Time Series Modelling of Pulp
                                               Objectives and Overview
Prices

          Mônica Barros                         To analyze quarterly (and monthly) data
                                                on pulp prices.
      Reinaldo Castro Souza                     Pulp prices: highly volatile series - large
                                                drops in prices have occurred on the past
            DEE, PUC-RIO                        years.
                                                On recent years, pulp prices had suffered
             August 1997
                                                from an erratic behavior, which can be
                                                related to global demand for paper and the
                                                level of inventories.

               info@mbarros.com            1                   info@mbarros.com              2




We present 2 distinct                          Characteristics of Pulp Market
approaches to the problem:                     and Industry
 1- Dynamic regression model to forecast        Capital intensive
 pulp prices and,
                                                International (over 80 % of Bleached Kraft
 2- Simulation approach based on returns        Pulp is exported from country of
                                                production and there are about 30
 calculated from pulp prices.                   producing countries)

                                                Scattered production - even the largest
                                                supplier cannot control prices (has less
                                                than 6 % of global market share)

               info@mbarros.com            3                   info@mbarros.com              4
Characteristics of Pulp Market                    Characteristics of Pulp Market
and Industry                                      and Industry
 Highly Integrated - most companies are            New pulp plants under construction in
 both pulp and paper producers.                    Asia and Latin America.
                                                   Supply tends to increase substantially for
 Pulp Price increases are not necessarily a        the next 5 years.
 major problem for paper producers, since
 they also increase their prices.                  Pulp prices directly affect profitability of
                                                   paper mills.
 However, there is some upper bound for            Thus, pulp and paper prices tend to move
 paper prices - above a certain level              in the same direction.
 demand tends to decrease.

                info@mbarros.com              5                    info@mbarros.com               6




Characteristics of Pulp Market
                                                  The Available Data
and Industry
 Production costs tend to be lower in              Here we deal with quoted prices (in US$) -
 emerging countries, but technological             individual contract prices may vary.
 changes in plants have lowered                    Quoted prices serve as a guideline for
 considerably the costs of production in           contracts (usually an upper bound)
 the USA, Canada and Scandinavian                  NORSCAN (North America + Scandinavian
                                                   Countries) inventories are available on a
 countries, which were historically the
                                                   monthly basis and may serve as an
 largest pulp producers.                           explanatory variable for pulp prices.


                info@mbarros.com              7                    info@mbarros.com               8
The Available Data                                 The Available Data

   Quarterly Prices: available since the 1st        NORSCAN inventories available monthly
   quarter of 1978.                                 since January 1985.
   The price series used refers to constant         To match NORSCAN inventories, we will
   prices (base = December 1996) whose              use price data from January 1985 on.
   values in US dollars were inflated using         The idea of using an artificial monthly
   the Consumer Price Index (CPI) in the            price series is due to the fact that we
   USA.                                             intend to use monthly inventories as a
   Monthly prices are obtained by                   leading indicator of price changes.
   interpolation (via CPI) quarterly prices.

                   info@mbarros.com            9                                    info@mbarros.com                                            10




                                                   NORSCAN Inventories versus
Pulp Prices
                                                   Pulp Prices
                                                    Low prices usually correspond to high
                     Pulp Prices (US$)
                                                    inventories, the converse is also true !!!
1100.00
1000.00
 900.00                                                                       NORS CAN Inv e nto rie s v e rs us Pric e
 800.00                                               2500
                                                      2300
 700.00
                                                      2100
 600.00                                               1900
                                                      1700
 500.00                                               1500
 400.00                                               1300
                                                      1100
 300.00                                                900
                                                       700
                                                       500
                                                         300.00   400.00   500.00    600.00   700.00     800.00    900.00   1000.00   1100.00
                                                                                               p ric e
Basic Dynamic Regression
Dynamic Regression Models
                                                                             Model
 1- Basic Model Structure                                                     All variables are significant, no further
   pricet = b0 + b1.(trendt) + b2.(invt-1) + b3.(pricet-1)                    lags of Y or inv are necessary, residuals
   + b4.(pricet-3) + et                                                       do not show serial correlation BUT:
 where :                                                                      The model is unable to identify radical
   pricet = pulp price at time t                                              price changes!
   trendt = linear trend                                                      The usefulness of the model is restricted
   invt-1 = NORSCAN inventory at time t-1                                     to “normal” periods, that is, whenever
   et = error term                                                            substantial price increases or drops do
                                                                              not occur.

                        info@mbarros.com                                13                    info@mbarros.com            14




Basic Dynamic Regression                                                     Basic Dynamic Regression
Model                                                                        Model
 For example, the 6 months ahead                                              All forecasts seem reasonable and real
 forecasts obtained by fitting the model                                      values fall within the confidence limits.
 until June 1995 are:
                                                                              A totally different situation occurs when
   P eriod
   1995.07
             L ower 2.5 %
                  897
                               F orecast
                                   965
                                           U p per 97.5 %
                                                1033
                                                            R eal V alue
                                                                  969
                                                                              we consider 6 months ahead forecasts
   1995.08       856.             939           1022              927         produced by the model fitted until
   1995.09        845             933           1022              924
                                                                              December 1995, as shown next:
   1995.10        833             928           1023             1005
   1995.11        787             887            987              956
   1995.12        725             828            931             910




                                                                                              info@mbarros.com            16
Basic Dynamic Regression                                                                 Basic Dynamic Regression
Model                                                                                    Model
 The 6 months ahead forecasts obtained by                                                 Now the forecasts generated by the model
 fitting the model until December 1995 are:                                               are clearly inappropriate, since the model
                                                                                          fails to capture the substantial price fall
  P erio d       L o w er 2 .5    F o reca st   U p p er 9 7 .5   R ea l V a lu e         occurring on the second quarter of 1996.
                      %                               %
  1 9 9 6 -0 1         786             854             922                638
  1 9 9 6 -0 2         704             787             870                634
  1 9 9 6 -0 3         623             712             802                632
  1 9 9 6 -0 4         543             639             734                433
  1 9 9 6 -0 5         504             605             706                431
  1 9 9 6 -0 6         506             611             716                430



                                                                                                          info@mbarros.com             18




What to do then ?????                                                                    What to do then ?????

