SlideShare a Scribd company logo
1 of 12
Download to read offline
FY 2011
Operating Results
of JSC Lenenergo
under RAS
This presentation is not an offer or invitation to make offers (advertisement) in respect of purchase or subscription to securities of
Lenenergo. Neither the presentation, nor any part hereof, nor the fact of its representation or distribution serve as the basis for entering
into any agreement or taking any investment decision; therefore, the presentation should not be relied upon in this respect.
This presentation may contain estimates. The estimates are not based on actual circumstances and include statements in respect of the
intentions, opinions or current expectations of JSC Lenenergo as regards the results of its activity, financial position, liquidity, prospects
of growth, strategy and the industry, in which JSC Lenenergo operates. Such estimates by their nature are characterized by presence of
risks and uncertainty factors since they are related to the events and depend on the circumstances, which may fail to happen in the
future.
Lenenergo warns that the estimates are not a guarantee of the future parameters, and the actual results of JSC Lenenergo activities, its
financial position and liquidity, as well as development of the industry, in which it operates, may significantly differ from those included
in the estimates contained herein. Besides, even if the results of the Company's activities, its financial position and liquidity, as well as
the development of the industry, in which it operates, correspond to the estimates contained herein, such results and events are not
indicative of the results and events in the future.
This presentation contains the information received from third parties besides the official information on JSC Lenenergo activities. This
information has been received from the sources which are reliable in JSC Lenenergo opinion. Nevertheless, we do not guarantee the
accuracy of such information which may be reduced or incomplete. All opinions and estimates contained herein reflect our opinion as at
the date of publication and are subject to change without notice. Lenenergo does not bear liability for the consequences of use of the
opinions or estimates contained herein, or information incompleteness.
JSC Lenenergo does not undertake obligations in respect of revision or confirmation of the estimates and evaluations, as well as in
respect of updating of the information contained herein.
Disclaimer
Personal number of Lenenergo as of 31.12.2011 was equal to 6,052 people
St.-Petersburg – 75.2%
Lenenergo share in the electric power transmission market
as of 31.12.2011:
90.85
%
9.15
%
Ordinary shares
928,021,679.004 pcs
Preferred shares
93,264,311 pcs
Authorized capital of Lenenergo is equal to RUR 1,019,285,990.004 Structure of share capital of JSC Lenenergo**
Information on Lenenergo shares
Quotation lists
MICEX B
Tickers
Ordinary shares LSNG
Preferred shares LSNGP
Capitalization
31.12.2011, USD mln*
348
Leningrad region – 60.3%
**as of the closing date of the register: 17.11.2011
Service area, thousand sq.km 87.3
Population, mln. people 6.2
Lenenergo is one of the largest electricity distribution companies in Russia, the operator
of 0.4-110 kV grids, servicing the territory of Saint-Petersburg and the Leningrad region
Main types of activity:
• electric power transmission and distribution services;
• technological connection of power receiving facilities (power plants) of business and
individuals to the grids
The Lenenergo share in Saint-Petersburg and Leningrad region in the electric power
transmission market as of 31.12.2011 – 69.8%
Lenenergo comprises 10 operational units in Saint-Petersburg and the Leningrad region
* The calculation is made on the capitalization
weighted average price on the MICEX SE at the rate
of the Central Bank on that date
Major competitors of Lenenergo: municipal electric network companies OAO SPbES in
Saint-Petersburg and OAO LOESK in the Leningrad region
I.D.E.ELECTRICITY DISTRIBUTION INVESTMENTS
1 LIMITED (ZAO IES Holding)
ENERGYO SOLUTIONS RUSSIA LIMITED
(EOS Russia)
RUSENERGO FUND LIMITED
JP MORGAN Funds
Other
The city of St.-Petersburg
(CPMC)
IDGC Holding
50.31%
25.16%
8.76%
4.15%
2.75%
1.83%
7.05%
General information on the Company
Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 1
1,540
3,258 3,806
1,417 1,350
11,409 10,334
15,813 15,061 13,316
28,439 27,672 29,095 28,975 30,060
20,828 26,088
34,201 37,009 38,409
5,566
8,190 10,356 8,630 9,659
Business and financial highlights
Unit 2008 2009 2010 2011
Installed capacity MVA 19,365.5 19,901.4 20,740.5 21,427.4
Overhead Transmission Lines 0.38-110 kV on circuit km 39,084.6 39,285.9 39,418.8 39,782.6
Overhead Transmission Lines 0.38-110 kV on line km 35,966.5 36,148.2 36,273.6 36,586.8
Cable lines 0.38-110 kV km 16,730.9 17,650.7 18,622.3 19,554.2
Substations 35-110 kV pcs (MVA) 368 (12,818) 370 (13,084) 372 (13,466) 373 (13,742)
Transformer substations 6-35 kV pcs (MVA) 13,646 (6,548) 13,909 (6,818) 14,361 (7,275) 14,770 (7,686)
Characteristics of Lenenergo assets
EBITDA, RUR mln
Revenue, RUR mln
Net profit, RUR mln
Productive supply, mln kWh
2008 2009 2010 2011 2012F
Dynamics of key indicators of Lenenergo
+ 3.7%
+ 3.8%
+ 11.9%
-4.7%
-11.5%
CAPEX, RUR mln
-0.4%
+ 8.2%
-16.7%
-62.8%
-4.8%
Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 2
10,356
8,630
2010 2011
-3,776 -4,560
7,382 6,418
от тех. присоединения
от передачи э/э
34,201
27,488
6,713
3,806
37,009
31,758
5,252
1,417
Выручка от реализации Себестоимость Валовая прибыль Чистая прибыль
2010 2011
Financial performance of Lenenergo in 2010 – 2011
+8.2% +15.5% -21.8 % -62.8%
Formation of sales profit and net profit, RUR mln
* Including other activities the amount of revenue
and costs of which is less than 1% of the total sum
3,806 1,417-62.8%
Net profit by types of activity*, RUR mln
