METODE SLOPE DEFLECTION
ContohSoal Portal BidangTidakBergoyang (Non-Sway Plane Frame)
Diketahuistruktur portal denganpembebanansepertigambarberikut :
Penyelesaian :
1. Derajat kebebasan dalam pergoyangan struktur statis tak tentu :
n = 2j – (m + 2f + 2h + r)
dengan :
n = jumlah derajat kebebasan (degree of fredom)
j = jumlah titik simpul, termasuk perletakan (joint)
m = jumlah batang yang dibatasi oleh dua joint (member)
f = jumlah perletakan jepit(fixed)
h = jumlah perletakan sendi (hinged)
r = jumlah perletakan rol (roll)
Cek: n = 2x4 – (3 + 2x2 + 2x0 + 1)
= 8 – 8 = 0 ≤0 →tidak ada pergoyangan
KELOMPOK 2
3
2. MENENTUKAN JUMLAH VARIABEL YANG ADA :
- A = rol, θA bukan variabel
- B = titik simpul, ada variable θB
- C = jepit, θC= 0
- D = jepit, θD=0
- Jadi variabelnya hanya satu, θB
3. PERHITUNGAN MOMEN PRIMER DAN KEKAKUAN BATANG
Momen primer
MF
BA = + 3/16 PL = + 3/16 (3) 6 = + 9 tm
MF
BC = - 1/8 PL = - 1/8 (2) 4 = - 1 tm
MF
CB = + 1/8 PL = + 1/8 (2) 4 = + 2 tm
Kekakuan batang
KBA = 3EI/L = 3(2EI)/6 = 1 EI
KBC = KCB = 4EI/L = 4(EI)/4 = 1 EI
KBD = KDB = 4EI/L = 4(EI)/6 = 0,66 EI
4. PERSAMAAN SLOPE DEFLECTION
MAB = M°AB + 1 EI (2θA + θB) = 0 + 2 EIθA + 1 EIθB (1)
MBA = M°BA + 1 EI (2θB + θA) = +9 + 2 EIθB + 1 EIθA (2)
MBC = M°BC + 1 EI (2θB + θC) = -1 + 2 EIθB + 1 EIθC (3)
MCB = M°CB + 1 EI (2θC + θB) = 1 + 2 EIθC + 1 EIθB (4)
MBD = M°BD + 0,66 EI (2θB + θD) = 0 + 1,33 EIθB + 0,66 EIθD (5)
MDB = M°DB + 0,66 EI (2θD + θB) = + 0 + 1,33 EIθD + 0,66 EIθB (6)
Syaratbatas (boundary condition) :
- C = jepit, θC=0
- D = jepit, θD=0
- A = rol, MAB =0
KELOMPOK 2
4
PERSMAAN SLOPE DEFLECTION MENJADI
0 =2 EIθA + 1 EIθB (1a)
MBA =9 + 2 EIθB + 1 EIθA (2a)
MBC = -1 + 2 EIθB (3a)
MCB = 1 + 1 EIθB (4a)
MBD = 1,33 EIθB (5a)
MDB = 0,66 EIθB (6a)
5. MENCARI NILAI θ B
Σ Mb = 0
(2a) + (3a) + (5a) = 0
(9 + 2 EIθB + 1 EIθA) +(-1 + 2 EIθB ) + (1,33 EIθB ) = 0
(+8+ 5,33 EI θB + 1EI θA) = 0
1EI θA + 5,33 EI θB = -8 (7)
Eliminasi – substitusi persamaan 1a dengan persamaan 7
1EI θA + 5,33 EI θB = -8 x 2 2EI θA + 10,66EI θB = 16
2EIθA + 1 EIθB = 0 x 1 2 EIθA + 1 EIθB = 0 -
9,66 EIθB = 16
EIθB =1,553
Substitusi EIθB ke persamaan 1a
2 EIθA + 1 EIθB = 0
2 EIθA + 1( 1,553 )= 0
2 EIθA + 1,553 = 0
EIθA = -0,776
KELOMPOK 2
