Westan Corporation uses a predetermined overhead rate of $22.50 per direct labor-hour based on estimates of $270,000 in overhead costs and 12,000 labor-hours. However, actual overhead costs were $268,000 with 11,300 labor-hours worked. Using the actual overhead costs and labor-hours, the overhead rate would be $23.72 per hour rather than the estimated $22.50 rate.