 Inventories seem to be a reasonable                                                      Moreover, the inventory series is more
 leading indicator for prices.                                                            “predictable” than the price series, so
                                                                                          more accurate and reasonable forecasts
 Also, NORSCAN inventories are available                                                  can be generated for NORSCAN
 monthly, and this might give us an idea,                                                 inventories.
 within one quarter, of the price
 movements on the next quarter.                                                           The important question is: when are the
                                                                                          inventories “atypical”, and can this
                                                                                          information be useful in the prediction of
                                                                                          pulp prices?
                                 info@mbarros.com                                   19                    info@mbarros.com             20
What to do then ?????                        Dummy Variable Creation

 To access whether inventory levels are       The Moving Averages computed with 6
 “typical” or not we compare observed         and 12 months of data are much
 NORSCAN inventories with forecasts           “smoother” estimators of inventories
 generated by Moving Averages (MA) using      than 2 and 3 months moving averages.
 2, 3, 6 and 12 months.
                                              We would expect forecasting errors to be
 The discrepancies between each MA            large when using the moving averages
 prediction and the actual inventory is       with 6 and 12 points as predictors.
 measured, and we define dummy variables
 for the corresponding periods.
               info@mbarros.com         21                    info@mbarros.com              22




Dummy Variable Creation                      Dummy Variable Creation

 The dummy variables constructed from         Why use Moving Averages to construct the
                                              dummies?
 the forecasting errors of the moving
 average models indicate whether
                                              The basic answer is: simplicity! The
 inventories are within “reasonable”          procedure can be easily implemented in a
 bounds.                                      worksheet without any knowledge of Time
                                              Series methods.

                                              Any other automatic method would also
                                              work, but the client would need access to a
                                              statistical software.

               info@mbarros.com         23                    info@mbarros.com              24
Dummy Variable Creation                        Dummy Variable Creation

 Define the percent discrepancy between         where MAt denotes the moving average
 the observed NORSCAN inventory at time         prediction for the inventory at time t and
 t and its moving average prediction as:        invt is the real value of NORSCAN
                                                inventory at t.

         DIFt = 100.
                       ( MAt − invt )
                                                If DIFt > 0, inventories were overestimated
                           MAt
                                                by the moving averages, otherwise they
                                                were underestimated.


                                                                info@mbarros.com             26




Dummy Variable Creation                        Dummy Variable Creation

 We next compute the DIF variables based        Percentage errors (in absolute value) tend
 on 2, 3 , 6 and 12 months Moving               are larger when we estimate inventories
 Averages in the period January/1986 to         using the “smoother” estimators (6 and 12
 February/1997 and look at their descriptive    months moving averages).
 statistics. We observe that:
                                                For example, the largest ( in absolute value)
                                                forecast error is -64.1%, indicating that the
                                                inventory was severely underestimated by a
                                                moving average with 12 points.


                 info@mbarros.com         27                    info@mbarros.com             28
Dummy Variable Creation                           Dummy Variable Creation

 Negative errors tend to be larger (in             The 25% percentile for all forecast error series
 absolute value) than positive errors.             (except that generated from the 12 point
                                                   moving average) is around -9.

 Thus, moving averages estimators tend to          The 75% percentile for all error series is larger
 grossly underestimate inventories.                than 7.


 The moving average estimators are very            We propose the use of the percentiles of the
                                                   forecast error distributions as bounds used to
 bad when inventory level rises.                   indicate whether the inventory level at a given
                                                   month is “atypical”.

                info@mbarros.com             29                             info@mbarros.com                      30




Dummy Variable Creation                           Dummy Variable Creation

 Let DIFMM2, DIFMM3, DIFMM6, DIFMM12
 denote, respectively, the forecast errors          Percentile     DIFMM2       DIFMM3         DIFMM6   DIFMM12

 generated by predictions based on 2, 3, 6             10 %
                                                       20 %
                                                                    -14.3
                                                                    -11.4
                                                                                  -14.8
                                                                                  -10.8
                                                                                                -21.4
                                                                                                -11.5
                                                                                                         -34.4
                                                                                                         -16.3
 and 12 months moving averages.                        30 %         -6.3          -6.9          -7.4      -9.0
                                                       40 %         -3.7          -3.4          -3.0      -3.9
                                                   50 % (median)    -0.95         +0.25         +0.40    +1.95

 The next table shows the percentiles for              60 %
                                                       70 %
                                                                     2.1
                                                                     4.9
                                                                                   3.3
                                                                                   5.9
                                                                                                 3.6
                                                                                                 7.4
                                                                                                          5.9
                                                                                                          9.8
 the forecast errors based on 2, 3, 6 and 12           80 %          8.7           8.3          11.4      17.1

 months moving averages.                               90 %         13.8          12.2          15.5      22.0




                info@mbarros.com             31
Dummy Variable Creation                                       Dummy Variable Creation

 Based on these values we define as                            An “abnormal” inventory level is detected
 “abnormal” situations those when the                          when :
 forecast error is outside the [p30% , p70%]                     DIFMM2 [ -6, 5] or
 interval.                                                       DIFMM3 [ -7, 6] or
                                                                 DIFMM6 [ -7 , 7] or
 We round these percentiles when creating                        DIFMM12 [ -9, 10]
 the dummy variables, and we obtain the
 following decision rule:


                      info@mbarros.com                   33                     info@mbarros.com       34




                                                              Two Fundamental Questions
Dummy Variable Creation
                                                              Now Arise
 We next create dummy variables based on                       1- Do the dummy variables have any
 this decision rule. The dummies are                           explanatory power over pulp prices?
 constructed as:                                               This can be verified through one way
                                                               ANOVA models using the dummies as
      −1 if DIFM belowthe lower limit of the interval
                 M                                             factors.
     
