SlideShare a Scribd company logo
1 of 13
Download to read offline
SAP MM & PP Course Material
December, 2007
Sample Training Lecture Slides
R/3 Org Structure Overview - MM
Client
Bus. Area
2000
Bus. Area
1000
Company
0003
Company
0002
Company
0001
Bus. Area
3000
Company
Code
Sto.Loc.
0001Plant
0001
Sto. Loc.
0002
Plant
0002
Sto. Loc.
0003
Plant
0003
Plant
Purchase Org
Storage Location
Materials ManagementFinancial
Valuation Area in SAP MM
 Valuation Area is either “Company Code” or “Plant”.
 When stock is valuated at plant level, you can valuate a material in different
plants at different prices.
 When you valuate stock at company code level, the valuation price of a material
is the same in all of a company's plants (that is, in a company code).
 SAP recommends that you valuate material at plant level.
 Valuation at plant level is mandatory if you want to use either of the Production
Planning or Product Cost Accounting components
Purchase Requisition (PR) Process Flow
Approval
Required?
Purchasing
No
Yes
MRP-
controlled?
Yes
No
Convert to
PO via MRP
List
Purchase
Orders
Released
Requisitions
Release
Requisition
Req. Created
Automatically or
Converted from
a Planned
Order in PP
Enter
Requisition
Requisitions
MRP Run in SAP
Services or Materials
Required (Outside of Those
Handled by MRP)
G/L Account Postings from GR
Material Price -
$10 a piece
Amount $100/
(10 PC * $10)
Order Price -
$12 a piece
Amount $120/
(10 PC * $12)
GR Diff - $2 a
piece
Amount $20
Invoice Price -
$11 a piece
Amount $110/
(10 PC * $11) +
Tax $11
Total Due $121
Invoice Verification Process
Purchase
Order
Goods
Receipt
Purchase Req
Tax
Calculation
Tax
Calculation
Invoice
Receipt
Pay to
Vendor
Purchase Order based Invoice Process
Tax is estimated on
PO Price
Tax is expensed at
Goods Receipt
Tax is paid or
accrued at Invoice
Receipt
CBP Vs. MRP - Key Differences
 MRP is based on current and future sales. Useful for the planning of finished products and important
assemblies and components. Requirement elements are sales orders, planned independent
requirements, material reservations.
 CBP is based on historical data and uses material forecasts or statistical procedures to determine future
requirements. It is not triggered by independent or dependent requirements. It is either triggered by
the available stock level falling below the reorder point or by forecast requirement calculated from
historical data.
M
R
P
C
B
P
MRP Type: Changed to Reorder Point Plan
Reqd
Date
Reqd
Qty
Material
12/24200Golf Iron
ReservationPurchase Req - creation indicator
Matl Master - MRP 1 View
Matl Master - MRP 2 View
Multiple PRs are created to cover
reqd qty: 237, because order qty
is limited by ‘fixed lot size’ of 60
per planned order / pur req
MRP Type - Reorder
Point Plan
Super BOM - Maintenance Screen
• Class Item as BOM
Component
• Will be replaced by a material
based on char value assigned
during BOM config for an order
• Variant Items / Alternate
Items as BOM Components
• One of the alternatives will be
selected based on char value
assigned during BOM config for
an order
• BOM Component is a
Configurable Material.
• Contains a Class Item
PC CASE - Configurable Item, contains ‘Class Item’
PC ASSY - A Configurable Item, contains another
‘Configurable Item’, PC CASE.
Configurable BOM - Config Simulation
Simulation - Assign / Pick Char Value
Result of Parent BOM (Level 0) - PC Assy
Result of Child BOM (Level 1) - PC Case
Result of Child BOM (Level 2) - Fan & Heat Sink
Level 1
Level 2
1 2
3
4
Level 0
Level 1
Level 2
Auto selection via Action
User selection
Capacity Leveling in Planned Order
Planned order capacity situation shows
an ‘over load’ of 43.2% at Work Center
WC 1 where the operation is carried
out.
• Required capacity: 79.58 HR
• Available capacity: 55.57 HR
• Cap Load: 143.2%
Overload
on 1/9
No overload
during other
periods
Capacity Evaluation - Order Qty 100
Production Order Settlement Example
Order Settlement Doc GR for Order (Post this Before Settlement)
Accounting Doc - Settlement Result
Controlling Doc - Settlement Result
Settlement - Sender & Receiver
KANBAN Execution - Example - Step 2
 Employee responsible for
Supply SA sees the
‘container’ status.
 A new PO ‘4500000096’ is
automatically created,
because the
‘Replenishment strategy’ is
set to ‘External
Procurement with Purchase
Orders’
 The PO is for qty 2 PC as
‘kanban’ qty is set to 2 in
‘control cycle’. The PO will
be sent to the Vendor
‘3000’
Employee sets ‘status’ to ‘In
Process’, yellow color.

