This assignment consists of two (2) sections a Work Breakdown Struc.docx

This assignment consists of two (2) sections: a Work Breakdown Structure (WBS) and a written paper.  You must submit both sections as separate files for the completion of this assignment.  Label each file name according to the section of the assignment it is written for. Imagine you have been hired to manage a project that will migrate a financial services legacy system to a Web-based cloud solution. This project will allow the organization to enhance user access from Web based clients and mobile platforms. There are approximately 1,000 users that will be accessing this financial services platform. For this project, you will need to include tasks to upgrade existing network infrastructure to support a new Web-based cloud solution with security enhancements to maintain data integrity and availability of application. Training for the users that are staffed within four (4) regional offices is also assumed. This project has a 60-day duration that must be represented at the top of your MS Project plan. As part of this project, it is essential that you plan the efforts required and provide estimates on what the costs and schedule may be. Section 1: Work Breakdown Structure (WBS) Required Format (MS Project File) Use MS Project or an Open Source alternative, such as Open Project to: Develop a Work Breakdown Structure (WBS) for the activities of the project using a phase or deliverable approach for determining the format of the WBS. Your WBS must: Identify at least fifteen (15) work packages listed below five (5) major phases / deliverables. List a code of the accounts identifier index to describe each work package within the WBS. List all the activities / tasks within your WBS, using Microsoft Project or Open Project,  and: Present the logical succession of each activity and list predecessor and successor activities associated with each activity. Indent the grouped activities / tasks under each major phase / deliverable.  Assign a milestone to represent the ending and beginning of a new phase. Assign realistic duration estimates for each activity. Remember that the overall project cannot exceed 60 days. Analyze the sequence of activities and add at least 20 predecessor and successor assignments to each activity. List the estimates in terms of days.  Section 2: Written Paper Required Format (MS Word File) Write a one (1) page paper in which you:  Explain how your specific WBS could help the team in estimating, planning, and understanding project requirements, deliverables, and efforts required to meet the financial services legacy system migration.  Explain at least three (3) risks in the plan and how they could be mitigated. Use at least one (1) quality resources in this assignment.  Note:  Wikipedia and similar Websites do not qualify as quality resources. Section 2 of the assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references .

This assignment consists of two (2) sections: a Work
Breakdown Structure (WBS) and a written paper.
You must submit both sections as separate files for the
completion of this assignment.
Label each file name according to the section of the assignment
it is written for.
Imagine you have been hired to manage a project that will
migrate a financial services legacy system to a Web-based cloud
solution. This project will allow the organization to enhance
user access from Web based clients and mobile platforms. There
are approximately 1,000 users that will be accessing this
financial services platform.
For this project, you will need to include tasks to upgrade
existing network infrastructure to support a new Web-based
cloud solution with security enhancements to maintain data
integrity and availability of application. Training for the users
that are staffed within four (4) regional offices is also assumed.
This project has a 60-day duration that must be represented at
the top of your MS Project plan. As part of this project, it is
essential that you plan the efforts required and provide
estimates on what the costs and schedule may be.
Section 1: Work Breakdown Structure (WBS)
Required Format (MS Project File)
Use MS Project or an Open Source alternative, such as Open
Project to:
Develop a Work Breakdown Structure (WBS) for the activities
of the project using a phase or deliverable approach for
determining the format of the WBS. Your WBS must:
Identify at least fifteen (15) work packages listed below five (5)
major phases / deliverables.
List a code of the accounts identifier index to describe each
work package within the WBS.
List all the activities / tasks within your WBS, using Microsoft
Project or Open Project, and:
Present the logical succession of each activity and list
predecessor and successor activities associated with each
activity.
Indent the grouped activities / tasks under each major phase /
deliverable.
Assign a milestone to represent the ending and beginning of a
new phase.
Assign realistic duration estimates for each activity. Remember
that the overall project cannot exceed 60 days.
Analyze the sequence of activities and add at least 20
predecessor and successor assignments to each activity.
List the estimates in terms of days.
Section 2: Written Paper
Required Format (MS Word File)
Write a one (1) page paper in which you:
Explain how your specific WBS could help the team in
estimating, planning, and understanding project requirements,
deliverables, and efforts required to meet the financial services
legacy system migration.
Explain at least three (3) risks in the plan and how they could
be mitigated.
Use at least one (1) quality resources in this assignment.
Note:
Wikipedia and similar Websites do not qualify as quality
resources.
Section 2 of the assignment must follow these formatting
requirements:
Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and references
must follow APA or school-specific format. Check with your
professor for any additional instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
Include charts or diagrams created in MS Project, or one of its
equivalents such as Open Project. The completed diagrams /
charts must be imported into the Word document before the
paper is submitted.
The specific course learning outcomes associated with this
assignment are:
Explain and apply the phases of the project management life
cycle.
Analyze and develop project schedules with appropriate
techniques and software tools.
Summarize methods to control technology projects through
information tracking and cost and change control techniques.
Use technology and information resources to research issues in
information systems.
Write clearly and concisely about Information Technology
Project Management topics using proper writing mechanics and
technical style conventions.
Click
here
to view the grading rubric.

