Materials Strategy - PFEP

                    Plan for Every Part



                                    Marek Piatkowski
                                      December 2010


Marek Piatkowski – FSP Consulting
                                                       1
1. Creating Plan-for-Every- Part




                        PFEP
           1.
                        Plan-for-Every-Part

                                                                         2.    Parts Storage -
                                                                               Supermarkets




                                                          Creating Purchased
                                                          Parts Supermarket




                                            Kanban                              Material
                                       3.   Based                        4.     Delivery
                                            Pull Signal                         Systems




   Marek Piatkowski – FSP Consulting
                                                                                                 2
Start collecting Information for (PFEP)

      PFEP is a data base.
      For every part, gather information related to:
                Part identification – part #, description, unique features …
                Storage information – container type, pieces/container …
                Transportation - what equipment needed to move parts
                Delivery – how frequently do we ship and deliver
                Production capabilities – daily or hourly production rates
                Customer Requirements – forecast and actual shipments
      Group every part into one of the three categories:
                Runners (A), Repeaters (B), or Strangers ©




   Marek Piatkowski – FSP Consulting
                                                                                3
Establishing PFEP – How much detail?

                 Part number                Container type
                 Description                Length
                 Daily usage                Width
                 Point of use location      Height
                 Storage location           Weight
                 Order frequency            Standard pack quantity
                 Supplier name              Delivery frequency
                 Supplier city              Carrier
                 Supplier country           Transit time
                 …                          …




   Marek Piatkowski – FSP Consulting
                                                                       4
Develop the PFEP Plan

    Identify if each container is “Line Ready” – YES or NO
                    Small box, easy to lift
                    Less than 12 KG (30 lbs)




   Marek Piatkowski – FSP Consulting
                                                             5
Does the part need Repacking ?
Marek Piatkowski – FSP Consulting
                                                            6
Si o No ?
Marek Piatkowski – FSP Consulting
                                                7
Marek Piatkowski – FSP Consulting
                                    8
Develop the PFEP Plan

      For every part identify inventory levels required at each machine
       and work station
           - how many boxes / containers?
           - Min = 2 hours of inventory
      If parts must be re-packaged
            - select a new container type
            - define and minimize Standard Pack Quantities
      Identify inventory levels (min/max) at each storage location and
       Supermarket




