CASE STUDY ON
MONORAIL
ID: 1300511600095
1300511600099
1300511600107
1300511600109
INTRODUCTION
MONORAIL FOR TRANSPORTATION
OF PEOPLE AND LIGHT FREIGHT IS
CHARACTERIZED BY THE
COMBINATION OF THE TWO
WORDS, "MONO" (ONE) AND
"RAIL", MEANING A
TRANSPORTATION SYSTEM THAT IS
SUPPORTED AND STABILIZED
ALONG A SINGLE RAIL, WHICH
COMMONLY IS CALLED A BEAM
WAY FOR AN ELEVATED SYSTEM.
CLASSIFICATION
1.MONORAILS THAT ARE SUSPENDED
UNDER A BEAM WAY ARE ALL ELEVATED
TYPES, AND BECAUSE OF NECESSARY
TRAFFIC CLEARANCE UNDER THE VEHICLE,
HAS THE LARGEST AERIAL REQUIREMENT
IN MONORAIL COMPARISONS. THE BEAM
WAY IS ABOVE THE VEHICLE AND
PROPULSION MOTORS AND BOGIES ARE
ON TOP OF THE VEHICLES. AN EXAMPLE IS
THE WUPPERTAL MONORAIL IN
GERMANY. THIS IS PERHAPS THE OLDEST
OF ALL MONORAILS AND IS STILL IN
OPERATION.
CLASSIFICATION
2. MONORAILS THAT ENVELOPE AND STRADDLE A BEAM WAY A TYPICAL AND MOST APPLIED MONORAIL
WORLD WIDE IS THE ALWEG MONORAIL CONCEPT, WHICH ENVELOPES AND STRADDLES A NARROW
DEEP BEAM WAY. THE ALWEG VEHICLE IS SUPPORTED BY 2 BOGIES, EACH HAVING LOAD BEARING
WHEELS ON THE TOP OF THE BEAM, AND IS GUIDED BY 2 ROWS OF STABILIZING WHEELS ALONG EACH
SIDE OF THE BEAM WAY. IN THIS CONCEPT THE BEAM WAY IS AN ESSENTIAL PART OF THE VEHICLE
SYSTEM EITHER WHEN ELEVATED OR AT SURFACE.
CLASSIFICATION
3. Monorails that run on top of a beam way or a slab at surface A typical one is the new
monorail technology trade named Urbanaut, which has a unique central guide rail on top of the
beam way that prevents uplift and derailment of the vehicle.
STRUCTURAL SYSTEM
STRUCTURAL SYSTEM
STRUCTURAL SYSTEM
STRUCTURAL SYSTEM
GUIDEWAY DESIGN
PILLAR SUPPORT DESIGN
STATION CONFIGURATIONS
COMPARISON
Comparison of large-type straddle-monorail with light rail aerials.
CASE STUDY
KL Monorail
THE KL MONORAIL LINE IS AN URBAN MONORAIL SYSTEM IN KUALA LUMPUR, MALAYSIA. IT OPENED ON 31
AUGUST 2003, WITH 11 STATIONS RUNNING 8.6 KM (5 MI) ON TWO PARALLEL ELEVATED TRACKS. IT
CONNECTS THE KUALA LUMPUR CENTRAL TRANSPORT HUB WITH THE "GOLDEN TRIANGLE".
NAME: LALUAN MONORAIL KL
TYPE: STRADDLE-BEAM MONORAIL
STATIONS: 11
DAILY RIDERSHIP: 68,679 (2015)
LINE LENGTH: 86 KM
OPERATING SPEED: 60 KM/H
STATIONS
THE LINE CONSISTS OF A SINGLE DUAL-WAY LINE THAT LINKS AREAS OF INNER KUALA LUMPUR
PREVIOUSLY NOT SERVED BY RAIL TRANSPORT.
THE STATIONS ARE DESIGNED AS ELEVATED STRUCTURES WITH TICKETING FACILITIES ON EITHER
THE GROUND LEVEL (AS SEEN IN THE KL SENTRAL STATION) OR THE FIRST-FLOOR LEVEL. THE
PLATFORMS ARE ON THE TOP FLOOR, SEPARATED FROM THE MONORAIL LINES BY FENCING.
THEY WERE ORIGINALLY COVERED BY LARGE CANVAS ROOFS, WHICH WERE REPLACED IN 2014
BY ALUMINIUM ZINC ROOFS.[2] CERTAIN STATIONS ARE SITUATED ABOVE ROADWAYS, OR ARE
SLIGHTLY LONGER THAN OTHERS. EACH STATION IS ALSO DESIGNATED WITH A SPONSOR, WITH
ROUTE MAPS ASSOCIATING EACH STATION WITH A PARTICULAR PRODUCT BRAND.
Rolling stock
The line uses permanently coupled two-car trains of a similar design to the Seattle Center Monorail's ALWEG
trains.[9] Each monorail train can accommodate 158 passengers during regular operations. The monorail carriages
themselves were constructed by Scomi Rail, a Malaysian monorail manufacturer,[9] at the Scomi Rail plant in
Rawang, which also featured its own tracks for monorail train tests.[10]
In December 2014, KL Monorail began putting the first two of its four-car trains into service[11] The Scomi SUTRA
monorails were designed and manufactured by Malaysian rail company Scomi Rail. Each train can accommodate
430 passengers per trip, compared with 213 passengers for the two-car trains.[11] Two more four-car trains are
scheduled to arrive in the first quarter of 2015 with the remaining eight arriving in stages. All the four-car trains
are scheduled to be in operation by the end of 2015.[11] Upon the delivery of the new four-car trains, the original
two-car trains which have been in use since KL Monorail opened will be decommissioned.[11] The new trains are
equipped with four closed-circuit television cameras and space for wheelchairs and strollers