Recomendados

Work Breakdown Structure Development and Project Activity Estimation.docx von
Work Breakdown Structure Development and Project Activity Estimation.docxWork Breakdown Structure Development and Project Activity Estimation.docx
Work Breakdown Structure Development and Project Activity Estimation.docxkeilenettie
5 views3 Folien
f you do not have Microsoft Project do not bid on this assignment, i.docx von
f you do not have Microsoft Project do not bid on this assignment, i.docxf you do not have Microsoft Project do not bid on this assignment, i.docx
f you do not have Microsoft Project do not bid on this assignment, i.docxdelciegreeks
6 views3 Folien
Assignment 4 Mobile App Part 1 (Work Breakdown Structure)This ass.docx von
Assignment 4 Mobile App Part 1 (Work Breakdown Structure)This ass.docxAssignment 4 Mobile App Part 1 (Work Breakdown Structure)This ass.docx
Assignment 4 Mobile App Part 1 (Work Breakdown Structure)This ass.docxastonrenna
6 views2 Folien
Term Paper Managing a Telecom ProjectDue Week 10 and worth 200 po.docx von
Term Paper Managing a Telecom ProjectDue Week 10 and worth 200 po.docxTerm Paper Managing a Telecom ProjectDue Week 10 and worth 200 po.docx
Term Paper Managing a Telecom ProjectDue Week 10 and worth 200 po.docxSANSKAR20
2 views4 Folien
Assignment 4 Mobile App Part 1 (Work Breakdown Structure)Due Week.docx von
Assignment 4 Mobile App Part 1 (Work Breakdown Structure)Due Week.docxAssignment 4 Mobile App Part 1 (Work Breakdown Structure)Due Week.docx
Assignment 4 Mobile App Part 1 (Work Breakdown Structure)Due Week.docxtidwellerin392
3 views2 Folien
This assignment contains two (2) deliverables a summary document to.docx von
This assignment contains two (2) deliverables a summary document to.docxThis assignment contains two (2) deliverables a summary document to.docx
This assignment contains two (2) deliverables a summary document to.docxterirasco
3 views2 Folien

Más contenido relacionado

Similar a This assignment consists of two (2) sections a Work Breakdown Struc.docx