 I =  0 if DIFM is inside the interval
                 M                                             2- Do we improve forecasts of pulp prices
      1 if DIFM is above the interval's upper limit
                 M                                             when dummies are included in the
     
                                                               dynamic regression model?


                                                                                info@mbarros.com       36
Do Dummies have explanatory                      Regression Model including
power over Pulp Prices ?                         dummies
 We fit one way ANOVA models for Pulp             We add dummy variables constructed
 Prices using the dummies as factors.             from 2 and 12 month MA inventory
 All ANOVA models are significant at 90%          estimators to the basic model.
 level.                                           The new model structure is:
 Thus, different levels of dummies affect         pricet = b0 + b1.(trendt) + b2.(invt-1) +
 pulp prices.                                     b3.(pricet-1) + b4.(pricet-3) + b5.(dummy2t) +
 We next insert dummies into the basic            b6.(dummy12t) + et
 regression model to access whether any
 gains in forecasting are accomplished.

                  info@mbarros.com          37                     info@mbarros.com                38




Regression Model including                       Regression Model including
dummies                                          dummies
 Where dummy2 and dummy12 are                     Dummies based on 3 and 6 months MA
 constructed from the prediction errors           were not included in the model, because
 using 2 and 12 month moving averages to          they’re highly insignificant.
 predict inventories.

 These 2 variables are not “strictly”
 significant, their significance level is
 about 85 %.


                  info@mbarros.com          39                     info@mbarros.com                40
Forecast Comparison                                                                                              Forecast Comparison
 The next table shows the forecasts produced from 2 models, that exclude
 and include dummy variables                                                                                                     A B S O LU T E V ALU E S O F % E R R O R S
                                                                                                                                               m o d e l w it h               m o d e l w it h o u t
                           O N E S T E P AHE AD F O R E C AS T S                                                                                d u m m ie s                     d u m m ie s
                                                                                                                    J a n /9 6                     3 3 .2 3                         3 3 .8 6
               a ctu a l          fo r e c a s t      % error               fo r e c a s t         % error
                                                                                                                    F eb /9 6                       5 .9 9                           3 .6 3
                p r ic e    ( w it h d u m m ie s )                ( w it h o u t d u m m ie s )        %
  J a n /9 6     638                  850             - 3 3 .2 3                854                 - 3 3 .8 6
                                                                                                                    M a r/9 6                       9 .8 1                           7 .9 1
  F eb /9 6      634                  596               5 .9 9                  611                   3 .6 3        A p r /9 6                     2 4 .2 5                         2 1 .7 1
  M a r/9 6      632                  570               9 .8 1                  582                   7 .9 1        M a y/9 6                       0 .0 0                           1 .1 6
  A p r /9 6     433                  538             - 2 4 .2 5                527                 - 2 1 .7 1      J u n /9 6                     1 1 .6 3                         1 1 .1 6
  M a y/9 6      431                  431               0 .0 0                  426                   1 .1 6        J u l/9 6                      1 1 .0 9                         1 2 .2 0
  J u n /9 6     430                  480             - 1 1 .6 3                478                 - 1 1 .1 6      A u g /9 6                      3 .9 0                           2 .7 8
  J u l/9 6      541                  481              1 1 .0 9                 475                  1 2 .2 0       S ep /9 6                       3 .9 0                           4 .2 8
  A u g /9 6     539                  518               3 .9 0                  524                   2 .7 8        O c t/9 6                       1 .8 1                           2 .1 8
  S ep /9 6      538                  517               3 .9 0                  515                   4 .2 8        N o v /9 6                      2 .0 0                           0 .7 3
  O c t/9 6      551                  541               1 .8 1                  539                   2 .1 8
                                                                                                                    D ec/9 6                        4 .7 5                           4 .3 9
  N o v /9 6     549                  538               2 .0 0                  545                   0 .7 3
                                                                                                                    J a n /9 7                      3 .2 0                           5 .0 0
  D ec/9 6       547                  521               4 .7 5                  523                   4 .3 9
                                                                                                                    F eb /9 7                       0 .6 4                           1 .0 6
  J a n /9 7     500                  516              - 3 .2 0                 525                  - 5 .0 0
  F eb /9 7      470                  473              - 0 .6 4                 475                  - 1 .0 6
                                                                                                                    M a r/9 7                       0 .7 9                           1 .4 7
  M a r/9 7      443                  446              - 0 .7 9                 449                  - 1 .4 7       A p r /9 7                      0 .8 8                           2 .8 6
  A p r /9 7     455                  451               0 .8 8                  442                   2 .8 6        M a y/9 7                       2 .0 4                           2 .8 6
  M a y/9 7      490                  480               2 .0 4                  476                   2 .8 6
                                                                                                                                  m ean :           7 .0 5                           7 .0 1
                            m ean % error :            - 1 .6 2                                      - 1 .7 2                     m ax :           3 3 .2 3                         3 3 .8 6
                            m in . % e r r o r :      - 3 3 .2 3                                    - 3 3 .8 6                     m in :           0 .0 0                           0 .7 3
                            m ax. % error :            1 1 .0 9                                      1 2 .2 0




Forecast Comparison                                                                                              Forecast Comparison

                  ABS OLUTE VALUES OF % ERRORS
                  "QUARTERLY" FORECAS TS
                                                                                                                  Some gain was obtained by including the
                                        model with                                    model without               dummies, but it is marginal!!!
                                         dummies                                        dummies
      Jan/96                              33.23                                          33.86
      Apr/96                              24.25                                          21.71
      Jul/96                              11.09                                          12.20                    The comparison of forecasts was done in
      Oct/96                               1.81                                           2.18                    a “worst case” scenario.
      Jan/97                               3.20                                           5.00
      Apr/97                               0.88                                           2.86

                     mean :                  12.41                                            12.97               The price drop from 1996/Q1 to 1996/Q2
                     max :                   33.23                                            33.86
                     min :                   0.88                                             2.18                was roughly 32%.


