SlideShare ist ein Scribd-Unternehmen logo
1 von 12
Downloaden Sie, um offline zu lesen
NABCEP PV Technical Sales Job Task Analysis 09.10 • 1Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010
N A B C E P
www.nabcep.org
Job Task Analysis
PVTechnical Sales
2 • NABCEP PV Technical Sales Job Task Analysis 09.10 Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010
NABCEP PV Technical Sales
Examination Specifications
N Items	 Content Domain
15	 Qualify the Customer
10	 Site Analysis
14	 Conceptual Design
5	 Financial Costs, Incentives, and Savings
4	 Financial Benefit Analysis and Financing
3	 Non-financial Benefit Analysis
5	 Performance Analysis
4	 Prepare Proposals
60	 (total)
Job Description:
A PV Tech Salesperson is a solar electric professional
with demonstrated expertise in the siting, design,
analysis and performance of PV systems who gathers
site specific information, analyzes customer needs and
energy usage for the purpose of advising and provid-
ing customers with the most appropriate solution for
their situation.
A. Qualify the Customer
1. Analyze electric bill
•	 Gather bills
•	 Look for seasonal patterns
•	 Look at different fuel sources being used
•	 Review utility rates
•	 Explain why solar may not be appropriate
2. Perform remote site assessment
•	 Determine house orientation
•	 Determine roof tilt/angle, available area
•	 Determine shading
•	 Evaluate obstructions
•	 Inquire about type and condition of roof
•	 Determine ownership status
•	 Determine type of property (residential 	
commercial, non-profit)
Knowledge of:
-- How site conditions impact feasibility 	
of solar system
-- Internet tools
-- The limitations of remote tools
-- Magnetic declination
NABCEP PV Technical Sales Content Outline
NABCEP PV Technical Sales Job Task Analysis 09.10 • 3Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010
3. Identify customer needs
•	 Ask about reasons for going solar
•	 Evaluate future energy usage
•	 Determine desired time frame
•	 Determine whether customer needs 	
financial assistance
•	 Determine electric usage pattern, time of day
•	 Discuss pros/cons of battery backup 	
vs. generator
Knowledge of:
-- Basic sales skills
-- Financial tools
-- The use electric rates function
-- Batteries
-- Electrical terminology
-- Correlating usage to specific appliances
4. Perform ball park estimate
•	 Estimate array size based on kWh 	
consumption and available array area
•	 Price array size based on average $/watt
•	 Evaluate potential price adders
•	 Factor in incentives
•	 Develop price range
•	 Develop savings estimate
•	 Develop preliminary economic analysis
•	 Present (verbally/brief) initial ballpark 	
proposal and benefits
•	 Discuss customer budget limits
Knowledge of:
-- Price adders
-- Roof type
-- Licensing requirements
-- How the height of building impacts 	
installation costs
-- Impact of long runs of conduit, 	
wiring on costs
-- Steepness
-- Distance from load center
5. Identify jurisdictional issues
•	 Determine zoning
•	 Determine fire marshal awareness
•	 Determine reservation issues
•	 Check city, county and utility requirements
•	 Identify utility
•	 Identify homeowner association
Knowledge of:
-- Zoning issues for your area
-- Codes for your area
-- Utilities process, interconnection 	
procedures, rules
-- Laws relating to homeowner’s associations
-- Insurance limitations
6. Manage customer expectations
•	 Advise customer that system doesn’t provide
backup power; when grid is down, it won’t work
•	 Explain differences between battery and 	
non-battery systems
•	 Explain that PV does not heat water, 	
space, or pools
•	 Explain that PV generates electricity, does not
offset gas loads
•	 Explain seasonal variations in output
•	 Explain required level of routine maintenance
•	 Explain system equipment manufacturer warranties
•	 Review life expectancy of equipment
•	 Discuss aesthetics
•	 Discuss ROI
•	 Explain emerging vs. existing technologies
•	 Explain expected output vs. system capacity
•	 Explain instantaneous power vs. annual 	
energy production
•	 Explain installation warranties
•	 Explain manufacturer warranties
•	 Explain insurance issues, workers’ comp, liability
•	 Explain effects on homeowner’s insurance
•	 Explain potential impact on roof warranty
•	 Explain performance validation methods
4 • NABCEP PV Technical Sales Job Task Analysis 09.10 Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010
Knowledge of:
-- Basic solar system knowledge
-- General financial understanding
-- Product knowledge
-- Knowledge of return on investment
-- Product limitations
 
B. Site Analysis
1. Inspect electrical service
•	 Determine service rating current and voltage
•	 Identify buss bar and main breaker
•	 Identify line tap vs. panel upgrade
•	 Determine available breaker space
•	 Determine grounding
•	 Identify manufacturer of panel
•	 Determine method of interconnection
•	 Determine limits (max back fed breaker) based
on local electrical code
•	 Inform customer of potential additional costs
related to utility hardware, transformers
•	 Discuss findings with customer
Knowledge of:
-- Electrical safety
-- OSHA
-- Electrical principles
-- Electrical codes
2. Identify locations for system components
•	 Identify inverter location
•	 Identify array location options
•	 Identify AC & DC disconnects
•	 Identify junction box
•	 Locate conduit runs
•	 Identify utility disconnect if applicable
•	 Determine lengths of conduit runs
Knowledge of:
-- NEC and manufacturer 	
clearance requirements
-- Solar exposure
-- Hazards (e.g., power lines, gas lines, meters)
-- The difference between AC & 	
DC disconnects
-- Voltage ratings on fuses, AC & DC switches
-- Utility differences on requirements 	
for disconnects
-- Tape measure
-- Laser level
3. Assess mounting location
•	 Identify roofing material
•	 Identify framing
•	 Identify spacing and spans
•	 Determine if there is an attic space vs. flat roof
•	 Assess structural integrity of roof 	
(look at underside)
•	 Document condition of roof (photos, notes, etc.)
•	 Determine soil composition for 	
ground/pole mounts
•	 Identify underground obstructions 	
(septic, gas lines)
•	 Determine solar exposure
•	 Measure roof area or ground area
Knowledge of:
-- Roofing materials
-- Basic framing
-- Standard building practices (spacing)
-- Roofing terminology
-- Risks of falling
-- Walking on roofs without causing damage
-- Reading blueprints
-- Angle gauge
-- Safety harness
NABCEP PV Technical Sales Job Task Analysis 09.10 • 5Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010
4. Perform shade analysis
•	 Identify existing shading obstructions
•	 Consider future shading obstructions
•	 Perform inter-row shading analysis
•	 Complete shade study
•	 Analyze annual loss from shading
•	 Analyze seasonal/daily variations in shade
•	 Determine whether rooftop analysis is necessary
•	 If safe, proceed with rooftop analysis
•	 If necessary, bring in crew for rooftop analysis
•	 If rooftop analysis is not feasible, 	
incorporate buffer
•	 Calculate within acceptable limits of 	
third-party audit, 3-5%
•	 Prepare the report
Knowledge of:
-- The impact of shade on solar systems
-- The proper use of the available tools
 