- =
Liquidity indicators 2010 2011 Deviation, p.p.
ROE 7.80% 2.54% -5.25
ROA 4.29% 1.32% -2.98
ROS 19.63% 14.19% -5.44
-16.7%
EBITDA, RUR mln
EBITDA margin, %
30.28% 23.32%
EBITDA 8,630 100%
Depreciation of
FA and IA
5,102 59.1%
Interest
to be paid
1,167 13.5%
Profit tax 944 10.9%
Net profit 1,417 16.4%
The decrease in net profit is driven by
the outstripping revenue growth compared to
the increase in cost as compared to the
previous reporting period, followed by the
increase in the negative balance of other income
and expenses.
In addition, since 01.01.2011 the Company
transited to RAB-based regulation. Considering
the incomplete accounting by the regulator
of the necessary expenses (primarily on the
federal factors: JSC UES FGC fee, losses of
electricity), as well as through the use of a
smoothing mechanism in 2011, the loss of
electric power transmission in 2011 was higher
than in 2010.
As a result of 2011 net profit from the
provision of services for technological
connection constituted RUR 6,418 mln, which is
13% less than in 2010.
Liquidity indicators
2010 2011
Sales revenue Costs Gross profit Net profit
from electricity transmission
from TC
The increase in revenues for electricity transmission
constituted 19.5%, or RUR 4,653 mln. The growth was
primarily driven by increased rates for electricity
transmission (an increase of the average rate
for 2011 relative to 2010 was: in St.-Petersburg -
19.4%, in the Leningrad region - 24.8%).
At the same time revenues from provision of services
for technological connection in 2011 decreased by
18.2% (RUR 1,853 mln), which is associated with the
closure of a large amount of property contracts
in 2010.
Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 3
23,873
28,526
10,164
8,311
2010 2011
от передачи э/э от тех. присоединения
26,112
30,456
1,305
1,226
2010 2011
передача э/э тех. присоединение
Structure of revenue and costs of Lenenergo in 2011
34,201 37,009
22.5%
77.1%
Revenue by types of activity*,
RUR mln
+8.2%
Prime cost by types of activity*,
RUR mln
27,488 31,758+15.5%
95.0%
4.7%
95.9%
3.9%
* Including other activities the amount of revenue and costs of which is less than 1% of the total sum
Structure of prime cost, RUR mln
Indicator 2010 2011
2011/2010
Δ in %
Controlled costs 4,667 5,456 16.9%
Material costs 601 661 10.1%
Labor remuneration fund 2,178 2,693 23.6%
Other costs 1,888 2,102 11.3%
Uncontrolled costs 22,821 26,302 15.3%
Purchased power to compensate for losses 5,865 5,357 -8.7%
Services on electricity transmission by
networks of TGOs
5,464 7,969 45.8%
Payment for services of JSC UES FGC 4,909 5,686 15.8%
Depreciation of FA and IA 4,135 5,102 23.4%
Lease payments 1,620 1,187 -26.7%
Other costs 828 1,001 20.9%
Total costs 27,488 31,758 15,5%
69.8%
29.7%
4,497 4,667 5,456
16,318
22,821
26,302
2009 2010 2011
Подконтрольные затраты Неподконтрольные затраты
Dynamics of costs structure, RUR mln
+3.8%
+16.9%
+39.9%
+15.3%
Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 4
From electricity
transmission
From technological
connection
From electricity
transmission
From technological
connection
Controlled costs Uncontrolled costs
According to 2011 results controlled costs
constitute 17.2%, uncontrolled costs - 82.8% of the
total costs of the Company.
In the structure of control of costs there is
prevailing labor remuneration fund (49.4%).
In the structure of uncontrolled costs there are
dominating services on electricity transmission by
networks of TGOs (30.3%), payment for services of JSC
FGC UES and the costs for purchased power to
compensate for losses. The most significant changes in
the structure of uncontrolled costs as compared to
2010 occurred in part of the growing share of the
costs of services for electricity transmission by
networks of TGOs (by 6.4 p.p.) followed by the
reduction in the share of purchased power to
compensate for losses (5.3 p.p.).
Credit portfolio and debt position of Lenenergo for the end of 2011
31.12.2010 31.12.2011
Δ in %
31.12.2011/
31.12.2010
Equity capital 51,759 56,195 8.6%
Liabilities, inc. 36,941 51,583 39.6%
Long-term borrowings 14,760 23,785 61.1%
Short-term borrowings 22,181 27,799 25.3%
Equity to liabilities 1.4 1.09 -
Leverage 22.2% 32.4% -10.2 p.p.
31.12.2010 31.12.2011
Δ in %
31.12.2011/
31.12.2010
Long-term credits and loans 13,562 20,800 53.4%
Short-term credits and loans, including: 1,000 6,000 500%
bonded loan (maturity in 2012) - 6,000 -
Debt on interest 172 193 12.2%
Accounts payable* 20,985 22,216 5.9%
Capital structure, RUR mln
Credit portfolio, RUR mln
SBERBANK
VTB BANK Saint-Petersburg
SVYAZ-BANK
JSB ROSSIYA
Debt position, RUR mln
7.71%
average weighted interest
rate in 2011
Agency Rating Assigned
Moody’s
Ba2
(forecast - stable)
November 2009
Moody’s Interfax Rating Agency
(rating on national scale)
Aa2.ru
(forecast - stable)
November 2009
Credit rating
Confirmed in February 2012
Borrowings flow in 2011, RUR mln
* Net debt is calculated as the sum of credits and loans (including the debt on accrued but not paid
interest) minus cash assets and short-term financial investments
* The amount of aggregate (long-term and short-term) accounts payable is displayed (without
debt on credits and loans)
31.12.2010 31.12.2011
Δ in %
31.12.2011/
31.12.2010
Net debt as of the end of the period* 14,405 20,197 40.2%
Net debt/EBITDA 1.39 2.34 -
As of the end 2011:
• RUR 20,800 mln – long-term liabilities on the sum of main debt;
• RUR 6,000 mln – short-term liabilities on the sum of main debt – loans
transferred into the structure of short-term liabilities in accordance with
accounting standards: prior to their maturity is less than one year;
-+
14,562 15,563
3,325
26,800
кредитный
портфель на
31.12.2010
привлечение
(выборка)
погашение кредитный
портфель на
31.12.2011
Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 5
Major banks partners of