Assignment 2 Work PackagesBuild on the project that you identifie.docx von
Assignment 2 Work PackagesBuild on the project that you identifie.docxAssignment 2 Work PackagesBuild on the project that you identifie.docx
Assignment 2 Work PackagesBuild on the project that you identifie.docxMatthewTennant613
4 views6 Folien
Assignment 3 Planning a Software Development ProjectThis assi von
Assignment 3 Planning a Software Development ProjectThis assiAssignment 3 Planning a Software Development ProjectThis assi
Assignment 3 Planning a Software Development ProjectThis assimellies4kxl
2 views4 Folien
Cis 554 week 10 term paper – strayer new von
Cis 554 week 10 term paper – strayer newCis 554 week 10 term paper – strayer new
Cis 554 week 10 term paper – strayer newEmeliaJackson2017
78 views3 Folien
Cis 554 week 10 term paper – strayer new von
Cis 554 week 10 term paper – strayer newCis 554 week 10 term paper – strayer new
Cis 554 week 10 term paper – strayer newCarolMurray2018
15 views3 Folien
Cis 554 week 10 term paper – strayer new von
Cis 554 week 10 term paper – strayer newCis 554 week 10 term paper – strayer new
Cis 554 week 10 term paper – strayer newtaynagant
46 views3 Folien
Cis 554 week 10 term paper – strayer new von
Cis 554 week 10 term paper – strayer newCis 554 week 10 term paper – strayer new
Cis 554 week 10 term paper – strayer newlynnruffin
70 views3 Folien

Similar a This assignment consists of two (2) sections a Work Breakdown Struc.docx(20)

Assignment 2 Work PackagesBuild on the project that you identifie.docx von MatthewTennant613
Assignment 2 Work PackagesBuild on the project that you identifie.docxAssignment 2 Work PackagesBuild on the project that you identifie.docx
Assignment 2 Work PackagesBuild on the project that you identifie.docx
Assignment 3 Planning a Software Development ProjectThis assi von mellies4kxl
Assignment 3 Planning a Software Development ProjectThis assiAssignment 3 Planning a Software Development ProjectThis assi
Assignment 3 Planning a Software Development ProjectThis assi
mellies4kxl2 views
Cis 554 week 10 term paper – strayer new von CarolMurray2018
Cis 554 week 10 term paper – strayer newCis 554 week 10 term paper – strayer new
Cis 554 week 10 term paper – strayer new
CarolMurray201815 views
Cis 554 week 10 term paper – strayer new von taynagant
Cis 554 week 10 term paper – strayer newCis 554 week 10 term paper – strayer new
Cis 554 week 10 term paper – strayer new
taynagant46 views
Cis 554 week 10 term paper – strayer new von lynnruffin
Cis 554 week 10 term paper – strayer newCis 554 week 10 term paper – strayer new
Cis 554 week 10 term paper – strayer new
lynnruffin70 views
Cis 554 week 10 term paper – strayer new von AmyBell2017
Cis 554 week 10 term paper – strayer newCis 554 week 10 term paper – strayer new
Cis 554 week 10 term paper – strayer new
AmyBell201756 views
CIS 348 Entire Course NEW von shyamuopuop
CIS 348 Entire Course NEWCIS 348 Entire Course NEW
CIS 348 Entire Course NEW
shyamuopuop37 views
Term Paper TopBikeDue Week 10 and worth 230 pointsThis .docx von jacqueliner9
Term Paper TopBikeDue Week 10 and worth 230 pointsThis .docxTerm Paper TopBikeDue Week 10 and worth 230 pointsThis .docx