5
6. MOMEN UJUNG
MAB = 2(-0,776) + 1( 1,553 )= -1,553 + 1,553 = 0 tm (1b)
MBA = +9 + 2 (1,553) + 1 (-0,776) = 9+ 3,106 -0,776 = 11 ,33 tm (2b)
MBC = -1 + 2 (1,553) = 2,106 tm (3b)
MCB = 1 + 1 (1,553) = 2,553 tm (4b)
MBD = 1,33 (1,553) =2,065 tm (5b)
MDB = 0,66 (1,553) =1,024 tm (6b)
7. URAIAN FREEBODY
 Batang AB
ΣMB = 0
RA.6 – P1.3 + MBA = 0
RA.6 – 3.3 + 11 ,33 = 0
6RA – 9 + 11 ,33 = 0
6RA + 2,33 = 0
RA = -0,388
ΣV= 0
RA - P1 + RB = 0
-0,388 - 3 + RB = 0
-3,388 + RB= 0
RB = 3,388
KELOMPOK 2
6
 Batang BC
ΣMB = 0
RC.4 + P2.2 – MCB - MBC = 0
RC.4 + 2 .2 – 2,553 – 2,106 = 0
4 RC + 4 – 4,639= 0
4 RC - 0,639 = 0
RC = 0,159
ΣV= 0
RB1 – P2 + RC = 0
RB1 – 2 + 0,159 = 0
0,159- 2+ RB1= 0
RB1 = 1,841
 Batang BD
ΣMB = 0
RD.6– MDB - MBD = 0
RD.6– 1,024 - 2,065 = 0
6RD – 1,024 - 2,065 = 0
6RD – 3,089= 0
RD= 3,089/6
RD=0,514
ΣV= 0
RB3 + RD = 0
RB3 + 0,514 = 0
RB3 =0,514
DV =RB + RB1
DV =3,388+ 1,841
DV =5,229
KELOMPOK 2
7
 FreebodySuperposisi
8. KONTROL STRUKTUR
 ΣMA = 0
(P1 x 2) – (VD x 4) + (HD x 4) + (P2 x 5) – (VC x 6) + MCB + MDB = 0
(3 X 2 ) – (5,229 X 4 ) + (0,514 x 4) +(2 X 5 )– (0,159 X 6 ) + 2,553 + 1,024 = 0
6 – 20,916 + 2,056 + 10 -0,954 + 2,553 + 1,024 = 0
0 = 0
 ΣV = 0
VA – P1 + VD – P2 + VC = 0
-0,388 – 3 + 5,229 – 2 + 0,159 = 0
0 = 0
 ΣH = 0 HC – HD = 0
0,514 – 0,514 = 0
0 = 0
KELOMPOK 2
8
9. MENGHITUNG BIDANG M & D
 Bidang M
- Batang AB
- Batang BC
Diagram momen (M)
Momen di x = 3
0 + Ra . x
0 + (-0,388) . 3
-1,164 tm
Diagram momen (M)
Momen di x = 2
2,106 + Rb . x
2,106 + 1,841 . 2
5,788 tm
KELOMPOK 2
9
 Bidang D
- Batang AB
Gaya lintangdari x = 0 sd x= 6
Dx = 0 , Ra = -0,388 ton
Dx = 3 , Ra – P1 = -0,388 - 6 = -6,388 ton
Dx = 6 , Ra – P1+Rb =-0,388 – 6 +6,388 = 0
- Batang BC
Gaya lintangdari x = 0 sd x= 4
Dx = 0 ,Rb= 1,841 ton
Dx = 2 ,Rb – P2 = 1,841 – 4 = -2,159 ton
Dx = 4 ,Rb – P2+Rc = 1,841 – 4 + 2,159 = 0
- Batang BD
BIDANGM BIDANGD
KELOMPOK 2
10
10. MenghitungBidang N
Batang BD
N BD = Rb + Rb1
= 3,388 + 1,841
= 5,229
A B C
D
5,229(+)
KELOMPOK 2
11
11. Diagram Superposisi BidangM , D , N
- Bidang M
- Bidang D
A B C
D
(-)
1,164 11,33
2,106
(-)
5,788
(+)
2,553
1,024
2,065
(-)
A B C
D
(-)
(-)
0,388
6,388
(+)
1,841
(-)
2,159
(-)0,514
KELOMPOK 2
12
- Bidang N
A B C
D
5,229(+)

