SlideShare a Scribd company logo
1 of 36
Hydraulics of Structures
What are structures? 
 Structures in this context are simply something 
placed in the channel to either measure or control 
flow. 
 Example: A principle spillway is used as part of a 
dam design to control the rate at which water is 
discharged from a reservoir. 
 Include both inlet and outlet control devices. 
 Control devices can operate as : 
 Open channel flow in which the flow has a 
free surface or 
 Pipe flow in which the flow is in a closed 
conduit under pressure.
Most basic principle of hydraulics 
of structures: 
As head on a structure increases, the flow that 
is discharged through the structure increases. 
 Figure 5.1 (Haan et al., 1994) shows the 
head-discharge relationships for several flow 
control structures.
Weirs 
 At its most basic, just an obstruction placed in a 
channel that constricts flow as it goes over a 
crest. 
 The crest is the edge of the weir over which the 
water flows. 
 As the water level (head) over the crest increases, 
the flow rate increases dramatically. 
 Two basic types of weirs 
 sharp crested 
 broad crested
Sharp Crested Weirs 
 A sharp crested weir is defined by a thin 
crest over which the water springs free as it 
leaves the upstream face of the weir. 
 Flow over a weir is also called the nappe. 
 Sharp crested weirs are generally 
constructed of sheet metal or similar thin 
material.
Sharp Crested Weir 
H 
nappe
Sharp Crested Weirs 
 Can have several shapes 
 Triangular (or v-notch) 
 Rectangular 
 Trapezoidal 
 Classified by the shape of its notch. 
 V-notch weirs have greater control under low flow 
conditions. 
 Rectangular weirs have larger capacity but are less 
sensitive for flow measurement.
Sharp Crested Weirs-General 
v 
2 
2 
1 
g 
H h dh 
Using Bernoulli’s equation 
v 
2 
2 
2 
2 
1 + + = + + - 
(H z h) 
v 22 
(H z) v 
2g 
2g 
z 
g
 Making the assumption that the velocity head at 
the upstream point will be much smaller than the 
velocity head as the flow goes over the weir we 
assume v2/2g is negligible and: 
1 
v 2gh 2 = 
H 
Crest 
dh 
L 
dQ v Ldh 2 = 
or 
dQ = 2ghLdh h
Integrating this from h = 0 to h = H gives 
2 
3 
= 
Q L 2g h 2 L gH 
= ò = 
0 
1 2 
2 
3 
h H 
h 
= 
Multiplying by a loss term to compensate for 
the deviation from ideal flow we get: 
2 
3 
Q = C 2 
d L 2gH 
3
Rectangular Weirs 
A rectangular weir that spans the full width of the channel 
is known as a suppressed weir. 
2 
Q = CLH3 
H 
L 
H 
Coefficient of Discharge
 Hydraulic head (H) for weirs is simply the height 
of the water surface above the weir crest, 
measured at a point upstream so that the influence 
of the velocity head can be ignored. 
 L is the length of the weir. 
 The coefficient of discharge (C) is dependent 
upon units and of the weir shape. 
 For a suppressed weir with H/h < 0.4 (where h is the 
height of the weir) C= 3.33 can be used. 
 For 0.4 < H/h < 10, C = 3.27 + 0.4 H/h
A rectangular weir that does not span the whole channel 
is called a weir with end contractions . The effective 
length of the weir will be less than the actual weir length 
due to contraction of the flow jet caused by the sidewalls. 
L’ 
L = L'-0.1NH 
Where N is the number of 
contractions and L’ is the 
measured length of the 
crest.
Triangular (v-notch ) weirs 
 Used to measure flow in low flow 
conditions. 
Q H 
Q = K tan q 
H2.5 
2
 For Q = 90°, K = 2.5 (typically), 
tan (Q/2) = 1 therefore, 
2 
Q = 2.5H5 
For other angles 
2g 
K C 8 d = 
15 
Where Cd is based on the angle, Q, and head, H.
 Note: Your handout with Figure 12.28 
presents the equation for a v-notch weir as: 
2 
Q = KH5 
with 
= q 
2 
2g tan 
K C 8 d 
15
Broad Crested Weirs 
H 
W 
Q = 3.09LH1.5 
Where L is the width of the weir.
Broad Crested Weirs 
 Broad crested weirs support the flow in the 
