7. Commissioning at its Highest Level is a systematic process of ensuring, through documented verification, that all building systems perform interactively according to the documented design intent and the owner’s operational needs
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23. Estimates of Const. Phase Commissioning Costs (Costs for Commissioning Authority, New Construction, per sf) $0.00 $0.50 $1.00 $1.50 $2.00 $2.50 $3.00 0 50 100 150 200 250 300 350 400 450 500 550 600 Floor Area ('000's sf) Commissioning Cost ($/sf) Simple Moderate Complex Specialty