C. Conceptual Design
1. Select appropriate equipment
•	 Explain module aesthetic options to customer
•	 Explain efficiency, cost, aesthetic differences
•	 Consider geographic location, climate
•	 Select the module(s)
•	 Match inverter to array
•	 Match inverter to service voltage
Knowledge of:
-- Product
-- Voltage windows
-- Websites that provide insolation data
2. Determine equipment location
•	 Avoid locations that will expose modules 	
to salt water
•	 Comply with manufacturer specifications 	
for inverter location
•	 Discuss potential sites for inverter 	
with customer
•	 Ask customer about long term plans for 	
renovations, etc.
•	 Consider type of monitoring system, 	
broadband vs. wired
•	 Discuss conduit runs
Knowledge of:
-- Noise level generated by equipment
-- Risks of damage to equipment
-- NEC requirements and local codes (AHJ)
-- Cooling requirements
-- Manufacturer’s clearances
-- Fire department requirements
6 • NABCEP PV Technical Sales Job Task Analysis 09.10 Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010
3. Plan system layout
•	 Determine module layout
•	 Determine electrical layout
•	 Determine which faces of roof to use
•	 Sketch system layout
Knowledge of:
-- String layout
-- Roof set backs
-- Geometry
-- Computer skills
-- Spacing between modules
4. Perform string sizing
•	 Select string sizing method
•	 Consider min, max temperatures, site
•	 Stand off distance (re: airflow)
•	 Match array voltage to inverter voltage with
applicable temperature conditions
•	 Consider module voltage degradation over time
Knowledge of:
-- Applying temperature coefficients
-- Correlation between temperature and voltage
5. Determine breaker size or
supply side connection
•	 Determine max inverter output given buss bar
•	 Evaluate whether there is room for a breaker
•	 Evaluate the service amperage
•	 Determine whether new electrical 	
service is needed
•	 Determine whether line side tap can be used
Knowledge of:
-- Spacing between modules
-- Electrical service sizes
-- Current ratings
-- Line side tap
6. Determine mounting method
and tilt angle
•	 Evaluate roof type and material
•	 Evaluate roof pitch
•	 Evaluate structural members 	
(wood, steel, trusses, rafters)
•	 Determine space required under modules
•	 Consider impact on roofing warranties
•	 Select racking
•	 Determine number and type of roof 	
penetrations, flashing
•	 Evaluate performance and aesthetic impact 	
of various tilt angles
•	 Identify trenching considerations
•	 Determine local height restrictions
Knowledge of:
-- Roofing
-- Product
-- Mounting systems
 
D. Financial Costs, Incentives,
and Savings
1. Explain types of incentives and net cost
•	 Explain local net metering policies
•	 Explain feed-in tariffs
•	 Identify utility financial models
•	 Explain state, city and federal tax credits, 	
treasury grants, depreciation, property tax 	
exemptions, RECs, PBIs, rebates, tax deduc-
tions, transfer credits, sales tax exemptions
•	 Calculate net cost after incentives
NABCEP PV Technical Sales Job Task Analysis 09.10 • 7Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010
2. Explain types of utility rates and net
electric bill savings
•	 Explain time of use
•	 Explain tiered rate structures
•	 Explain what energy and demand charges are
•	 Explain how solar impacts demand charges
•	 Explain how solar impacts energy charges
•	 Discuss possibility of switching from one rate
structure to another
•	 Explain potential future rate 	
escalations, decreases
•	 Calculate electric bill savings
 
•	 Calculate internal rate of return 	
(exclude financing costs)
•	 Calculate simple return on investment
•	 Calculate years to payback
•	 Explain pre-tax and after-tax benefits
•	 Calculate theoretical resale value 	
increase on property
•	 Explain to customer potential property 	
equity impact
•	 Explain degradation rate
•	 Calculate net savings
•	 Inform customer that projections are not 	
legally binding, disclaimer
Knowledge of:
-- Financials
-- Compound interest calculations
2. Evaluate appropriate financing options
•	 Cash up front
•	 Home equity loan
•	 Leasing
•	 Power Purchase Agreement (PPA)
•	 Consumer loans
•	 Community based financing, PACE
•	 Utility loans
Knowledge of:
-- Financing options
 
F. Non-Financial Benefit Analysis
1. Calculate/quantify environmental benefits
proportional to estimated production
•	 Calculate Co2 avoidance
•	 Calculate tons of coal saved
•	 Calculate water saved
•	 Calculate miles not driven in car
•	 Calculate acres of trees saved
•	 Calculate barrels of oil saved
E. Financial Benefit Analysis
and Financing
1. Calculate financial analysis
•	 Calculate cash flow analysis
•	 Calculate bill savings
•	 Calculate maintenance expenses
•	 Calculate replacement/repair costs 	
for inverter
•	 Develop multi-year timeline detailing 	
costs/benefits
8 • NABCEP PV Technical Sales Job Task Analysis 09.10 Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010
2. Describe non-financial
non-environmental benefits
•	 Articulate/calculate energy independence
•	 Articulate social benefits
•	 Articulate other non-environmental benefits
  
