1. MALLANAGOUDA S PATIL
1/2
Address for Communication
Plot-37,Sect-20, Krushnannagar,
Chinchwad, Pune-411019
Contact- malla_patil87@yahoo.co.in |
+91 8983482571
SUMMARY B.E. (Mechanical); with ~5+ years of industrial engineering experience
Capable of motivating & driving teams to execute engineering projects.
Independent decision making; excellent analytical and communication skills.
Exposure to wide variety of industrial domains (EPC: Oil & gas, Product development
engineering, Structural engineering; HVAC: Pressure Vessel, Chillers, Air Filter Units;
SPM & Pipe bending; CAD knowledge & Preparing drawing, GA, GD&T) and manufac-
turing processes.
OBJECTIVE Looking for a senior design / Project engineering role
AREAS OF
EXPERTISE
Project Execution- Scheduling of engineering activities, Studying high level project docu-
ments, contract management, interface coordination, OTD (On Time Delivery), varia-
tion/change management; Conducting technical design review; Selection of standard com-
ponents by communicating with supplier;
Mechanical Engineering- Global (high level) design, detail engineering, structural product
design, piping design, pressure sealing, pressure vessel design, air filter units design, Lifting
equipment design, SPM & Pipe bending machine design, engineering for HSE (Health, Safe-
ty & Environment), criticality matrix, client documentation (drawings, test reports & manuals),
production documentation (drawings, GD&T & procedures), hand calculation, ability to de-
sign products from scratches.
Familiarity with Design Codes & Standards- Piping (ASME B31.3/31.8), Pipe fittings
(ASME B-16.5), Mechanical properties (ASME SecII Part-D), Pressure vessel (ASME
SecVIII), Subsea systems (API6A/17D, ISO13628-x, Norsok/DNV series),
CAD/CAE packages- Solid works, Catia, UG-NX, Auto Cad,
ERP System- SAP (CAD PLM & supply chain);
OS environments& other- Windows, Linux, SharePoint, Project Interface Tools.
WORK EXPE-
RIENCE
5Years and 6 months
Design Engineer (Project Execution); Aker Power gas Subsea (P) Ltd., Pune.
~3.5years (Feb 2012- till date | served through Fox Solutions, Hyderabad; Aker Power gas
Subsea is part of Norwegian conglomerate Aker Solutions specialized in subsea oil & gas
production systems.
Role summary:
Project execution: Responsible for product integration into the system: interface co-
ordination amongst Client, other contractors & other teams; conducting design re-
views, conducting coordination meetings with team; responsible for keeping delivery
schedule; technical responsible in procurement.
Design engineering: Engineering responsible for products: developing oil & gas
structural equipment’s in collaboration with specialist engineers & product groups
confirming to codes & standards; drawing/documentation quality checker. Hand cal-
culations for Lifting, welding, Piping.
Involves working with cross-cultural teams from Norway, Sweden, UK, USA, Malaysia, &
Brazil.
Major Projects:
Kaombo MSP, Angola (Since July’2014) for Total, France: Design responsible for
Testing equipment’s, Protection Caps, Pressure barriers caps, and compensation
caps for high pressure production & service pipe/flow lines.
MoHo, Kango (May’2013- June’2014) for Total, France: Engineering responsible for
2. MALLANAGOUDA S PATIL
2/2
developing structural product (Umbilical Termination) for supplying chemical& Hy-
draulic fluids, Electrical & Fiber optic connectors. This is operated by remotely oper-
ated vehicle. And also Pig loop connection for cleaning high pressure pipe line.
Svalin, Norway (March’2012-April’20134) for Statoil: Design engineer for developing
structural connection products for connecting high pressure flow/pipe/risers lines.
Cad design Engineer; Thermax India Ltd., Pune.
1.6 years (Aug2010- Feb2012) Worked as a Cad Design Engineer at RTIC (Research Tech-
nology and Innovation) Department.
Work Profile- Developing the product as per P & I. and validating design as per stand-
ard. Preparing Engineering Drawings. Performing simulation on simpler load cases,
Calculation of pressure vessel, Nozzle, Dished end wall thickness, welding thickness.
Projects:
Vapor absorption cooling system (Sep’2010-Jan’2011),
LIBR cooling system (Feb’2011- May’2011),
In house compatible Air filter-wall mounted / Floor stand / Table top unit
(June’2011-Aug’2011),
Sterling engine (Power developing engine using steam) (Sep’2011-Nov2011)
Two axis solar parabolic trough (Dec2011-Jan2012).
Graduate Engineer Trainee; Naveen Hydro controls, Pune,
10 month (Sep 2009- July 2010); Worked as a Trainee Engineer, Placed in Design Eng. De-
partment
Responsible for Design of SPM machines, Pipe Bending machines and press ma-
chines. Developing the concept and validating design. Preparing Engineering Draw-
ings.
Hydraulic cylinder bore calculation.
Projects-
Hydraulic Pipe end squeezing machine.
Hydraulic press machine.
Three axis CNC hydraulic pipe bending machine.
ACADEMIC B.E. (Mechanical), 2005-2009; 70%; Distinction.
HIT Nidasoshi, Belgaum, Karnataka; VTU Belgaum.
12th. 2005; 72%; First class.
J N V Dharwad, Karnataka; CBSE.
10th. 2003; 66%; First Class.
J N V Dharwad, Karnataka; CBSE.
TRAININGS,
CERTIFICA-
TIONS &
ACHIEVE-
MENTS
Certified Solidworks Professional (CSWP)- 2014
Contract Awareness Training- 2014; Aker Solutions
HVAC training- 2012
PERSONAL
PROFILE
Date of birth : 29/12/1987
Nationality : Indian
Passport No. : K2640887
Date of Issue : 08/03/2012
Date of Expiry : 07/03/2022
Languages Known- English, Hindi, Kannada
Notice Period- 1 months
Sincerely,
(Mallanagouda S Patil)
1st Aug 2015