API-510-CLOSED-1
1. The gamma ray radiography has maximum density of:
a. 2.0 HD
b. 4.0 HD
c. No upper limit is prescribed
d. Depends on the viewed
2. A re-rating of a vessel is not completed till the new name plate fixing is overseen by
a. Jurisdiction
b. Authorized inspector
c. Pressure vessel engineer
d. Insurance surveyor
3. The filler metal used should have minimum specified tensile strength equal to or greater than
the minimum specified tensile strength of the base metal. If a filler metal is used that has a
minimum specified tensile strength lower than the minimum specified tensile strength of the base
metal
a. Lower strength electrodes are not permitted for repair welding
b. Maximum 50% of thickness can be repaired using such electrodes
c. Increase weld deposit thickness suitably to compensate the lower strength
d. B & C
4. The greatest time between the testing of pressure relieving devices per API 510?
a. 5 years
b. Pressure relief valves shall be tested at intervals that are frequent enough to verify that the
valves perform reliably.
c. 10 years.
d. Pressure relief devices must be tested at every shutdown
5. If you were looking for the last date that a pressure relief valve was set, where should this
information always be?
a. In the product literature from the valve company.
b. The API 510 mandatory computer inspection records.
c. Relief valve's tag.
d. In the records of the repair shop.
6. Which of the following should a progressive record for a pressure vessel contain?
a. The exact location on a plot plan.
b. The piping schedule for the vessel.
c. A complete weld map from the original construction plans.
d. Construction and design information, operating and inspection history.
7. If performing an external inspection of a vessel what consideration need be given the external
insulation?
a. It shall always be removed to inspect underneath.
b. If insulation is in good condition and the vessel operates within the high and low temperatures
stated in API 510, removal of insulation is not necessary for inspection of the
vessel.
c. Selected portions must be removed for inspections.
d. You may not use any plug locations used for UT thickness reading to inspect the vessel.
8. What must be considered important in the inspection of a metallic-lining?
a. That there are no dissimilar welds.
b. That the linings made of pure alloy only.
c. That vent holes exist in all liners.
d. That there are no holes or cracks present in the lining.
9. What do construction codes mean, as it regards repairs to a pressure vessel?
a. The current ASME Code edition.
b. The NBIC
c. The Code the vessel was constructed to, including non standard and jurisdictional special
vessels.
d. The API 510 Code.
10. Which of the following over pressure protection is not found on a pressure vessel?
a. Safety Relief
b. Pilot Operated
c. Rupture Disk
d. Pressure / Vacuum Vent
11. The report for qualifying a welder is:
a. Safety Relief
b. Piolet Operated
c. Rupture Disc
d. Pressure/Vacuum Vent
12. Charpy impact tests are intended to prove that a material is:
a. Tough at the desired MDMT of the vessel to be constructed using that material.
b. Some what prone td brittle fracture.
c. Acceptable for use in high temperature service.
d. Not required to be heat treated.
13. According to Section IX, all welders must be re-tested for a process:
a. If they have not been tested before.
b. If they have not used the process in the past 1 month or longer and have not been welding with
other processes.
c. If they have not used the process for the past 3 months or longer
d. If the welder's ability to make sounds welds with process is in doubt.
14. Which of the following describes a type/s of rupture disks?
a. Multiple layer of graphite impregnated fibers
b. Various metals - usually flat except steel
c. Impervious graphite, un-bulged
d. Various metals, usually pre-bulged or impervious graphite, usually flat.
15. Which of the following describes a lamination in metal plate?
a. Laminations usually represent large cavities.
b. Laminations are present only on the edges of plate.
c. Laminations run at a slant or parallel to the plate surface.
d. Laminations run normal to the plate surface.
16. You are inspecting a failure in a Carbon Steel vessel wall, what conditions would you look for
if it was believed that the fracture was a brittle one?
a. There is almost a no lack of ductility.
b. The fractured surfaces has a smooth surface
c. The material might be a thin gauge material, and working at elevated temperature
d. There is an almost complete lack of ductility and the material might have been working at low
temperature.
17. A bulged metal rupture disk with the pressure on the concave side has life expectancy of:
a. 5 years
b. 2 years
c. 1 year
d. Indefinite length till it ruptures
18. For same bursting pressure of the disc, higher operating pressures are possible with a rupture
disk of the type in which, the pressure acts on:
a. Concave side
b. Convex side (Reverse buckling)
c. Flat type
d. Operating pressures for all above will be same
19. When a crack is discovered in a vessel that is in a highly stressed area. What action should
you recommend be considered as a first step in any effort to correct the flaw?
a. Using an insert patch
b. Removing the crack by grinding and inspect using an NDE
procedure before repair.
c. Call in a pressure vessel engineer.
d. Design an overlay patch that has rounded corners
20. When looking for surface cracks in a vessel made of ferrous material which of the following is
the most capable of detection?
a. Fluorescent penetrant method
b. Visible Color contrast penetrant method
c. Radiography
d. Close visual Inspection with good lighting.
API-510-CLOSED-1
1. A ASME Sec. V, T-282.1
2. B API 510, 7.3-e
3. D API 510, 7.2.11
4. C API 510, 6.6
5. C API 576 6.2.2
6. D API 510, 6.7
7. B API 510, 6.3
8. D API 572, 10.4.5
9. C API 510, 1.1
10. D API 576, 4.8.1
11. C ASME IX, QW-300.3
12. A ASME VIII, UG-84, Definition of Charpy (Notch Toughness)
13. D ASME IX, QW-322.1
14. D API576, 4.9.1, 4.9.5
15. C API 572 10.4.4
16. D IRE CHAPTER II, 205.01
17. C API 576, 4.9.3
18. C API 576, 4.9.3
19. C API 510, 7.1.3
20. A Basic Knowledge of PT
API-510-CLOSED-1
1. A ASME Sec. V, T-282.1
2. B API 510, 7.3-e
3. D API 510, 7.2.11
4. C API 510, 6.6
5. C API 576 6.2.2
6. D API 510, 6.7
7. B API 510, 6.3
8. D API 572, 10.4.5
9. C API 510, 1.1
10. D API 576, 4.8.1
11. C ASME IX, QW-300.3
12. A ASME VIII, UG-84, Definition of Charpy (Notch Toughness)
13. D ASME IX, QW-322.1
14. D API576, 4.9.1, 4.9.5
15. C API 572 10.4.4
16. D IRE CHAPTER II, 205.01
17. C API 576, 4.9.3
18. C API 576, 4.9.3
19. C API 510, 7.1.3
20. A Basic Knowledge of PT