More Related Content

What's hot

contoh kerjaan struktur beton bertulang 2
contoh kerjaan struktur beton bertulang 2contoh kerjaan struktur beton bertulang 2
contoh kerjaan struktur beton bertulang 2Aryo Bimantoro
 
Modul 4-balok menganjur diatas dua perletakan
Modul 4-balok menganjur diatas dua perletakanModul 4-balok menganjur diatas dua perletakan
Modul 4-balok menganjur diatas dua perletakanMOSES HADUN
 
Modul 6- garis pengaruh, Garis pengaruh, statika dan mekanika dasar
Modul 6- garis pengaruh, Garis pengaruh, statika dan mekanika dasarModul 6- garis pengaruh, Garis pengaruh, statika dan mekanika dasar
Modul 6- garis pengaruh, Garis pengaruh, statika dan mekanika dasarMOSES HADUN
 
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAPPERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAPSumarno Feriyal
 
Beton prategangz (1) (3)
Beton prategangz (1) (3)Beton prategangz (1) (3)
Beton prategangz (1) (3)wildan grenadi
 
Contoh penyelesaian soal uas beton ii
Contoh penyelesaian soal uas beton iiContoh penyelesaian soal uas beton ii
Contoh penyelesaian soal uas beton iiHarry Calbara
 
Bab 2 perencanaan gording
Bab 2 perencanaan gordingBab 2 perencanaan gording
Bab 2 perencanaan gordingGraham Atmadja
 
Cara menghitung alinyemen horizontal
Cara menghitung alinyemen horizontalCara menghitung alinyemen horizontal
Cara menghitung alinyemen horizontalJulia Maidar
 
Materi kuliah beton sederhana
Materi kuliah beton sederhanaMateri kuliah beton sederhana
Materi kuliah beton sederhanaperkasa45
 
Tugas besar baja 1
Tugas besar baja 1Tugas besar baja 1
Tugas besar baja 1Aziz Adi
 
MERENCANAKAN BALOK BETON PRATEGANG
MERENCANAKAN BALOK BETON PRATEGANGMERENCANAKAN BALOK BETON PRATEGANG
MERENCANAKAN BALOK BETON PRATEGANGMira Pemayun
 
Pembebanan jembatan rangka (revisi profil baja)
Pembebanan jembatan rangka (revisi profil baja) Pembebanan jembatan rangka (revisi profil baja)
Pembebanan jembatan rangka (revisi profil baja) NitaMewaKameliaSiman
 
Tugas-Tugas Beton 1-10
Tugas-Tugas Beton 1-10Tugas-Tugas Beton 1-10
Tugas-Tugas Beton 1-10noussevarenna
 
contoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balokcontoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balokShaleh Afif Hasibuan
 
STRUKTUR STATIS TAK TENTU METODE CLAPEYRON- CONTINUOUS BEAM-2
STRUKTUR STATIS TAK TENTU METODE CLAPEYRON- CONTINUOUS BEAM-2STRUKTUR STATIS TAK TENTU METODE CLAPEYRON- CONTINUOUS BEAM-2
STRUKTUR STATIS TAK TENTU METODE CLAPEYRON- CONTINUOUS BEAM-2MOSES HADUN
 
IRIGASI DAN BANGUNAN AIR (TUGAS S1 TEKNIK SIPIL UNTAG SEMARANG, MAT KUL : IRBA2)
IRIGASI DAN BANGUNAN AIR (TUGAS S1 TEKNIK SIPIL UNTAG SEMARANG, MAT KUL : IRBA2)IRIGASI DAN BANGUNAN AIR (TUGAS S1 TEKNIK SIPIL UNTAG SEMARANG, MAT KUL : IRBA2)
IRIGASI DAN BANGUNAN AIR (TUGAS S1 TEKNIK SIPIL UNTAG SEMARANG, MAT KUL : IRBA2)afifsalim
 

What's hot (20)

contoh kerjaan struktur beton bertulang 2
contoh kerjaan struktur beton bertulang 2contoh kerjaan struktur beton bertulang 2
contoh kerjaan struktur beton bertulang 2
 
Modul 4-balok menganjur diatas dua perletakan
Modul 4-balok menganjur diatas dua perletakanModul 4-balok menganjur diatas dua perletakan
Modul 4-balok menganjur diatas dua perletakan
 
Modul 6- garis pengaruh, Garis pengaruh, statika dan mekanika dasar
Modul 6- garis pengaruh, Garis pengaruh, statika dan mekanika dasarModul 6- garis pengaruh, Garis pengaruh, statika dan mekanika dasar
Modul 6- garis pengaruh, Garis pengaruh, statika dan mekanika dasar
 
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAPPERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
 
Balok gerber
Balok gerberBalok gerber
Balok gerber
 
Beton prategangz (1) (3)
Beton prategangz (1) (3)Beton prategangz (1) (3)
Beton prategangz (1) (3)
 