                                                                                                                                                info@mbarros.com                                       44
Forecast Comparison                                   Forecasts until December 1997

 One should attempt to include other                   Basic scenario uses automatic forecasts
 explanatory variables, but there aren’t               for NORSCAN inventories.
 many available candidates!
                                                       These projections correspond to dummies
 Shipment/Inventory ratio is one of the                with value 0 until the end of 1997.
 candidates, but shipments series is short
 (since 1994).




                     info@mbarros.com            45                   info@mbarros.com           46




                                                      Alternative Approach:
Forecasts until December 1997
                                                      Simulation
                                                       We now adopt a totally different approach.
           m with
            odel     m without
                      odel           m with
                                       odel
           dum ies
               m       dum ies
                           m          dum ies
                                          m
                                    +ARCHerror
  Jun/97     495         492            497            We will work with returns constructed
  Jul/97     514         507            518            from quarterly prices, and attempt to
  Aug/97     510         504            513
  Sep/97     498         493            501
                                                       model and forecast these returns.
  Oct/97     511         504            515
  Nov/97     512         504            515
  Dec/97     499         493            502




                                                                      info@mbarros.com           48
Alternative Approach:                            We propose the following
Simulation                                       model for the returns:
 Let Pt and Pt-1 denote pulp prices on                     P 
                                                  yt = log t  = µt + σ t Zt where Zt are iid N(0,1)
 quarters t and t-1.                                       Pt −1 
 The geometric returns are defined as:            where both µt and σt2 are time varying
                                                  according to the equations:
               P 
    y t = log  t 
               Pt − 1                             µ t = (1 − λ 1 ). y t + λ 1 . µ t − 1
                                                        and
 Where log denotes the natural logarithm.
                                                    σ   2
                                                        t   = (1 − λ 2 ). y t2 + λ 2 . σ   2
                                                                                           t −1




Rationale behind this structure                  Drawbacks

 Both µt and σt2 are time varying, and their      Choice of smoothing constants λ1 and λ2
 updating equations are easy to implement.        If we perform a grid search we find out
 The equation for σt2 resembles that of an        that the mimimum mean squared error
 integrated GARCH model.                          constants are obtained when λ1 and λ2
 If the lambdas are large ( > 0.7 or 0.8),        tend to zero.
 information decay is slow;                       This is due to the fact that we are
 Otherwise, the latest observations will          attempting to optimize both constants for
 have a large weight, and the memory is           the whole sample !
 short.

                      info@mbarros.com      51                              info@mbarros.com            52
Drawbacks                                           Implementation

 We need to make an arbitrary choice.                One step ahead prediction (corresponding
 Intuitively, the smoothing constant for σt2         to 1997/Q3 can be easily obtained by
 should be larger than that of µt .                  simulating a large Normal sample and
                                                     applying the last estimated values for µt
                                                     and σt2 .
                                                     Besides the point estimates of pulp prices,
                                                     we can use additional information from
                                                     the generated probability distribution, that
                                                     can lead, for example, to Value at Risk
                                                     (VaR) estimates.
                 info@mbarros.com              53                    info@mbarros.com           54




Implementation                                      Example

 k step ahead forecast could be obtained in          We next show the result of one
 an analogous fashion, by incorporating at           implementation where:
 each step the last prediction, re-estimating        the smoothing constants are λ1 = 0.5 and
 µt and σt2 by the same procedure and                λ2 = 0.7,
 generating another sample of iid Normal             the last observed price is US$ 490 (2nd
 variables.                                          quarter 1997),
                                                     5000 iid Normal variables are generated.



                 info@mbarros.com              55                    info@mbarros.com           56
Example   Example




Example   Example

           The last estimates of µt and σt are,
           respectively, 1.01% and 22.27%
           The simulated price distribution is:
              D i s t ri b u t i o n o f P re d i c t e d P ri c e s
              3 rd Q u a rt e r 1 9 9 7

                  m e a n :               5 0 7
               m in im u m :              2 3 7
               m a x im u m :            1 1 9 0
                s td . d e v . :          1 1 5

               p e rc e n tile s         v a   lu e
                     5 %                   3   4 2
                    1 0 %                  3   7 3
                    2 5 %                  4   2 4
                    5 0 %                  4   9 4
                    7 5 %                  5   7 7
                    9 0 %                  6   5 6
                    9 5 %                  7   1 4
Comparison of Estimates                       Conclusion

 For comparison, the estimated values for      The alternative approach is completely
 Prices in July 1997 are:                      heuristic, but may serve as an
   model with dummies : 514                    approximation when the true data
   model without dummies : 507                 generating process is hard to identify, or
   model with dummies and ARCH errors : 518    when dynamic regression models do not
   median of simulated prices : 494            seem to provide a completely satisfactory
   mean of simulated prices : 507              answer.




                                                              info@mbarros.com          62

More Related Content

Viewers also liked

NeoNet - Introductie organizational fitness
NeoNet - Introductie organizational fitnessNeoNet - Introductie organizational fitness
NeoNet - Introductie organizational fitness
NeoNet
 
NeoNet - Introductie portfolio management
NeoNet - Introductie portfolio managementNeoNet - Introductie portfolio management
NeoNet - Introductie portfolio management
NeoNet
 
Rm overview
Rm overviewRm overview
Rm overview
Fulcrum
 

Viewers also liked (19)

Reigning in the Data (FOSSCON 2014) - Ephemeral Messaging and Privacy In Post...
Reigning in the Data (FOSSCON 2014) - Ephemeral Messaging and Privacy In Post...Reigning in the Data (FOSSCON 2014) - Ephemeral Messaging and Privacy In Post...
Reigning in the Data (FOSSCON 2014) - Ephemeral Messaging and Privacy In Post...
 