More Related Content

What's hot

karunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Archkarunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.ArchTuhina Chatterjee
 
Planning for system of transportation
Planning for system of transportationPlanning for system of transportation
Planning for system of transportationKU Leuven
 
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Gargee Ghosh
 
UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals) UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals) shrikrishna kesharwani
 
Berlin hauptbanhof central railway
Berlin hauptbanhof central railwayBerlin hauptbanhof central railway
Berlin hauptbanhof central railwaySneha Lata
 
Kochi Metro Rail Project.doc
Kochi Metro Rail Project.docKochi Metro Rail Project.doc
Kochi Metro Rail Project.docSuryadev Maity
 
Vyttila Mobility hub
Vyttila Mobility hubVyttila Mobility hub
Vyttila Mobility hubDhanuraj D
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMChandanPadhi3
 
Transit oriented development
Transit oriented developmentTransit oriented development
Transit oriented developmentPalak Khandelwal
 
Integrated multi modal transportation system
Integrated multi modal transportation system Integrated multi modal transportation system
Integrated multi modal transportation system Aditya Gupta
 
Transportation analysis at anand vihar
Transportation analysis at anand viharTransportation analysis at anand vihar
Transportation analysis at anand viharSneha Lata
 
Planning principles of Bus Terminals and Logistics Parks
Planning principles of Bus Terminals and Logistics ParksPlanning principles of Bus Terminals and Logistics Parks
Planning principles of Bus Terminals and Logistics ParksYajush Sonar
 
Screen line and Corrider Line Analysis
Screen line and Corrider Line AnalysisScreen line and Corrider Line Analysis
Screen line and Corrider Line AnalysisAbhishek Kansara
 
A case study on Rajkillpakkam Junction,Chennai
A case study on Rajkillpakkam Junction,ChennaiA case study on Rajkillpakkam Junction,Chennai
A case study on Rajkillpakkam Junction,ChennaiSukhdeep Jat
 
National urban transport policy
National urban transport policyNational urban transport policy
National urban transport policyShubham Jain
 
Road types and Road networks
Road types and Road networksRoad types and Road networks
Road types and Road networksSwapnil Joshi
 
Literature case study - ARTIC
Literature case study - ARTICLiterature case study - ARTIC
Literature case study - ARTICnainadesh
 

What's hot (20)

karunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Archkarunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Arch
 
