to satisfy the space loads computed in Loads Engine Plant engine • Calculates the central plant energy needed to supply the utilities demand computed in Systems. Economics engine • Calculates the energy cost • Calculates cost benefit of various building systems design Energy Model Design Phase Understand Weather Thermal Comfort (with CFD) Thermal Model Façade Design Building Mass Design Energy Model Lighting Design Equipment Sizing Air-Side System Water-Side System Building Direction External Wall Design Window Wall Ratio Window Design Shading Design Width-Depth Ratio Layout Design Peak Load Profile Cooling Load Distribution M&E Equip Selection System Configuration M&E Equip Selection System Configuration Renewable Potential Others Operation Phase Passive Design -BuildingLoad Active Design -Building Energy - Energy Cost - Payback Period Assist Verification Figure out actual operative problems Test the different control strategy Operation Period Building Retrofit Calibrated Model Lighting and Facade Air-Side System Water-Side System Retrofit -Building Energy - Energy Cost - Payback Period Research Study EnergyModelling
  • 11. 11 June 2017 11 EnergyModelling Energy Modelling Green Mark Requirement Green Mark Non-Residential New Buildings v4.1 Green Mark New Healthcare Facilities v1.0 Green Mark New Data Centres v1.1 Green Mark NRB: 2015 EnergyModelling Green Mark Energy Modelling -Framework & Methodologies • Models – Reference Model – Proposed Model • Reference model: Building that complies to all minimum requirements prescribes in codes and standards. • Proposed model: Building that being designed for – more than meets code requirements, incorporating innovative energy efficient systems.
  • 12. 11 June 2017 12 EnergyModelling Green Mark Energy Modelling -Framework & Methodologies Compliance with Singapore Standards • SS530:2014 – Energy efficiency standard for building services and equipment. (replace SS530: 2006) • SS553:2015 -Code of Practice for Air-conditioning and mechanical ventilation in buildings. (replace SS553:2009 ) • SS531:2013 Part 1: 2006 - Code of Practice for Lighting of work places (replace SS531:2006 ) • ETTV requirements: Guidelines on Envelope Thermal Transfer Value for Buildings. Others references: ASHRAE std 90.1, std 62.1 EnergyModelling Green Mark Energy Modelling -Framework & Methodologies Compliance with Singapore Standards • SS530:2014 – Energy efficiency standard for building services and equipment. (replace SS530: 2006) • SS553:2015 -Code of Practice for Air-conditioning and mechanical ventilation in buildings. (replace SS553:2009 ) • SS531:2013 Part 1: 2006 - Code of Practice for Lighting of work places (replace SS531:2006 ) • ETTV requirements: Guidelines on Envelope Thermal Transfer Value for Buildings. Others references: ASHRAE std 90.1, std 62.1
  • 13. 11 June 2017 13 EnergyModelling Green Mark Energy Modelling – Software Selection • The software must be able to model the thermal performance of buildings in a multi- zone format and calculate the building’s total energy consumption over a continuous 12- months period. • The software must be tested by a recognized institution in accordance to the Standard Method of Test for the Evaluation of Building Energy Analysis Computer Programs - ANSI/ASHRAE STD 140 or other international equivalent, such as IEA HVAC BESTEST. EnergyModelling Green Mark Energy Modelling – Software Selection • DOE-2* • Energy-10 • EnergyPlus* • eQUEST* • HAP (E-20) • Note: * Free software • IES VE • PowerDOE • TAS • TRACE • TRNSYS • VisualDOE 4.1
  • 14. 11 June 2017 14 EnergyModelling Green Mark Energy Modelling - Methodology Create massing model Layout, shape, size, orientation Define roof, windows, floors, openings, shading, walls, etc U-value, color, dimensions, transmission, etc Define zones having different ACMV For each zone, define heat loads, lighting systems, operating schedules, etc EnergyModelling Green Mark Energy Modelling - Methodology Define ACMV details for each zone COP, flow rates, set-points, etc for pumps, fans, dehumidifiers, chillers, etc Local weather data files Run simulation Peak load, Part load, Annual power consumption data Sensors & other efficient features may reduce operating times, energy consumptions
  • 15. 11 June 2017 15 EnergyModelling Green Mark Energy Modelling - Methodology Extract relevant data from the building plans or other project documentations as inputs for Proposed Model. • Building design layout in terms of shape, size and orientation. • Materials for walls, windows, roofs, floors, doors and permanent shading devices. • Internal loads such as levels and schedules for occupancy, lighting systems, equipment, appliances and machinery within the building. • HVAC equipment, controls and other associated components selected for use in the building. EnergyModelling Green Mark Energy Modelling - Methodology • Perform hourly simulation for proposed model. • Compute the overall energy consumption of the model, using the building envelope and all energy-consuming equipment that are selected during the design stage. • These include chillers, air handling systems, plant equipment, and non-HVAC systems such as lightings, lifts, escalators, and receptacle loads from equipment.
  • 16. 11 June 2017 16 EnergyModelling Green Mark Energy Modelling - Methodology Extract relevant data from the Codes and Singapore standards or other project documentations as inputs for reference model. • Building design layout in terms of shape, size and orientation. • Materials for walls, windows, roofs, floors, doors and permanent shading devices. • Internal loads such as levels and schedules for occupancy, lighting systems, equipment, appliances and machinery within the building. • HVAC equipment, controls and other associated components selected for use in the building. EnergyModelling Green Mark Energy Modelling - Methodology • Perform hourly simulation for reference model. • Compute the overall energy consumption of the model, using the building envelope and all energy-consuming equipment that are selected during the design stage. • Compare the overall energy consumption of the Reference Model against the Proposed Model.
