3. MC University
PM Assets Tab Defined
PM Assets Tab Overview
Repair Center Filter
Use Asset Defaults
Header Action Bar
4. MC University
PM Assets Tab Overview
Provides a list of Assets / Locations associated
with the selected PM schedule
Assets added will be used for generation of
Work Orders
5. MC University
Repair Center Filter
Filters Assets displayed to specific Repair
Centers
Repair Center specified on PM Asset record
6. MC University
Use Asset Defaults
Control designates fields of Asset record that
should be referenced for generation
If selected, the following options will appear
to choose from:
7. MC University
Use Asset Defaults (cont’d)
If Indicator is not checked:
• Asset attributes from PM Asset record regardless
of current value on Asset
• Value stored with Asset at time of record creation
8. MC University
Use Asset Defaults (cont’d)
If Indicator is checked:
• Attributes of Asset at time of Work Order
generation
9. MC University
Header Action Bar
Add… Asset to schedule:
• Asset Lookup is used
• Asset / Location Popup for entering
organizational attribute fields
10. MC University
Header Action Bar (cont’d)
Update… button:
• Update same information on multiple Assets
• Fields left blank will not be affected
11. MC University
Header Action Bar (cont’d)
Remove… Assets from schedule:
• Select single or multiple Assets and remove from
PM schedule
12. MC University
Exploring the PM Assets Tab: Example
In this example the PM Assets Tab will be
explored by:
• Filtering Assets by Repair Center
• Removing Assets from the schedule
13. MC University
Fields and Columns
Selection Box
Name
Parent Location
Route Order
Next Scheduled
Next Procedure
Enabled?
15. MC University
Name
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled
notification
16. MC University
Parent Location
Name and ID of designated Asset displayed
Work Order generation information
Asset In-Service and PM Schedule Disabled
notification
21. MC University
Adding Assets to Schedule
Adding Assets Overview
Asset / Location Module Lookup
Asset / Location Popup
22. MC University
Adding Assets Overview
Enabled Assets added to Assets tab will have
Work Orders generated
Procedures also can determine which Assets
will be associated with PM
23. MC University
Asset / Location Module Lookup
Add… button opens Asset / Location Module
Lookup
Use controls to find Asset(s) to be added
24. MC University
Asset / Location Module Lookup (cont’d)
Example of adding Assets to PM:
25. MC University
Asset / Location Popup
Displays information to determine next
scheduled maintenance:
• Route Order
• Last Generated and Last Completed
26. MC University
Asset / Location Popup (cont’d)
• Meter Intervals
• Occurrence Counter and Next Scheduled Interval
Counter
27. MC University
Asset / Location Popup (cont’d)
Example of Last Generated and Last
Completed date:
28. MC University
Asset / Location Popup (cont’d)
Displays organizational attributes:
• Repair Center, stock room, and tool room
• Shift
29. MC University
Asset / Location Popup (cont’d)
• Supervisor
• Shop, department, account, etc.
• Enabled?
30. MC University
Asset / Location Popup (cont’d)
Example of field values retrieved from Asset:
31. MC University
Exploring the PM Assets Tab: Example
In this example, multiple Assets will be added
to a PM schedule!