Planning for system of transportation
Planning for system of transportationPlanning for system of transportation
Planning for system of transportation
 
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
 
Transit hub
Transit hub Transit hub
Transit hub
 
UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals) UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
 
Berlin hauptbanhof central railway
Berlin hauptbanhof central railwayBerlin hauptbanhof central railway
Berlin hauptbanhof central railway
 
PPT on Monorail
PPT on MonorailPPT on Monorail
PPT on Monorail
 
Kochi Metro Rail Project.doc
Kochi Metro Rail Project.docKochi Metro Rail Project.doc
Kochi Metro Rail Project.doc
 
Vyttila Mobility hub
Vyttila Mobility hubVyttila Mobility hub
Vyttila Mobility hub
 
Bangalore Metro Project
Bangalore Metro ProjectBangalore Metro Project
Bangalore Metro Project
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEM
 
Transit oriented development
Transit oriented developmentTransit oriented development
Transit oriented development
 
Integrated multi modal transportation system
Integrated multi modal transportation system Integrated multi modal transportation system
Integrated multi modal transportation system
 
Transportation analysis at anand vihar
Transportation analysis at anand viharTransportation analysis at anand vihar
Transportation analysis at anand vihar
 
Planning principles of Bus Terminals and Logistics Parks
Planning principles of Bus Terminals and Logistics ParksPlanning principles of Bus Terminals and Logistics Parks
Planning principles of Bus Terminals and Logistics Parks
 
Screen line and Corrider Line Analysis
Screen line and Corrider Line AnalysisScreen line and Corrider Line Analysis
Screen line and Corrider Line Analysis
 
A case study on Rajkillpakkam Junction,Chennai
A case study on Rajkillpakkam Junction,ChennaiA case study on Rajkillpakkam Junction,Chennai
A case study on Rajkillpakkam Junction,Chennai
 
National urban transport policy
National urban transport policyNational urban transport policy
National urban transport policy
 
Road types and Road networks
Road types and Road networksRoad types and Road networks
Road types and Road networks
 
Literature case study - ARTIC
Literature case study - ARTICLiterature case study - ARTIC
Literature case study - ARTIC
 

Similar to Case study on monorail

Eshan Senanayake- Thesis 2011
Eshan Senanayake- Thesis 2011Eshan Senanayake- Thesis 2011
Eshan Senanayake- Thesis 2011Eshan Senanayake
 
Monorail Presentation
Monorail PresentationMonorail Presentation
Monorail PresentationEshu Kumar
 
A detailed study on infrastructure of monorail
A detailed study on infrastructure of monorailA detailed study on infrastructure of monorail
A detailed study on infrastructure of monorailBalaSubramani71
 
Anuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILUREAnuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILUREAnuvrat Shukla
 
electric loco shed lalllguda
electric loco shed lalllgudaelectric loco shed lalllguda
electric loco shed lalllgudazakriya furkhan
 
HS2.6 Interchange Stations Exec Report
HS2.6 Interchange Stations Exec ReportHS2.6 Interchange Stations Exec Report
HS2.6 Interchange Stations Exec ReportRobert Keenan AIA, OAA
 
Monorail vs Metrorail
Monorail vs MetrorailMonorail vs Metrorail
Monorail vs MetrorailSuresh7862
 
Application of monorail system in Sri Lanka
Application of monorail system in Sri LankaApplication of monorail system in Sri Lanka
Application of monorail system in Sri LankaChamal Gimnath
 
Rapid KL Transport System
Rapid KL Transport System Rapid KL Transport System
Rapid KL Transport System Yousef Abujubba
 
ppt for training in locomotive
ppt for training in locomotive ppt for training in locomotive
ppt for training in locomotive Govind kumawat
 
The Project Model, Engineering challenges and Performance Measurement of HK A...
The Project Model, Engineering challenges and Performance Measurement of HK A...The Project Model, Engineering challenges and Performance Measurement of HK A...
The Project Model, Engineering challenges and Performance Measurement of HK A...Chun Wing Daniel Tsang
 