Leadership Styles
Leadership StylesLeadership Styles
Leadership Styles
 
Barros monica isf2012
Barros monica isf2012Barros monica isf2012
Barros monica isf2012
 
NeoNet - Introductie organizational fitness
NeoNet - Introductie organizational fitnessNeoNet - Introductie organizational fitness
NeoNet - Introductie organizational fitness
 
Icord 2007
Icord 2007Icord 2007
Icord 2007
 
NeoNet - Introductie portfolio management
NeoNet - Introductie portfolio managementNeoNet - Introductie portfolio management
NeoNet - Introductie portfolio management
 
Reining in the Data ITAG tech360 Penn State Great Valley 2015
Reining in the Data   ITAG tech360 Penn State Great Valley 2015 Reining in the Data   ITAG tech360 Penn State Great Valley 2015
Reining in the Data ITAG tech360 Penn State Great Valley 2015
 
Southeast load
Southeast loadSoutheast load
Southeast load
 
Rm overview
Rm overviewRm overview
Rm overview
 
Reinvent Yourself - Preso for Walnut St Labs SUMY 19-Aug-2014
Reinvent Yourself - Preso for Walnut St Labs SUMY 19-Aug-2014Reinvent Yourself - Preso for Walnut St Labs SUMY 19-Aug-2014
Reinvent Yourself - Preso for Walnut St Labs SUMY 19-Aug-2014
 
Barros Monica Isf2012
Barros Monica Isf2012Barros Monica Isf2012
Barros Monica Isf2012
 
Mobile Security for the Modern Tech Mogul
Mobile Security for the Modern Tech MogulMobile Security for the Modern Tech Mogul
Mobile Security for the Modern Tech Mogul
 
Residential%20 Electrical%20 Energy%20 Consumption%20 Profile%20in%20 Brazil
Residential%20 Electrical%20 Energy%20 Consumption%20 Profile%20in%20 BrazilResidential%20 Electrical%20 Energy%20 Consumption%20 Profile%20in%20 Brazil
Residential%20 Electrical%20 Energy%20 Consumption%20 Profile%20in%20 Brazil
 
Devops With Boxfuse and Shippable
Devops With Boxfuse and ShippableDevops With Boxfuse and Shippable
Devops With Boxfuse and Shippable
 
JJR Marketing Presentation
JJR Marketing PresentationJJR Marketing Presentation
JJR Marketing Presentation
 
Ecomod 2007
Ecomod 2007Ecomod 2007
Ecomod 2007
 
Work Place Motivation
Work Place MotivationWork Place Motivation
Work Place Motivation
 
Time series and forecasting from wikipedia
Time series and forecasting from wikipediaTime series and forecasting from wikipedia
Time series and forecasting from wikipedia
 
Leadership Styles
Leadership StylesLeadership Styles
Leadership Styles
 

More from Monica Barros (7)

Monica Barros - Econometria - ENCE 2010 - Resumo Capítulo 9 Gujarati
Monica Barros - Econometria - ENCE 2010 - Resumo Capítulo 9 GujaratiMonica Barros - Econometria - ENCE 2010 - Resumo Capítulo 9 Gujarati
Monica Barros - Econometria - ENCE 2010 - Resumo Capítulo 9 Gujarati
 
Capitulo 8 gujarati resumo
Capitulo 8 gujarati resumoCapitulo 8 gujarati resumo
Capitulo 8 gujarati resumo
 
Monica Barros - Econometria - ENCE - 2010 - Resumo Capitulo 7 Gujarati
Monica Barros - Econometria - ENCE - 2010 - Resumo Capitulo 7 GujaratiMonica Barros - Econometria - ENCE - 2010 - Resumo Capitulo 7 Gujarati
Monica Barros - Econometria - ENCE - 2010 - Resumo Capitulo 7 Gujarati
 
Introdução à programação em R
Introdução à programação em RIntrodução à programação em R
Introdução à programação em R
 
V30n3a02
V30n3a02V30n3a02
V30n3a02
 
V29n2a04 Artigo Revista Sobrapo
V29n2a04 Artigo Revista SobrapoV29n2a04 Artigo Revista Sobrapo
V29n2a04 Artigo Revista Sobrapo
 