Lenenergo:
Credit portfolio
as of 31.12.2010
Attraction Maturity Credit portfolio
as of 31.12.2011
34%
7%
13%
21%
25%
Investment program of Lenenergo in 2011
Capital investments of JSC Lenenergo in 2011 constituted RUR 15,061 mln
Parameters of investment program, RUR mln
Indicator
Saint-Petersburg Leningrad region JSC Lenenergo
2010 2011
Δ in %
2011/2010
2010 2011
Δ in %
2011/2010
2010 2011
Δ in %
2011/2010
Disbursement, RUR mln, net after
VAT
12,574 10,829 -13.9% 3,239 4,232 30.7% 15,813 15,061 -4.8%
Commissioning of FA, RUR mln 11,328 11,246 -0.7% 2,421 5,077 109.7% 13,749 16,323 18.7%
Financing, RUR mln, VAT included 12,704 11,446 -9.9% 3,723 4,101 10.2% 16,427 15,547 -5.4%
Commissioning of capacities,
MVA
704 623 -11.5% 228 372 63.2% 932 996 6.9%
Commissioning of capacities, km 995 935 -6.0% 512 778 52.0% 1,507 1,713 13.7%
Capacity gain, MVA 647 513 -20.7% 215 279 29.8% 862 792 -8.1%
Capacity gain, km 912 740 -18.9% 180 340 88.9% 1,092 1,081 -1.0%
CAPEX, RUR mln
15,813 15,061
Funding sources of capital investments for 2011-2012, RUR mln net of VAT
кредиты
авансы по ТП
амортизация
расчеты имуществом
Indicator 2010 2011
Δ in %
2011/2010
Investment program, total 15,813 15,061 -4.8%
depreciation 2,656 5,133 93.2%
net profit from electricity transmission 377 - -
additional issues, including loans attracted for
additional issues
- 1,034 -
sale of assets 5,296 1,898 -64.2%
lost income 528 18 -96.6%
bank loans 3,372 3,173 -5.9%
TC fees 3,585 3,804 6.1%
4,503
6,752
10,377
8,309
2010 2011
ТПиР Новое строительство
доп. эмиссия акций
R&R New construction
TC fees
depreciation
additional issues
bank loans
sale of assets
Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 6
28,439
27,672
29,095 28,975
2008 2009 2010 2011
33,496
29,095
4,401 3,587
33,460
28,975
4,485 3,546
Отпуск в сеть Полезный отпуск Общие потери в сетях Потери в сетях
Ленэнерго
2010 2011
Electric power transmission of JSC Lenenergo in 2011
Dynamics of indicators of electric power transmission on Lenenergo grids
in 2010 – 2011, mln kWh
-0.1% -0.4%
+1.9%
-1.1%
Dynamics of productive supply, mln kWh
Dynamics of losses in Lenenergo grids, %
The Company is implementing the Program on reduction of
electricity losses in grids, according to which the target level of
electricity losses in the grids JSC Lenenergo in 2015 is equal to
9.1%
Losses in Lenenergo grids are
significantly lower than the losses in
territorial grid organizations
Measures to reduce electricity losses
Reduction of losses,
Mln kWh
Reduction of technological losses 23,139
Reduction of commercial losses 22,695
Costs for long-term implementation of the
program in 2011
RUR 109 mln
Implementation of the Program on reduction of electricity
losses in Lenenergo grids in 2011
Economic effect of implementing the
program on reduction of losses in 2011
RUR 64 mln
Показатели
Supply to grid,
mln kWh
Productive supply,
mln kWh
Total losses in grids Losses in Lenenergo grids
2010 2011 2010 2011
Mln
kWh
%
Mln
kWh
%
Mln
kWh
%
Mln
kWh
%
2010 2011 2010 2011
JSC Lenenergo, including: 33,496 33,460 29,095 28,975 4,401 13.1 4,485 13.4 3,587 10.72 3,546 10.6
St.-Petersburg 21,244 21,297 18,626 18,931 2,618 12.3 2,758 13.0 2,313 10.89 2,335 10.97
Leningrad region 12,252 12,163 10,469 10,436 1,783 14.6 1,727 14.2 1,273 10.39 1,211 9.96
10.0 10.3 10.7 10.6
2008 2009 2010 2011
Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 7
Supply to grid Total losses in gridsProductive supply Total losses in
Lenenergo grids
630 MW 645 MW
485 MW
321 MW
заключено договоров исполнено договоров
2010 2011
11 159
pcs
14 561
pcs
Technological connection of JSC Lenenergo in 2011
- 23%
Outcomes of technological connection of JSC Lenenergo in 2010 – 2011, pcs (MW)
- 49%
4 173
pcs
Region
Contracts concluded Contracts closed
pcs MW pcs MW pcs MW pcs MW
2010 2011 2010 2011
JSC Lenenergo 11,159 629.5 14,561 485.2 4,173 645.3 6,302 320.6
St.-Petersburg 1,390 247.9 3,656 247.2 1,356 460.0 2,328 169.2
Leningrad region 9,769 381.6 10,905 238.0 2,817 185.3 3,974 151.4
RUR mln share, %
Revenues from TC, including 8,310.6 100.0%
On existing contracts
(term of services after 01.01.2011)
5,143.9 61.9%
On overdue contracts
(term of services prior to 01.01.2011)
3,166.6 38.1%
Execution of overdue obligations on TC in 2011, RUR mln Structure of revenues from TC in 2010 - 2011, RUR mln
Revenues form TC 2010
share, %
(2010)
2011
share, %
(2011)
Revenues from TC, incld. 10,163.7 100.0% 8,310.6 100.0%
Execution on monetary
contracts
3,738.7 36.8% 6,237.6 75.1%
Execution on property
contracts
6,425.0 63.2% 2,072.9 24.9%
6 302
pcs
Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 8
Contracts concluded Contracts closed
In quantitative terms, in 2011 the main
demand for technological connections was
fixed in the Leningrad region - 74.8% of
the contracts concluded (in 2010 -
87.5%). The basic amount of performed
obligations for 2011 also accounts for the
Leningrad region - 63.0% (in 2010 - 67.5%).
There were concluded and closed more contracts in 2011 than in 2010,
but the total capacity of the contracts concluded and performed
decreased. The excess in capacity (MW) of performed obligations in
2010 over 2011 is driven by the implementation in 2010 of a significant
proportion of property obligations. A reduction in the total capacity
followed by an increase in the number of contracts for the 12 months of
2011 is also associated with an increase in the number of contracts with a
capacity of up to 15 kW
THANK YOU
FOR YOUR ATTENTION!
JSC Lenenergo
196247, Russia, Saint-Petersburg, Constitution Sq., 1
Head of Department for Corporate Governance and Shareholders Relationship
Andrey Smolnikov
Tel./ fax +7 (812) 595 31 76
Smolnikov.AS@nwenergo.com
Investor Relations
Ulyana Davydova
Tel. +7 (812) 494 39 06
Fax +7 (812) 494 37 34
ir@lenenergo.ru
Davydova.UE@nwenergo.com
www.lenenergo.ru
CONTACTS