   Marek Piatkowski – FSP Consulting
                                                                           9
Plan-for-Every-Part - Data Base
   PN-150 Part                                                    Supl.    Supplier    Press            Wheel    Part's 1=Line #1 Used on # Parts / Kanban System
                 Part Type   Hand              Description                                     Model
    Number                                                        Type      Name       Line             Base     Weight 2=Both Oper. # Frame           Routing
  FU-31301*      Bracket         RH   Front End Sheet Metal        Ext Ridgeview                                  1.12      2       220      1     PN-150 Supplier
  FU-31302*      Bracket         LH   Front End Sheet Metal        Ext Ridgeview                                  1.12      2       220      1     PN-150 Supplier
  FU-31304-220 Bracket                #1 Body Bracket              Ext Acemco                   4x2               1.4       2       220      2     PN-150 Supplier
  FU-31307       Bracket         RH   Lower Control Arm            Ext Tecumseh                 4x4               3.1       1       245      1     PN-150 Supplier
  FU-31308       Bracket         LH   Lower Control Arm            Ext Tecumseh                 4x4               3.1       1       245      1     PN-150 Supplier
  FU-31313*      Bracket         RH   Front Shock                  Ext Metal Form N.            4x4               2.9       1       255      1     PN-150 Supplier
  FU-31314*      Bracket         LH   Front Shock                  Ext Metal Form N.            4x4               2.9       1       255      1     PN-150 Supplier
  FU-31319-10* Bracket           RH   Front Upper Control Arm      Ext Ridgeview                4x4               1.3       1       245      2     PN-150 Supplier
  FU-31320*      Bracket         LH   Rear Upper Control Arm       Ext Ridgeview                4x4               1.1       1       245      2     PN-150 Supplier
  FU-31323-10 Bracket            RH   Front Jounce Bracket         Ext Tecumseh                 4x4               2.3       1       280      1     PN-150 Supplier
  FU-31324-10 Bracket            LH   Front Jounce Bracket         Ext Tecumseh                 4x4               2.3       1       280      1     PN-150 Supplier
  FU-31569*      Bracket         RH   Engine Differential          Ext Hamlin                   4x4               2.2       1       255      1     PN-150 Supplier
  FU-31570*      Bracket         LH   Engine                       Ext Hamlin                   4x4               2.2       1       255      1     PN-150 Supplier
  FU-31595       Bracket         RH   T-Bar Sub-assembly           Ext Tecumseh                 4x4               0.8       1       20       1     PN-150 Supplier
  FU-31596       Bracket         LH   T-Bar Sub-assembly           Ext Tecumseh                 4x4               0.8       1       20       1     PN-150 Supplier
  FU-31599       Reinforcement RH     # 1 Cross Bar                Ext Luitink                  4x4               0.9       1       50       1     PN-150 Supplier
  FU-31600       Reinforcement LH     # 1 Cross Bar                Ext Luitink                  4x4               0.9       1       50       1     PN-150 Supplier
  FU-31601       Bracket         RH   Lower Control Arm            Ext Tecumseh                 4x2               4.2       2       240      1     PN-150 Supplier
  FU-31602       Bracket         LH   Lower Control Arm            Ext Tecumseh                 4x2               4.2       2       240      1     PN-150 Supplier
  FU-31603       Bracket              Cab Mounting Rear            Ext Tower-Upper                     SW & LW    1.9       2       220      2     PN-150 Supplier
  FU-31604       Bracket              Cab Mounting Rear            Ext Tower-Upper                       SC       1.9       2       220      2     PN-150 Supplier
  FU-31605       Bracket              Upper Control Arm            Ext Luitink                  4x2                2        2       240      4     PN-150 Supplier
  FU-31607       Reinforcement RH     Lower Control Arm Bracket                                 4x2                         2                1
  FU-31608       Reinforcement LH     Lower Control Arm Bracket    Ext Tecumseh                 4x2               1.5       2       285      1     PN-150 Supplier
  FU-31609       Bracket         RH   Front Jounce Bracket         Ext Ridgeview                4x2               0.88      2       250      1     PN-150 Supplier
  FU-31610       Bracket         LH   Front JNC                    Ext Ridgeview                4x2               0.88      2       250      1     PN-150 Supplier
  FU-31639       Bracket         RH   Tire Stop                    Ext Ridgeview                                  0.4       2       30       1     PN-150 Supplier
  FU-31640       Bracket         LH   Tire Stop                    Ext Ridgeview                                  0.4       2       30       1     PN-150 Supplier
  FU-31641       Reinforcement RH     Center Side Bar              Ext Ridgeview                        SWB       1.3       2       Sub      1     PN-150 Supplier
  FU-31642       Reinforcement LH     Center Side Bar              Ext Ridgeview                        SWB       1.3       2       Sub      1     PN-150 Supplier
  FU-31648       Reinforcement        Center Side Bar              Ext Ridgeview                         SC       0.2       2       255      1     PN-150 Supplier

   Marek Piatkowski – FSP Consulting
                                                                                                                                                                     10
Lean Transformation Solutions
                                                             Marek Piatkowski
                                                         F.S.P. Consulting Inc.
                                                         F.S.P.

                                                            VM: 416-235-2631
                                                                  416-235-
                                                            Cell: 248-207-0416
                                                                  248-207-
                                                 Marek.Piatkowski@rogers.com
                                                      www.TWI-
                                                      www.TWI-Network.com


Marek Piatkowski – FSP Consulting
                                                                                  11

Weitere ähnliche Inhalte

Was ist angesagt?

value stream mapping
value stream mappingvalue stream mapping
value stream mappingJitesh Gaurav
 
Lean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting ClassLean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting ClassSam Bishop
 
Physical inventory and warehouse management
Physical inventory and warehouse managementPhysical inventory and warehouse management
Physical inventory and warehouse managementStudsPlanet.com
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementSunil Dhadiwal
 
PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...
PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...
PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...GoLeanSixSigma.com
 
Sales & Operations Planning Process
Sales & Operations Planning ProcessSales & Operations Planning Process
Sales & Operations Planning ProcessHarshal Badgujar
 
Lean Matrials Management - Introduction to milk run - November 2016
Lean Matrials Management - Introduction to milk run - November 2016Lean Matrials Management - Introduction to milk run - November 2016
Lean Matrials Management - Introduction to milk run - November 2016W3 Group Canada Inc.
 
Lean Materials Management - Parts presentation at the line - November 2016
Lean Materials Management - Parts presentation at the line - November 2016Lean Materials Management - Parts presentation at the line - November 2016
Lean Materials Management - Parts presentation at the line - November 2016W3 Group Canada Inc.
 