longitudinal direction (direction of flow). 
 They are used where sharp-crested weirs 
may have maintenance problems. 
 The nappe of a broad crested weir does not 
spring free.
Roadway Overtopping 
( ) 3 
2 
o d r Q = C L HW 
Where 
Qo – overtopping flowrate 
Cd - overtopping discharge coefficient 
L – length of roadway crest 
HWr – upstream depth 
Cd = ktCr 
Cr – discharge 
coefficient 
kt – submergence 
factor 
Figure 5.7
Orifices 
 An orifice is simply an opening through 
which flow occurs. 
 They can be used to: 
 Control flow as in a drop inlet 
 Measure the flow through a pipe.
 The discharge equation for orifice flow is: 
2 
Q = C'A(2gH) 1 
Where: 
C’ is the orifice coefficient (0.6 for sharp edges, 0.98 for 
rounded edges). 
A is the cross-sectional area of the orifice in ft2 
g is the gravitational constant 
H is the head on the orifice
 At low heads, orifices can act as weirs. 
 Calculate the discharge using the suppressed 
weir equation where L is equal to the 
circumference of the pipe. 
 Calculate the discharge using the orifice 
equation. 
 The lower discharge will be the actual 
discharge.
Pipes as Flow Control Devices 
0.6D 
D 
H’ 
H K v 
2 
2g 
e e = 
H K v 
2 
2g 
b b = 
H K L v 
2 
2g 
c c = 
v2 
2g 
H 
Energy Grade 
Line 
Elbow and Transition L 
H'= v + + + 
e b c 
2 
H H H 
2g
2 
H' v e b c 
(1 K K K L) 
2g 
= + + + 
2 
1 
2 
1 
v (2gH') 
+ + + 
(1 K K K L) 
e b c 
= 
2 
1 
2 
1 
Q a(2gH') 
+ + + 
(1 K K K L) 
e b c 
=
Head Loss Coefficients 
 Ke is the entrance head loss coefficient and is typically 
given a value of 1.0 for circular inlets. 
 Kb is the bend head loss coefficient and is typically 
given a value of 0.5 for circular risers connected to 
round conduits. 
 For risers with rectangular inlets, the bend head losses 
and entrance head losses are typically combined to a 
term Ke’ where values of Ke’ can be found in Table 5.3 
and : 
2 
1 
Q a(2gH') 
+ + 
e c 
2 
1 
(1 K ' K L) 
=
Head Loss Coefficients 
 Kc is the head loss coefficient due to 
friction. 
 Values for Kc are given in Tables 5.1 and 
5.2 for circular and square pipes. 
 Kc is multiplied by L, the entire length of 
the pipe, including the riser.
 Frequently, when the drop inlet is the same 
size as the remainder of the pipe, orifice 
flow will control and the pipe will never 
flow full. 
 If it is desirable to have the pipe flowing 
full, it may be necessary to increase the 
size of the drop inlet.
Using Flow Control Structures as 
Spillways 
 A given drop inlet spillway can have a variety of 
discharge relationships, given the head. 
 At the lowest stages the riser acts as a weir. 
 As the level of the reservoir rises, water flowing in from 
all sides of the inlet interferes so that the inlet begins to 
act as an orifice. 
 As the level continues to rise, the outlet eventually begins 
to flow full and pipe flow prevails. 
 A stage-discharge curve is developed by plotting Q vs. H 
for each of the three relationships. The minimum flow for 
a given head is the actual discharge used.
Rockfill Outlets as Controls 
ROCKFILL 
have 
h1 
dh 
h2 
dl 
HYDRAULIC PROFILE
Rockfill Outlets 
 Advantages 
 Abundant 
 Generally available 
 Usually inexpensive 
 Relative permanence
Rockfill Outlets 
 Major expenses 
 Grading 
 Transporting 
 Placing stone
Rockfill Outlets 
 Used for 
 Protective channel linings and breakwaters 
 Add stability to dams 
 Provide energy dissipation zones for reservoir 
outlets 
 Flow control structure
Modified Darcy-Weisbach 
Equation 
V 
g 
1 
x 
d 
f 
dh 
dl 
k 
2 
2 
=
Rockfill as Control Structure 
Model 
Reynolds Number Equation 
( ) 
nx 
R = d - 
s V e 
Friction factor 
dh 
dl 
x 2 = 
f gd k 2 
V
Friction Factor-Reynolds 
Number Relationship 
= 1600 +3.83 
k R 
e 
f
h2 – have Relationships 
h1 = h2 + dh 
h h1 h2 ave 
= + 
2