Weitere ähnliche Inhalte

Was ist angesagt?

Api 570 course material
Api 570 course materialApi 570 course material
Api 570 course materialTASSIO DOURADO
 
Api practice questions
Api practice questions  Api practice questions
Api practice questions Hamza Khamkar
 
dokumen.tips_asme-b31-4-espanolpdf (2).pdf
dokumen.tips_asme-b31-4-espanolpdf (2).pdfdokumen.tips_asme-b31-4-espanolpdf (2).pdf
dokumen.tips_asme-b31-4-espanolpdf (2).pdfAlfredoBravo26
 
Liquid dye-penetrant-test-inspection-free-ndt-sample-procedure
Liquid dye-penetrant-test-inspection-free-ndt-sample-procedureLiquid dye-penetrant-test-inspection-free-ndt-sample-procedure
Liquid dye-penetrant-test-inspection-free-ndt-sample-procedureRaznan Ramli
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2Jithu John
 
Twi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questionsTwi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questionsThang Do Minh
 
API 570 B31.3 qustion.pdf
API 570 B31.3 qustion.pdfAPI 570 B31.3 qustion.pdf
API 570 B31.3 qustion.pdfEmmanuelMatutu
 
Shop fabrication of structural steel
Shop fabrication of structural steelShop fabrication of structural steel
Shop fabrication of structural steelAhmed Allam
 
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxPresentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxhesham ismail
 
Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1dhiaa ebadi
 
269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdfmoumo1
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for pipingKhiem Vo Duy
 

Was ist angesagt? (20)

Welder qualification
Welder qualificationWelder qualification
Welder qualification
 
Api 570 01_api_570
Api 570 01_api_570Api 570 01_api_570
Api 570 01_api_570
 
Api 570 course material
Api 570 course materialApi 570 course material
Api 570 course material
 
Api practice questions
Api practice questions  Api practice questions
Api practice questions
 
dokumen.tips_asme-b31-4-espanolpdf (2).pdf
dokumen.tips_asme-b31-4-espanolpdf (2).pdfdokumen.tips_asme-b31-4-espanolpdf (2).pdf
dokumen.tips_asme-b31-4-espanolpdf (2).pdf
 