G. Performance Analysis
1. Calculate production
•	 Consider insolation data
•	 Review temperature data for the area
•	 Consider microclimate data if available
•	 Consider impact of dust and dirt
•	 Module name plate rating
•	 Consider time of use
•	 Consider shading
•	 Consider wire losses
•	 Consider module operating temperature, 	
regional ambient temperatures and air flow
•	 Consider component efficiencies 	
(e.g.,  inverter, DC modules)
•	 Consider tilt
•	 Consider azimuth
•	 Consider diodes and connections
•	 Consider module mismatch
•	 Consider system availability
•	 Consider tracking, dual or single axis
•	 Consider system age or degradation
Knowledge of:
-- Sites that can provide data
-- PVWATTS or SAM
-- RETScreen
-- How various factors impact production
2. Identify factors that degrade system
performance over time
•	 Module degradation over time
•	 Landscaping issues, tree growth
•	 New construction
H. Prepare Proposals
1. Create minimum acceptable proposal
•	 Include production estimate
•	 Include STC DC system power rating 	
(and CEC AC or other rating as applicable)
•	 Include average monthly electric bill 	
savings estimate
•	 Include total cost, rebates, tax incentives, 	
and net cost
•	 Identify and estimate permit fees, interconnec-
tion fees, taxes and other foreseeable costs
•	 Identify variable or unknown costs and 	
provide estimated range of cost
•	 Include payment schedule
•	 Identify incentives paid over time 	
(PBI, FIT, SRECs)
•	 Include construction timeline and 	
milestone dates
•	 Include major equipment list, power ratings,
and part count
•	 List assumptions, special factors, and 	
locations for equipment installation
Knowledge of:
-- Reading manufacturer data sheets
-- Rating specs
-- Documents required for completing the sale
2. Include additional elements as
applicable and/or appropriate
•	 Include financial benefit and/or financing
discussion as applicable
•	 Include non-financial benefit discussion 	
as applicable
•	 Include energy efficiency and conservation
discussion as applicable
NABCEP PV Technical Sales Job Task Analysis 09.10 • 9Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010
PV Technical Sales
Certification Requirements
Eligibility Requirements for the
PV Technical Sales Certification
To become certified and maintain certification, the 	
applicant must minimally:
•	 Be at least 18 years of age
•	 Meet prerequisites of related experience and/or
education as outlined below
•	 Complete an application form documenting 	
requirements
•	 Sign and agree to uphold a code of ethics
•	 Pay application and exam fee
•	 Pass a written exam
•	 Complete continuing education and installation
requirements within the recertification timeframe
Education,Training and
Experience Requirements
To qualify to sit for the NABCEP PV Technical Sales
Certification examination, the candidate must demon-
strate that he/she meets at least one of the following
minimum entry requirement tracks outlined at right.
Note: All USA applicants must have OSHA 10 Hour
Construction Class Card. Applicants from other countries
must provide an equivalent safety training credential from
your jurisdiction as a prerequisite for the exam.
Additionally training in sales techniques and 	
customer management is strongly recommended 	
for all candidates.
Qualifying Categories for the PV Technical
Sales Certification Examination
a) 	 A minimum of sixty (60) hours cumulative train-
ing covering the PV Technical Sales Job Task
Analysis: AND a minimum of one (1) year of
verifiable sales experience; AND have successfully
passed the NABCEP Entry Level PV Exam; OR
b) 	 A minimum of thirty-two (32) hours cumulative
training covering the PV Technical Sales Job Task
Analysis; AND a minimum of two (2) years of
verifiable sales experience; AND have successfully
passed the NABCEP Entry Level PV Exam; OR
c) 	 Two (2)-year renewable energy technology or
technician degree from an accredited educational
institution; AND a minimum of one (1) year verifi-
able experience; AND have successfully passed
the NABCEP Entry Level PV Exam; OR
d) 	 Four (4)-year degree from an accredited educa-
tional institution; AND one (1) year verifiable sales
experience; OR
NOTE: A minimum of 30 hours of additional training in all aspects of the
PV Technical Sales Job Task Analysis is strongly recommended.
e)	 Be a NABCEP Certified Solar PV or NABCEP
Installer Emeritus; OR
NOTE: A minimum of 30 hours of additional training in non-installation
aspects of the PV Technical Sales Job Task Analysis is strongly recommended.
f) 	 Hold Journeyman or licensed Electrician creden-
tials; AND have successfully passed the NABCEP
Entry Level PV Exam; OR
NOTE: A minimum of 30 hours of additional training in all aspects of the
PV Technical Sales Job Task Analysis is strongly recommended.
g) 	 A minimum of five (5) years verifiable 	
sales experience.
NOTE: A minimum of 30 hours of additional training in all aspects of the
PV Technical Sales Job Task Analysis is strongly recommended.
10 • NABCEP PV Technical Sales Job Task Analysis 09.10 Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010
Definition of Verifiable Sales Experience
For purposes of this process, verifiable sales experi-
ence selling PV systems requires being in a responsible
role in sales and or design process for the job. This
includes titles including (but not limited to), sales
manager, site analyst, financial analyst, system 	
designer, technical support person, etc.
Definition: 1 year verifiable sales experience = being
the lead sales person, analyst or designer of a mini-
mum of 4 PV systems occurring at some point in the
12 months prior to submitting an application for the
exam*. At least 2 of the 4 PV systems must be larger
than 2 kW DC (peak). At least one (1) installation must
be a system that is grid connected.
All systems claimed must have accompanying docu-
mentation including proposal, electrical permitting
and inspection records, and customer confirmation
that the system sold met their expectations. The candi-
date is asked to describe the scope of work they were
responsible for on each installation. (All proposals
and related proprietary information will be treated as
strictly confidential.)
In regions where electrical inspection is not possible,
the Application Review Committee will judge experi-
ence based on supplied documentation.
*If applying through track (G), you will need to submit
documentation for 20 verifiable system sales or pro-
posals that have occurred in the last 5 years. 10 of the
20 systems must be larger than 2kW DC (peak) and at
least 5 systems must be grid connected.
Training Requirement for the PV Technical
Sales Certification
Candidates applying through categories that require
training (A or B) must document that they have 	
received the minimum hours of training specified. 	
This training must cover the PV Technical Sales Job
Task Analysis (JTA).
While additional training is not required for each
qualifying category it is strongly recommended. The
exam is such that some level of training on all aspects
of the PV Technical Sales Job Task Analysis will likely
be necessary for most applicants to achieve a passing
score. Candidates are therefore encouraged to seek
training classes as needed.
It is recommended that applicants look for training
courses accredited by the Institute of Sustainable 	
Power Quality (ISPQ) or taught by instructors certi-
fied by ISPQ. Please visit www.IRECusa.org for full
listings. NOTE: The minimum of 10 hours of OSHA or
equivalent training is in addition to the training hours
specified for each qualifying category.
NABCEP will accept training to meet the requirements
when the training meets the following outcomes:
Have a formal training format, with a teacher-learner
structure. This implies a connection between a learner
and a learning source. It can include classroom time led
by an instructor and/or discussion leader. It can also in-
clude activities in which a learner is engaged in a planned
learning event in which he/she is separated from faculty
and other students but where the learner receives some
sort of feedback and the learner’s progress is monitored.
NABCEP PV Technical Sales Job Task Analysis 09.10 • 11Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010
Examples include computer-assisted instruction, interac-
tive video/CD/DVD and/or web site learning. Covers
core competencies from the PV Technical Sales Job
Task Analysis.
Acceptable training providers include:
•	 Any institution accredited by an agency recog-
nized by the federal Department of Education
(Universities, Community Colleges etc.);
•	 Dedicated independent Renewable Energy 	
training programs (accreditation by ISPQ is
strongly recommended);
•	 Apprenticeship training programs recognized by
the Department of Labor or equivalent;
•	 Those approved by State or Provincial Contractor
Licensing Boards; and;
•	 Vocational/Technical training programs.
Education Requirements for the PV Technical
Sales Certification
If qualifying through entry track (C) or (D), you must
submit a copy of your diploma or transcript from an
institution accredited by an agency recognized by the
federal Department of Education showing that you
have obtained a two-year or four-year degree.
Documentation of Training,
Education & Credentials
Formal education and training are optional depending
on the Qualifying Category you chose, even though
NABCEP believes that applicants will benefit from
quality training when preparing to take the certifica-
tion exam. If your Qualifying Category requires train-
ing, education or a specific credential, copies of official
transcripts or diplomas will need to be attached to the
application form.
If qualifying under category (A) or (B), a copy of your
proof of completion the cumulative hours of required
training will need to be attached to the application.
If qualifying under category (C) or (D), copies of official
transcripts and diplomas attesting to your attendance and
degrees earned will need to be attached to the application.
If qualifying under category (A), (B), (C), (E) or (F),
you will have to indicate in the application which
credential(s) you hold and attach a copy of your certifi-
cate or other proof of having achieved the credential(s)
to this application.
About the NABCEP PV Entry Level Exam
Requirement
Some of the pathways to qualify require that candidates
pass the NABCEP PV Entry Level exam. Passing the PV
Entry Level exam shows that individuals have achieved
a basic understanding of PV system design and installa-
tion. The Entry Level exam is not a certification exam.
For information on how to become eligible to sit for
the Entry Level exam and for the complete list of all
current registered Entry Level Providers, please visit:
http://www.nabcep.org/entry-level-certificate-program/for-students
12 • NABCEP PV Technical Sales Job Task Analysis 09.10 Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010
Documentation of Verifiable Sales
Experience
Please view “Definition of Verifiable Sales Experience”
above for the definition of verifiable sales experience
and system requirements.
All systems claimed must have accompanying docu-
mentation including the proposal, electrical permitting
and inspection records, and customer confirmation
that the system sold met their expectations. If permits
are not available a written explanation documenting
your role and responsibilities in the sale process along
with the outcome of the sales process may be submit-
ted for review. Applicants may also attach photos as
optional documentation. When completing the applica-
tion, applicants will be asked to describe the scope of
work they were responsible for on each installation.
All proposals and related proprietary information will
be treated as strictly confidential (See Section 15 of the
Candidates Handbook for details on confidentiality of
application documents).
In addition, for each system, applicants will need to
provide: a) location of the job site, including some
combination of the following: dates during which the
job was performed, system-owner contact informa-
tion, size of the total system, system components, and
if required in the jurisdiction, copies of any inspection
certificates or permits involved (including county &
lot # if available).
NABCEP reserves the right to contact system own-
ers/operators, permitting authorities, and responsible
contractors to verify work listed in this section. The
Application Form will prompt you to attach copies
of any permits or inspection certificates acquired. In
cases where no inspection or permitted process was re-
quired, the Application Review Committee will make
decisions about eligibility based on supplied docu-
mentation. Optional documentation includes anything
that you feel verifies the installation and demonstrates
your successful role.
Licensure Requirement
If a license is required in the jurisdiction in which
the work is performed, candidates must submit their
license number—or the license number under which
the work was performed.
North American Board of
Certified Energy Practitioners
56 Clifton Country Road, Suite 202
Clifton Park, NY 12065
800-654-0021  /  info@nabcep.org
www.nabcep.org