More Related Content

What's hot

Master data
Master dataMaster data
Master datababloo6
 
Material master views
Material master viewsMaterial master views
Material master viewsLokesh Modem
 
Dilip sadh mm wm overview
Dilip sadh  mm wm overviewDilip sadh  mm wm overview
Dilip sadh mm wm overviewdilipsadh
 
Sap mm online training letslearnglobal
Sap mm online training   letslearnglobalSap mm online training   letslearnglobal
Sap mm online training letslearngloballetslearnglobal
 
SAP Production Planning and Execution presentation
SAP Production Planning and Execution presentationSAP Production Planning and Execution presentation
SAP Production Planning and Execution presentationAnkur Aggarwal
 
SAP MM Business Scenarios
SAP MM  Business ScenariosSAP MM  Business Scenarios
SAP MM Business ScenariosLokesh Modem
 
Master Data in Material Management
Master Data in Material ManagementMaster Data in Material Management
Master Data in Material ManagementGanesh Padala
 
Inter Company Billing in SAP -Basics
Inter Company Billing in SAP -BasicsInter Company Billing in SAP -Basics
Inter Company Billing in SAP -BasicsMangesh Ambardekar
 
SAP_Inventory_Management_Overview_PPT v1.1
SAP_Inventory_Management_Overview_PPT v1.1SAP_Inventory_Management_Overview_PPT v1.1
SAP_Inventory_Management_Overview_PPT v1.1Deb Martina
 
Class PowerPoint PIR
Class PowerPoint PIRClass PowerPoint PIR
Class PowerPoint PIRKellie Abbey
 
Introduction to sap r3 (mm)
Introduction to sap r3 (mm)Introduction to sap r3 (mm)
Introduction to sap r3 (mm)Vanitha Dassari
 
Sap MRP materials requirements planning
Sap MRP materials requirements planningSap MRP materials requirements planning
Sap MRP materials requirements planningnagarajusap06
 

What's hot (20)

Master data
Master dataMaster data
Master data
 
Material master views
Material master viewsMaterial master views
Material master views
 
Sap Mm
Sap   MmSap   Mm
Sap Mm
 
Dilip sadh mm wm overview
Dilip sadh  mm wm overviewDilip sadh  mm wm overview
Dilip sadh mm wm overview
 
Sap mm online training letslearnglobal
Sap mm online training   letslearnglobalSap mm online training   letslearnglobal
Sap mm online training letslearnglobal
 
Master data in mm
Master data in mm Master data in mm
Master data in mm
 
SAP Production Planning and Execution presentation
SAP Production Planning and Execution presentationSAP Production Planning and Execution presentation
SAP Production Planning and Execution presentation
 
SAP MM Business Scenarios
SAP MM  Business ScenariosSAP MM  Business Scenarios
SAP MM Business Scenarios
 
Master Data in Material Management
Master Data in Material ManagementMaster Data in Material Management
Master Data in Material Management
 
Sap mm ppt
Sap mm pptSap mm ppt
Sap mm ppt
 
Inter Company Billing in SAP -Basics
Inter Company Billing in SAP -BasicsInter Company Billing in SAP -Basics
Inter Company Billing in SAP -Basics
 
Sap MM Presentation
Sap MM PresentationSap MM Presentation
Sap MM Presentation
 
Stock overview
Stock overviewStock overview
Stock overview
 
The procure to pay process
The procure to pay process The procure to pay process
The procure to pay process
 
Presentation1 material master data
Presentation1 material master dataPresentation1 material master data
Presentation1 material master data
 
SAP_Inventory_Management_Overview_PPT v1.1
SAP_Inventory_Management_Overview_PPT v1.1SAP_Inventory_Management_Overview_PPT v1.1
SAP_Inventory_Management_Overview_PPT v1.1
 
SAP MM Essential Master Data
SAP MM Essential Master DataSAP MM Essential Master Data
SAP MM Essential Master Data
 
Class PowerPoint PIR
Class PowerPoint PIRClass PowerPoint PIR
Class PowerPoint PIR
 
Introduction to sap r3 (mm)
Introduction to sap r3 (mm)Introduction to sap r3 (mm)
Introduction to sap r3 (mm)
 