More Related Content

What's hot

Sediment Transport
Sediment TransportSediment Transport
Sediment Transport
Ben Watson
 

What's hot (20)

Flood frequency analysis
Flood frequency analysisFlood frequency analysis
Flood frequency analysis
 
Flood estimation
Flood estimation Flood estimation
Flood estimation
 
design of weirs
design of weirsdesign of weirs
design of weirs
 
Stream flow measurement
Stream flow  measurementStream flow  measurement
Stream flow measurement
 
Flood frequency analyses
Flood frequency analysesFlood frequency analyses
Flood frequency analyses
 
Runoff & Flood Frequency Analysis
Runoff & Flood Frequency AnalysisRunoff & Flood Frequency Analysis
Runoff & Flood Frequency Analysis
 
Hydrology (Estimation of peak flood discharge)
Hydrology (Estimation of peak flood discharge)Hydrology (Estimation of peak flood discharge)
Hydrology (Estimation of peak flood discharge)
 
(Part iii)- open channels
(Part iii)- open channels(Part iii)- open channels
(Part iii)- open channels
 
Presentation aboout flood routing
Presentation aboout flood routingPresentation aboout flood routing
Presentation aboout flood routing
 
Dams
DamsDams
Dams
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
Chapter 3 channel design
Chapter 3  channel designChapter 3  channel design
Chapter 3 channel design
 
Sediment Transport
Sediment TransportSediment Transport
Sediment Transport
 
Chapter 2 open channel hydraulics
Chapter 2 open channel hydraulicsChapter 2 open channel hydraulics
Chapter 2 open channel hydraulics
 
Ch4 surface runoff
Ch4 surface runoffCh4 surface runoff
Ch4 surface runoff
 
Reservoir capacity
Reservoir capacityReservoir capacity
Reservoir capacity
 
Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 12
Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 12Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 12
Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 12
 
Classification of weis new
Classification of weis newClassification of weis new
Classification of weis new
 
Well Hydraulics (Lecture 1)
Well Hydraulics (Lecture 1)Well Hydraulics (Lecture 1)
Well Hydraulics (Lecture 1)
 
Streamflow-measurement.ppt
Streamflow-measurement.pptStreamflow-measurement.ppt
Streamflow-measurement.ppt
 

Viewers also liked

Characteristics of sharp weirs and the hydraulic jump
Characteristics of sharp weirs and the hydraulic jumpCharacteristics of sharp weirs and the hydraulic jump
Characteristics of sharp weirs and the hydraulic jump
Dickens Mimisa
 
Introduction with weirs flumes and orifices
Introduction with weirs flumes and orificesIntroduction with weirs flumes and orifices
Introduction with weirs flumes and orifices
AKHIL BHARTI
 
Cu06997 lecture 11_hydraulic_structures
Cu06997 lecture 11_hydraulic_structuresCu06997 lecture 11_hydraulic_structures
Cu06997 lecture 11_hydraulic_structures
Henk Massink
 
Assessment of the preference of smallholders' farmers on the adoption of soil...
Assessment of the preference of smallholders' farmers on the adoption of soil...Assessment of the preference of smallholders' farmers on the adoption of soil...
Assessment of the preference of smallholders' farmers on the adoption of soil...
Mziray14
 
Drip irrigation............
Drip irrigation............Drip irrigation............
Drip irrigation............
Bhupesh Katriya
 