Weitere ähnliche Inhalte

Andere mochten auch

#Solar mooc 2009 nabcep study guide solutions 1-29
#Solar mooc 2009 nabcep study guide solutions 1-29#Solar mooc 2009 nabcep study guide solutions 1-29
#Solar mooc 2009 nabcep study guide solutions 1-29solpowerpeople
 
Pv sales intro and session one
Pv sales intro and session one Pv sales intro and session one
Pv sales intro and session one moeshahram
 
NABCEP Exam Prep Review for PV Installation & Tech Sales 
NABCEP Exam Prep Review for PV Installation & Tech Sales NABCEP Exam Prep Review for PV Installation & Tech Sales 
NABCEP Exam Prep Review for PV Installation & Tech Sales solpowerpeople
 
053013 pv system site assessment (1)
053013 pv system site assessment (1)053013 pv system site assessment (1)
053013 pv system site assessment (1)solpowerpeople
 
Solar panel Technology ppt
Solar panel Technology pptSolar panel Technology ppt
Solar panel Technology pptGourav Kumar
 
Solar energy power point presentation
Solar energy power point presentation Solar energy power point presentation
Solar energy power point presentation Shrijeet Modi
 
Solar energy ppt
Solar energy pptSolar energy ppt
Solar energy pptshubhajit_b
 

Andere mochten auch (8)

#Solar mooc 2009 nabcep study guide solutions 1-29
#Solar mooc 2009 nabcep study guide solutions 1-29#Solar mooc 2009 nabcep study guide solutions 1-29
#Solar mooc 2009 nabcep study guide solutions 1-29
 
Pv sales intro and session one
Pv sales intro and session one Pv sales intro and session one
Pv sales intro and session one
 
NABCEP Exam Prep Review for PV Installation & Tech Sales 
NABCEP Exam Prep Review for PV Installation & Tech Sales NABCEP Exam Prep Review for PV Installation & Tech Sales 
NABCEP Exam Prep Review for PV Installation & Tech Sales 
 
053013 pv system site assessment (1)
053013 pv system site assessment (1)053013 pv system site assessment (1)
053013 pv system site assessment (1)
 
Solar panel Technology ppt
Solar panel Technology pptSolar panel Technology ppt
Solar panel Technology ppt
 
Solar power.ppt
Solar power.pptSolar power.ppt
Solar power.ppt
 
Solar energy power point presentation
Solar energy power point presentation Solar energy power point presentation
Solar energy power point presentation
 
Solar energy ppt
Solar energy pptSolar energy ppt
Solar energy ppt
 

Ähnlich wie Nabcep techincal-sales-jta-guide-9-30-10 web

esci-61-pv-system-design-and-sizing-slides.pdf
esci-61-pv-system-design-and-sizing-slides.pdfesci-61-pv-system-design-and-sizing-slides.pdf
esci-61-pv-system-design-and-sizing-slides.pdfRiazAhmad205274
 
equipments like CT,PT SUBSTATION PPT.ppt
equipments like CT,PT SUBSTATION PPT.pptequipments like CT,PT SUBSTATION PPT.ppt
equipments like CT,PT SUBSTATION PPT.pptsrinjayjha
 
Small Commercial Solar: Grow Your Business With This Untapped Sector
Small Commercial Solar: Grow Your Business With This Untapped SectorSmall Commercial Solar: Grow Your Business With This Untapped Sector
Small Commercial Solar: Grow Your Business With This Untapped Sectorallearthrenewables
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxSchneider Electric
 
3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_trainingmelanie_bissonnette
 
17 mse003 pv plant devlopement
17 mse003 pv plant devlopement17 mse003 pv plant devlopement
17 mse003 pv plant devlopementpaneliya sagar
 
Sizing And Selection of Cable Systems.ppt
Sizing And Selection of Cable Systems.pptSizing And Selection of Cable Systems.ppt
Sizing And Selection of Cable Systems.pptSameeraShaman
 
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
05 - IEC 61400-15 Update, Jason Fields (NREL).pptxZaidMasoodKhan
 
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...Maghrenov
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)sajid akram
 
Example company network design
Example company network designExample company network design
Example company network designYassin Umeta
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015naiyar yazdani
 

Ähnlich wie Nabcep techincal-sales-jta-guide-9-30-10 web (20)

esci-61-pv-system-design-and-sizing-slides.pdf
esci-61-pv-system-design-and-sizing-slides.pdfesci-61-pv-system-design-and-sizing-slides.pdf
esci-61-pv-system-design-and-sizing-slides.pdf
 
