INTELLIACT AGPLM OPEN HOURSProduct structures: The key for the “Design anywhere - Produceeverywhere” approachUwe Leonhardt...
INTRODUCTIONPosition of the subject «Design anywhere - produce everywhere»   Dislocation of manufacturing sites due to lo...
ASPECTS IN THE COMPANYIntegration depth of product structure       Common                   Common parts in one central lo...
ASPECTS IN THE COMPANYDepth of process integration      Externally                External services in construction. Chang...
ASPECTS IN A COMPANYSystem architectures Distribution of objects between systemsPDM centered management of documents     ...
Nächste SlideShare
Wird geladen in …5
×

PLM Open Hours - The key for the design anywhere – produce everywhere approach

885 Aufrufe

Veröffentlicht am

Within previous concepts products are often defined by one bill of material (BOM). This BOM is handed over from development to production. These concepts are clearly defined and easy to manage over the release-process.

This proceeding doesn’t fulfil the requirements of global aligned companies anymore.
1. Product portfolio are segmented for local markets (Design anywhere)
2. Products are dynamically produced in several production sites (Produce everywhere)

Therefore the following questions must be discussed:
- How to control products for remote production sites?
- What is the influence of local production technologies ore local suppliers on my product structure?
- How to deal with global master and local transaction data?
- How to handle localised products and global spare part management?
- How to control product configuration?
- How to setup an adequate variant-management

Within a globalised environment clearly defined product structures are the backbone for global development and production.

Veröffentlicht in: Business, Technologie
0 Kommentare
0 Gefällt mir
Statistik
Notizen
  • Als Erste(r) kommentieren

  • Gehören Sie zu den Ersten, denen das gefällt!

Keine Downloads
Aufrufe
Aufrufe insgesamt
885
Auf SlideShare
0
Aus Einbettungen
0
Anzahl an Einbettungen
144
Aktionen
Geteilt
0
Downloads
0
Kommentare
0
Gefällt mir
0
Einbettungen 0
Keine Einbettungen

Keine Notizen für die Folie

PLM Open Hours - The key for the design anywhere – produce everywhere approach

  1. 1. INTELLIACT AGPLM OPEN HOURSProduct structures: The key for the “Design anywhere - Produceeverywhere” approachUwe Leonhardt, 08.04.2013, http://www.plmopenhours.net/Intelliact AGSiewerdtstrasse 8CH-8050 ZürichTel. +41 (44) 315 67 40Mail mail@intelliact.chWeb http://www.intelliact.ch
  2. 2. INTRODUCTIONPosition of the subject «Design anywhere - produce everywhere» Dislocation of manufacturing sites due to low salary costs Tasks of product development are concerned more and more  Know-how increases in countries with low salary costs  Tasks of development for local markets take wisely place there too Examples of the position of the subject  Dislocations of locations for fabrication – Sourcing: Local Suppliers – Local materials – Local engineer standards – Local methods for fabrication  distributed tasks of development – Realization of common structures – Authorization – Access of data with sufficient performance  Generally: controlling of change management PLM Open Hours - 08.04.2013 2
  3. 3. ASPECTS IN THE COMPANYIntegration depth of product structure Common Common parts in one central location(norm parts, standard 1 component parts etc.) Common Common generic structure of products with common 2 platform technical interfaces Central structure of company platform, location or specific Localized 3 products structure for each country Specific Central structure of concern, specific structures for factory 4 adaptation for manufacturing Common «Design anywhere, produce everywhere» Common central 5 products product with distributed development and production PLM Open Hours - 08.04.2013 3
  4. 4. ASPECTS IN THE COMPANYDepth of process integration Externally External services in construction. Change Management at 1 developed parts external partner site. Externally External services in construction for partial solution e. g. versions or 2 developed solutions moduls. Exchange of informations on structure level. Change management has to be under control of lead site. Integrated external Common development of external partner and provider in 3 developments one system Manufacturing Display of documents for the specific production for each 4 technology different plant, e. g. execution depending on location Products specific in Specific structures for each location in one product 5 location Integrated Central processes and structures, the whole company works 6 processes –virtual in a central part- and process-model enterprise PLM Open Hours - 08.04.2013 4
  5. 5. ASPECTS IN A COMPANYSystem architectures Distribution of objects between systemsPDM centered management of documents management of documents ERP centered management of seperated for master and transaction documents dataCAD CAD CAD PDM ERP PDM ERP PDM ERP DMS DMS DMS DMS Distributed systems distributed PDM-systems Distributed ERP-systems Distributed PDM- and ERP-systems PDM ERP PDM ERP PDM ERP PDM ERP PDM ERP Portal PLM Open Hours - 08.04.2013 5

×