Contoh penyelesaian soal uas beton ii
Contoh penyelesaian soal uas beton iiContoh penyelesaian soal uas beton ii
Contoh penyelesaian soal uas beton ii
 
Bab 2 perencanaan gording
Bab 2 perencanaan gordingBab 2 perencanaan gording
Bab 2 perencanaan gording
 
Cara menghitung alinyemen horizontal
Cara menghitung alinyemen horizontalCara menghitung alinyemen horizontal
Cara menghitung alinyemen horizontal
 
Materi kuliah beton sederhana
Materi kuliah beton sederhanaMateri kuliah beton sederhana
Materi kuliah beton sederhana
 
Tugas besar baja 1
Tugas besar baja 1Tugas besar baja 1
Tugas besar baja 1
 
MERENCANAKAN BALOK BETON PRATEGANG
MERENCANAKAN BALOK BETON PRATEGANGMERENCANAKAN BALOK BETON PRATEGANG
MERENCANAKAN BALOK BETON PRATEGANG
 
Pembebanan jembatan rangka (revisi profil baja)
Pembebanan jembatan rangka (revisi profil baja) Pembebanan jembatan rangka (revisi profil baja)
Pembebanan jembatan rangka (revisi profil baja)
 
Tugas-Tugas Beton 1-10
Tugas-Tugas Beton 1-10Tugas-Tugas Beton 1-10
Tugas-Tugas Beton 1-10
 
contoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balokcontoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balok
 
STRUKTUR STATIS TAK TENTU METODE CLAPEYRON- CONTINUOUS BEAM-2
STRUKTUR STATIS TAK TENTU METODE CLAPEYRON- CONTINUOUS BEAM-2STRUKTUR STATIS TAK TENTU METODE CLAPEYRON- CONTINUOUS BEAM-2
STRUKTUR STATIS TAK TENTU METODE CLAPEYRON- CONTINUOUS BEAM-2
 
Portal 3 sendi
Portal 3 sendiPortal 3 sendi
Portal 3 sendi
 
Perencanaan Kolom
Perencanaan KolomPerencanaan Kolom
Perencanaan Kolom
 
IRIGASI DAN BANGUNAN AIR (TUGAS S1 TEKNIK SIPIL UNTAG SEMARANG, MAT KUL : IRBA2)
IRIGASI DAN BANGUNAN AIR (TUGAS S1 TEKNIK SIPIL UNTAG SEMARANG, MAT KUL : IRBA2)IRIGASI DAN BANGUNAN AIR (TUGAS S1 TEKNIK SIPIL UNTAG SEMARANG, MAT KUL : IRBA2)
IRIGASI DAN BANGUNAN AIR (TUGAS S1 TEKNIK SIPIL UNTAG SEMARANG, MAT KUL : IRBA2)
 
Perhitungan tulangAN kolom
Perhitungan tulangAN kolomPerhitungan tulangAN kolom
Perhitungan tulangAN kolom
 

Similar to Analisa struktur metode slope deflection

Ejercicios resueltos de análisis estructural
Ejercicios resueltos de análisis estructuralEjercicios resueltos de análisis estructural
Ejercicios resueltos de análisis estructuralKatia Ibarra
 
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)Sumarno Feriyal
 
Slope deflection equation structure analysis - civil engineering
Slope deflection equation   structure analysis - civil engineeringSlope deflection equation   structure analysis - civil engineering
Slope deflection equation structure analysis - civil engineeringAshu Kushwaha
 
4 portal-dan-pelengkung-tiga-sendi
4 portal-dan-pelengkung-tiga-sendi4 portal-dan-pelengkung-tiga-sendi
4 portal-dan-pelengkung-tiga-sendiIgorTherik
 
MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)
MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)
MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)Sumarno Feriyal
 
Influence linebeams (ce 311)
Influence linebeams (ce 311)Influence linebeams (ce 311)
Influence linebeams (ce 311)Prionath Roy
 
Influence linebeams (ce 311)
Influence linebeams (ce 311)Influence linebeams (ce 311)
Influence linebeams (ce 311)Prionath Roy
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Calculo de momentos en una viga continua cuando se encuentran
Calculo de momentos en una viga continua cuando se encuentranCalculo de momentos en una viga continua cuando se encuentran
Calculo de momentos en una viga continua cuando se encuentranCNEL
 
easy step on how to solve slope deflection
easy step on how to solve slope deflectioneasy step on how to solve slope deflection
easy step on how to solve slope deflectionAlmasdan Alih
 