Modelagem Revistas
Modelagem RevistasModelagem Revistas
Modelagem Revistas
 

Pulp And Paper Isf

  • 1. Time Series Modelling of Pulp Objectives and Overview Prices Mônica Barros To analyze quarterly (and monthly) data on pulp prices. Reinaldo Castro Souza Pulp prices: highly volatile series - large drops in prices have occurred on the past DEE, PUC-RIO years. On recent years, pulp prices had suffered August 1997 from an erratic behavior, which can be related to global demand for paper and the level of inventories. info@mbarros.com 1 info@mbarros.com 2 We present 2 distinct Characteristics of Pulp Market approaches to the problem: and Industry 1- Dynamic regression model to forecast Capital intensive pulp prices and, International (over 80 % of Bleached Kraft 2- Simulation approach based on returns Pulp is exported from country of production and there are about 30 calculated from pulp prices. producing countries) Scattered production - even the largest supplier cannot control prices (has less than 6 % of global market share) info@mbarros.com 3 info@mbarros.com 4
  • 2. Characteristics of Pulp Market Characteristics of Pulp Market and Industry and Industry Highly Integrated - most companies are New pulp plants under construction in both pulp and paper producers. Asia and Latin America. Supply tends to increase substantially for Pulp Price increases are not necessarily a the next 5 years. major problem for paper producers, since they also increase their prices. Pulp prices directly affect profitability of paper mills. However, there is some upper bound for Thus, pulp and paper prices tend to move paper prices - above a certain level in the same direction. demand tends to decrease. info@mbarros.com 5 info@mbarros.com 6 Characteristics of Pulp Market The Available Data and Industry Production costs tend to be lower in Here we deal with quoted prices (in US$) - emerging countries, but technological individual contract prices may vary. changes in plants have lowered Quoted prices serve as a guideline for considerably the costs of production in contracts (usually an upper bound) the USA, Canada and Scandinavian NORSCAN (North America + Scandinavian Countries) inventories are available on a countries, which were historically the monthly basis and may serve as an largest pulp producers. explanatory variable for pulp prices. info@mbarros.com 7 info@mbarros.com 8
  • 3. The Available Data The Available Data Quarterly Prices: available since the 1st NORSCAN inventories available monthly quarter of 1978. since January 1985. The price series used refers to constant To match NORSCAN inventories, we will prices (base = December 1996) whose use price data from January 1985 on. values in US dollars were inflated using The idea of using an artificial monthly the Consumer Price Index (CPI) in the price series is due to the fact that we USA. intend to use monthly inventories as a Monthly prices are obtained by leading indicator of price changes. interpolation (via CPI) quarterly prices. info@mbarros.com 9 info@mbarros.com 10 NORSCAN Inventories versus Pulp Prices Pulp Prices Low prices usually correspond to high Pulp Prices (US$) inventories, the converse is also true !!! 1100.00 1000.00 900.00 NORS CAN Inv e nto rie s v e rs us Pric e 800.00 2500 2300 700.00 2100 600.00 1900 1700 500.00 1500 400.00 1300 1100 300.00 900 700 500 300.00 400.00 500.00 600.00 700.00 800.00 900.00 1000.00 1100.00 p ric e
  • 4. Basic Dynamic Regression Dynamic Regression Models Model 1- Basic Model Structure All variables are significant, no further pricet = b0 + b1.(trendt) + b2.(invt-1) + b3.(pricet-1) lags of Y or inv are necessary, residuals + b4.(pricet-3) + et do not show serial correlation BUT: where : The model is unable to identify radical pricet = pulp price at time t price changes! trendt = linear trend The usefulness of the model is restricted invt-1 = NORSCAN inventory at time t-1 to “normal” periods, that is, whenever et = error term substantial price increases or drops do not occur. info@mbarros.com 13 info@mbarros.com 14 Basic Dynamic Regression Basic Dynamic Regression Model Model For example, the 6 months ahead All forecasts seem reasonable and real forecasts obtained by fitting the model values fall within the confidence limits. until June 1995 are: A totally different situation occurs when P eriod 1995.07 L ower 2.5 % 897 F orecast 965 U p per 97.5 % 1033 R eal V alue 969 we consider 6 months ahead forecasts 1995.08 856. 939 1022 927 produced by the model fitted until 1995.09 845 933 1022 924 December 1995, as shown next: 1995.10 833 928 1023 1005 1995.11 787 887 987 956 1995.12 725 828 931 910 info@mbarros.com 16
  • 5. Basic Dynamic Regression Basic Dynamic Regression Model Model The 6 months ahead forecasts obtained by Now the forecasts generated by the model fitting the model until December 1995 are: are clearly inappropriate, since the model fails to capture the substantial price fall P erio d L o w er 2 .5 F o reca st U p p er 9 7 .5 R ea l V a lu e occurring on the second quarter of 1996. % % 1 9 9 6 -0 1 786 854 922 638 1 9 9 6 -0 2 704 787 870 634 1 9 9 6 -0 3 623 712 802 632 1 9 9 6 -0 4 543 639 734 433 1 9 9 6 -0 5 504 605 706 431 1 9 9 6 -0 6 506 611 716 430 info@mbarros.com 18 What to do then ????? What to do then ????? Inventories seem to be a reasonable Moreover, the inventory series is more leading indicator for prices. “predictable” than the price series, so more accurate and reasonable forecasts Also, NORSCAN inventories are available can be generated for NORSCAN monthly, and this might give us an idea, inventories. within one quarter, of the price movements on the next quarter. The important question is: when are the inventories “atypical”, and can this information be useful in the prediction of pulp prices? info@mbarros.com 19 info@mbarros.com 20