Liquid dye-penetrant-test-inspection-free-ndt-sample-procedure
Liquid dye-penetrant-test-inspection-free-ndt-sample-procedureLiquid dye-penetrant-test-inspection-free-ndt-sample-procedure
Liquid dye-penetrant-test-inspection-free-ndt-sample-procedure
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2
 
Twi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questionsTwi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questions
 
API 570 B31.3 qustion.pdf
API 570 B31.3 qustion.pdfAPI 570 B31.3 qustion.pdf
API 570 B31.3 qustion.pdf
 
Shop fabrication of structural steel
Shop fabrication of structural steelShop fabrication of structural steel
Shop fabrication of structural steel
 
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxPresentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptx
 
1 1
1 11 1
1 1
 
Aws d1.1 guides
Aws d1.1 guidesAws d1.1 guides
Aws d1.1 guides
 
Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1
 
Api 510 study plan
Api 510 study planApi 510 study plan
Api 510 study plan
 
How to Qualify a Welding Procedure
How to Qualify a Welding ProcedureHow to Qualify a Welding Procedure
How to Qualify a Welding Procedure
 
Film interpretation
Film interpretationFilm interpretation
Film interpretation
 
Corrosion Circuits
Corrosion CircuitsCorrosion Circuits
Corrosion Circuits
 
269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 

Ähnlich wie Api 510-closed-1[1]

Sampleq practice-exam-d11-2002 (1)
Sampleq practice-exam-d11-2002 (1)Sampleq practice-exam-d11-2002 (1)
Sampleq practice-exam-d11-2002 (1)Lennard Charles
 
1. Which section of a contract contains guidelines that ensure f.docx
1.   Which section of a contract contains guidelines that ensure f.docx1.   Which section of a contract contains guidelines that ensure f.docx
1. Which section of a contract contains guidelines that ensure f.docxSONU61709
 
Ultrasonic Testing Specific-01
Ultrasonic Testing Specific-01Ultrasonic Testing Specific-01
Ultrasonic Testing Specific-01YOGESH JADHAV
 
Ultrasonic Testing Specific-02
Ultrasonic Testing Specific-02Ultrasonic Testing Specific-02
Ultrasonic Testing Specific-02YOGESH JADHAV
 
Cswip 3.1 question & Answers
Cswip 3.1 question & AnswersCswip 3.1 question & Answers
Cswip 3.1 question & AnswersRavi Shankar
 
PCB manufacture design rule
PCB manufacture design rulePCB manufacture design rule
PCB manufacture design ruleJane Soong
 
ro plant 5000 gpd price in Karachi Pakistan
ro plant 5000 gpd price in Karachi Pakistanro plant 5000 gpd price in Karachi Pakistan
ro plant 5000 gpd price in Karachi Pakistanogokarachi
 
Cswip 3.1 qustion -1.pdf Azam Files
Cswip 3.1 qustion -1.pdf Azam Files Cswip 3.1 qustion -1.pdf Azam Files
Cswip 3.1 qustion -1.pdf Azam Files GausulAzam12
 
file-no-10-api-936_compress.pdf
file-no-10-api-936_compress.pdffile-no-10-api-936_compress.pdf
file-no-10-api-936_compress.pdfErRANaveen1
 
Bs 1881 122(1) 1983
Bs 1881 122(1) 1983Bs 1881 122(1) 1983
Bs 1881 122(1) 1983EPMC TUNISIA
 
Custom tint-solutions-austin-san-antonio-window-film-7-mil-clear-specifier-sh...
Custom tint-solutions-austin-san-antonio-window-film-7-mil-clear-specifier-sh...Custom tint-solutions-austin-san-antonio-window-film-7-mil-clear-specifier-sh...
Custom tint-solutions-austin-san-antonio-window-film-7-mil-clear-specifier-sh...CustomTintSolutionsSanAntonio
 
review-grade-11-3rd-quarter.pptx
review-grade-11-3rd-quarter.pptxreview-grade-11-3rd-quarter.pptx
review-grade-11-3rd-quarter.pptxNorMayJeanHinayas1
 

Ähnlich wie Api 510-closed-1[1] (20)

Sampleq practice-exam-d11-2002 (1)
Sampleq practice-exam-d11-2002 (1)Sampleq practice-exam-d11-2002 (1)
Sampleq practice-exam-d11-2002 (1)
 
