1. 1
Curriculum Vitae ( CV)
Mohammed Bashir Ali Al Bashir
MECHANICAL ENGINEER
Transferable I gamma available
Saudi Driving License available
Saudi Arabia East MLM Camp Abu Hadriah
Member Ship of Saudi Council Of Engineering (SCE)
Project Management Professional ( PMP) Earn 35 hours PMI Member Ship
Email : m.albashir12014@gmail.com
Mob : 00966501941349 and 00966560582826
Objective:
Seeking a challenging position In professional and dynamic organization allow me to share
my acquired knowledge and skills while providing growth and get my potential to continue
the great time.
Personal information:
Nationality:Sudanese
Place & date of birth:Sudan 1978.
Marital status:single.
Religion:Muslim
Qualification:
B.Sc. honors of mechanical engineering fromSudan University of science& technology
(2004) Sudan
Diploma of English language communication fromKhartoum University 2005 Sudan
Diploma of computer application fromKhartoum University 2006 Sudan
Diploma of human resource management (HRM) fromKhartoum University Sudan 2013
Project managementprofessional (PMP) Exams preparation course earn 35 hours
2. 2
Summary:
Mechanical engineer with more than 10 years’ experience of progressive experience
specialist in project team supervision energy petroleum field earth moving heightening
dams adept to working effectively with all level of employees in cross functional team .
Creative professionally with extensive project experience from concept to development.
Talents include:
* Pipe line * water transmission system * pumps * valves * motors * HVAC mechanical
system
*Power plants * plumbing design * sewage system * firefighting system
Excellent client and project management skills action orientated with strong ability to
communicate effectively with consultant & other construction discipline and client alike
with more cooperative with civil & surveying team& electrical & ict.
Highlights:
* Water Transmission System& Pipe Line & Steel Tanks & Pumps & Valves &Vents &
Drainage
* Petroleum Field.
* HVAC (AHU & ACCU & package unit)
* Building systemdesigned
* Plumbing (Sewage)
* Firefighting system(hydrants& FM 200 & extinguisher).
Construction field & Housing projects.
Experience:
Mechanical engineering ( Site Engineer &Commissioning Engineer) 11/2014 up to current
Project name: Ras AL Khair Hafar Al Batin Water Transmission System ( RHWTS).
RAS AL KHAIR Pump Station #1 ( PS#1) Eastern Area province khafgi Road
Company: MAPA LIMAC MNG (JV)
3. 3
Consultant(engineer):ILF CONSULTANTENGINEERING
Client:saline water conversion corporation (SWCC).
Roles And Responsibility
The followingare the currentRolesandResponsibilities,undergoneduringthe previous/current
Experience,beingworkedfroma ML Contractor side withILFconsultant
And ( SWCC) client.
* General supervisionandinspectthe installation,modificationandcommissioningof mechanical
systemsatconstructionsites
* Monitor,verify,anddocumentthe workbeingperformedthroughsite engineers.
* To ensure properimplementationof designatsite.
* Provide technical assistance to the constructionteamasneeded.
* Generate/Review material requisitions,submittals,andensure contractperformance measures
are met.
* Ensure thatall mechanical site activitiesare conductedundercontrolledconditionsaspershop
drawings, methodstatements,specificationandworkplan
* To coordinate withotherengineeringdiscipline
* Evaluate the projectconstructionto ensure compliancewithstandardsformechanical systems.
* Serve as the Site Representativeforall mattersrelatedtoconstructionqualityassuranceof
mechanical works.
* Receive/actionRequestforInspection (RFI) thatapplytomechanical works.RFI’srequiringdesign
feedbackwill be directedtothe engineer manager for response.Review the responsesfor
adequacy.
* Preparation of installationmethodstatementsincoordinationwiththe QA/QCrepresentatives
and checkthe prepareddocuments.
* Advice the QA/QC personalsforthe ITPinterference points.
* To handle the complete Mechanical installation,testing,commissioning(HVAC,andother
mechanical activities)
* Plan, review,andcoordinate designandconstructionoperationstoensure compliance with
designdrawingsandspecifications
*Investigate equipmentandsystemfailuresorunexpectedmaintenance problems
* To monitorandcontrol expensesrelatedtoprojectworkandensure organizational forecastsand
budgetsare metfor these expenses.