Term Paper TopBikeDue Week 10 and worth 230 pointsThis .docx
jacqueliner97 views
Planning a Software Development ProjectDue Week 7 and worth 90 poi.docx von rosacrosdale
Planning a Software Development ProjectDue Week 7 and worth 90 poi.docxPlanning a Software Development ProjectDue Week 7 and worth 90 poi.docx
Planning a Software Development ProjectDue Week 7 and worth 90 poi.docx
rosacrosdale6 views
Assignment 3 Planning a Software Development ProjectDue Week 7 an.docx von tidwellerin392
Assignment 3 Planning a Software Development ProjectDue Week 7 an.docxAssignment 3 Planning a Software Development ProjectDue Week 7 an.docx
Assignment 3 Planning a Software Development ProjectDue Week 7 an.docx
tidwellerin3923 views
Assignment 3 Planning a Software Development ProjectDue 11-.docx von luearsome
Assignment 3 Planning a Software Development ProjectDue 11-.docxAssignment 3 Planning a Software Development ProjectDue 11-.docx
Assignment 3 Planning a Software Development ProjectDue 11-.docx
luearsome1 view
his assignment consists of two (2) sections a written project plan,.docx von fideladallimore
his assignment consists of two (2) sections a written project plan,.docxhis assignment consists of two (2) sections a written project plan,.docx
his assignment consists of two (2) sections a written project plan,.docx
fideladallimore5 views
This assignment consists of two (2) sectionsMS Project Exercise.docx von OllieShoresna
This assignment consists of two (2) sectionsMS Project Exercise.docxThis assignment consists of two (2) sectionsMS Project Exercise.docx
This assignment consists of two (2) sectionsMS Project Exercise.docx
OllieShoresna3 views
Bus 517 assignment 2 project scope von Laynevine
Bus 517 assignment 2   project scopeBus 517 assignment 2   project scope
Bus 517 assignment 2 project scope
Laynevine126 views
517 assignment 2 – project scope von hwcampusinfo
 517 assignment 2 – project scope 517 assignment 2 – project scope
517 assignment 2 – project scope
hwcampusinfo312 views
Business RequirementsThis assignment consists of two (2) sections.docx von aman341480
Business RequirementsThis assignment consists of two (2) sections.docxBusiness RequirementsThis assignment consists of two (2) sections.docx
Business RequirementsThis assignment consists of two (2) sections.docx
aman3414802 views
WORK MUST BE ORIGINAL! Paper will be checked for plagiaris.docx von keilenettie
WORK MUST BE ORIGINAL! Paper will be checked for plagiaris.docxWORK MUST BE ORIGINAL! Paper will be checked for plagiaris.docx
WORK MUST BE ORIGINAL! Paper will be checked for plagiaris.docx
keilenettie4 views
Project Management Process - InitiationThis assignment consists of.docx von bfingarjcmc
Project Management Process - InitiationThis assignment consists of.docxProject Management Process - InitiationThis assignment consists of.docx
Project Management Process - InitiationThis assignment consists of.docx
bfingarjcmc3 views
Click the link above to submit your assignment.Students, ple.docx von vernettacrofts
Click the link above to submit your assignment.Students, ple.docxClick the link above to submit your assignment.Students, ple.docx
Click the link above to submit your assignment.Students, ple.docx
vernettacrofts0 views