4th Period Review(Carta)With Answers
4th Period Review(Carta)With Answers4th Period Review(Carta)With Answers
4th Period Review(Carta)With Answersberemontalvo
 
Control Colaborativo n° 1
Control Colaborativo n° 1Control Colaborativo n° 1
Control Colaborativo n° 1Jorge Rodriguez
 
Baja - Batang Aksial Lentur
Baja - Batang Aksial Lentur Baja - Batang Aksial Lentur
Baja - Batang Aksial Lentur Yasmin Rosyad
 
matriks kekakuan kebebabasan sesungguhnya pada balok statis tdk tentu
matriks kekakuan kebebabasan sesungguhnya pada balok statis tdk tentumatriks kekakuan kebebabasan sesungguhnya pada balok statis tdk tentu
matriks kekakuan kebebabasan sesungguhnya pada balok statis tdk tentuMuh. Panca Zainuddin Arif
 

Similar to Analisa struktur metode slope deflection (20)

Ejercicios resueltos de análisis estructural
Ejercicios resueltos de análisis estructuralEjercicios resueltos de análisis estructural
Ejercicios resueltos de análisis estructural
 
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
 
Slope deflection equation structure analysis - civil engineering
Slope deflection equation   structure analysis - civil engineeringSlope deflection equation   structure analysis - civil engineering
Slope deflection equation structure analysis - civil engineering
 
3 formulario para_vigas_y_porticos
3 formulario para_vigas_y_porticos3 formulario para_vigas_y_porticos
3 formulario para_vigas_y_porticos
 
4 portal-dan-pelengkung-tiga-sendi
4 portal-dan-pelengkung-tiga-sendi4 portal-dan-pelengkung-tiga-sendi
4 portal-dan-pelengkung-tiga-sendi
 
MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)
MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)
MEKANIKA REKAYASA 3 (METODE CROSS DAN METODE TAKABEYA)
 
algebraic expressions class viii Hindi version sushma
algebraic expressions class viii Hindi version sushmaalgebraic expressions class viii Hindi version sushma
algebraic expressions class viii Hindi version sushma
 
Shi20396 ch06
Shi20396 ch06Shi20396 ch06
Shi20396 ch06
 
Influence linebeams (ce 311)
Influence linebeams (ce 311)Influence linebeams (ce 311)
Influence linebeams (ce 311)
 
Influence linebeams (ce 311)
Influence linebeams (ce 311)Influence linebeams (ce 311)
Influence linebeams (ce 311)
 
Shi20396 ch04
Shi20396 ch04Shi20396 ch04
Shi20396 ch04
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Calculo de momentos en una viga continua cuando se encuentran
Calculo de momentos en una viga continua cuando se encuentranCalculo de momentos en una viga continua cuando se encuentran
Calculo de momentos en una viga continua cuando se encuentran
 
easy step on how to solve slope deflection
easy step on how to solve slope deflectioneasy step on how to solve slope deflection
easy step on how to solve slope deflection
 
3rd Semester (June-2016) Computer Science and Information Science Engineering...
3rd Semester (June-2016) Computer Science and Information Science Engineering...3rd Semester (June-2016) Computer Science and Information Science Engineering...
3rd Semester (June-2016) Computer Science and Information Science Engineering...
 
1 perhitungan-balok
1 perhitungan-balok1 perhitungan-balok
1 perhitungan-balok
 
4th Period Review(Carta)With Answers
4th Period Review(Carta)With Answers4th Period Review(Carta)With Answers
4th Period Review(Carta)With Answers
 
Control Colaborativo n° 1
Control Colaborativo n° 1Control Colaborativo n° 1
Control Colaborativo n° 1
 
Baja - Batang Aksial Lentur
Baja - Batang Aksial Lentur Baja - Batang Aksial Lentur
Baja - Batang Aksial Lentur
 
matriks kekakuan kebebabasan sesungguhnya pada balok statis tdk tentu
matriks kekakuan kebebabasan sesungguhnya pada balok statis tdk tentumatriks kekakuan kebebabasan sesungguhnya pada balok statis tdk tentu
matriks kekakuan kebebabasan sesungguhnya pada balok statis tdk tentu
 

Recently uploaded

Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 

Recently uploaded (20)

Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 

Analisa struktur metode slope deflection

  • 1. KELOMPOK 2 1 ANALISA STRUKTUR SLOPE DEFLECTION KELOMPOK 2 MUCHAMAD LUQMAN RAHMAWAN (1561122003) WAHYU PURNOMO ADI (1561122004) MADE BAGUS GITA DARMA (1561122005) UNIVERSITAS WARMADEWA FAKULTAS TEKNIK JURUSAN TEKNIK SIPIL
  • 2. KELOMPOK 2 2 METODE SLOPE DEFLECTION ContohSoal Portal BidangTidakBergoyang (Non-Sway Plane Frame) Diketahuistruktur portal denganpembebanansepertigambarberikut : Penyelesaian : 1. Derajat kebebasan dalam pergoyangan struktur statis tak tentu : n = 2j – (m + 2f + 2h + r) dengan : n = jumlah derajat kebebasan (degree of fredom) j = jumlah titik simpul, termasuk perletakan (joint) m = jumlah batang yang dibatasi oleh dua joint (member) f = jumlah perletakan jepit(fixed) h = jumlah perletakan sendi (hinged) r = jumlah perletakan rol (roll) Cek: n = 2x4 – (3 + 2x2 + 2x0 + 1) = 8 – 8 = 0 ≤0 →tidak ada pergoyangan
  • 3. KELOMPOK 2 3 2. MENENTUKAN JUMLAH VARIABEL YANG ADA : - A = rol, θA bukan variabel - B = titik simpul, ada variable θB - C = jepit, θC= 0 - D = jepit, θD=0 - Jadi variabelnya hanya satu, θB 3. PERHITUNGAN MOMEN PRIMER DAN KEKAKUAN BATANG Momen primer MF BA = + 3/16 PL = + 3/16 (3) 6 = + 9 tm MF BC = - 1/8 PL = - 1/8 (2) 4 = - 1 tm MF CB = + 1/8 PL = + 1/8 (2) 4 = + 2 tm Kekakuan batang KBA = 3EI/L = 3(2EI)/6 = 1 EI KBC = KCB = 4EI/L = 4(EI)/4 = 1 EI KBD = KDB = 4EI/L = 4(EI)/6 = 0,66 EI 4. PERSAMAAN SLOPE DEFLECTION MAB = M°AB + 1 EI (2θA + θB) = 0 + 2 EIθA + 1 EIθB (1) MBA = M°BA + 1 EI (2θB + θA) = +9 + 2 EIθB + 1 EIθA (2) MBC = M°BC + 1 EI (2θB + θC) = -1 + 2 EIθB + 1 EIθC (3) MCB = M°CB + 1 EI (2θC + θB) = 1 + 2 EIθC + 1 EIθB (4) MBD = M°BD + 0,66 EI (2θB + θD) = 0 + 1,33 EIθB + 0,66 EIθD (5) MDB = M°DB + 0,66 EI (2θD + θB) = + 0 + 1,33 EIθD + 0,66 EIθB (6) Syaratbatas (boundary condition) : - C = jepit, θC=0 - D = jepit, θD=0 - A = rol, MAB =0
  • 4. KELOMPOK 2 4 PERSMAAN SLOPE DEFLECTION MENJADI 0 =2 EIθA + 1 EIθB (1a) MBA =9 + 2 EIθB + 1 EIθA (2a) MBC = -1 + 2 EIθB (3a) MCB = 1 + 1 EIθB (4a) MBD = 1,33 EIθB (5a) MDB = 0,66 EIθB (6a) 5. MENCARI NILAI θ B Σ Mb = 0 (2a) + (3a) + (5a) = 0 (9 + 2 EIθB + 1 EIθA) +(-1 + 2 EIθB ) + (1,33 EIθB ) = 0 (+8+ 5,33 EI θB + 1EI θA) = 0 1EI θA + 5,33 EI θB = -8 (7) Eliminasi – substitusi persamaan 1a dengan persamaan 7 1EI θA + 5,33 EI θB = -8 x 2 2EI θA + 10,66EI θB = 16 2EIθA + 1 EIθB = 0 x 1 2 EIθA + 1 EIθB = 0 - 9,66 EIθB = 16 EIθB =1,553 Substitusi EIθB ke persamaan 1a 2 EIθA + 1 EIθB = 0 2 EIθA + 1( 1,553 )= 0 2 EIθA + 1,553 = 0 EIθA = -0,776