  • 6. What to do then ????? Dummy Variable Creation To access whether inventory levels are The Moving Averages computed with 6 “typical” or not we compare observed and 12 months of data are much NORSCAN inventories with forecasts “smoother” estimators of inventories generated by Moving Averages (MA) using than 2 and 3 months moving averages. 2, 3, 6 and 12 months. We would expect forecasting errors to be The discrepancies between each MA large when using the moving averages prediction and the actual inventory is with 6 and 12 points as predictors. measured, and we define dummy variables for the corresponding periods. info@mbarros.com 21 info@mbarros.com 22 Dummy Variable Creation Dummy Variable Creation The dummy variables constructed from Why use Moving Averages to construct the dummies? the forecasting errors of the moving average models indicate whether The basic answer is: simplicity! The inventories are within “reasonable” procedure can be easily implemented in a bounds. worksheet without any knowledge of Time Series methods. Any other automatic method would also work, but the client would need access to a statistical software. info@mbarros.com 23 info@mbarros.com 24
  • 7. Dummy Variable Creation Dummy Variable Creation Define the percent discrepancy between where MAt denotes the moving average the observed NORSCAN inventory at time prediction for the inventory at time t and t and its moving average prediction as: invt is the real value of NORSCAN inventory at t. DIFt = 100. ( MAt − invt ) If DIFt > 0, inventories were overestimated MAt by the moving averages, otherwise they were underestimated. info@mbarros.com 26 Dummy Variable Creation Dummy Variable Creation We next compute the DIF variables based Percentage errors (in absolute value) tend on 2, 3 , 6 and 12 months Moving are larger when we estimate inventories Averages in the period January/1986 to using the “smoother” estimators (6 and 12 February/1997 and look at their descriptive months moving averages). statistics. We observe that: For example, the largest ( in absolute value) forecast error is -64.1%, indicating that the inventory was severely underestimated by a moving average with 12 points. info@mbarros.com 27 info@mbarros.com 28
  • 8. Dummy Variable Creation Dummy Variable Creation Negative errors tend to be larger (in The 25% percentile for all forecast error series absolute value) than positive errors. (except that generated from the 12 point moving average) is around -9. Thus, moving averages estimators tend to The 75% percentile for all error series is larger grossly underestimate inventories. than 7. The moving average estimators are very We propose the use of the percentiles of the forecast error distributions as bounds used to bad when inventory level rises. indicate whether the inventory level at a given month is “atypical”. info@mbarros.com 29 info@mbarros.com 30 Dummy Variable Creation Dummy Variable Creation Let DIFMM2, DIFMM3, DIFMM6, DIFMM12 denote, respectively, the forecast errors Percentile DIFMM2 DIFMM3 DIFMM6 DIFMM12 generated by predictions based on 2, 3, 6 10 % 20 % -14.3 -11.4 -14.8 -10.8 -21.4 -11.5 -34.4 -16.3 and 12 months moving averages. 30 % -6.3 -6.9 -7.4 -9.0 40 % -3.7 -3.4 -3.0 -3.9 50 % (median) -0.95 +0.25 +0.40 +1.95 The next table shows the percentiles for 60 % 70 % 2.1 4.9 3.3 5.9 3.6 7.4 5.9 9.8 the forecast errors based on 2, 3, 6 and 12 80 % 8.7 8.3 11.4 17.1 months moving averages. 90 % 13.8 12.2 15.5 22.0 info@mbarros.com 31
  • 9. Dummy Variable Creation Dummy Variable Creation Based on these values we define as An “abnormal” inventory level is detected “abnormal” situations those when the when : forecast error is outside the [p30% , p70%] DIFMM2 [ -6, 5] or interval. DIFMM3 [ -7, 6] or DIFMM6 [ -7 , 7] or We round these percentiles when creating DIFMM12 [ -9, 10] the dummy variables, and we obtain the following decision rule: info@mbarros.com 33 info@mbarros.com 34 Two Fundamental Questions Dummy Variable Creation Now Arise We next create dummy variables based on 1- Do the dummy variables have any this decision rule. The dummies are explanatory power over pulp prices? constructed as: This can be verified through one way ANOVA models using the dummies as  −1 if DIFM belowthe lower limit of the interval M factors.  I =  0 if DIFM is inside the interval M 2- Do we improve forecasts of pulp prices  1 if DIFM is above the interval's upper limit M when dummies are included in the  dynamic regression model? info@mbarros.com 36
  • 10. Do Dummies have explanatory Regression Model including power over Pulp Prices ? dummies We fit one way ANOVA models for Pulp We add dummy variables constructed Prices using the dummies as factors. from 2 and 12 month MA inventory All ANOVA models are significant at 90% estimators to the basic model. level. The new model structure is: Thus, different levels of dummies affect pricet = b0 + b1.(trendt) + b2.(invt-1) + pulp prices. b3.(pricet-1) + b4.(pricet-3) + b5.(dummy2t) + We next insert dummies into the basic b6.(dummy12t) + et regression model to access whether any gains in forecasting are accomplished. info@mbarros.com 37 info@mbarros.com 38 Regression Model including Regression Model including dummies dummies Where dummy2 and dummy12 are Dummies based on 3 and 6 months MA constructed from the prediction errors were not included in the model, because using 2 and 12 month moving averages to they’re highly insignificant. predict inventories. These 2 variables are not “strictly” significant, their significance level is about 85 %. info@mbarros.com 39 info@mbarros.com 40