More Related Content

More from Lenenergo IR

FY2012 Key Results (RAS)
FY2012 Key Results (RAS)FY2012 Key Results (RAS)
FY2012 Key Results (RAS)Lenenergo IR
 
Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...Lenenergo IR
 
Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...
Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...
Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...Lenenergo IR
 
Conference - Call. RAB-regulation parameters_SCRIPT
Conference - Call. RAB-regulation parameters_SCRIPTConference - Call. RAB-regulation parameters_SCRIPT
Conference - Call. RAB-regulation parameters_SCRIPTLenenergo IR
 
THE RUSSIA FORUM 2011
THE RUSSIA FORUM 2011THE RUSSIA FORUM 2011
THE RUSSIA FORUM 2011Lenenergo IR
 
Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...Lenenergo IR
 
Investor's Day of JSC "IDGC Holding"
Investor's Day of JSC "IDGC Holding"Investor's Day of JSC "IDGC Holding"
Investor's Day of JSC "IDGC Holding"Lenenergo IR
 
FY 2010 Operational & Financial Results (under RAS)
FY 2010 Operational & Financial Results (under RAS)FY 2010 Operational & Financial Results (under RAS)
FY 2010 Operational & Financial Results (under RAS)Lenenergo IR
 
Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...
Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...
Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...Lenenergo IR
 
9M 2011 Operational & Financial Results of JSC “Lenenergo”
9M 2011 Operational & Financial Results of JSC “Lenenergo”9M 2011 Operational & Financial Results of JSC “Lenenergo”
9M 2011 Operational & Financial Results of JSC “Lenenergo”Lenenergo IR
 
RAB regulation parameters, estimates of key financial indicators of JSC “Lene...
RAB regulation parameters, estimates of key financial indicators of JSC “Lene...RAB regulation parameters, estimates of key financial indicators of JSC “Lene...
RAB regulation parameters, estimates of key financial indicators of JSC “Lene...Lenenergo IR
 
Conference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPT
Conference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPTConference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPT
Conference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPTLenenergo IR
 
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...Lenenergo IR
 
Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...
Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...
Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...Lenenergo IR
 
INVESTOR RELATIONS PRESENTATION
INVESTOR RELATIONS PRESENTATIONINVESTOR RELATIONS PRESENTATION
INVESTOR RELATIONS PRESENTATIONLenenergo IR
 
ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»
ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»
ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»Lenenergo IR
 
IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...
IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...
IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...Lenenergo IR
 
ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИ
ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИ
ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИLenenergo IR
 
Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010
Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010
Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010Lenenergo IR
 

More from Lenenergo IR (20)

FY2012 Key Results (RAS)
FY2012 Key Results (RAS)FY2012 Key Results (RAS)
FY2012 Key Results (RAS)
 
RUSSIA FORUM 2012
RUSSIA FORUM 2012RUSSIA FORUM 2012
RUSSIA FORUM 2012
 
Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...
 
Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...
Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...
Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...
 
Conference - Call. RAB-regulation parameters_SCRIPT
Conference - Call. RAB-regulation parameters_SCRIPTConference - Call. RAB-regulation parameters_SCRIPT
Conference - Call. RAB-regulation parameters_SCRIPT
 
THE RUSSIA FORUM 2011
THE RUSSIA FORUM 2011THE RUSSIA FORUM 2011
THE RUSSIA FORUM 2011
 
Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...
 
Investor's Day of JSC "IDGC Holding"
Investor's Day of JSC "IDGC Holding"Investor's Day of JSC "IDGC Holding"
Investor's Day of JSC "IDGC Holding"
 
FY 2010 Operational & Financial Results (under RAS)
FY 2010 Operational & Financial Results (under RAS)FY 2010 Operational & Financial Results (under RAS)
FY 2010 Operational & Financial Results (under RAS)
 
Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...
Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...
Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...
 
9M 2011 Operational & Financial Results of JSC “Lenenergo”
9M 2011 Operational & Financial Results of JSC “Lenenergo”9M 2011 Operational & Financial Results of JSC “Lenenergo”
9M 2011 Operational & Financial Results of JSC “Lenenergo”
 
RAB regulation parameters, estimates of key financial indicators of JSC “Lene...
RAB regulation parameters, estimates of key financial indicators of JSC “Lene...RAB regulation parameters, estimates of key financial indicators of JSC “Lene...
RAB regulation parameters, estimates of key financial indicators of JSC “Lene...
 
Conference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPT
Conference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPTConference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPT
Conference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPT
 
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
 
Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...
Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...
Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...
 
INVESTOR RELATIONS PRESENTATION
INVESTOR RELATIONS PRESENTATIONINVESTOR RELATIONS PRESENTATION
INVESTOR RELATIONS PRESENTATION
 
ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»
ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»
ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»
 
IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...
IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...
IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...
 
ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИ
ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИ
ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИ
 
Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010
Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010
Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010
 

Recently uploaded

VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...SUHANI PANDEY
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableSheetaleventcompany
 
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...tanu pandey
 
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663Call Girls Mumbai
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...mriyagarg453
 
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsPakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsgwenoracqe6
 
Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024TeckResourcesLtd
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsTILDEN
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxMollyBrown86
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceDelhi Call girls
 

Recently uploaded (20)

Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
 
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
 
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
 
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
 
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
 
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsPakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
 
Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxx
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
 