Viewers also liked (20)

Weirs
WeirsWeirs
Weirs
 
open channel flow
open channel flowopen channel flow
open channel flow
 
Characteristics of sharp weirs and the hydraulic jump
Characteristics of sharp weirs and the hydraulic jumpCharacteristics of sharp weirs and the hydraulic jump
Characteristics of sharp weirs and the hydraulic jump
 
Introduction with weirs flumes and orifices
Introduction with weirs flumes and orificesIntroduction with weirs flumes and orifices
Introduction with weirs flumes and orifices
 
weirs
weirsweirs
weirs
 
Cu06997 lecture 11_hydraulic_structures
Cu06997 lecture 11_hydraulic_structuresCu06997 lecture 11_hydraulic_structures
Cu06997 lecture 11_hydraulic_structures
 
Notches and weir
Notches and weirNotches and weir
Notches and weir
 
"Hybrid" KT & Project Planning GUIDE
"Hybrid" KT & Project Planning GUIDE"Hybrid" KT & Project Planning GUIDE
"Hybrid" KT & Project Planning GUIDE
 
Smart tunnel
Smart  tunnelSmart  tunnel
Smart tunnel
 
Assessment of the preference of smallholders' farmers on the adoption of soil...
Assessment of the preference of smallholders' farmers on the adoption of soil...Assessment of the preference of smallholders' farmers on the adoption of soil...
Assessment of the preference of smallholders' farmers on the adoption of soil...
 
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
 
Modern methods of irrigation
Modern methods of irrigationModern methods of irrigation
Modern methods of irrigation
 
Sprinkler irrigation kvg
Sprinkler irrigation kvgSprinkler irrigation kvg
Sprinkler irrigation kvg
 
Sprinkler irrigation system
Sprinkler irrigation systemSprinkler irrigation system
Sprinkler irrigation system
 
Flow measurement
Flow measurementFlow measurement
Flow measurement
 
Stormwater management presentation slides
Stormwater management presentation slidesStormwater management presentation slides
Stormwater management presentation slides
 
Drip irrigation
Drip irrigationDrip irrigation
Drip irrigation
 
Chap1 open channel flow
Chap1 open channel flowChap1 open channel flow
Chap1 open channel flow
 
Open Channel Flow
Open Channel FlowOpen Channel Flow
Open Channel Flow
 
Drip irrigation............
Drip irrigation............Drip irrigation............
Drip irrigation............
 

Similar to Hydraulics of structures

Ce 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwaysCe 3205-lecture-08-spillways
Ce 3205-lecture-08-spillways
saibabu48
 

Similar to Hydraulics of structures (20)

Notches and weir
Notches and weirNotches and weir
Notches and weir
 
Presentation on notches and weirs
Presentation on notches and weirsPresentation on notches and weirs
Presentation on notches and weirs
 
0 open channel intro 5
0 open channel   intro 50 open channel   intro 5
0 open channel intro 5
 
Flow of incompressible fluids through pipes
Flow of incompressible fluids through pipes Flow of incompressible fluids through pipes
Flow of incompressible fluids through pipes
 
FluidMech_2014_5.ppt
FluidMech_2014_5.pptFluidMech_2014_5.ppt
FluidMech_2014_5.ppt
 
Fluidmnhggffhyrfytftydtdtdtre65Mech_2014_5 (2).ppt
Fluidmnhggffhyrfytftydtdtdtre65Mech_2014_5 (2).pptFluidmnhggffhyrfytftydtdtdtre65Mech_2014_5 (2).ppt
Fluidmnhggffhyrfytftydtdtdtre65Mech_2014_5 (2).ppt
 
lecture-2.pdf
lecture-2.pdflecture-2.pdf
lecture-2.pdf
 
Basic equation of fluid flow mechan.pptx
Basic equation of fluid flow mechan.pptxBasic equation of fluid flow mechan.pptx
Basic equation of fluid flow mechan.pptx
 
6. Flow Through uc Channels (CE).pdf
6. Flow Through uc Channels (CE).pdf6. Flow Through uc Channels (CE).pdf
6. Flow Through uc Channels (CE).pdf
 