Planning for Substation Maintenance and Reliability
Planning for Substation Maintenance and ReliabilityPlanning for Substation Maintenance and Reliability
Planning for Substation Maintenance and Reliability
 
equipments like CT,PT SUBSTATION PPT.ppt
equipments like CT,PT SUBSTATION PPT.pptequipments like CT,PT SUBSTATION PPT.ppt
equipments like CT,PT SUBSTATION PPT.ppt
 
05 2017 03_ralph_gottschalg_standardsbodyperspective
05 2017 03_ralph_gottschalg_standardsbodyperspective05 2017 03_ralph_gottschalg_standardsbodyperspective
05 2017 03_ralph_gottschalg_standardsbodyperspective
 
Small Commercial Solar: Grow Your Business With This Untapped Sector
Small Commercial Solar: Grow Your Business With This Untapped SectorSmall Commercial Solar: Grow Your Business With This Untapped Sector
Small Commercial Solar: Grow Your Business With This Untapped Sector
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
 
3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training
 
17 mse003 pv plant devlopement
17 mse003 pv plant devlopement17 mse003 pv plant devlopement
17 mse003 pv plant devlopement
 
Dermarkar
DermarkarDermarkar
Dermarkar
 
Sizing And Selection of Cable Systems.ppt
Sizing And Selection of Cable Systems.pptSizing And Selection of Cable Systems.ppt
Sizing And Selection of Cable Systems.ppt
 
10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium
10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium
10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium
 
Yasser Wahba CV
Yasser Wahba CVYasser Wahba CV
Yasser Wahba CV
 
Services Master
Services MasterServices Master
Services Master
 
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
 
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)
 
Example company network design
Example company network designExample company network design
Example company network design
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015
 
DESIGN
DESIGNDESIGN
DESIGN
 

Mehr von moeshahram

Ppt dirty side of green careers
Ppt dirty side of green careersPpt dirty side of green careers
Ppt dirty side of green careersmoeshahram
 
Swic student realizm presentaion
Swic student realizm presentaionSwic student realizm presentaion
Swic student realizm presentaionmoeshahram
 
1. mounting components 1
1. mounting components 11. mounting components 1
1. mounting components 1moeshahram
 
2. csi rebate process workshop october 2010 long-1
2. csi rebate process workshop   october 2010 long-12. csi rebate process workshop   october 2010 long-1
2. csi rebate process workshop october 2010 long-1moeshahram
 
7. pg&e understanding your bill commercial-w solar
7. pg&e understanding your bill commercial-w solar7. pg&e understanding your bill commercial-w solar
7. pg&e understanding your bill commercial-w solarmoeshahram
 
4. pv energy components & systems
4. pv energy components & systems4. pv energy components & systems
4. pv energy components & systemsmoeshahram
 
Bill scott seminar presentation - foothill cc.ppt
Bill scott seminar presentation - foothill cc.pptBill scott seminar presentation - foothill cc.ppt
Bill scott seminar presentation - foothill cc.pptmoeshahram
 
1. basic solar thermal training v3 robert cooley
1. basic solar thermal training v3 robert cooley1. basic solar thermal training v3 robert cooley
1. basic solar thermal training v3 robert cooleymoeshahram
 
Irec annual-trends-report-10-1-10 web
Irec annual-trends-report-10-1-10 webIrec annual-trends-report-10-1-10 web
Irec annual-trends-report-10-1-10 webmoeshahram
 
Irec solar market_trends_report_2009
Irec solar market_trends_report_2009Irec solar market_trends_report_2009
Irec solar market_trends_report_2009moeshahram
 

Mehr von moeshahram (10)

Ppt dirty side of green careers
Ppt dirty side of green careersPpt dirty side of green careers
Ppt dirty side of green careers
 
Swic student realizm presentaion
Swic student realizm presentaionSwic student realizm presentaion
Swic student realizm presentaion
 
1. mounting components 1
1. mounting components 11. mounting components 1
1. mounting components 1
 
2. csi rebate process workshop october 2010 long-1
2. csi rebate process workshop   october 2010 long-12. csi rebate process workshop   october 2010 long-1
2. csi rebate process workshop october 2010 long-1
 
7. pg&e understanding your bill commercial-w solar
7. pg&e understanding your bill commercial-w solar7. pg&e understanding your bill commercial-w solar
7. pg&e understanding your bill commercial-w solar
 
4. pv energy components & systems
4. pv energy components & systems4. pv energy components & systems
4. pv energy components & systems
 
Bill scott seminar presentation - foothill cc.ppt
Bill scott seminar presentation - foothill cc.pptBill scott seminar presentation - foothill cc.ppt
Bill scott seminar presentation - foothill cc.ppt
 
1. basic solar thermal training v3 robert cooley
1. basic solar thermal training v3 robert cooley1. basic solar thermal training v3 robert cooley
1. basic solar thermal training v3 robert cooley
 
Irec annual-trends-report-10-1-10 web
Irec annual-trends-report-10-1-10 webIrec annual-trends-report-10-1-10 web
Irec annual-trends-report-10-1-10 web
 
Irec solar market_trends_report_2009
Irec solar market_trends_report_2009Irec solar market_trends_report_2009
Irec solar market_trends_report_2009
 

Kürzlich hochgeladen

MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesMuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesManik S Magar
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesKari Kakkonen
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesThousandEyes
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxfnnc6jmgwh
 
WomenInAutomation2024: AI and Automation for eveyone
WomenInAutomation2024: AI and Automation for eveyoneWomenInAutomation2024: AI and Automation for eveyone
WomenInAutomation2024: AI and Automation for eveyoneUiPathCommunity
 
Landscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfLandscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfAarwolf Industries LLC
 
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Jeffrey Haguewood
 
JET Technology Labs White Paper for Virtualized Security and Encryption Techn...
JET Technology Labs White Paper for Virtualized Security and Encryption Techn...JET Technology Labs White Paper for Virtualized Security and Encryption Techn...
JET Technology Labs White Paper for Virtualized Security and Encryption Techn...amber724300
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024TopCSSGallery
 
Kuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialKuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialJoão Esperancinha
 
Infrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platformsInfrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platformsYoss Cohen
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...itnewsafrica
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Kaya Weers
 
QMMS Lesson 2 - Using MS Excel Formula.pdf
QMMS Lesson 2 - Using MS Excel Formula.pdfQMMS Lesson 2 - Using MS Excel Formula.pdf
QMMS Lesson 2 - Using MS Excel Formula.pdfROWELL MARQUINA
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditSkynet Technologies
 

Kürzlich hochgeladen (20)

MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesMuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examples
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
 
WomenInAutomation2024: AI and Automation for eveyone
WomenInAutomation2024: AI and Automation for eveyoneWomenInAutomation2024: AI and Automation for eveyone
WomenInAutomation2024: AI and Automation for eveyone
 
Landscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfLandscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdf
 
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
 
JET Technology Labs White Paper for Virtualized Security and Encryption Techn...
JET Technology Labs White Paper for Virtualized Security and Encryption Techn...JET Technology Labs White Paper for Virtualized Security and Encryption Techn...
JET Technology Labs White Paper for Virtualized Security and Encryption Techn...
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024
 
Kuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialKuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorial
 
Infrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platformsInfrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platforms
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)
 
QMMS Lesson 2 - Using MS Excel Formula.pdf
QMMS Lesson 2 - Using MS Excel Formula.pdfQMMS Lesson 2 - Using MS Excel Formula.pdf
QMMS Lesson 2 - Using MS Excel Formula.pdf
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance Audit
 

Nabcep techincal-sales-jta-guide-9-30-10 web

  • 1. NABCEP PV Technical Sales Job Task Analysis 09.10 • 1Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010 N A B C E P www.nabcep.org Job Task Analysis PVTechnical Sales
  • 2. 2 • NABCEP PV Technical Sales Job Task Analysis 09.10 Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010 NABCEP PV Technical Sales Examination Specifications N Items Content Domain 15 Qualify the Customer 10 Site Analysis 14 Conceptual Design 5 Financial Costs, Incentives, and Savings 4 Financial Benefit Analysis and Financing 3 Non-financial Benefit Analysis 5 Performance Analysis 4 Prepare Proposals 60 (total) Job Description: A PV Tech Salesperson is a solar electric professional with demonstrated expertise in the siting, design, analysis and performance of PV systems who gathers site specific information, analyzes customer needs and energy usage for the purpose of advising and provid- ing customers with the most appropriate solution for their situation. A. Qualify the Customer 1. Analyze electric bill • Gather bills • Look for seasonal patterns • Look at different fuel sources being used • Review utility rates • Explain why solar may not be appropriate 2. Perform remote site assessment • Determine house orientation • Determine roof tilt/angle, available area • Determine shading • Evaluate obstructions • Inquire about type and condition of roof • Determine ownership status • Determine type of property (residential commercial, non-profit) Knowledge of: -- How site conditions impact feasibility of solar system -- Internet tools -- The limitations of remote tools -- Magnetic declination NABCEP PV Technical Sales Content Outline
  • 3. NABCEP PV Technical Sales Job Task Analysis 09.10 • 3Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010 3. Identify customer needs • Ask about reasons for going solar • Evaluate future energy usage • Determine desired time frame • Determine whether customer needs financial assistance • Determine electric usage pattern, time of day • Discuss pros/cons of battery backup vs. generator Knowledge of: -- Basic sales skills -- Financial tools -- The use electric rates function -- Batteries -- Electrical terminology -- Correlating usage to specific appliances 4. Perform ball park estimate • Estimate array size based on kWh consumption and available array area • Price array size based on average $/watt • Evaluate potential price adders • Factor in incentives • Develop price range • Develop savings estimate • Develop preliminary economic analysis • Present (verbally/brief) initial ballpark proposal and benefits • Discuss customer budget limits Knowledge of: -- Price adders -- Roof type -- Licensing requirements -- How the height of building impacts installation costs -- Impact of long runs of conduit, wiring on costs -- Steepness -- Distance from load center 5. Identify jurisdictional issues • Determine zoning • Determine fire marshal awareness • Determine reservation issues • Check city, county and utility requirements • Identify utility • Identify homeowner association Knowledge of: -- Zoning issues for your area -- Codes for your area -- Utilities process, interconnection procedures, rules -- Laws relating to homeowner’s associations -- Insurance limitations 6. Manage customer expectations • Advise customer that system doesn’t provide backup power; when grid is down, it won’t work • Explain differences between battery and non-battery systems • Explain that PV does not heat water, space, or pools • Explain that PV generates electricity, does not offset gas loads • Explain seasonal variations in output • Explain required level of routine maintenance • Explain system equipment manufacturer warranties • Review life expectancy of equipment • Discuss aesthetics • Discuss ROI • Explain emerging vs. existing technologies • Explain expected output vs. system capacity • Explain instantaneous power vs. annual energy production • Explain installation warranties • Explain manufacturer warranties • Explain insurance issues, workers’ comp, liability • Explain effects on homeowner’s insurance • Explain potential impact on roof warranty • Explain performance validation methods
  • 4. 4 • NABCEP PV Technical Sales Job Task Analysis 09.10 Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010 Knowledge of: -- Basic solar system knowledge -- General financial understanding -- Product knowledge -- Knowledge of return on investment -- Product limitations   B. Site Analysis 1. Inspect electrical service • Determine service rating current and voltage • Identify buss bar and main breaker • Identify line tap vs. panel upgrade • Determine available breaker space • Determine grounding • Identify manufacturer of panel • Determine method of interconnection • Determine limits (max back fed breaker) based on local electrical code • Inform customer of potential additional costs related to utility hardware, transformers • Discuss findings with customer Knowledge of: -- Electrical safety -- OSHA -- Electrical principles -- Electrical codes 2. Identify locations for system components • Identify inverter location • Identify array location options • Identify AC & DC disconnects • Identify junction box • Locate conduit runs • Identify utility disconnect if applicable • Determine lengths of conduit runs Knowledge of: -- NEC and manufacturer clearance requirements -- Solar exposure -- Hazards (e.g., power lines, gas lines, meters) -- The difference between AC & DC disconnects -- Voltage ratings on fuses, AC & DC switches -- Utility differences on requirements for disconnects -- Tape measure -- Laser level 3. Assess mounting location • Identify roofing material • Identify framing • Identify spacing and spans • Determine if there is an attic space vs. flat roof • Assess structural integrity of roof (look at underside) • Document condition of roof (photos, notes, etc.) • Determine soil composition for ground/pole mounts • Identify underground obstructions (septic, gas lines) • Determine solar exposure • Measure roof area or ground area Knowledge of: -- Roofing materials -- Basic framing -- Standard building practices (spacing) -- Roofing terminology -- Risks of falling -- Walking on roofs without causing damage -- Reading blueprints -- Angle gauge -- Safety harness
  • 5. NABCEP PV Technical Sales Job Task Analysis 09.10 • 5Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010 4. Perform shade analysis • Identify existing shading obstructions • Consider future shading obstructions • Perform inter-row shading analysis • Complete shade study • Analyze annual loss from shading • Analyze seasonal/daily variations in shade • Determine whether rooftop analysis is necessary • If safe, proceed with rooftop analysis • If necessary, bring in crew for rooftop analysis • If rooftop analysis is not feasible, incorporate buffer • Calculate within acceptable limits of third-party audit, 3-5% • Prepare the report Knowledge of: -- The impact of shade on solar systems -- The proper use of the available tools   C. Conceptual Design 1. Select appropriate equipment • Explain module aesthetic options to customer • Explain efficiency, cost, aesthetic differences • Consider geographic location, climate • Select the module(s) • Match inverter to array • Match inverter to service voltage Knowledge of: -- Product -- Voltage windows -- Websites that provide insolation data 2. Determine equipment location • Avoid locations that will expose modules to salt water • Comply with manufacturer specifications for inverter location • Discuss potential sites for inverter with customer • Ask customer about long term plans for renovations, etc. • Consider type of monitoring system, broadband vs. wired • Discuss conduit runs Knowledge of: -- Noise level generated by equipment -- Risks of damage to equipment -- NEC requirements and local codes (AHJ) -- Cooling requirements -- Manufacturer’s clearances -- Fire department requirements