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
 

FY 2011 Operating Results of JSC Lenenergo under RAS

  • 1. FY 2011 Operating Results of JSC Lenenergo under RAS
  • 2. This presentation is not an offer or invitation to make offers (advertisement) in respect of purchase or subscription to securities of Lenenergo. Neither the presentation, nor any part hereof, nor the fact of its representation or distribution serve as the basis for entering into any agreement or taking any investment decision; therefore, the presentation should not be relied upon in this respect. This presentation may contain estimates. The estimates are not based on actual circumstances and include statements in respect of the intentions, opinions or current expectations of JSC Lenenergo as regards the results of its activity, financial position, liquidity, prospects of growth, strategy and the industry, in which JSC Lenenergo operates. Such estimates by their nature are characterized by presence of risks and uncertainty factors since they are related to the events and depend on the circumstances, which may fail to happen in the future. Lenenergo warns that the estimates are not a guarantee of the future parameters, and the actual results of JSC Lenenergo activities, its financial position and liquidity, as well as development of the industry, in which it operates, may significantly differ from those included in the estimates contained herein. Besides, even if the results of the Company's activities, its financial position and liquidity, as well as the development of the industry, in which it operates, correspond to the estimates contained herein, such results and events are not indicative of the results and events in the future. This presentation contains the information received from third parties besides the official information on JSC Lenenergo activities. This information has been received from the sources which are reliable in JSC Lenenergo opinion. Nevertheless, we do not guarantee the accuracy of such information which may be reduced or incomplete. All opinions and estimates contained herein reflect our opinion as at the date of publication and are subject to change without notice. Lenenergo does not bear liability for the consequences of use of the opinions or estimates contained herein, or information incompleteness. JSC Lenenergo does not undertake obligations in respect of revision or confirmation of the estimates and evaluations, as well as in respect of updating of the information contained herein. Disclaimer
  • 3. Personal number of Lenenergo as of 31.12.2011 was equal to 6,052 people St.-Petersburg – 75.2% Lenenergo share in the electric power transmission market as of 31.12.2011: 90.85 % 9.15 % Ordinary shares 928,021,679.004 pcs Preferred shares 93,264,311 pcs Authorized capital of Lenenergo is equal to RUR 1,019,285,990.004 Structure of share capital of JSC Lenenergo** Information on Lenenergo shares Quotation lists MICEX B Tickers Ordinary shares LSNG Preferred shares LSNGP Capitalization 31.12.2011, USD mln* 348 Leningrad region – 60.3% **as of the closing date of the register: 17.11.2011 Service area, thousand sq.km 87.3 Population, mln. people 6.2 Lenenergo is one of the largest electricity distribution companies in Russia, the operator of 0.4-110 kV grids, servicing the territory of Saint-Petersburg and the Leningrad region Main types of activity: • electric power transmission and distribution services; • technological connection of power receiving facilities (power plants) of business and individuals to the grids The Lenenergo share in Saint-Petersburg and Leningrad region in the electric power transmission market as of 31.12.2011 – 69.8% Lenenergo comprises 10 operational units in Saint-Petersburg and the Leningrad region * The calculation is made on the capitalization weighted average price on the MICEX SE at the rate of the Central Bank on that date Major competitors of Lenenergo: municipal electric network companies OAO SPbES in Saint-Petersburg and OAO LOESK in the Leningrad region I.D.E.ELECTRICITY DISTRIBUTION INVESTMENTS 1 LIMITED (ZAO IES Holding) ENERGYO SOLUTIONS RUSSIA LIMITED (EOS Russia) RUSENERGO FUND LIMITED JP MORGAN Funds Other The city of St.-Petersburg (CPMC) IDGC Holding 50.31% 25.16% 8.76% 4.15% 2.75% 1.83% 7.05% General information on the Company Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 1
  • 4. 1,540 3,258 3,806 1,417 1,350 11,409 10,334 15,813 15,061 13,316 28,439 27,672 29,095 28,975 30,060 20,828 26,088 34,201 37,009 38,409 5,566 8,190 10,356 8,630 9,659 Business and financial highlights Unit 2008 2009 2010 2011 Installed capacity MVA 19,365.5 19,901.4 20,740.5 21,427.4 Overhead Transmission Lines 0.38-110 kV on circuit km 39,084.6 39,285.9 39,418.8 39,782.6 Overhead Transmission Lines 0.38-110 kV on line km 35,966.5 36,148.2 36,273.6 36,586.8 Cable lines 0.38-110 kV km 16,730.9 17,650.7 18,622.3 19,554.2 Substations 35-110 kV pcs (MVA) 368 (12,818) 370 (13,084) 372 (13,466) 373 (13,742) Transformer substations 6-35 kV pcs (MVA) 13,646 (6,548) 13,909 (6,818) 14,361 (7,275) 14,770 (7,686) Characteristics of Lenenergo assets EBITDA, RUR mln Revenue, RUR mln Net profit, RUR mln Productive supply, mln kWh 2008 2009 2010 2011 2012F Dynamics of key indicators of Lenenergo + 3.7% + 3.8% + 11.9% -4.7% -11.5% CAPEX, RUR mln -0.4% + 8.2% -16.7% -62.8% -4.8% Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 2
