MAHENDRA MORANG
UNIT – PRODUCTION
PLANNING, SCHEDULING, AND
CONTROLLING
A.R
A.R
Concept
• Production Planning and scheduling helps
to
– deliver the product to the customers on time.
– Maintain desired level of inventory.
A.R
Concept : Dependent Demand
• For any product for which a schedule can be
established, dependent demand techniques
should be used
A.R
Ranges of Production Planning – Time
perspective
• 5-10 years production planning
– Plant construction
– Location selection
– Product line decision / design
• 2- 5 years
– Capital budgeting
– Equipment and plant capacity decision
– Layout
• Month to a year
– Inventory decision
– Labour decision
A.R
Basic Functions : Production Planning and
Scheduling
• How much to produce (Volume) and when to
produce ( Timing)
• Optimal utilization of plant and capacity
determination
• Balancing output and capacity
A.R
Basic Terminologies
• Business Plan :
– Overall level of business activity forecasted for 6-18
months – Top level MGMT, expressed in monetary
units.
– Forecasting is based on ;
• General Economic condition
• Industries condition
• Level of competetion in the industry (Refer M. Porter’s Five
Force Model)
– Business Plan must be supported by
• Finance, Production, Marketing, R&D (functional
Dept)
A.R
Aggregate Output Planning
• Overall output planning for 6-18 months (how
much to produce during these periods)-
expressed in Units.
• But does not include product specifications such
as styles, colours, shape etc.
• Aggregate output planning must support the
business plan.
A.R
Aggregate capacity Planning
• Maintains balance between desired output
(expected demand and existing capacity)
• It balances
– Output level, capacity constraints, temporary capacity
adjustments – TO meet the demand.
A.R
Master Production Schedules
▶ Specifies
▶ what is to be made
▶ When
▶ How much
▶ Must be in accordance with the aggregate
production plan
▶ Inputs from financial plans, customer demand,
engineering, supplier performance
A.R
MPS – Objectives
▶ To meet the demand for an individual product in
a product family.
▶ Examples of product and product family
▶ Product family – Bakery
▶ Individual product – Cake / Biscuits/ Cookies.
▶ Disaggregating products families and
individual products and accordingly
schedules the production for an individual
product.
A.R
Master Production Schedule Contd.
▶ MPS is established in terms of specific products
▶ More detailed level of planning devides the product
groups into individual products.
▶ Schedule must be followed for a reasonable
length of time
▶ The MPS is a statement of what is to be
produced, not a forecast of demand
A.R
Master Production Planning Process
Sales & Operations
Planning
Generates an aggregate
plan
Supply Chain
Procurement
Supplier
performance
Human Resources
Staff planning
Production
Capacity
Inventory
Marketing
Customer
demand
Finance
Cash flow
Master production
schedule
A.R
Master Production Schedule Contd
• MPS coordinates Marketing and production
– Schedules the production for specific order
• MPS requires changes when;
– New improvement in method of production or
production process re-engineering
– Delayed supply or equipment failure
A.R
Factors to be considered in MPS /
Behavioural Considerations
• Production volume
• Production method
• Production policy
• Reliability of supply
• Current loading
• Internal transportation
• Capacity of plant and availability of Manpower
• Unanticipated events ; strikes, machine
breakdown, employee turnover
A.R
Material Requirement Planning
• Material requirement planning tells
– When to release and receive specific material – to
support the Master production schedules
A.R
Material Requirement Planning - Objectives
• Inventory reduction
• Kanban – availing materials at time in right quantity
• JIT-
• Production efficiency
• Reduction in production and delivery lead tiime
• Coordinate
– Production, inventory, procurement
A.R
Rough Cut Capacity Planning
• A process of testing the feasibility of production
schedules against the capacity.
• It examines whether existing capacity supports
the MPS .
• It identifies the gap between capacity
requirement and Master production schedule.
A.R
A.R
A.R

More Related Content

What's hot

Production planning and control
Production planning and controlProduction planning and control
Production planning and control
Gerald Michael
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
Delwin Arikatt
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
Junaid Hassan
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
Biswajit Ghosh
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
jhanakshah
 

What's hot (20)

Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
MRP-II
MRP-IIMRP-II
MRP-II
 
Process design & steps
Process design & stepsProcess design & steps
Process design & steps
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
MRP I and MRP II
MRP I and MRP IIMRP I and MRP II
MRP I and MRP II
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
 
Production Management
Production Management Production Management
Production Management
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
 
Production control
Production controlProduction control
Production control
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Mba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control aMba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control a
 
Production and operations management
Production and operations managementProduction and operations management
Production and operations management
 