* To handle procurementactivitiesrelatingtocontractsand subcontracts in accordance with
CompanyProceduresandProcurementdepartmentactivities.
. To ensure safetystandardsand proceduresare implementedandfollowedinaccordance with
Safety officer.( Health&safetyenvironment( HSE)
For Pipe line & Steel Tanks:
Installation of pipe with following the weld numbering & weld log procedure after
preparation:
4. 4
*Follow excavation of trench and supported & shop fabrication.
*Review material certificate & pipe number and current application of stringing.
*Fusion bonds epoxy coating external girth weld area& spools.
*Cement Mortal Lining.
Attended the:
Hydro Test Pressure up to 120 bar due to 350 km from 0 point.
Vacuum test of water storage tank.
Follow inspection test plan (ITP) Raise RFI with the consultant and get approval with the
installation also MIRR material receiving certificate& calibration certificate.
Did the pre commissioning & commissioning & start up with line fill by water?
PUMP & MOTOR:
Installation of 3 booster pumps& 3 main pumps in both B.P house& M.P house.
Installation of coupling after did the
Alignment . Tolerance +/-0.05 mm
Soft foot test for motor and pump. Tolerance +/-0.05 mm.
Installation of valves butterfly valve& ball valve& check valves & flow control valves due to
all the shafts
Main Pump Recirculation Pump(RCV)& Booster Pump Recirculation pump(RCV).
Solo run test for motor with checking rpm of 3586 rpm
Checked sound level up to 86 dcml
Checked vibration up to 5 mm/s.
*Checked temp up to 50 degree.
Attended the pre commissioning & commissioning of all valves including Motorize (MOV).
the pre commissioning & commissioning of flow control valves with hydraulic actuators .
HVAC (ZAMIL COOL CARE)
Installation of 2 package unit with 4 compressors up to 60 ton refrigerant r 134a with 2
motors & fans& filters& cooling coil condenser.
Supervision of installation and fabrication of duct design & plenum box.& refrigerant pipe.
5. 5
Included duct mounted & hangers& supports wall & duct cladding & wall opening sleeve
&access doors& seems &sealing& maintenance access &flexible duct connection& vibration
isolators& spring.& reinforcements.
Installation of motorize volume dampers MVD & motorized fire dampers MFD& back
draft damper BDD& bell of mouth BMO & sand trap louver STL.
Installation of humidifier & heating coil& cooling coil.& exhaust fan& supply fan.& fan
blowers
Attend of refrigerant leakage test with RFIS .
Supervision with zamil cool care:
Attend light test for ducts.
Installation of air handling unit AHU.
Installation of ACCU mini central split air condition.
Attended testing adjusting & air balancing of each buildings ( office B.P house& M.P
house& kitchen ,lavatory, prayer room, MV room, etc).
With measurement flow report and calibration certificate/S
Attended pre commissioning & commissioning & startup of all the system.
Plumbing:.
Prepare MIRR and designs for installation pipes& fittings & roof drains& floor drains traps&
backwater valves, carrier systemgrease oil solid interceptors clean out, wall and post
hydrants stainless steel and floor sink.
Installation of trench drains system& flush valves& faucets and shower system.
Potable water system
Fabricate &Installation of pipes and water control systemincludes
Pressure reducing valves& temperature & pressure relief valve check valve ball valve
Pumps .
Attended hydro test pressure up to 10 bar.
Fire fighting system
FM 200 hydrant with SEFFCO company
Attended fabrication installation & commissioning. Of FM200.
Installation of water system& pre commission & commission.
6. 6
Fire extinguisher installing & commissioning.
Attended hydro test pressure up to 200 psi 14 bar
Marafig al tashgeel company Riyadh
Mechanical engineer ( maintenance)
from 22-07-2013 up to 04-11-2013
Duties:
Prepare schedule of preventive maintenance.
Supervision of all the equipment maintenance including
Suddenly defect
Trouble shooting of all defects and made solution for that.
Send reports to technical manager.
Follow the recommendation from vendors.
CCMD chinese company SUDAN
From 2006 upto 2012
Mechanical engineer
Project: Rosisers Dam Heightening Project
Contractor: CCMD JV
Consultant: Lamer Germany
Client : Dam Implementation Units
Duties
Supervision of all the equipment on the site and prepare schedule with preventive
maintenance.
Follow the procedure of vendor.
Prepare data sheet and daily report to the consultant.