MAGELEV TRAINS report seminar report
MAGELEV TRAINS  report seminar reportMAGELEV TRAINS  report seminar report
MAGELEV TRAINS report seminar reportALBIN SUNNY
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)anand prasad
 

Similar to Case study on monorail (20)

Eshan Senanayake- Thesis 2011
Eshan Senanayake- Thesis 2011Eshan Senanayake- Thesis 2011
Eshan Senanayake- Thesis 2011
 
Monorail Presentation
Monorail PresentationMonorail Presentation
Monorail Presentation
 
348
348348
348
 
A detailed study on infrastructure of monorail
A detailed study on infrastructure of monorailA detailed study on infrastructure of monorail
A detailed study on infrastructure of monorail
 
Anuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILUREAnuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILURE
 
electric loco shed lalllguda
electric loco shed lalllgudaelectric loco shed lalllguda
electric loco shed lalllguda
 
report on monorail technolgy
report on monorail technolgyreport on monorail technolgy
report on monorail technolgy
 
HS2.6 Interchange Stations Exec Report
HS2.6 Interchange Stations Exec ReportHS2.6 Interchange Stations Exec Report
HS2.6 Interchange Stations Exec Report
 
Monorail vs Metrorail
Monorail vs MetrorailMonorail vs Metrorail
Monorail vs Metrorail
 
Application of monorail system in Sri Lanka
Application of monorail system in Sri LankaApplication of monorail system in Sri Lanka
Application of monorail system in Sri Lanka
 
Rapid KL Transport System
Rapid KL Transport System Rapid KL Transport System
Rapid KL Transport System
 
Maglev train
Maglev trainMaglev train
Maglev train
 
Maglev train
Maglev trainMaglev train
Maglev train
 
ppt on monorail technology
ppt on monorail technologyppt on monorail technology
ppt on monorail technology
 
A seminar on ir coaches2018
A seminar on ir coaches2018A seminar on ir coaches2018
A seminar on ir coaches2018
 
ppt for training in locomotive
ppt for training in locomotive ppt for training in locomotive
ppt for training in locomotive
 
Sandeep
SandeepSandeep
Sandeep
 
The Project Model, Engineering challenges and Performance Measurement of HK A...
The Project Model, Engineering challenges and Performance Measurement of HK A...The Project Model, Engineering challenges and Performance Measurement of HK A...
The Project Model, Engineering challenges and Performance Measurement of HK A...
 
MAGELEV TRAINS report seminar report
MAGELEV TRAINS  report seminar reportMAGELEV TRAINS  report seminar report
MAGELEV TRAINS report seminar report
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
 