Ce 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwaysCe 3205-lecture-08-spillways
Ce 3205-lecture-08-spillways
 
Flow through pipes ppt
Flow through pipes pptFlow through pipes ppt
Flow through pipes ppt
 
Flow In Pipes
Flow In PipesFlow In Pipes
Flow In Pipes
 
notch and its types
 notch and its types notch and its types
notch and its types
 
Culvertdesign
CulvertdesignCulvertdesign
Culvertdesign
 
Friction in noncircular conduits of fluid.pptx
Friction in noncircular conduits of fluid.pptxFriction in noncircular conduits of fluid.pptx
Friction in noncircular conduits of fluid.pptx
 
Pipe sizing
Pipe sizingPipe sizing
Pipe sizing
 
Flow through pipes
Flow through pipesFlow through pipes
Flow through pipes
 
S3 Minor Losses Presentation
S3 Minor Losses PresentationS3 Minor Losses Presentation
S3 Minor Losses Presentation
 
Closed conduct flow
Closed conduct flowClosed conduct flow
Closed conduct flow
 
Closed conduct flow
Closed conduct flowClosed conduct flow
Closed conduct flow
 

More from Zagazig University

[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
Zagazig University
 
(صفحه مهندس تنفيذى) استلام اعمال التنفيذ
(صفحه مهندس تنفيذى) استلام اعمال التنفيذ(صفحه مهندس تنفيذى) استلام اعمال التنفيذ
(صفحه مهندس تنفيذى) استلام اعمال التنفيذ
Zagazig University
 

More from Zagazig University (15)

حرب المعلومات
حرب المعلوماتحرب المعلومات
حرب المعلومات
 
دعاء للأبناء
دعاء للأبناءدعاء للأبناء
دعاء للأبناء
 
للتخلص من العيون
للتخلص من العيونللتخلص من العيون
للتخلص من العيون
 
أدعية تيسير الزّواج والتّعجيل فيه
أدعية تيسير الزّواج والتّعجيل فيهأدعية تيسير الزّواج والتّعجيل فيه
أدعية تيسير الزّواج والتّعجيل فيه
 
اللهم ﻳﺎﻗﺎﺻﻢ ﺍﻟﺠﺒﺎﺑﺮﺓ ﻭﻛﺎﺳﺮ ﺍﻷﻛﺎﺳﺮﺓ
اللهم ﻳﺎﻗﺎﺻﻢ ﺍﻟﺠﺒﺎﺑﺮﺓ ﻭﻛﺎﺳﺮ ﺍﻷﻛﺎﺳﺮﺓاللهم ﻳﺎﻗﺎﺻﻢ ﺍﻟﺠﺒﺎﺑﺮﺓ ﻭﻛﺎﺳﺮ ﺍﻷﻛﺎﺳﺮﺓ
اللهم ﻳﺎﻗﺎﺻﻢ ﺍﻟﺠﺒﺎﺑﺮﺓ ﻭﻛﺎﺳﺮ ﺍﻷﻛﺎﺳﺮﺓ
 
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
 
(صفحه مهندس تنفيذى) استلام اعمال التنفيذ
(صفحه مهندس تنفيذى) استلام اعمال التنفيذ(صفحه مهندس تنفيذى) استلام اعمال التنفيذ
(صفحه مهندس تنفيذى) استلام اعمال التنفيذ
 
Art 3 a10.1007-2fs11269-013-0407-z
Art 3 a10.1007-2fs11269-013-0407-zArt 3 a10.1007-2fs11269-013-0407-z
Art 3 a10.1007-2fs11269-013-0407-z
 
1 purpose definitions
1 purpose definitions1 purpose definitions
1 purpose definitions
 
2 hydrology overview_quantities
2 hydrology overview_quantities2 hydrology overview_quantities
2 hydrology overview_quantities
 
21637 محاضرة (8)calibration
21637 محاضرة (8)calibration21637 محاضرة (8)calibration
21637 محاضرة (8)calibration
 