  • 5. 10,356 8,630 2010 2011 -3,776 -4,560 7,382 6,418 от тех. присоединения от передачи э/э 34,201 27,488 6,713 3,806 37,009 31,758 5,252 1,417 Выручка от реализации Себестоимость Валовая прибыль Чистая прибыль 2010 2011 Financial performance of Lenenergo in 2010 – 2011 +8.2% +15.5% -21.8 % -62.8% Formation of sales profit and net profit, RUR mln * Including other activities the amount of revenue and costs of which is less than 1% of the total sum 3,806 1,417-62.8% Net profit by types of activity*, RUR mln - = Liquidity indicators 2010 2011 Deviation, p.p. ROE 7.80% 2.54% -5.25 ROA 4.29% 1.32% -2.98 ROS 19.63% 14.19% -5.44 -16.7% EBITDA, RUR mln EBITDA margin, % 30.28% 23.32% EBITDA 8,630 100% Depreciation of FA and IA 5,102 59.1% Interest to be paid 1,167 13.5% Profit tax 944 10.9% Net profit 1,417 16.4% The decrease in net profit is driven by the outstripping revenue growth compared to the increase in cost as compared to the previous reporting period, followed by the increase in the negative balance of other income and expenses. In addition, since 01.01.2011 the Company transited to RAB-based regulation. Considering the incomplete accounting by the regulator of the necessary expenses (primarily on the federal factors: JSC UES FGC fee, losses of electricity), as well as through the use of a smoothing mechanism in 2011, the loss of electric power transmission in 2011 was higher than in 2010. As a result of 2011 net profit from the provision of services for technological connection constituted RUR 6,418 mln, which is 13% less than in 2010. Liquidity indicators 2010 2011 Sales revenue Costs Gross profit Net profit from electricity transmission from TC The increase in revenues for electricity transmission constituted 19.5%, or RUR 4,653 mln. The growth was primarily driven by increased rates for electricity transmission (an increase of the average rate for 2011 relative to 2010 was: in St.-Petersburg - 19.4%, in the Leningrad region - 24.8%). At the same time revenues from provision of services for technological connection in 2011 decreased by 18.2% (RUR 1,853 mln), which is associated with the closure of a large amount of property contracts in 2010. Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 3
  • 6. 23,873 28,526 10,164 8,311 2010 2011 от передачи э/э от тех. присоединения 26,112 30,456 1,305 1,226 2010 2011 передача э/э тех. присоединение Structure of revenue and costs of Lenenergo in 2011 34,201 37,009 22.5% 77.1% Revenue by types of activity*, RUR mln +8.2% Prime cost by types of activity*, RUR mln 27,488 31,758+15.5% 95.0% 4.7% 95.9% 3.9% * Including other activities the amount of revenue and costs of which is less than 1% of the total sum Structure of prime cost, RUR mln Indicator 2010 2011 2011/2010 Δ in % Controlled costs 4,667 5,456 16.9% Material costs 601 661 10.1% Labor remuneration fund 2,178 2,693 23.6% Other costs 1,888 2,102 11.3% Uncontrolled costs 22,821 26,302 15.3% Purchased power to compensate for losses 5,865 5,357 -8.7% Services on electricity transmission by networks of TGOs 5,464 7,969 45.8% Payment for services of JSC UES FGC 4,909 5,686 15.8% Depreciation of FA and IA 4,135 5,102 23.4% Lease payments 1,620 1,187 -26.7% Other costs 828 1,001 20.9% Total costs 27,488 31,758 15,5% 69.8% 29.7% 4,497 4,667 5,456 16,318 22,821 26,302 2009 2010 2011 Подконтрольные затраты Неподконтрольные затраты Dynamics of costs structure, RUR mln +3.8% +16.9% +39.9% +15.3% Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 4 From electricity transmission From technological connection From electricity transmission From technological connection Controlled costs Uncontrolled costs According to 2011 results controlled costs constitute 17.2%, uncontrolled costs - 82.8% of the total costs of the Company. In the structure of control of costs there is prevailing labor remuneration fund (49.4%). In the structure of uncontrolled costs there are dominating services on electricity transmission by networks of TGOs (30.3%), payment for services of JSC FGC UES and the costs for purchased power to compensate for losses. The most significant changes in the structure of uncontrolled costs as compared to 2010 occurred in part of the growing share of the costs of services for electricity transmission by networks of TGOs (by 6.4 p.p.) followed by the reduction in the share of purchased power to compensate for losses (5.3 p.p.).
  • 7. Credit portfolio and debt position of Lenenergo for the end of 2011 31.12.2010 31.12.2011 Δ in % 31.12.2011/ 31.12.2010 Equity capital 51,759 56,195 8.6% Liabilities, inc. 36,941 51,583 39.6% Long-term borrowings 14,760 23,785 61.1% Short-term borrowings 22,181 27,799 25.3% Equity to liabilities 1.4 1.09 - Leverage 22.2% 32.4% -10.2 p.p. 31.12.2010 31.12.2011 Δ in % 31.12.2011/ 31.12.2010 Long-term credits and loans 13,562 20,800 53.4% Short-term credits and loans, including: 1,000 6,000 500% bonded loan (maturity in 2012) - 6,000 - Debt on interest 172 193 12.2% Accounts payable* 20,985 22,216 5.9% Capital structure, RUR mln Credit portfolio, RUR mln SBERBANK VTB BANK Saint-Petersburg SVYAZ-BANK JSB ROSSIYA Debt position, RUR mln 7.71% average weighted interest rate in 2011 Agency Rating Assigned Moody’s Ba2 (forecast - stable) November 2009 Moody’s Interfax Rating Agency (rating on national scale) Aa2.ru (forecast - stable) November 2009 Credit rating Confirmed in February 2012 Borrowings flow in 2011, RUR mln * Net debt is calculated as the sum of credits and loans (including the debt on accrued but not paid interest) minus cash assets and short-term financial investments * The amount of aggregate (long-term and short-term) accounts payable is displayed (without debt on credits and loans) 31.12.2010 31.12.2011 Δ in % 31.12.2011/ 31.12.2010 Net debt as of the end of the period* 14,405 20,197 40.2% Net debt/EBITDA 1.39 2.34 - As of the end 2011: • RUR 20,800 mln – long-term liabilities on the sum of main debt; • RUR 6,000 mln – short-term liabilities on the sum of main debt – loans transferred into the structure of short-term liabilities in accordance with accounting standards: prior to their maturity is less than one year; -+ 14,562 15,563 3,325 26,800 кредитный портфель на 31.12.2010 привлечение (выборка) погашение кредитный портфель на 31.12.2011 Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 5 Major banks partners of Lenenergo: Credit portfolio as of 31.12.2010 Attraction Maturity Credit portfolio as of 31.12.2011