Recently uploaded

MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Case study on monorail

  • 1. CASE STUDY ON MONORAIL ID: 1300511600095 1300511600099 1300511600107 1300511600109
  • 2. INTRODUCTION MONORAIL FOR TRANSPORTATION OF PEOPLE AND LIGHT FREIGHT IS CHARACTERIZED BY THE COMBINATION OF THE TWO WORDS, "MONO" (ONE) AND "RAIL", MEANING A TRANSPORTATION SYSTEM THAT IS SUPPORTED AND STABILIZED ALONG A SINGLE RAIL, WHICH COMMONLY IS CALLED A BEAM WAY FOR AN ELEVATED SYSTEM.
  • 3. CLASSIFICATION 1.MONORAILS THAT ARE SUSPENDED UNDER A BEAM WAY ARE ALL ELEVATED TYPES, AND BECAUSE OF NECESSARY TRAFFIC CLEARANCE UNDER THE VEHICLE, HAS THE LARGEST AERIAL REQUIREMENT IN MONORAIL COMPARISONS. THE BEAM WAY IS ABOVE THE VEHICLE AND PROPULSION MOTORS AND BOGIES ARE ON TOP OF THE VEHICLES. AN EXAMPLE IS THE WUPPERTAL MONORAIL IN GERMANY. THIS IS PERHAPS THE OLDEST OF ALL MONORAILS AND IS STILL IN OPERATION.
  • 4. CLASSIFICATION 2. MONORAILS THAT ENVELOPE AND STRADDLE A BEAM WAY A TYPICAL AND MOST APPLIED MONORAIL WORLD WIDE IS THE ALWEG MONORAIL CONCEPT, WHICH ENVELOPES AND STRADDLES A NARROW DEEP BEAM WAY. THE ALWEG VEHICLE IS SUPPORTED BY 2 BOGIES, EACH HAVING LOAD BEARING WHEELS ON THE TOP OF THE BEAM, AND IS GUIDED BY 2 ROWS OF STABILIZING WHEELS ALONG EACH SIDE OF THE BEAM WAY. IN THIS CONCEPT THE BEAM WAY IS AN ESSENTIAL PART OF THE VEHICLE SYSTEM EITHER WHEN ELEVATED OR AT SURFACE.
  • 5. CLASSIFICATION 3. Monorails that run on top of a beam way or a slab at surface A typical one is the new monorail technology trade named Urbanaut, which has a unique central guide rail on top of the beam way that prevents uplift and derailment of the vehicle.
  • 13. COMPARISON Comparison of large-type straddle-monorail with light rail aerials.
  • 14. CASE STUDY KL Monorail THE KL MONORAIL LINE IS AN URBAN MONORAIL SYSTEM IN KUALA LUMPUR, MALAYSIA. IT OPENED ON 31 AUGUST 2003, WITH 11 STATIONS RUNNING 8.6 KM (5 MI) ON TWO PARALLEL ELEVATED TRACKS. IT CONNECTS THE KUALA LUMPUR CENTRAL TRANSPORT HUB WITH THE "GOLDEN TRIANGLE". NAME: LALUAN MONORAIL KL TYPE: STRADDLE-BEAM MONORAIL STATIONS: 11 DAILY RIDERSHIP: 68,679 (2015) LINE LENGTH: 86 KM OPERATING SPEED: 60 KM/H
  • 15. STATIONS THE LINE CONSISTS OF A SINGLE DUAL-WAY LINE THAT LINKS AREAS OF INNER KUALA LUMPUR PREVIOUSLY NOT SERVED BY RAIL TRANSPORT. THE STATIONS ARE DESIGNED AS ELEVATED STRUCTURES WITH TICKETING FACILITIES ON EITHER THE GROUND LEVEL (AS SEEN IN THE KL SENTRAL STATION) OR THE FIRST-FLOOR LEVEL. THE PLATFORMS ARE ON THE TOP FLOOR, SEPARATED FROM THE MONORAIL LINES BY FENCING. THEY WERE ORIGINALLY COVERED BY LARGE CANVAS ROOFS, WHICH WERE REPLACED IN 2014 BY ALUMINIUM ZINC ROOFS.[2] CERTAIN STATIONS ARE SITUATED ABOVE ROADWAYS, OR ARE SLIGHTLY LONGER THAN OTHERS. EACH STATION IS ALSO DESIGNATED WITH A SPONSOR, WITH ROUTE MAPS ASSOCIATING EACH STATION WITH A PARTICULAR PRODUCT BRAND.
  • 16. Rolling stock The line uses permanently coupled two-car trains of a similar design to the Seattle Center Monorail's ALWEG trains.[9] Each monorail train can accommodate 158 passengers during regular operations. The monorail carriages themselves were constructed by Scomi Rail, a Malaysian monorail manufacturer,[9] at the Scomi Rail plant in Rawang, which also featured its own tracks for monorail train tests.[10] In December 2014, KL Monorail began putting the first two of its four-car trains into service[11] The Scomi SUTRA monorails were designed and manufactured by Malaysian rail company Scomi Rail. Each train can accommodate 430 passengers per trip, compared with 213 passengers for the two-car trains.[11] Two more four-car trains are scheduled to arrive in the first quarter of 2015 with the remaining eight arriving in stages. All the four-car trains are scheduled to be in operation by the end of 2015.[11] Upon the delivery of the new four-car trains, the original two-car trains which have been in use since KL Monorail opened will be decommissioned.[11] The new trains are equipped with four closed-circuit television cameras and space for wheelchairs and strollers