API-510-OPEN-1.pdf
API-510-OPEN-1.pdfAPI-510-OPEN-1.pdf
API-510-OPEN-1.pdf
 
1. Which section of a contract contains guidelines that ensure f.docx
1.   Which section of a contract contains guidelines that ensure f.docx1.   Which section of a contract contains guidelines that ensure f.docx
1. Which section of a contract contains guidelines that ensure f.docx
 
RT Specific 01
RT Specific 01RT Specific 01
RT Specific 01
 
Api 510-closed-2
Api 510-closed-2Api 510-closed-2
Api 510-closed-2
 
Ultrasonic Testing Specific-01
Ultrasonic Testing Specific-01Ultrasonic Testing Specific-01
Ultrasonic Testing Specific-01
 
7. obturation
7. obturation7. obturation
7. obturation
 
Ultrasonic Testing Specific-02
Ultrasonic Testing Specific-02Ultrasonic Testing Specific-02
Ultrasonic Testing Specific-02
 
Cswip 3.1 question & Answers
Cswip 3.1 question & AnswersCswip 3.1 question & Answers
Cswip 3.1 question & Answers
 
PCB manufacture design rule
PCB manufacture design rulePCB manufacture design rule
PCB manufacture design rule
 
Cooling tower mcq
Cooling tower mcqCooling tower mcq
Cooling tower mcq
 
ro plant 5000 gpd price in Karachi Pakistan
ro plant 5000 gpd price in Karachi Pakistanro plant 5000 gpd price in Karachi Pakistan
ro plant 5000 gpd price in Karachi Pakistan
 
Telescopic poles nea
Telescopic poles  neaTelescopic poles  nea
Telescopic poles nea
 
Cswip 3.1 qustion -1.pdf Azam Files
Cswip 3.1 qustion -1.pdf Azam Files Cswip 3.1 qustion -1.pdf Azam Files
Cswip 3.1 qustion -1.pdf Azam Files
 
file-no-10-api-936_compress.pdf
file-no-10-api-936_compress.pdffile-no-10-api-936_compress.pdf
file-no-10-api-936_compress.pdf
 
Bs 1881 122(1) 1983
Bs 1881 122(1) 1983Bs 1881 122(1) 1983
Bs 1881 122(1) 1983
 
Custom tint-solutions-austin-san-antonio-window-film-7-mil-clear-specifier-sh...
Custom tint-solutions-austin-san-antonio-window-film-7-mil-clear-specifier-sh...Custom tint-solutions-austin-san-antonio-window-film-7-mil-clear-specifier-sh...
Custom tint-solutions-austin-san-antonio-window-film-7-mil-clear-specifier-sh...
 
review-grade-11-3rd-quarter.pptx
review-grade-11-3rd-quarter.pptxreview-grade-11-3rd-quarter.pptx
review-grade-11-3rd-quarter.pptx
 
Bs 1881 112 1983
Bs 1881 112 1983Bs 1881 112 1983
Bs 1881 112 1983
 
Terms
TermsTerms
Terms
 

Kürzlich hochgeladen

Upgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsUpgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsIntellect Design Arena Ltd
 
Fabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsFabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsWristbands Ireland
 
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdfChicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdfSourav Sikder
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxWorkforce Group
 
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfTalent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfCharles Cotter, PhD
 
BCE24 | Virtual Brand Ambassadors: Making Brands Personal - John Meulemans
BCE24 | Virtual Brand Ambassadors: Making Brands Personal - John MeulemansBCE24 | Virtual Brand Ambassadors: Making Brands Personal - John Meulemans
BCE24 | Virtual Brand Ambassadors: Making Brands Personal - John MeulemansBBPMedia1
 
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...Khaled Al Awadi
 
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...Brian Solis
 
Mihir Menda - Member of Supervisory Board at RMZ
Mihir Menda - Member of Supervisory Board at RMZMihir Menda - Member of Supervisory Board at RMZ
Mihir Menda - Member of Supervisory Board at RMZKanakChauhan5
 
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...AustraliaChapterIIBA
 
Entrepreneurship & organisations: influences and organizations
Entrepreneurship & organisations: influences and organizationsEntrepreneurship & organisations: influences and organizations
Entrepreneurship & organisations: influences and organizationsP&CO
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfJohnCarloValencia4
 
MoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor PresentationMoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor Presentationbaron83
 
Project Brief & Information Architecture Report
Project Brief & Information Architecture ReportProject Brief & Information Architecture Report
Project Brief & Information Architecture Reportamberjiles31
 
Slicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup BerlinSlicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup BerlinAnton Skornyakov
 
Data skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story pointsData skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story pointsyasinnathani
 
Anyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agencyAnyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agencyHanna Klim
 
Plano de marketing- inglês em formato ppt
Plano de marketing- inglês  em formato pptPlano de marketing- inglês  em formato ppt
Plano de marketing- inglês em formato pptElizangelaSoaresdaCo
 
Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..dlewis191
 
MC Heights construction company in Jhang
MC Heights construction company in JhangMC Heights construction company in Jhang
MC Heights construction company in Jhangmcgroupjeya
 

Kürzlich hochgeladen (20)

Upgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsUpgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking Applications
 
Fabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsFabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and Festivals
 
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdfChicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
 
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfTalent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
 
BCE24 | Virtual Brand Ambassadors: Making Brands Personal - John Meulemans
BCE24 | Virtual Brand Ambassadors: Making Brands Personal - John MeulemansBCE24 | Virtual Brand Ambassadors: Making Brands Personal - John Meulemans
BCE24 | Virtual Brand Ambassadors: Making Brands Personal - John Meulemans
 
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...
 
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
 
Mihir Menda - Member of Supervisory Board at RMZ
Mihir Menda - Member of Supervisory Board at RMZMihir Menda - Member of Supervisory Board at RMZ
Mihir Menda - Member of Supervisory Board at RMZ
 
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
 
Entrepreneurship & organisations: influences and organizations
Entrepreneurship & organisations: influences and organizationsEntrepreneurship & organisations: influences and organizations
Entrepreneurship & organisations: influences and organizations
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
 
MoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor PresentationMoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor Presentation
 
Project Brief & Information Architecture Report
Project Brief & Information Architecture ReportProject Brief & Information Architecture Report
Project Brief & Information Architecture Report
 
Slicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup BerlinSlicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup Berlin
 
Data skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story pointsData skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story points
 
Anyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agencyAnyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agency
 
Plano de marketing- inglês em formato ppt
Plano de marketing- inglês  em formato pptPlano de marketing- inglês  em formato ppt
Plano de marketing- inglês em formato ppt
 
Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..
 
MC Heights construction company in Jhang
MC Heights construction company in JhangMC Heights construction company in Jhang
MC Heights construction company in Jhang
 

Api 510-closed-1[1]