  • 8. 34% 7% 13% 21% 25% Investment program of Lenenergo in 2011 Capital investments of JSC Lenenergo in 2011 constituted RUR 15,061 mln Parameters of investment program, RUR mln Indicator Saint-Petersburg Leningrad region JSC Lenenergo 2010 2011 Δ in % 2011/2010 2010 2011 Δ in % 2011/2010 2010 2011 Δ in % 2011/2010 Disbursement, RUR mln, net after VAT 12,574 10,829 -13.9% 3,239 4,232 30.7% 15,813 15,061 -4.8% Commissioning of FA, RUR mln 11,328 11,246 -0.7% 2,421 5,077 109.7% 13,749 16,323 18.7% Financing, RUR mln, VAT included 12,704 11,446 -9.9% 3,723 4,101 10.2% 16,427 15,547 -5.4% Commissioning of capacities, MVA 704 623 -11.5% 228 372 63.2% 932 996 6.9% Commissioning of capacities, km 995 935 -6.0% 512 778 52.0% 1,507 1,713 13.7% Capacity gain, MVA 647 513 -20.7% 215 279 29.8% 862 792 -8.1% Capacity gain, km 912 740 -18.9% 180 340 88.9% 1,092 1,081 -1.0% CAPEX, RUR mln 15,813 15,061 Funding sources of capital investments for 2011-2012, RUR mln net of VAT кредиты авансы по ТП амортизация расчеты имуществом Indicator 2010 2011 Δ in % 2011/2010 Investment program, total 15,813 15,061 -4.8% depreciation 2,656 5,133 93.2% net profit from electricity transmission 377 - - additional issues, including loans attracted for additional issues - 1,034 - sale of assets 5,296 1,898 -64.2% lost income 528 18 -96.6% bank loans 3,372 3,173 -5.9% TC fees 3,585 3,804 6.1% 4,503 6,752 10,377 8,309 2010 2011 ТПиР Новое строительство доп. эмиссия акций R&R New construction TC fees depreciation additional issues bank loans sale of assets Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 6
  • 9. 28,439 27,672 29,095 28,975 2008 2009 2010 2011 33,496 29,095 4,401 3,587 33,460 28,975 4,485 3,546 Отпуск в сеть Полезный отпуск Общие потери в сетях Потери в сетях Ленэнерго 2010 2011 Electric power transmission of JSC Lenenergo in 2011 Dynamics of indicators of electric power transmission on Lenenergo grids in 2010 – 2011, mln kWh -0.1% -0.4% +1.9% -1.1% Dynamics of productive supply, mln kWh Dynamics of losses in Lenenergo grids, % The Company is implementing the Program on reduction of electricity losses in grids, according to which the target level of electricity losses in the grids JSC Lenenergo in 2015 is equal to 9.1% Losses in Lenenergo grids are significantly lower than the losses in territorial grid organizations Measures to reduce electricity losses Reduction of losses, Mln kWh Reduction of technological losses 23,139 Reduction of commercial losses 22,695 Costs for long-term implementation of the program in 2011 RUR 109 mln Implementation of the Program on reduction of electricity losses in Lenenergo grids in 2011 Economic effect of implementing the program on reduction of losses in 2011 RUR 64 mln Показатели Supply to grid, mln kWh Productive supply, mln kWh Total losses in grids Losses in Lenenergo grids 2010 2011 2010 2011 Mln kWh % Mln kWh % Mln kWh % Mln kWh % 2010 2011 2010 2011 JSC Lenenergo, including: 33,496 33,460 29,095 28,975 4,401 13.1 4,485 13.4 3,587 10.72 3,546 10.6 St.-Petersburg 21,244 21,297 18,626 18,931 2,618 12.3 2,758 13.0 2,313 10.89 2,335 10.97 Leningrad region 12,252 12,163 10,469 10,436 1,783 14.6 1,727 14.2 1,273 10.39 1,211 9.96 10.0 10.3 10.7 10.6 2008 2009 2010 2011 Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 7 Supply to grid Total losses in gridsProductive supply Total losses in Lenenergo grids
  • 10. 630 MW 645 MW 485 MW 321 MW заключено договоров исполнено договоров 2010 2011 11 159 pcs 14 561 pcs Technological connection of JSC Lenenergo in 2011 - 23% Outcomes of technological connection of JSC Lenenergo in 2010 – 2011, pcs (MW) - 49% 4 173 pcs Region Contracts concluded Contracts closed pcs MW pcs MW pcs MW pcs MW 2010 2011 2010 2011 JSC Lenenergo 11,159 629.5 14,561 485.2 4,173 645.3 6,302 320.6 St.-Petersburg 1,390 247.9 3,656 247.2 1,356 460.0 2,328 169.2 Leningrad region 9,769 381.6 10,905 238.0 2,817 185.3 3,974 151.4 RUR mln share, % Revenues from TC, including 8,310.6 100.0% On existing contracts (term of services after 01.01.2011) 5,143.9 61.9% On overdue contracts (term of services prior to 01.01.2011) 3,166.6 38.1% Execution of overdue obligations on TC in 2011, RUR mln Structure of revenues from TC in 2010 - 2011, RUR mln Revenues form TC 2010 share, % (2010) 2011 share, % (2011) Revenues from TC, incld. 10,163.7 100.0% 8,310.6 100.0% Execution on monetary contracts 3,738.7 36.8% 6,237.6 75.1% Execution on property contracts 6,425.0 63.2% 2,072.9 24.9% 6 302 pcs Presentation of JSC Lenenergo FY 2011 Results (RAS ) | 8 Contracts concluded Contracts closed In quantitative terms, in 2011 the main demand for technological connections was fixed in the Leningrad region - 74.8% of the contracts concluded (in 2010 - 87.5%). The basic amount of performed obligations for 2011 also accounts for the Leningrad region - 63.0% (in 2010 - 67.5%). There were concluded and closed more contracts in 2011 than in 2010, but the total capacity of the contracts concluded and performed decreased. The excess in capacity (MW) of performed obligations in 2010 over 2011 is driven by the implementation in 2010 of a significant proportion of property obligations. A reduction in the total capacity followed by an increase in the number of contracts for the 12 months of 2011 is also associated with an increase in the number of contracts with a capacity of up to 15 kW
  • 11. THANK YOU FOR YOUR ATTENTION!
  • 12. JSC Lenenergo 196247, Russia, Saint-Petersburg, Constitution Sq., 1 Head of Department for Corporate Governance and Shareholders Relationship Andrey Smolnikov Tel./ fax +7 (812) 595 31 76 Smolnikov.AS@nwenergo.com Investor Relations Ulyana Davydova Tel. +7 (812) 494 39 06 Fax +7 (812) 494 37 34 ir@lenenergo.ru Davydova.UE@nwenergo.com www.lenenergo.ru CONTACTS