  • 5. KELOMPOK 2 5 6. MOMEN UJUNG MAB = 2(-0,776) + 1( 1,553 )= -1,553 + 1,553 = 0 tm (1b) MBA = +9 + 2 (1,553) + 1 (-0,776) = 9+ 3,106 -0,776 = 11 ,33 tm (2b) MBC = -1 + 2 (1,553) = 2,106 tm (3b) MCB = 1 + 1 (1,553) = 2,553 tm (4b) MBD = 1,33 (1,553) =2,065 tm (5b) MDB = 0,66 (1,553) =1,024 tm (6b) 7. URAIAN FREEBODY  Batang AB ΣMB = 0 RA.6 – P1.3 + MBA = 0 RA.6 – 3.3 + 11 ,33 = 0 6RA – 9 + 11 ,33 = 0 6RA + 2,33 = 0 RA = -0,388 ΣV= 0 RA - P1 + RB = 0 -0,388 - 3 + RB = 0 -3,388 + RB= 0 RB = 3,388
  • 6. KELOMPOK 2 6  Batang BC ΣMB = 0 RC.4 + P2.2 – MCB - MBC = 0 RC.4 + 2 .2 – 2,553 – 2,106 = 0 4 RC + 4 – 4,639= 0 4 RC - 0,639 = 0 RC = 0,159 ΣV= 0 RB1 – P2 + RC = 0 RB1 – 2 + 0,159 = 0 0,159- 2+ RB1= 0 RB1 = 1,841  Batang BD ΣMB = 0 RD.6– MDB - MBD = 0 RD.6– 1,024 - 2,065 = 0 6RD – 1,024 - 2,065 = 0 6RD – 3,089= 0 RD= 3,089/6 RD=0,514 ΣV= 0 RB3 + RD = 0 RB3 + 0,514 = 0 RB3 =0,514 DV =RB + RB1 DV =3,388+ 1,841 DV =5,229
  • 7. KELOMPOK 2 7  FreebodySuperposisi 8. KONTROL STRUKTUR  ΣMA = 0 (P1 x 2) – (VD x 4) + (HD x 4) + (P2 x 5) – (VC x 6) + MCB + MDB = 0 (3 X 2 ) – (5,229 X 4 ) + (0,514 x 4) +(2 X 5 )– (0,159 X 6 ) + 2,553 + 1,024 = 0 6 – 20,916 + 2,056 + 10 -0,954 + 2,553 + 1,024 = 0 0 = 0  ΣV = 0 VA – P1 + VD – P2 + VC = 0 -0,388 – 3 + 5,229 – 2 + 0,159 = 0 0 = 0  ΣH = 0 HC – HD = 0 0,514 – 0,514 = 0 0 = 0
  • 8. KELOMPOK 2 8 9. MENGHITUNG BIDANG M & D  Bidang M - Batang AB - Batang BC Diagram momen (M) Momen di x = 3 0 + Ra . x 0 + (-0,388) . 3 -1,164 tm Diagram momen (M) Momen di x = 2 2,106 + Rb . x 2,106 + 1,841 . 2 5,788 tm
  • 9. KELOMPOK 2 9  Bidang D - Batang AB Gaya lintangdari x = 0 sd x= 6 Dx = 0 , Ra = -0,388 ton Dx = 3 , Ra – P1 = -0,388 - 6 = -6,388 ton Dx = 6 , Ra – P1+Rb =-0,388 – 6 +6,388 = 0 - Batang BC Gaya lintangdari x = 0 sd x= 4 Dx = 0 ,Rb= 1,841 ton Dx = 2 ,Rb – P2 = 1,841 – 4 = -2,159 ton Dx = 4 ,Rb – P2+Rc = 1,841 – 4 + 2,159 = 0 - Batang BD BIDANGM BIDANGD
  • 10. KELOMPOK 2 10 10. MenghitungBidang N Batang BD N BD = Rb + Rb1 = 3,388 + 1,841 = 5,229 A B C D 5,229(+)
  • 11. KELOMPOK 2 11 11. Diagram Superposisi BidangM , D , N - Bidang M - Bidang D A B C D (-) 1,164 11,33 2,106 (-) 5,788 (+) 2,553 1,024 2,065 (-) A B C D (-) (-) 0,388 6,388 (+) 1,841 (-) 2,159 (-)0,514
  • 12. KELOMPOK 2 12 - Bidang N A B C D 5,229(+)