Sap MRP materials requirements planning
Sap MRP materials requirements planningSap MRP materials requirements planning
Sap MRP materials requirements planning
 

Similar to Sample sap mm pp course material

Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)Mostafa Ewees
 
SAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna NookellaSAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna Nookellamuralikrishnanookella
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec domsBabasab Patil
 
Planning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.pptPlanning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.pptSwayamTiwari12
 
SAP S4 Hana transformation benefits
SAP S4 Hana transformation benefitsSAP S4 Hana transformation benefits
SAP S4 Hana transformation benefitsNithin PM
 
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-infoMBA, MSc, Alberto Castellano
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Bhavin Shah
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Bhavin Shah
 
Sap mrp-configuration-pp
Sap mrp-configuration-ppSap mrp-configuration-pp
Sap mrp-configuration-ppLokesh Modem
 
SAP_PM_Major_integration_with_other_modules_1703686356.pdf
SAP_PM_Major_integration_with_other_modules_1703686356.pdfSAP_PM_Major_integration_with_other_modules_1703686356.pdf
SAP_PM_Major_integration_with_other_modules_1703686356.pdfssuserdc8c8c
 
55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sap55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sapPepa Pencheva
 
2015 Sage Summit IIG session- Product Lifecycle Management
2015 Sage Summit IIG session-  Product Lifecycle Management 2015 Sage Summit IIG session-  Product Lifecycle Management
2015 Sage Summit IIG session- Product Lifecycle Management Information Integration Group
 
cutoverstrategy - Copy.ppt
cutoverstrategy - Copy.pptcutoverstrategy - Copy.ppt
cutoverstrategy - Copy.pptmaheshgaikwad93
 
QAD solution (ENG)
QAD solution (ENG)QAD solution (ENG)
QAD solution (ENG)Phu Ton
 
Product costing343411327309984
Product costing343411327309984Product costing343411327309984
Product costing343411327309984shivaprakash
 
Co product costing master data
Co product costing master dataCo product costing master data
Co product costing master dataHema Latha
 
Case study industrial equipments & machinery manufacturers
Case study industrial equipments & machinery manufacturersCase study industrial equipments & machinery manufacturers
Case study industrial equipments & machinery manufacturersRoadmapITSolution
 

Similar to Sample sap mm pp course material (20)

Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
 
SAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna NookellaSAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna Nookella
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
Planning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.pptPlanning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.ppt
 
SAP S4 Hana transformation benefits
SAP S4 Hana transformation benefitsSAP S4 Hana transformation benefits
SAP S4 Hana transformation benefits
 
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
 
Cbp
CbpCbp
Cbp
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
 
Sap mrp-configuration-pp
Sap mrp-configuration-ppSap mrp-configuration-pp
Sap mrp-configuration-pp
 
SAP_PM_Major_integration_with_other_modules_1703686356.pdf
SAP_PM_Major_integration_with_other_modules_1703686356.pdfSAP_PM_Major_integration_with_other_modules_1703686356.pdf
SAP_PM_Major_integration_with_other_modules_1703686356.pdf
 
55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sap55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sap
 
2015 Sage Summit IIG session- Product Lifecycle Management
2015 Sage Summit IIG session-  Product Lifecycle Management 2015 Sage Summit IIG session-  Product Lifecycle Management
2015 Sage Summit IIG session- Product Lifecycle Management
 
cutoverstrategy - Copy.ppt
cutoverstrategy - Copy.pptcutoverstrategy - Copy.ppt
cutoverstrategy - Copy.ppt
 
cutoverstrategy.ppt
cutoverstrategy.pptcutoverstrategy.ppt
cutoverstrategy.ppt
 
QAD solution (ENG)
QAD solution (ENG)QAD solution (ENG)
QAD solution (ENG)
 
Product costing343411327309984
Product costing343411327309984Product costing343411327309984
Product costing343411327309984
 
Ch17 Mrp
Ch17  MrpCh17  Mrp
Ch17 Mrp
 
Co product costing master data
Co product costing master dataCo product costing master data
Co product costing master data
 
Case study industrial equipments & machinery manufacturers
Case study industrial equipments & machinery manufacturersCase study industrial equipments & machinery manufacturers
Case study industrial equipments & machinery manufacturers
 

Recently uploaded

AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...apidays
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbuapidays
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 

Recently uploaded (20)

AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 

Sample sap mm pp course material

  • 1. SAP MM & PP Course Material December, 2007 Sample Training Lecture Slides
  • 2. R/3 Org Structure Overview - MM Client Bus. Area 2000 Bus. Area 1000 Company 0003 Company 0002 Company 0001 Bus. Area 3000 Company Code Sto.Loc. 0001Plant 0001 Sto. Loc. 0002 Plant 0002 Sto. Loc. 0003 Plant 0003 Plant Purchase Org Storage Location Materials ManagementFinancial
  • 3. Valuation Area in SAP MM  Valuation Area is either “Company Code” or “Plant”.  When stock is valuated at plant level, you can valuate a material in different plants at different prices.  When you valuate stock at company code level, the valuation price of a material is the same in all of a company's plants (that is, in a company code).  SAP recommends that you valuate material at plant level.  Valuation at plant level is mandatory if you want to use either of the Production Planning or Product Cost Accounting components
  • 4. Purchase Requisition (PR) Process Flow Approval Required? Purchasing No Yes MRP- controlled? Yes No Convert to PO via MRP List Purchase Orders Released Requisitions Release Requisition Req. Created Automatically or Converted from a Planned Order in PP Enter Requisition Requisitions MRP Run in SAP Services or Materials Required (Outside of Those Handled by MRP)
  • 5. G/L Account Postings from GR Material Price - $10 a piece Amount $100/ (10 PC * $10) Order Price - $12 a piece Amount $120/ (10 PC * $12) GR Diff - $2 a piece Amount $20 Invoice Price - $11 a piece Amount $110/ (10 PC * $11) + Tax $11 Total Due $121
  • 6. Invoice Verification Process Purchase Order Goods Receipt Purchase Req Tax Calculation Tax Calculation Invoice Receipt Pay to Vendor Purchase Order based Invoice Process Tax is estimated on PO Price Tax is expensed at Goods Receipt Tax is paid or accrued at Invoice Receipt
  • 7. CBP Vs. MRP - Key Differences  MRP is based on current and future sales. Useful for the planning of finished products and important assemblies and components. Requirement elements are sales orders, planned independent requirements, material reservations.  CBP is based on historical data and uses material forecasts or statistical procedures to determine future requirements. It is not triggered by independent or dependent requirements. It is either triggered by the available stock level falling below the reorder point or by forecast requirement calculated from historical data. M R P C B P
  • 8. MRP Type: Changed to Reorder Point Plan Reqd Date Reqd Qty Material 12/24200Golf Iron ReservationPurchase Req - creation indicator Matl Master - MRP 1 View Matl Master - MRP 2 View Multiple PRs are created to cover reqd qty: 237, because order qty is limited by ‘fixed lot size’ of 60 per planned order / pur req MRP Type - Reorder Point Plan
  • 9. Super BOM - Maintenance Screen • Class Item as BOM Component • Will be replaced by a material based on char value assigned during BOM config for an order • Variant Items / Alternate Items as BOM Components • One of the alternatives will be selected based on char value assigned during BOM config for an order • BOM Component is a Configurable Material. • Contains a Class Item PC CASE - Configurable Item, contains ‘Class Item’ PC ASSY - A Configurable Item, contains another ‘Configurable Item’, PC CASE.
  • 10. Configurable BOM - Config Simulation Simulation - Assign / Pick Char Value Result of Parent BOM (Level 0) - PC Assy Result of Child BOM (Level 1) - PC Case Result of Child BOM (Level 2) - Fan & Heat Sink Level 1 Level 2 1 2 3 4 Level 0 Level 1 Level 2 Auto selection via Action User selection
  • 11. Capacity Leveling in Planned Order Planned order capacity situation shows an ‘over load’ of 43.2% at Work Center WC 1 where the operation is carried out. • Required capacity: 79.58 HR • Available capacity: 55.57 HR • Cap Load: 143.2% Overload on 1/9 No overload during other periods Capacity Evaluation - Order Qty 100
  • 12. Production Order Settlement Example Order Settlement Doc GR for Order (Post this Before Settlement) Accounting Doc - Settlement Result Controlling Doc - Settlement Result Settlement - Sender & Receiver
  • 13. KANBAN Execution - Example - Step 2  Employee responsible for Supply SA sees the ‘container’ status.  A new PO ‘4500000096’ is automatically created, because the ‘Replenishment strategy’ is set to ‘External Procurement with Purchase Orders’  The PO is for qty 2 PC as ‘kanban’ qty is set to 2 in ‘control cycle’. The PO will be sent to the Vendor ‘3000’ Employee sets ‘status’ to ‘In Process’, yellow color.