Más de meagantobias

This has to be an excel spreadsheet and a 1-2 word document. Please .docx von
This has to be an excel spreadsheet and a 1-2 word document. Please .docxThis has to be an excel spreadsheet and a 1-2 word document. Please .docx
This has to be an excel spreadsheet and a 1-2 word document. Please .docxmeagantobias
16 views1 Folie
This has the description of the whole project as an attachment (Bany.docx von
This has the description of the whole project as an attachment (Bany.docxThis has the description of the whole project as an attachment (Bany.docx
This has the description of the whole project as an attachment (Bany.docxmeagantobias
4 views1 Folie
This final essay is based on the Unit 3 tennis-match outline. You .docx von
This final essay is based on the Unit 3 tennis-match outline. You .docxThis final essay is based on the Unit 3 tennis-match outline. You .docx
This final essay is based on the Unit 3 tennis-match outline. You .docxmeagantobias
4 views2 Folien
This essay will focus on an issue being debated in your current care.docx von
This essay will focus on an issue being debated in your current care.docxThis essay will focus on an issue being debated in your current care.docx
This essay will focus on an issue being debated in your current care.docxmeagantobias
2 views1 Folie
This exam consists of two parts.The first part consists of five (5.docx von
This exam consists of two parts.The first part consists of five (5.docxThis exam consists of two parts.The first part consists of five (5.docx
This exam consists of two parts.The first part consists of five (5.docxmeagantobias
3 views11 Folien
This here easy homwork just answer quastions as note form in 2 pag.docx von
This here easy homwork just answer quastions as note form in 2 pag.docxThis here easy homwork just answer quastions as note form in 2 pag.docx
This here easy homwork just answer quastions as note form in 2 pag.docxmeagantobias
6 views2 Folien

