OBJECTIVES
Gravity flow of water is harvested through check/weird dam, irrigational
canal and pipelines for agriculture purpose and increase food
production.
Income increased for small & marginal farmers through cultivation of
different crops.
Water and land resource are utilized judiciously by the community.
Presented by;
Mumai Pheiga
Secretary RNBA
2. YEOMEN EXTENSION SERVICES (YES) -SENAPATI
ACTION OF WOMEN IN DEVELOPMENT (AWID) -UKHRUL
DEVELOPMENT AGENCY FOR TRIBLE PEOPLE (DATP) -TAMENGLONG
EVANGELICAL ASSEMBLY CHURCH (EAC) -CHURACHANDPUR
PEOPLE’S RESOURCE DEVELOPMENT ASSOCIATION (PRDA) -BISHNUPUR
RURAL AID SERVICES (RAS) -CHURACHANDPUR
WOMEN ACTION FOR RECONSTRUCTION & REFORMATION (WARR) -UKHRUL
CHAMDIL KHUBUL SOCIAL WELFARE ARTS & CULTURE ASSOCIATION
(CKSWACA) -CHANDEL
WEAKER SECTION’S DEVELOPMENT COUNCIL (WSDC) -CHANDEL
RURAL EDUCATON & ACTION FOR CHANGE,MANIPUR (REACH-M) -CHANDEL
ZELIANGRONG EVENGELICAL FELLOWSHIP (ZEF) -TAMENGLONG
RURAL WOMEN UPLIFTMENT SOCIETY (RWUS) -CHURACHANDPUR
RONGMEI CHRISTIAN DEVELOPMENT SOCIETY (RCDS) -BISHNUPUR
RONGMEI NAGA BAPTIST ASSOCIATION (RNBA) -TAMENGLONG
4. PROGRAM COMPONENTS
A CONSTRUCTION WORK INFRASTRUCTURE INPUTS No./Metre
1 Check dam 23
2 Renovation of check dam 04
3 Intake chamber/structure construction 21
4 Distribution chamber/reservoir & Outlet Box 24
5 Canal lining/excavation of irrigational canal 3593 Metre (Expected)
6 Water Transport pipelines (HDP), Culvert & Pick-up 63 Metre (Expected)
7 Boulder Sausage Nil
B SOCIAL MOBILISATION
1 Joint meetings of implementing Partner NGO and User 28 times
Groups
2 Data Collection from villages (1st year and 2nd year) 75 villages
C CAPACITY BUILDING
1 Joint workshops of SDTT/JTT/RNBA/NGO partners 4 times
5. DETAILS OF PROJECT ACTIVITIES/VILLAGE/LOCATION/AREA COVERAGE OF PARTNER WISE.
Sl. Name of Name of villages Activities to be taken up Total family Area to be
No PIO’s involved to be covered
covered (Acres)
1 Action of Women in T-chanhong Renovation of Check Dam/ Irrigation 19 33.5
Development (AWID) Canal Lining
Taishar-2 Construction of Check Dam/ Intake Chamber. 14 22
TOTAL 33 55.5
2 People’s Resource G.Mongjang Check Dam 21 45
Development Gothol Check Dam-(I) ,nCheck Dam-(2) 42 73
Association (PRDA)
TOTAL 63 118
3 Rongmei Naga Baptist Lonjang (Kabui Khullen) Intake Chamber/ Irrigational Canal Lining 27 45.5
Association (RNBA)
Bakuwa Intake Chamber(5 no.) 26 50
Bwanruangh Check Dam/Intake Chamber-(1)/ 23 69.5
Intake Chamber-(2)/
Distribution Out-let Boxes.
TOTAL 76 165
4 Development Agency Duigaram Check Dam./Intake Chamber. 14 36
for Tribal People Excavation of open canal
(DATP) Guangram Check Dam/Intake Chamber/ 10 23
Excavation of open canal with pipeline for hard rock
portion.
Total 24 59
5 Chamdil Khubul Social Chandel Christian Check Dam/ Irrigation Canalining/ Excavation. 40 114
Welfare Arts & Culture Chamdil Khubul, Renovation of Check Dam/ lining/Excavation. 41 215.6
Association (CKSWACA)
Chandel Christian-Hnatham Check Dam/Lining/Excavation 22 90
Total 103 420
6 Rural Women Upliftment Thenmuol Check Dam-(1) 16 33
Society (RWUS)
Hmarveng Distribution Outlet Reservoir 19 50
TOTAL 35 83
6. Sl. Name of Name of villages Activities to be taken up Total family to be Area to be covered
No PIO’s involved covered Acres
7 Zeliangrong Evangelical Phallong Check Dam 25 53
Fellowship (ZEF)
Machiengluang Intake Chamber/Canal Lining Excavation. 30 27
TOTAL 55 80
8 Rural Aid Service (RAS) B.Kaljang Construction of Check Dam/ Distribution 28 148
Outlet Box.
Boljol Check Dam/ Distribution Outlet/ 25 105
Irrigational canal Lining/ Pipeline Outlet Box.
TOTAL 53 253
9 Rural Education and Action for Langol Distribution Outlet-Box/ Pipeline fitting/ 106 111.15
Change-Manipur Culvert Pick up weir
(REACH-M) Kangshang-2 Check Dam/ Distribution Outlet-Box/ lining. 16 34.58
Machi, Check Dam/ DistributionOutlet-Box/ Lining 15 10
TOTAL 137 186
10 Weaker Section’s Development Laiching Khunman Check Dam/Lining/Excavation 19 49
Council (WSDC)
Lainingkhul Check Dam/Lining/Excavation 23 35
TOTAL 42 84
11 WomenAction For Reconstruction Phange 1&2 Check Dam-(1)Check Dam-(2) 15 22.0
& Reformation (WARR)
Maku Check Dam(1)Check Dam-(2) 43 50
51 50
TOTAL 109 122
12 (EAC) Tuiningkhal Renovation of Check Dam/ Pipeline fitting/ 21 80
Culvert Pick up weir.
G. Khonom Check Dam 20 100
TOTAL 41 180
7. Sl. No Name of Name of Activities to be Total family Area to be
PIO’s villages taken up to be covered covered
involved (Acres)
13 Yeomen Extension Services (YES) Amesiiphro Check Dam-(1)/ 17 47
Check Dam-(2)/
Canal Lining Excavation
Taphou Maram & Check Dam/ Intake 17 37
Rongmei Namthan Chamber/ Irrigation-Canal
Lining Excavation
TOTAL 34 84
14 Rongmei Christian Development Wainem Intake Chamber/Structure/ 30 67
Society (RCDS) Canal Lining/ Excavation
Thenjang Renovation of Check Dam/ 21 43
Irrigation of
Canal lining.
TOTAL 51 110
Grand Total 849 2782
9. Approximate calculation
Total land (to be covered) = 2800 Acres (Expected)
Total family = 849 (Expected Beneficiaries)
Total population = 5083 (Expected)
Average size of land per beneficiary = 1-3 acres (Expected)
Project Cost = Rs.1,19,12,893/-
Per acre investment = Rs.4250/-