Facility Layout
Facility LayoutFacility Layout
Facility Layout
 
Ppc
PpcPpc
Ppc
 

Viewers also liked

Production planning
Production planningProduction planning
Production planning
Sarkar Jayo
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
Swatanu Satpathy
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
amirthakarthi
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
sai precious
 
Alta White Paper D2C eCommerce Case Study 2016
Alta White Paper D2C eCommerce Case Study 2016Alta White Paper D2C eCommerce Case Study 2016
Alta White Paper D2C eCommerce Case Study 2016
Patrick Nicholson
 

Viewers also liked (20)

Production planning
Production planningProduction planning
Production planning
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
 
Product Operation Planning & Control
Product Operation Planning & ControlProduct Operation Planning & Control
Product Operation Planning & Control
 
scheduling
schedulingscheduling
scheduling
 
SAP Production Planning
SAP Production PlanningSAP Production Planning
SAP Production Planning
 
Enterprise Resource Planning- BEST PPT
Enterprise Resource Planning- BEST PPTEnterprise Resource Planning- BEST PPT
Enterprise Resource Planning- BEST PPT
 
25 KPIs Every Manager Needs To Know
25 KPIs Every Manager Needs To Know25 KPIs Every Manager Needs To Know
25 KPIs Every Manager Needs To Know
 
Production planning-and-control
Production planning-and-controlProduction planning-and-control
Production planning-and-control
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
Alta White Paper D2C eCommerce Case Study 2016
Alta White Paper D2C eCommerce Case Study 2016Alta White Paper D2C eCommerce Case Study 2016
Alta White Paper D2C eCommerce Case Study 2016
 
mpx Replay, Expedite Your Catch-Up and C3 Workflow 2 of 2
mpx Replay, Expedite Your Catch-Up and C3 Workflow 2 of 2mpx Replay, Expedite Your Catch-Up and C3 Workflow 2 of 2
mpx Replay, Expedite Your Catch-Up and C3 Workflow 2 of 2
 
Context Based Authentication
Context Based AuthenticationContext Based Authentication
Context Based Authentication
 
Nt1310 project
Nt1310 projectNt1310 project
Nt1310 project
 
Basics of Coding in Pediatrics Medical Billing
Basics of Coding in Pediatrics Medical BillingBasics of Coding in Pediatrics Medical Billing
Basics of Coding in Pediatrics Medical Billing
 
Information från Läkemedelsverket #5 2013
Information från Läkemedelsverket #5 2013Information från Läkemedelsverket #5 2013
Information från Läkemedelsverket #5 2013
 
Credit cards
Credit cardsCredit cards
Credit cards
 
"15 Business Story Ideas to Jump on Now"
"15 Business Story Ideas to Jump on Now""15 Business Story Ideas to Jump on Now"
"15 Business Story Ideas to Jump on Now"
 
cathy resume
cathy resumecathy resume
cathy resume
 

Similar to Production planning and scheduling

OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
ManiMj6
 
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesOm lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
videoaakash15
 
ROXANNE LEAH SMITH-2015
ROXANNE LEAH SMITH-2015ROXANNE LEAH SMITH-2015
ROXANNE LEAH SMITH-2015
Roxanne Smith
 
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_siesOm lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
videoaakash15
 
PP_Amit Tandan new
PP_Amit Tandan newPP_Amit Tandan new
PP_Amit Tandan new
Amit Tandan
 
PP_Amit Tandan new
PP_Amit Tandan newPP_Amit Tandan new
PP_Amit Tandan new
Amit Tandan
 
S2019302018 m saqib nawaz mps
S2019302018 m saqib nawaz mpsS2019302018 m saqib nawaz mps
S2019302018 m saqib nawaz mps
MSaqibNawaz
 

Similar to Production planning and scheduling (20)

OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
 
Production Planning And Control
Production Planning And ControlProduction Planning And Control
Production Planning And Control
 
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesOm lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
 
Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...
Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...
Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...
 
Cv
CvCv
Cv
 
Master schedualing
Master schedualingMaster schedualing
Master schedualing
 
Abdul resume cv
Abdul resume cvAbdul resume cv
Abdul resume cv
 
module 2 OM.pptx
module 2 OM.pptxmodule 2 OM.pptx
module 2 OM.pptx
 
Resume -TARAK
Resume -TARAKResume -TARAK
Resume -TARAK
 
Bba 1584 planning n forecasting
Bba 1584 planning n forecastingBba 1584 planning n forecasting
Bba 1584 planning n forecasting
 
Supply Chain Management in ERP
Supply Chain Management in ERPSupply Chain Management in ERP
Supply Chain Management in ERP
 
Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptx
 
ROXANNE LEAH SMITH-2015
ROXANNE LEAH SMITH-2015ROXANNE LEAH SMITH-2015
ROXANNE LEAH SMITH-2015
 
Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and control
 
CSCMP 2014: Using S&OP to Improve Enterprise Resiliency
CSCMP 2014: Using S&OP to Improve Enterprise ResiliencyCSCMP 2014: Using S&OP to Improve Enterprise Resiliency
CSCMP 2014: Using S&OP to Improve Enterprise Resiliency
 
Production management
Production managementProduction management
Production management
 
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_siesOm lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
 
PP_Amit Tandan new
PP_Amit Tandan newPP_Amit Tandan new
PP_Amit Tandan new
 
PP_Amit Tandan new
PP_Amit Tandan newPP_Amit Tandan new
PP_Amit Tandan new
 
S2019302018 m saqib nawaz mps
S2019302018 m saqib nawaz mpsS2019302018 m saqib nawaz mps
S2019302018 m saqib nawaz mps
 

Recently uploaded

Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
AllTops
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
SandaliGurusinghe2
 

Recently uploaded (14)

Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 

Production planning and scheduling

  • 1. MAHENDRA MORANG UNIT – PRODUCTION PLANNING, SCHEDULING, AND CONTROLLING A.R
  • 2. A.R Concept • Production Planning and scheduling helps to – deliver the product to the customers on time. – Maintain desired level of inventory.
  • 3. A.R Concept : Dependent Demand • For any product for which a schedule can be established, dependent demand techniques should be used
  • 4. A.R Ranges of Production Planning – Time perspective • 5-10 years production planning – Plant construction – Location selection – Product line decision / design • 2- 5 years – Capital budgeting – Equipment and plant capacity decision – Layout • Month to a year – Inventory decision – Labour decision
  • 5. A.R Basic Functions : Production Planning and Scheduling • How much to produce (Volume) and when to produce ( Timing) • Optimal utilization of plant and capacity determination • Balancing output and capacity
  • 6. A.R Basic Terminologies • Business Plan : – Overall level of business activity forecasted for 6-18 months – Top level MGMT, expressed in monetary units. – Forecasting is based on ; • General Economic condition • Industries condition • Level of competetion in the industry (Refer M. Porter’s Five Force Model) – Business Plan must be supported by • Finance, Production, Marketing, R&D (functional Dept)
  • 7. A.R Aggregate Output Planning • Overall output planning for 6-18 months (how much to produce during these periods)- expressed in Units. • But does not include product specifications such as styles, colours, shape etc. • Aggregate output planning must support the business plan.
  • 8. A.R Aggregate capacity Planning • Maintains balance between desired output (expected demand and existing capacity) • It balances – Output level, capacity constraints, temporary capacity adjustments – TO meet the demand.
  • 9. A.R Master Production Schedules ▶ Specifies ▶ what is to be made ▶ When ▶ How much ▶ Must be in accordance with the aggregate production plan ▶ Inputs from financial plans, customer demand, engineering, supplier performance
  • 10. A.R MPS – Objectives ▶ To meet the demand for an individual product in a product family. ▶ Examples of product and product family ▶ Product family – Bakery ▶ Individual product – Cake / Biscuits/ Cookies. ▶ Disaggregating products families and individual products and accordingly schedules the production for an individual product.
  • 11. A.R Master Production Schedule Contd. ▶ MPS is established in terms of specific products ▶ More detailed level of planning devides the product groups into individual products. ▶ Schedule must be followed for a reasonable length of time ▶ The MPS is a statement of what is to be produced, not a forecast of demand
  • 12. A.R Master Production Planning Process Sales & Operations Planning Generates an aggregate plan Supply Chain Procurement Supplier performance Human Resources Staff planning Production Capacity Inventory Marketing Customer demand Finance Cash flow Master production schedule
  • 13. A.R Master Production Schedule Contd • MPS coordinates Marketing and production – Schedules the production for specific order • MPS requires changes when; – New improvement in method of production or production process re-engineering – Delayed supply or equipment failure
  • 14. A.R Factors to be considered in MPS / Behavioural Considerations • Production volume • Production method • Production policy • Reliability of supply • Current loading • Internal transportation • Capacity of plant and availability of Manpower • Unanticipated events ; strikes, machine breakdown, employee turnover
  • 15. A.R Material Requirement Planning • Material requirement planning tells – When to release and receive specific material – to support the Master production schedules
  • 16. A.R Material Requirement Planning - Objectives • Inventory reduction • Kanban – availing materials at time in right quantity • JIT- • Production efficiency • Reduction in production and delivery lead tiime • Coordinate – Production, inventory, procurement
  • 17. A.R Rough Cut Capacity Planning • A process of testing the feasibility of production schedules against the capacity. • It examines whether existing capacity supports the MPS . • It identifies the gap between capacity requirement and Master production schedule.
  • 18. A.R
  • 19. A.R
  • 20. A.R