  • 11. Forecast Comparison Forecast Comparison The next table shows the forecasts produced from 2 models, that exclude and include dummy variables A B S O LU T E V ALU E S O F % E R R O R S m o d e l w it h m o d e l w it h o u t O N E S T E P AHE AD F O R E C AS T S d u m m ie s d u m m ie s J a n /9 6 3 3 .2 3 3 3 .8 6 a ctu a l fo r e c a s t % error fo r e c a s t % error F eb /9 6 5 .9 9 3 .6 3 p r ic e ( w it h d u m m ie s ) ( w it h o u t d u m m ie s ) % J a n /9 6 638 850 - 3 3 .2 3 854 - 3 3 .8 6 M a r/9 6 9 .8 1 7 .9 1 F eb /9 6 634 596 5 .9 9 611 3 .6 3 A p r /9 6 2 4 .2 5 2 1 .7 1 M a r/9 6 632 570 9 .8 1 582 7 .9 1 M a y/9 6 0 .0 0 1 .1 6 A p r /9 6 433 538 - 2 4 .2 5 527 - 2 1 .7 1 J u n /9 6 1 1 .6 3 1 1 .1 6 M a y/9 6 431 431 0 .0 0 426 1 .1 6 J u l/9 6 1 1 .0 9 1 2 .2 0 J u n /9 6 430 480 - 1 1 .6 3 478 - 1 1 .1 6 A u g /9 6 3 .9 0 2 .7 8 J u l/9 6 541 481 1 1 .0 9 475 1 2 .2 0 S ep /9 6 3 .9 0 4 .2 8 A u g /9 6 539 518 3 .9 0 524 2 .7 8 O c t/9 6 1 .8 1 2 .1 8 S ep /9 6 538 517 3 .9 0 515 4 .2 8 N o v /9 6 2 .0 0 0 .7 3 O c t/9 6 551 541 1 .8 1 539 2 .1 8 D ec/9 6 4 .7 5 4 .3 9 N o v /9 6 549 538 2 .0 0 545 0 .7 3 J a n /9 7 3 .2 0 5 .0 0 D ec/9 6 547 521 4 .7 5 523 4 .3 9 F eb /9 7 0 .6 4 1 .0 6 J a n /9 7 500 516 - 3 .2 0 525 - 5 .0 0 F eb /9 7 470 473 - 0 .6 4 475 - 1 .0 6 M a r/9 7 0 .7 9 1 .4 7 M a r/9 7 443 446 - 0 .7 9 449 - 1 .4 7 A p r /9 7 0 .8 8 2 .8 6 A p r /9 7 455 451 0 .8 8 442 2 .8 6 M a y/9 7 2 .0 4 2 .8 6 M a y/9 7 490 480 2 .0 4 476 2 .8 6 m ean : 7 .0 5 7 .0 1 m ean % error : - 1 .6 2 - 1 .7 2 m ax : 3 3 .2 3 3 3 .8 6 m in . % e r r o r : - 3 3 .2 3 - 3 3 .8 6 m in : 0 .0 0 0 .7 3 m ax. % error : 1 1 .0 9 1 2 .2 0 Forecast Comparison Forecast Comparison ABS OLUTE VALUES OF % ERRORS "QUARTERLY" FORECAS TS Some gain was obtained by including the model with model without dummies, but it is marginal!!! dummies dummies Jan/96 33.23 33.86 Apr/96 24.25 21.71 Jul/96 11.09 12.20 The comparison of forecasts was done in Oct/96 1.81 2.18 a “worst case” scenario. Jan/97 3.20 5.00 Apr/97 0.88 2.86 mean : 12.41 12.97 The price drop from 1996/Q1 to 1996/Q2 max : 33.23 33.86 min : 0.88 2.18 was roughly 32%. info@mbarros.com 44
  • 12. Forecast Comparison Forecasts until December 1997 One should attempt to include other Basic scenario uses automatic forecasts explanatory variables, but there aren’t for NORSCAN inventories. many available candidates! These projections correspond to dummies Shipment/Inventory ratio is one of the with value 0 until the end of 1997. candidates, but shipments series is short (since 1994). info@mbarros.com 45 info@mbarros.com 46 Alternative Approach: Forecasts until December 1997 Simulation We now adopt a totally different approach. m with odel m without odel m with odel dum ies m dum ies m dum ies m +ARCHerror Jun/97 495 492 497 We will work with returns constructed Jul/97 514 507 518 from quarterly prices, and attempt to Aug/97 510 504 513 Sep/97 498 493 501 model and forecast these returns. Oct/97 511 504 515 Nov/97 512 504 515 Dec/97 499 493 502 info@mbarros.com 48
  • 13. Alternative Approach: We propose the following Simulation model for the returns: Let Pt and Pt-1 denote pulp prices on  P  yt = log t  = µt + σ t Zt where Zt are iid N(0,1) quarters t and t-1.  Pt −1  The geometric returns are defined as: where both µt and σt2 are time varying according to the equations:  P  y t = log  t   Pt − 1  µ t = (1 − λ 1 ). y t + λ 1 . µ t − 1 and Where log denotes the natural logarithm. σ 2 t = (1 − λ 2 ). y t2 + λ 2 . σ 2 t −1 Rationale behind this structure Drawbacks Both µt and σt2 are time varying, and their Choice of smoothing constants λ1 and λ2 updating equations are easy to implement. If we perform a grid search we find out The equation for σt2 resembles that of an that the mimimum mean squared error integrated GARCH model. constants are obtained when λ1 and λ2 If the lambdas are large ( > 0.7 or 0.8), tend to zero. information decay is slow; This is due to the fact that we are Otherwise, the latest observations will attempting to optimize both constants for have a large weight, and the memory is the whole sample ! short. info@mbarros.com 51 info@mbarros.com 52
  • 14. Drawbacks Implementation We need to make an arbitrary choice. One step ahead prediction (corresponding Intuitively, the smoothing constant for σt2 to 1997/Q3 can be easily obtained by should be larger than that of µt . simulating a large Normal sample and applying the last estimated values for µt and σt2 . Besides the point estimates of pulp prices, we can use additional information from the generated probability distribution, that can lead, for example, to Value at Risk (VaR) estimates. info@mbarros.com 53 info@mbarros.com 54 Implementation Example k step ahead forecast could be obtained in We next show the result of one an analogous fashion, by incorporating at implementation where: each step the last prediction, re-estimating the smoothing constants are λ1 = 0.5 and µt and σt2 by the same procedure and λ2 = 0.7, generating another sample of iid Normal the last observed price is US$ 490 (2nd variables. quarter 1997), 5000 iid Normal variables are generated. info@mbarros.com 55 info@mbarros.com 56
  • 15. Example Example Example Example The last estimates of µt and σt are, respectively, 1.01% and 22.27% The simulated price distribution is: D i s t ri b u t i o n o f P re d i c t e d P ri c e s 3 rd Q u a rt e r 1 9 9 7 m e a n : 5 0 7 m in im u m : 2 3 7 m a x im u m : 1 1 9 0 s td . d e v . : 1 1 5 p e rc e n tile s v a lu e 5 % 3 4 2 1 0 % 3 7 3 2 5 % 4 2 4 5 0 % 4 9 4 7 5 % 5 7 7 9 0 % 6 5 6 9 5 % 7 1 4
  • 16. Comparison of Estimates Conclusion For comparison, the estimated values for The alternative approach is completely Prices in July 1997 are: heuristic, but may serve as an model with dummies : 514 approximation when the true data model without dummies : 507 generating process is hard to identify, or model with dummies and ARCH errors : 518 when dynamic regression models do not median of simulated prices : 494 seem to provide a completely satisfactory mean of simulated prices : 507 answer. info@mbarros.com 62