Más de meagantobias(20)

This has to be an excel spreadsheet and a 1-2 word document. Please .docx von meagantobias
This has to be an excel spreadsheet and a 1-2 word document. Please .docxThis has to be an excel spreadsheet and a 1-2 word document. Please .docx
This has to be an excel spreadsheet and a 1-2 word document. Please .docx
meagantobias16 views
This has the description of the whole project as an attachment (Bany.docx von meagantobias
This has the description of the whole project as an attachment (Bany.docxThis has the description of the whole project as an attachment (Bany.docx
This has the description of the whole project as an attachment (Bany.docx
meagantobias4 views
This final essay is based on the Unit 3 tennis-match outline. You .docx von meagantobias
This final essay is based on the Unit 3 tennis-match outline. You .docxThis final essay is based on the Unit 3 tennis-match outline. You .docx
This final essay is based on the Unit 3 tennis-match outline. You .docx
meagantobias4 views
This essay will focus on an issue being debated in your current care.docx von meagantobias
This essay will focus on an issue being debated in your current care.docxThis essay will focus on an issue being debated in your current care.docx
This essay will focus on an issue being debated in your current care.docx
meagantobias2 views
This exam consists of two parts.The first part consists of five (5.docx von meagantobias
This exam consists of two parts.The first part consists of five (5.docxThis exam consists of two parts.The first part consists of five (5.docx
This exam consists of two parts.The first part consists of five (5.docx
meagantobias3 views
This here easy homwork just answer quastions as note form in 2 pag.docx von meagantobias
This here easy homwork just answer quastions as note form in 2 pag.docxThis here easy homwork just answer quastions as note form in 2 pag.docx
This here easy homwork just answer quastions as note form in 2 pag.docx
meagantobias6 views
This Final Assignment for the course allows you to put all of the pi.docx von meagantobias
This Final Assignment for the course allows you to put all of the pi.docxThis Final Assignment for the course allows you to put all of the pi.docx
This Final Assignment for the course allows you to put all of the pi.docx
meagantobias2 views
THIS FOR ANYONE WHO BOUGHT A TUTORIAL FOR A TUTOR AND THEY WERE LIED.docx von meagantobias
THIS FOR ANYONE WHO BOUGHT A TUTORIAL FOR A TUTOR AND THEY WERE LIED.docxTHIS FOR ANYONE WHO BOUGHT A TUTORIAL FOR A TUTOR AND THEY WERE LIED.docx
THIS FOR ANYONE WHO BOUGHT A TUTORIAL FOR A TUTOR AND THEY WERE LIED.docx
meagantobias3 views
This essay is only 350-700 words in APA format, Due 419Roman Co.docx von meagantobias
This essay is only 350-700 words in APA format, Due 419Roman Co.docxThis essay is only 350-700 words in APA format, Due 419Roman Co.docx
This essay is only 350-700 words in APA format, Due 419Roman Co.docx
meagantobias3 views
This essay pertains to my Business 100 classIn a formal 300 - .docx von meagantobias
This essay pertains to my Business 100 classIn a formal 300 - .docxThis essay pertains to my Business 100 classIn a formal 300 - .docx
This essay pertains to my Business 100 classIn a formal 300 - .docx
meagantobias2 views
This discussion requires you to construct a single document consisti.docx von meagantobias
This discussion requires you to construct a single document consisti.docxThis discussion requires you to construct a single document consisti.docx
This discussion requires you to construct a single document consisti.docx
meagantobias3 views
this essay is about my learning style which is visual and has to be .docx von meagantobias
this essay is about my learning style which is visual and has to be .docxthis essay is about my learning style which is visual and has to be .docx
this essay is about my learning style which is visual and has to be .docx
meagantobias2 views
This discussion topic requires you to reflect on the Performance Imp.docx von meagantobias
This discussion topic requires you to reflect on the Performance Imp.docxThis discussion topic requires you to reflect on the Performance Imp.docx
This discussion topic requires you to reflect on the Performance Imp.docx
meagantobias2 views
This discussion is a research activity in which you will evaluate th.docx von meagantobias
This discussion is a research activity in which you will evaluate th.docxThis discussion is a research activity in which you will evaluate th.docx
This discussion is a research activity in which you will evaluate th.docx
meagantobias3 views
This discussion forum explores using social media as an assessment t.docx von meagantobias
This discussion forum explores using social media as an assessment t.docxThis discussion forum explores using social media as an assessment t.docx
This discussion forum explores using social media as an assessment t.docx
meagantobias2 views
This discussion is not a graded item but should be used to discuss a.docx von meagantobias
This discussion is not a graded item but should be used to discuss a.docxThis discussion is not a graded item but should be used to discuss a.docx
This discussion is not a graded item but should be used to discuss a.docx
meagantobias2 views
This final assignment analyzes a number of important issues in recru.docx von meagantobias
This final assignment analyzes a number of important issues in recru.docxThis final assignment analyzes a number of important issues in recru.docx
This final assignment analyzes a number of important issues in recru.docx
meagantobias2 views
This entire thing will take around 20-30 minutes to be completed..docx von meagantobias
This entire thing will take around 20-30 minutes to be completed..docxThis entire thing will take around 20-30 minutes to be completed..docx
This entire thing will take around 20-30 minutes to be completed..docx
meagantobias2 views
This essay should be roughly 3-5 concise paragraphs. It should provi.docx von meagantobias
This essay should be roughly 3-5 concise paragraphs. It should provi.docxThis essay should be roughly 3-5 concise paragraphs. It should provi.docx
This essay should be roughly 3-5 concise paragraphs. It should provi.docx
meagantobias2 views
This discussion forum analyzes the usefulness of learning communitie.docx von meagantobias
This discussion forum analyzes the usefulness of learning communitie.docxThis discussion forum analyzes the usefulness of learning communitie.docx
This discussion forum analyzes the usefulness of learning communitie.docx
meagantobias2 views