8 calibration
8 calibration8 calibration
8 calibration
 
7 routing
7 routing7 routing
7 routing
 
2 hydrology overview_quantities
2 hydrology overview_quantities2 hydrology overview_quantities
2 hydrology overview_quantities
 
2012 pe review__hyd_
2012 pe review__hyd_2012 pe review__hyd_
2012 pe review__hyd_
 

Recently uploaded

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 

Hydraulics of structures

  • 2. What are structures?  Structures in this context are simply something placed in the channel to either measure or control flow.  Example: A principle spillway is used as part of a dam design to control the rate at which water is discharged from a reservoir.  Include both inlet and outlet control devices.  Control devices can operate as :  Open channel flow in which the flow has a free surface or  Pipe flow in which the flow is in a closed conduit under pressure.
  • 3. Most basic principle of hydraulics of structures: As head on a structure increases, the flow that is discharged through the structure increases.  Figure 5.1 (Haan et al., 1994) shows the head-discharge relationships for several flow control structures.
  • 4. Weirs  At its most basic, just an obstruction placed in a channel that constricts flow as it goes over a crest.  The crest is the edge of the weir over which the water flows.  As the water level (head) over the crest increases, the flow rate increases dramatically.  Two basic types of weirs  sharp crested  broad crested
  • 5. Sharp Crested Weirs  A sharp crested weir is defined by a thin crest over which the water springs free as it leaves the upstream face of the weir.  Flow over a weir is also called the nappe.  Sharp crested weirs are generally constructed of sheet metal or similar thin material.
  • 7. Sharp Crested Weirs  Can have several shapes  Triangular (or v-notch)  Rectangular  Trapezoidal  Classified by the shape of its notch.  V-notch weirs have greater control under low flow conditions.  Rectangular weirs have larger capacity but are less sensitive for flow measurement.
  • 8. Sharp Crested Weirs-General v 2 2 1 g H h dh Using Bernoulli’s equation v 2 2 2 2 1 + + = + + - (H z h) v 22 (H z) v 2g 2g z g
  • 9.  Making the assumption that the velocity head at the upstream point will be much smaller than the velocity head as the flow goes over the weir we assume v2/2g is negligible and: 1 v 2gh 2 = H Crest dh L dQ v Ldh 2 = or dQ = 2ghLdh h
  • 10. Integrating this from h = 0 to h = H gives 2 3 = Q L 2g h 2 L gH = ò = 0 1 2 2 3 h H h = Multiplying by a loss term to compensate for the deviation from ideal flow we get: 2 3 Q = C 2 d L 2gH 3
  • 11. Rectangular Weirs A rectangular weir that spans the full width of the channel is known as a suppressed weir. 2 Q = CLH3 H L H Coefficient of Discharge
  • 12.  Hydraulic head (H) for weirs is simply the height of the water surface above the weir crest, measured at a point upstream so that the influence of the velocity head can be ignored.  L is the length of the weir.  The coefficient of discharge (C) is dependent upon units and of the weir shape.  For a suppressed weir with H/h < 0.4 (where h is the height of the weir) C= 3.33 can be used.  For 0.4 < H/h < 10, C = 3.27 + 0.4 H/h
  • 13. A rectangular weir that does not span the whole channel is called a weir with end contractions . The effective length of the weir will be less than the actual weir length due to contraction of the flow jet caused by the sidewalls. L’ L = L'-0.1NH Where N is the number of contractions and L’ is the measured length of the crest.
  • 14. Triangular (v-notch ) weirs  Used to measure flow in low flow conditions. Q H Q = K tan q H2.5 2
  • 15.  For Q = 90°, K = 2.5 (typically), tan (Q/2) = 1 therefore, 2 Q = 2.5H5 For other angles 2g K C 8 d = 15 Where Cd is based on the angle, Q, and head, H.
  • 16.  Note: Your handout with Figure 12.28 presents the equation for a v-notch weir as: 2 Q = KH5 with = q 2 2g tan K C 8 d 15