  • 6. 6 • NABCEP PV Technical Sales Job Task Analysis 09.10 Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010 3. Plan system layout • Determine module layout • Determine electrical layout • Determine which faces of roof to use • Sketch system layout Knowledge of: -- String layout -- Roof set backs -- Geometry -- Computer skills -- Spacing between modules 4. Perform string sizing • Select string sizing method • Consider min, max temperatures, site • Stand off distance (re: airflow) • Match array voltage to inverter voltage with applicable temperature conditions • Consider module voltage degradation over time Knowledge of: -- Applying temperature coefficients -- Correlation between temperature and voltage 5. Determine breaker size or supply side connection • Determine max inverter output given buss bar • Evaluate whether there is room for a breaker • Evaluate the service amperage • Determine whether new electrical service is needed • Determine whether line side tap can be used Knowledge of: -- Spacing between modules -- Electrical service sizes -- Current ratings -- Line side tap 6. Determine mounting method and tilt angle • Evaluate roof type and material • Evaluate roof pitch • Evaluate structural members (wood, steel, trusses, rafters) • Determine space required under modules • Consider impact on roofing warranties • Select racking • Determine number and type of roof penetrations, flashing • Evaluate performance and aesthetic impact of various tilt angles • Identify trenching considerations • Determine local height restrictions Knowledge of: -- Roofing -- Product -- Mounting systems   D. Financial Costs, Incentives, and Savings 1. Explain types of incentives and net cost • Explain local net metering policies • Explain feed-in tariffs • Identify utility financial models • Explain state, city and federal tax credits, treasury grants, depreciation, property tax exemptions, RECs, PBIs, rebates, tax deduc- tions, transfer credits, sales tax exemptions • Calculate net cost after incentives
  • 7. NABCEP PV Technical Sales Job Task Analysis 09.10 • 7Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010 2. Explain types of utility rates and net electric bill savings • Explain time of use • Explain tiered rate structures • Explain what energy and demand charges are • Explain how solar impacts demand charges • Explain how solar impacts energy charges • Discuss possibility of switching from one rate structure to another • Explain potential future rate escalations, decreases • Calculate electric bill savings   • Calculate internal rate of return (exclude financing costs) • Calculate simple return on investment • Calculate years to payback • Explain pre-tax and after-tax benefits • Calculate theoretical resale value increase on property • Explain to customer potential property equity impact • Explain degradation rate • Calculate net savings • Inform customer that projections are not legally binding, disclaimer Knowledge of: -- Financials -- Compound interest calculations 2. Evaluate appropriate financing options • Cash up front • Home equity loan • Leasing • Power Purchase Agreement (PPA) • Consumer loans • Community based financing, PACE • Utility loans Knowledge of: -- Financing options   F. Non-Financial Benefit Analysis 1. Calculate/quantify environmental benefits proportional to estimated production • Calculate Co2 avoidance • Calculate tons of coal saved • Calculate water saved • Calculate miles not driven in car • Calculate acres of trees saved • Calculate barrels of oil saved E. Financial Benefit Analysis and Financing 1. Calculate financial analysis • Calculate cash flow analysis • Calculate bill savings • Calculate maintenance expenses • Calculate replacement/repair costs for inverter • Develop multi-year timeline detailing costs/benefits
  • 8. 8 • NABCEP PV Technical Sales Job Task Analysis 09.10 Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010 2. Describe non-financial non-environmental benefits • Articulate/calculate energy independence • Articulate social benefits • Articulate other non-environmental benefits   G. Performance Analysis 1. Calculate production • Consider insolation data • Review temperature data for the area • Consider microclimate data if available • Consider impact of dust and dirt • Module name plate rating • Consider time of use • Consider shading • Consider wire losses • Consider module operating temperature, regional ambient temperatures and air flow • Consider component efficiencies (e.g., inverter, DC modules) • Consider tilt • Consider azimuth • Consider diodes and connections • Consider module mismatch • Consider system availability • Consider tracking, dual or single axis • Consider system age or degradation Knowledge of: -- Sites that can provide data -- PVWATTS or SAM -- RETScreen -- How various factors impact production 2. Identify factors that degrade system performance over time • Module degradation over time • Landscaping issues, tree growth • New construction H. Prepare Proposals 1. Create minimum acceptable proposal • Include production estimate • Include STC DC system power rating (and CEC AC or other rating as applicable) • Include average monthly electric bill savings estimate • Include total cost, rebates, tax incentives, and net cost • Identify and estimate permit fees, interconnec- tion fees, taxes and other foreseeable costs • Identify variable or unknown costs and provide estimated range of cost • Include payment schedule • Identify incentives paid over time (PBI, FIT, SRECs) • Include construction timeline and milestone dates • Include major equipment list, power ratings, and part count • List assumptions, special factors, and locations for equipment installation Knowledge of: -- Reading manufacturer data sheets -- Rating specs -- Documents required for completing the sale 2. Include additional elements as applicable and/or appropriate • Include financial benefit and/or financing discussion as applicable • Include non-financial benefit discussion as applicable • Include energy efficiency and conservation discussion as applicable
  • 9. NABCEP PV Technical Sales Job Task Analysis 09.10 • 9Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010 PV Technical Sales Certification Requirements Eligibility Requirements for the PV Technical Sales Certification To become certified and maintain certification, the applicant must minimally: • Be at least 18 years of age • Meet prerequisites of related experience and/or education as outlined below • Complete an application form documenting requirements • Sign and agree to uphold a code of ethics • Pay application and exam fee • Pass a written exam • Complete continuing education and installation requirements within the recertification timeframe Education,Training and Experience Requirements To qualify to sit for the NABCEP PV Technical Sales Certification examination, the candidate must demon- strate that he/she meets at least one of the following minimum entry requirement tracks outlined at right. Note: All USA applicants must have OSHA 10 Hour Construction Class Card. Applicants from other countries must provide an equivalent safety training credential from your jurisdiction as a prerequisite for the exam. Additionally training in sales techniques and customer management is strongly recommended for all candidates. Qualifying Categories for the PV Technical Sales Certification Examination a) A minimum of sixty (60) hours cumulative train- ing covering the PV Technical Sales Job Task Analysis: AND a minimum of one (1) year of verifiable sales experience; AND have successfully passed the NABCEP Entry Level PV Exam; OR b) A minimum of thirty-two (32) hours cumulative training covering the PV Technical Sales Job Task Analysis; AND a minimum of two (2) years of verifiable sales experience; AND have successfully passed the NABCEP Entry Level PV Exam; OR c) Two (2)-year renewable energy technology or technician degree from an accredited educational institution; AND a minimum of one (1) year verifi- able experience; AND have successfully passed the NABCEP Entry Level PV Exam; OR d) Four (4)-year degree from an accredited educa- tional institution; AND one (1) year verifiable sales experience; OR NOTE: A minimum of 30 hours of additional training in all aspects of the PV Technical Sales Job Task Analysis is strongly recommended. e) Be a NABCEP Certified Solar PV or NABCEP Installer Emeritus; OR NOTE: A minimum of 30 hours of additional training in non-installation aspects of the PV Technical Sales Job Task Analysis is strongly recommended. f) Hold Journeyman or licensed Electrician creden- tials; AND have successfully passed the NABCEP Entry Level PV Exam; OR NOTE: A minimum of 30 hours of additional training in all aspects of the PV Technical Sales Job Task Analysis is strongly recommended. g) A minimum of five (5) years verifiable sales experience. NOTE: A minimum of 30 hours of additional training in all aspects of the PV Technical Sales Job Task Analysis is strongly recommended.