  • 1. API-510-CLOSED-1 1. The gamma ray radiography has maximum density of: a. 2.0 HD b. 4.0 HD c. No upper limit is prescribed d. Depends on the viewed 2. A re-rating of a vessel is not completed till the new name plate fixing is overseen by a. Jurisdiction b. Authorized inspector c. Pressure vessel engineer d. Insurance surveyor 3. The filler metal used should have minimum specified tensile strength equal to or greater than the minimum specified tensile strength of the base metal. If a filler metal is used that has a minimum specified tensile strength lower than the minimum specified tensile strength of the base metal a. Lower strength electrodes are not permitted for repair welding b. Maximum 50% of thickness can be repaired using such electrodes c. Increase weld deposit thickness suitably to compensate the lower strength d. B & C 4. The greatest time between the testing of pressure relieving devices per API 510? a. 5 years b. Pressure relief valves shall be tested at intervals that are frequent enough to verify that the valves perform reliably. c. 10 years. d. Pressure relief devices must be tested at every shutdown 5. If you were looking for the last date that a pressure relief valve was set, where should this information always be? a. In the product literature from the valve company. b. The API 510 mandatory computer inspection records. c. Relief valve's tag. d. In the records of the repair shop.
  • 2. 6. Which of the following should a progressive record for a pressure vessel contain? a. The exact location on a plot plan. b. The piping schedule for the vessel. c. A complete weld map from the original construction plans. d. Construction and design information, operating and inspection history. 7. If performing an external inspection of a vessel what consideration need be given the external insulation? a. It shall always be removed to inspect underneath. b. If insulation is in good condition and the vessel operates within the high and low temperatures stated in API 510, removal of insulation is not necessary for inspection of the vessel. c. Selected portions must be removed for inspections. d. You may not use any plug locations used for UT thickness reading to inspect the vessel. 8. What must be considered important in the inspection of a metallic-lining? a. That there are no dissimilar welds. b. That the linings made of pure alloy only. c. That vent holes exist in all liners. d. That there are no holes or cracks present in the lining. 9. What do construction codes mean, as it regards repairs to a pressure vessel? a. The current ASME Code edition. b. The NBIC c. The Code the vessel was constructed to, including non standard and jurisdictional special vessels. d. The API 510 Code. 10. Which of the following over pressure protection is not found on a pressure vessel? a. Safety Relief b. Pilot Operated c. Rupture Disk d. Pressure / Vacuum Vent
  • 3. 11. The report for qualifying a welder is: a. Safety Relief b. Piolet Operated c. Rupture Disc d. Pressure/Vacuum Vent 12. Charpy impact tests are intended to prove that a material is: a. Tough at the desired MDMT of the vessel to be constructed using that material. b. Some what prone td brittle fracture. c. Acceptable for use in high temperature service. d. Not required to be heat treated. 13. According to Section IX, all welders must be re-tested for a process: a. If they have not been tested before. b. If they have not used the process in the past 1 month or longer and have not been welding with other processes. c. If they have not used the process for the past 3 months or longer d. If the welder's ability to make sounds welds with process is in doubt. 14. Which of the following describes a type/s of rupture disks? a. Multiple layer of graphite impregnated fibers b. Various metals - usually flat except steel c. Impervious graphite, un-bulged d. Various metals, usually pre-bulged or impervious graphite, usually flat. 15. Which of the following describes a lamination in metal plate? a. Laminations usually represent large cavities. b. Laminations are present only on the edges of plate. c. Laminations run at a slant or parallel to the plate surface. d. Laminations run normal to the plate surface. 16. You are inspecting a failure in a Carbon Steel vessel wall, what conditions would you look for if it was believed that the fracture was a brittle one? a. There is almost a no lack of ductility. b. The fractured surfaces has a smooth surface c. The material might be a thin gauge material, and working at elevated temperature d. There is an almost complete lack of ductility and the material might have been working at low temperature.
  • 4. 17. A bulged metal rupture disk with the pressure on the concave side has life expectancy of: a. 5 years b. 2 years c. 1 year d. Indefinite length till it ruptures 18. For same bursting pressure of the disc, higher operating pressures are possible with a rupture disk of the type in which, the pressure acts on: a. Concave side b. Convex side (Reverse buckling) c. Flat type d. Operating pressures for all above will be same 19. When a crack is discovered in a vessel that is in a highly stressed area. What action should you recommend be considered as a first step in any effort to correct the flaw? a. Using an insert patch b. Removing the crack by grinding and inspect using an NDE procedure before repair. c. Call in a pressure vessel engineer. d. Design an overlay patch that has rounded corners 20. When looking for surface cracks in a vessel made of ferrous material which of the following is the most capable of detection? a. Fluorescent penetrant method b. Visible Color contrast penetrant method c. Radiography d. Close visual Inspection with good lighting.
  • 5. API-510-CLOSED-1 1. A ASME Sec. V, T-282.1 2. B API 510, 7.3-e 3. D API 510, 7.2.11 4. C API 510, 6.6 5. C API 576 6.2.2 6. D API 510, 6.7 7. B API 510, 6.3 8. D API 572, 10.4.5 9. C API 510, 1.1 10. D API 576, 4.8.1 11. C ASME IX, QW-300.3 12. A ASME VIII, UG-84, Definition of Charpy (Notch Toughness) 13. D ASME IX, QW-322.1 14. D API576, 4.9.1, 4.9.5 15. C API 572 10.4.4 16. D IRE CHAPTER II, 205.01 17. C API 576, 4.9.3 18. C API 576, 4.9.3 19. C API 510, 7.1.3 20. A Basic Knowledge of PT
  • 6. API-510-CLOSED-1 1. A ASME Sec. V, T-282.1 2. B API 510, 7.3-e 3. D API 510, 7.2.11 4. C API 510, 6.6 5. C API 576 6.2.2 6. D API 510, 6.7 7. B API 510, 6.3 8. D API 572, 10.4.5 9. C API 510, 1.1 10. D API 576, 4.8.1 11. C ASME IX, QW-300.3 12. A ASME VIII, UG-84, Definition of Charpy (Notch Toughness) 13. D ASME IX, QW-322.1 14. D API576, 4.9.1, 4.9.5 15. C API 572 10.4.4 16. D IRE CHAPTER II, 205.01 17. C API 576, 4.9.3 18. C API 576, 4.9.3 19. C API 510, 7.1.3 20. A Basic Knowledge of PT