Último

Lecture: Open Innovation von
Lecture: Open InnovationLecture: Open Innovation
Lecture: Open InnovationMichal Hron
96 views56 Folien
ICANN von
ICANNICANN
ICANNRajaulKarim20
64 views13 Folien
ACTIVITY BOOK key water sports.pptx von
ACTIVITY BOOK key water sports.pptxACTIVITY BOOK key water sports.pptx
ACTIVITY BOOK key water sports.pptxMar Caston Palacio
430 views4 Folien
AI Tools for Business and Startups von
AI Tools for Business and StartupsAI Tools for Business and Startups
AI Tools for Business and StartupsSvetlin Nakov
101 views39 Folien
Computer Introduction-Lecture06 von
Computer Introduction-Lecture06Computer Introduction-Lecture06
Computer Introduction-Lecture06Dr. Mazin Mohamed alkathiri
71 views12 Folien

Último(20)

Lecture: Open Innovation von Michal Hron
Lecture: Open InnovationLecture: Open Innovation
Lecture: Open Innovation
Michal Hron96 views
AI Tools for Business and Startups von Svetlin Nakov
AI Tools for Business and StartupsAI Tools for Business and Startups
AI Tools for Business and Startups
Svetlin Nakov101 views
Class 10 English notes 23-24.pptx von TARIQ KHAN
Class 10 English notes 23-24.pptxClass 10 English notes 23-24.pptx
Class 10 English notes 23-24.pptx
TARIQ KHAN107 views
Education and Diversity.pptx von DrHafizKosar
Education and Diversity.pptxEducation and Diversity.pptx
Education and Diversity.pptx
DrHafizKosar118 views
Narration lesson plan.docx von TARIQ KHAN
Narration lesson plan.docxNarration lesson plan.docx
Narration lesson plan.docx
TARIQ KHAN104 views
UWP OA Week Presentation (1).pptx von Jisc
UWP OA Week Presentation (1).pptxUWP OA Week Presentation (1).pptx
UWP OA Week Presentation (1).pptx
Jisc74 views
Drama KS5 Breakdown von WestHatch
Drama KS5 BreakdownDrama KS5 Breakdown
Drama KS5 Breakdown
WestHatch71 views
Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation) von AnshulDewangan3
 Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation) Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation)
Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation)
AnshulDewangan3316 views
Ch. 7 Political Participation and Elections.pptx von Rommel Regala
Ch. 7 Political Participation and Elections.pptxCh. 7 Political Participation and Elections.pptx
Ch. 7 Political Participation and Elections.pptx
Rommel Regala72 views
Use of Probiotics in Aquaculture.pptx von AKSHAY MANDAL
Use of Probiotics in Aquaculture.pptxUse of Probiotics in Aquaculture.pptx
Use of Probiotics in Aquaculture.pptx
AKSHAY MANDAL89 views
The Open Access Community Framework (OACF) 2023 (1).pptx von Jisc
The Open Access Community Framework (OACF) 2023 (1).pptxThe Open Access Community Framework (OACF) 2023 (1).pptx
The Open Access Community Framework (OACF) 2023 (1).pptx
Jisc85 views
Psychology KS5 von WestHatch
Psychology KS5Psychology KS5
Psychology KS5
WestHatch77 views

This assignment consists of two (2) sections a Work Breakdown Struc.docx

  • 1. This assignment consists of two (2) sections: a Work Breakdown Structure (WBS) and a written paper. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Imagine you have been hired to manage a project that will migrate a financial services legacy system to a Web-based cloud solution. This project will allow the organization to enhance user access from Web based clients and mobile platforms. There are approximately 1,000 users that will be accessing this financial services platform. For this project, you will need to include tasks to upgrade existing network infrastructure to support a new Web-based cloud solution with security enhancements to maintain data integrity and availability of application. Training for the users that are staffed within four (4) regional offices is also assumed. This project has a 60-day duration that must be represented at the top of your MS Project plan. As part of this project, it is essential that you plan the efforts required and provide estimates on what the costs and schedule may be. Section 1: Work Breakdown Structure (WBS) Required Format (MS Project File) Use MS Project or an Open Source alternative, such as Open Project to: Develop a Work Breakdown Structure (WBS) for the activities of the project using a phase or deliverable approach for determining the format of the WBS. Your WBS must: Identify at least fifteen (15) work packages listed below five (5) major phases / deliverables. List a code of the accounts identifier index to describe each work package within the WBS. List all the activities / tasks within your WBS, using Microsoft Project or Open Project, and: Present the logical succession of each activity and list
  • 2. predecessor and successor activities associated with each activity. Indent the grouped activities / tasks under each major phase / deliverable. Assign a milestone to represent the ending and beginning of a new phase. Assign realistic duration estimates for each activity. Remember that the overall project cannot exceed 60 days. Analyze the sequence of activities and add at least 20 predecessor and successor assignments to each activity. List the estimates in terms of days. Section 2: Written Paper Required Format (MS Word File) Write a one (1) page paper in which you: Explain how your specific WBS could help the team in estimating, planning, and understanding project requirements, deliverables, and efforts required to meet the financial services legacy system migration. Explain at least three (3) risks in the plan and how they could be mitigated. Use at least one (1) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources. Section 2 of the assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. Include charts or diagrams created in MS Project, or one of its equivalents such as Open Project. The completed diagrams /
  • 3. charts must be imported into the Word document before the paper is submitted. The specific course learning outcomes associated with this assignment are: Explain and apply the phases of the project management life cycle. Analyze and develop project schedules with appropriate techniques and software tools. Summarize methods to control technology projects through information tracking and cost and change control techniques. Use technology and information resources to research issues in information systems. Write clearly and concisely about Information Technology Project Management topics using proper writing mechanics and technical style conventions. Click here to view the grading rubric.