  • 10. 10 • NABCEP PV Technical Sales Job Task Analysis 09.10 Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010 Definition of Verifiable Sales Experience For purposes of this process, verifiable sales experi- ence selling PV systems requires being in a responsible role in sales and or design process for the job. This includes titles including (but not limited to), sales manager, site analyst, financial analyst, system designer, technical support person, etc. Definition: 1 year verifiable sales experience = being the lead sales person, analyst or designer of a mini- mum of 4 PV systems occurring at some point in the 12 months prior to submitting an application for the exam*. At least 2 of the 4 PV systems must be larger than 2 kW DC (peak). At least one (1) installation must be a system that is grid connected. All systems claimed must have accompanying docu- mentation including proposal, electrical permitting and inspection records, and customer confirmation that the system sold met their expectations. The candi- date is asked to describe the scope of work they were responsible for on each installation. (All proposals and related proprietary information will be treated as strictly confidential.) In regions where electrical inspection is not possible, the Application Review Committee will judge experi- ence based on supplied documentation. *If applying through track (G), you will need to submit documentation for 20 verifiable system sales or pro- posals that have occurred in the last 5 years. 10 of the 20 systems must be larger than 2kW DC (peak) and at least 5 systems must be grid connected. Training Requirement for the PV Technical Sales Certification Candidates applying through categories that require training (A or B) must document that they have received the minimum hours of training specified. This training must cover the PV Technical Sales Job Task Analysis (JTA). While additional training is not required for each qualifying category it is strongly recommended. The exam is such that some level of training on all aspects of the PV Technical Sales Job Task Analysis will likely be necessary for most applicants to achieve a passing score. Candidates are therefore encouraged to seek training classes as needed. It is recommended that applicants look for training courses accredited by the Institute of Sustainable Power Quality (ISPQ) or taught by instructors certi- fied by ISPQ. Please visit www.IRECusa.org for full listings. NOTE: The minimum of 10 hours of OSHA or equivalent training is in addition to the training hours specified for each qualifying category. NABCEP will accept training to meet the requirements when the training meets the following outcomes: Have a formal training format, with a teacher-learner structure. This implies a connection between a learner and a learning source. It can include classroom time led by an instructor and/or discussion leader. It can also in- clude activities in which a learner is engaged in a planned learning event in which he/she is separated from faculty and other students but where the learner receives some sort of feedback and the learner’s progress is monitored.
  • 11. NABCEP PV Technical Sales Job Task Analysis 09.10 • 11Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010 Examples include computer-assisted instruction, interac- tive video/CD/DVD and/or web site learning. Covers core competencies from the PV Technical Sales Job Task Analysis. Acceptable training providers include: • Any institution accredited by an agency recog- nized by the federal Department of Education (Universities, Community Colleges etc.); • Dedicated independent Renewable Energy training programs (accreditation by ISPQ is strongly recommended); • Apprenticeship training programs recognized by the Department of Labor or equivalent; • Those approved by State or Provincial Contractor Licensing Boards; and; • Vocational/Technical training programs. Education Requirements for the PV Technical Sales Certification If qualifying through entry track (C) or (D), you must submit a copy of your diploma or transcript from an institution accredited by an agency recognized by the federal Department of Education showing that you have obtained a two-year or four-year degree. Documentation of Training, Education & Credentials Formal education and training are optional depending on the Qualifying Category you chose, even though NABCEP believes that applicants will benefit from quality training when preparing to take the certifica- tion exam. If your Qualifying Category requires train- ing, education or a specific credential, copies of official transcripts or diplomas will need to be attached to the application form. If qualifying under category (A) or (B), a copy of your proof of completion the cumulative hours of required training will need to be attached to the application. If qualifying under category (C) or (D), copies of official transcripts and diplomas attesting to your attendance and degrees earned will need to be attached to the application. If qualifying under category (A), (B), (C), (E) or (F), you will have to indicate in the application which credential(s) you hold and attach a copy of your certifi- cate or other proof of having achieved the credential(s) to this application. About the NABCEP PV Entry Level Exam Requirement Some of the pathways to qualify require that candidates pass the NABCEP PV Entry Level exam. Passing the PV Entry Level exam shows that individuals have achieved a basic understanding of PV system design and installa- tion. The Entry Level exam is not a certification exam. For information on how to become eligible to sit for the Entry Level exam and for the complete list of all current registered Entry Level Providers, please visit: http://www.nabcep.org/entry-level-certificate-program/for-students
  • 12. 12 • NABCEP PV Technical Sales Job Task Analysis 09.10 Small Wind Resource Guide Rev 1.0 06/07/2010 © NABCEP 2010 Documentation of Verifiable Sales Experience Please view “Definition of Verifiable Sales Experience” above for the definition of verifiable sales experience and system requirements. All systems claimed must have accompanying docu- mentation including the proposal, electrical permitting and inspection records, and customer confirmation that the system sold met their expectations. If permits are not available a written explanation documenting your role and responsibilities in the sale process along with the outcome of the sales process may be submit- ted for review. Applicants may also attach photos as optional documentation. When completing the applica- tion, applicants will be asked to describe the scope of work they were responsible for on each installation. All proposals and related proprietary information will be treated as strictly confidential (See Section 15 of the Candidates Handbook for details on confidentiality of application documents). In addition, for each system, applicants will need to provide: a) location of the job site, including some combination of the following: dates during which the job was performed, system-owner contact informa- tion, size of the total system, system components, and if required in the jurisdiction, copies of any inspection certificates or permits involved (including county & lot # if available). NABCEP reserves the right to contact system own- ers/operators, permitting authorities, and responsible contractors to verify work listed in this section. The Application Form will prompt you to attach copies of any permits or inspection certificates acquired. In cases where no inspection or permitted process was re- quired, the Application Review Committee will make decisions about eligibility based on supplied docu- mentation. Optional documentation includes anything that you feel verifies the installation and demonstrates your successful role. Licensure Requirement If a license is required in the jurisdiction in which the work is performed, candidates must submit their license number—or the license number under which the work was performed. North American Board of Certified Energy Practitioners 56 Clifton Country Road, Suite 202 Clifton Park, NY 12065 800-654-0021 / info@nabcep.org www.nabcep.org