  • 17. Broad Crested Weirs H W Q = 3.09LH1.5 Where L is the width of the weir.
  • 18. Broad Crested Weirs  Broad crested weirs support the flow in the longitudinal direction (direction of flow).  They are used where sharp-crested weirs may have maintenance problems.  The nappe of a broad crested weir does not spring free.
  • 19. Roadway Overtopping ( ) 3 2 o d r Q = C L HW Where Qo – overtopping flowrate Cd - overtopping discharge coefficient L – length of roadway crest HWr – upstream depth Cd = ktCr Cr – discharge coefficient kt – submergence factor Figure 5.7
  • 20. Orifices  An orifice is simply an opening through which flow occurs.  They can be used to:  Control flow as in a drop inlet  Measure the flow through a pipe.
  • 21.  The discharge equation for orifice flow is: 2 Q = C'A(2gH) 1 Where: C’ is the orifice coefficient (0.6 for sharp edges, 0.98 for rounded edges). A is the cross-sectional area of the orifice in ft2 g is the gravitational constant H is the head on the orifice
  • 22.  At low heads, orifices can act as weirs.  Calculate the discharge using the suppressed weir equation where L is equal to the circumference of the pipe.  Calculate the discharge using the orifice equation.  The lower discharge will be the actual discharge.
  • 23. Pipes as Flow Control Devices 0.6D D H’ H K v 2 2g e e = H K v 2 2g b b = H K L v 2 2g c c = v2 2g H Energy Grade Line Elbow and Transition L H'= v + + + e b c 2 H H H 2g
  • 24. 2 H' v e b c (1 K K K L) 2g = + + + 2 1 2 1 v (2gH') + + + (1 K K K L) e b c = 2 1 2 1 Q a(2gH') + + + (1 K K K L) e b c =
  • 25. Head Loss Coefficients  Ke is the entrance head loss coefficient and is typically given a value of 1.0 for circular inlets.  Kb is the bend head loss coefficient and is typically given a value of 0.5 for circular risers connected to round conduits.  For risers with rectangular inlets, the bend head losses and entrance head losses are typically combined to a term Ke’ where values of Ke’ can be found in Table 5.3 and : 2 1 Q a(2gH') + + e c 2 1 (1 K ' K L) =
  • 26. Head Loss Coefficients  Kc is the head loss coefficient due to friction.  Values for Kc are given in Tables 5.1 and 5.2 for circular and square pipes.  Kc is multiplied by L, the entire length of the pipe, including the riser.
  • 27.  Frequently, when the drop inlet is the same size as the remainder of the pipe, orifice flow will control and the pipe will never flow full.  If it is desirable to have the pipe flowing full, it may be necessary to increase the size of the drop inlet.
  • 28. Using Flow Control Structures as Spillways  A given drop inlet spillway can have a variety of discharge relationships, given the head.  At the lowest stages the riser acts as a weir.  As the level of the reservoir rises, water flowing in from all sides of the inlet interferes so that the inlet begins to act as an orifice.  As the level continues to rise, the outlet eventually begins to flow full and pipe flow prevails.  A stage-discharge curve is developed by plotting Q vs. H for each of the three relationships. The minimum flow for a given head is the actual discharge used.
  • 29. Rockfill Outlets as Controls ROCKFILL have h1 dh h2 dl HYDRAULIC PROFILE
  • 30. Rockfill Outlets  Advantages  Abundant  Generally available  Usually inexpensive  Relative permanence
  • 31. Rockfill Outlets  Major expenses  Grading  Transporting  Placing stone
  • 32. Rockfill Outlets  Used for  Protective channel linings and breakwaters  Add stability to dams  Provide energy dissipation zones for reservoir outlets  Flow control structure
  • 33. Modified Darcy-Weisbach Equation V g 1 x d f dh dl k 2 2 =
  • 34. Rockfill as Control Structure Model Reynolds Number Equation ( ) nx R = d - s V e Friction factor dh dl x 2 = f gd k 2 V
  • 35. Friction Factor-Reynolds Number Relationship = 1600 +3.83 k R e f
  • 36. h2 – have Relationships h1 = h2 + dh h h1 h2 ave = + 2