  • 17. 11 June 2017 17 EnergyModelling Green Mark Energy Modelling - Methodology Completed Building Compile monthly whole-building energy use utility data for 12 months. Reference building model Revise schedules and occupancy data Simulate annual energy consumption and compare with actual performance Explain any difference EnergyModelling Case Study – Tampines Grande Proposed Erection of 2 Blocks of 8-Storey Office Building with One Level of Basement Carpark on HDB Land Parcel P15 Lot 2559K Mk 29 at Tampines Grande (Tampines Planning Area)
  • 18. 11 June 2017 18 EnergyModelling Level 1 Case Study – Tampines Grande, Singapore EnergyModelling Case Study – Tampines Grande, Singapore Level 2
  • 19. 11 June 2017 19 EnergyModelling Case Study – Tampines Grande, Singapore Typical Floor L3-L8 EnergyModelling Case Study – Tampines Grande, Singapore Simulation Inputs – Building Envelope (example) BUILDING ELEMENT REFERENCE MODEL PROPOSED MODEL Wall Construction Glass, Air gap, cement plaster, light weight wall, Rockwool insulation, Alum Cladding; U = 2.72 W/m2K Glass, Air gap, cement plaster, light weight wall, Rockwool insulation, Alum Cladding, U = 0.83 W/m2K; south façade U=0.54 W/m2K Windows Same as Proposed Model 12mm Single glaze U = 4.1, SC = 0.7 Double glaze U = 1.7, SC = 0.32 Skylight Same as Proposed Model RC slab Floor Medium construction, U = 0.8 W/m2K RC roof , U = 0.49 W/m2K Roof Same as Proposed Model 0.54 Window to Wall Ratio (WWR) ETTV = 50 W/m2 ETTV = 39.5 W/m2
  • 20. 11 June 2017 20 EnergyModelling Case Study – Tampines Grande, Singapore Simulation Inputs – Lighting Power Budget (example) BUILDING ELEMENT REFERENCE MODEL PROPOSED MODEL Lighting Power Density (W/m2) Office = 15 W/m2 Circulation = 10 W/m2 Main Lobby = 10 W/m2 Mgt Office = 15 W/m2 Restaurant = 15 W/m2 Retail = 25 W/m2 Stairs = 6 W/m2 Car Park = 5 W/m2 Utilities = 10 W/m2 Toilet = 10 W/m2 Office = 10 W/m2 Circulation = 8 W/m2 Main Lobby = 10 W/m2 Mgt Office = 10 W/m2 Restaurant = 15 W/m2 Retail = 25 W/m2 Stairs = 4 W/m2 Car Park = 3 W/m2 Utilities = 10 W/m2 Toilet = 10 W/m2 EnergyModelling Case Study – Tampines Grande, Singapore Simulation Inputs – ACMV (example) BUILDING ELEMENTS REFERENCE MODEL PROPOSED MODEL AHU Fan Properties AHU VAV Fan with 0.67 W/cmh AHU Fan with average 0.36W/cmh Central Plant Efficiency Auto-sizing based on peak load CHW pump = 0.053 kW/ton CW pump = 0.057 kW/ton Cooling Tower = 0.059 kW/ton 2 x 600 Rton Cent Chillers, COP = 7.25 2 x 300 Rton Screw Chillers, COP = 6.94 CHW pump = 0.04 kW/ton CW pump = 0.03 kW/ton Cooling Tower = 0.03 kW/ton HVAC Circulation Properties CHW pump 2.85 (l/m)/ikW, head: 25 m CHW pump efficiency = 51.93 x 94.2 CW pump 3.23 (l/m)/ikW, head: 15m CW pump efficiency = 29.2 x 93.2 CHW pump 2.85 (l/m)/ikW, head: 25 m CHW pump efficiency = 89.42 x 94.5 CW pump 3.23 (l/m)/ikW, head: 15 m CW pump efficiency = 85.19 x 93.9
  • 21. 11 June 2017 21 EnergyModelling Case Study – Tampines Grande, Singapore Simulation Inputs – ACMV (example) BASE : Building Design to comply with Code of Practices & BCA Approved documents. ECM1 :Improve ETTV from 50 W/m2 to 39 W/m2 ECM 2:Select T5 lighting solution that reduces 30% from BASE case. ECM3 : Improve air ventilation efficiency by 45% from BASE case. ECM4 : Chilled water plant Optimization and efficiency improvement by 25%. ECM5 : Incorporate motion sensor & CO2 sensor in building design. ECM6 : Introduce perimeter lighting control with photo sensor. ECM7 : Energy Efficient AC VVVF lift & escalator with slow down feature. ECM8 : Incorporate energy recovery solution for fresh air pre-cool AHU ECM9 : Integrate Solar Photovoltaic Panel at roof top of development. EnergyModelling Case Study – Tampines Grande, Singapore Simulation Inputs – ACMV (example) Annual Energy Consumption Comparison for ECMs 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 Base ECM 1 ECM 2 ECM 3 ECM 4 ECM 5 ECM 6 ECM 7 ECM 8 ECM 9 ECMs Electricity (MWh) Lift & Escalator Ventilation Fan Air Con Receptacle Lighting 33 % 2% 11% 14% 24% 26% 27% 28% 30% 33%
  • 22. 11 June 2017 22 Conclusion • A building’s in-use performance may be predicted even before it is built. • Predicting its performance then allows us to decide if changes are needed and what should be changed. • Simulations are better used as a design tool than as a verification tool. Its cheaper to simulateIts cheaper to simulateIts cheaper to simulateIts cheaper to simulate than to build the wrong buildingthan to build the wrong buildingthan to build the wrong buildingthan to build the wrong building THANK YOU For Inquiries, please email to wahwah@bsd.com.sg 44