6 just in-time and lean thinking
6 just in-time and lean thinking6 just in-time and lean thinking
6 just in-time and lean thinkingmanpsingh87
 
Managing warehouse operations. How to manage and run warehouse operations by ...
Managing warehouse operations. How to manage and run warehouse operations by ...Managing warehouse operations. How to manage and run warehouse operations by ...
Managing warehouse operations. How to manage and run warehouse operations by ...Omar Youssef
 
value stream mapping
value stream mappingvalue stream mapping
value stream mappingvvmech
 
S&op process template
S&op process templateS&op process template
S&op process templateLuke Lenahan
 
Supply Chain Management chap 5
Supply Chain Management chap 5Supply Chain Management chap 5
Supply Chain Management chap 5Umair Arain
 
Lean Supermarket - Visual Management - November 2016
Lean Supermarket - Visual Management - November 2016Lean Supermarket - Visual Management - November 2016
Lean Supermarket - Visual Management - November 2016W3 Group Canada Inc.
 
Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleFrank-G. Adler
 

Was ist angesagt? (20)

value stream mapping
value stream mappingvalue stream mapping
value stream mapping
 
Material flow
Material flowMaterial flow
Material flow
 
Lean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting ClassLean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting Class
 
Physical inventory and warehouse management
Physical inventory and warehouse managementPhysical inventory and warehouse management
Physical inventory and warehouse management
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
S&OP FINAL
S&OP FINALS&OP FINAL
S&OP FINAL
 
PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...
PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...
PROJECT STORYBOARD: Reducing Purchase Order Lead Time by 33% Using Lean Six S...
 
Sales & Operations Planning Process
Sales & Operations Planning ProcessSales & Operations Planning Process
Sales & Operations Planning Process
 
Kanban Pull System
Kanban Pull SystemKanban Pull System
Kanban Pull System
 
Lean Matrials Management - Introduction to milk run - November 2016
Lean Matrials Management - Introduction to milk run - November 2016Lean Matrials Management - Introduction to milk run - November 2016
Lean Matrials Management - Introduction to milk run - November 2016
 
Lean Materials Management - Parts presentation at the line - November 2016
Lean Materials Management - Parts presentation at the line - November 2016Lean Materials Management - Parts presentation at the line - November 2016
Lean Materials Management - Parts presentation at the line - November 2016
 
6 just in-time and lean thinking
6 just in-time and lean thinking6 just in-time and lean thinking
6 just in-time and lean thinking
 
How to improve order picking efficiency
How to improve order picking efficiencyHow to improve order picking efficiency
How to improve order picking efficiency
 
Managing warehouse operations. How to manage and run warehouse operations by ...
Managing warehouse operations. How to manage and run warehouse operations by ...Managing warehouse operations. How to manage and run warehouse operations by ...
Managing warehouse operations. How to manage and run warehouse operations by ...
 
value stream mapping
value stream mappingvalue stream mapping
value stream mapping
 
S&op process template
S&op process templateS&op process template
S&op process template
 
Supply Chain Management chap 5
Supply Chain Management chap 5Supply Chain Management chap 5
Supply Chain Management chap 5
 
Lean Supermarket - Visual Management - November 2016
Lean Supermarket - Visual Management - November 2016Lean Supermarket - Visual Management - November 2016
Lean Supermarket - Visual Management - November 2016
 
Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training Module
 
S&OP Workshop
S&OP Workshop S&OP Workshop
S&OP Workshop
 

Andere mochten auch

Andere mochten auch (13)

Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017
 
Introduction to Takt time - January 2017
Introduction to Takt time - January 2017Introduction to Takt time - January 2017
Introduction to Takt time - January 2017
 
Production scheduling boards - November 2016
Production scheduling boards - November 2016Production scheduling boards - November 2016
Production scheduling boards - November 2016
 
Shop Floor Management I I
Shop  Floor  Management  I IShop  Floor  Management  I I
Shop Floor Management I I
 
Sap pp shop floor control configuration
Sap pp   shop floor control configurationSap pp   shop floor control configuration
Sap pp shop floor control configuration
 
Shop Floor Visual Management - November 2016
Shop Floor Visual Management - November 2016Shop Floor Visual Management - November 2016
Shop Floor Visual Management - November 2016
 
Operational KPIs - Definitions November 2016
Operational KPIs - Definitions November 2016Operational KPIs - Definitions November 2016
Operational KPIs - Definitions November 2016
 
Shop-Floor-Management
Shop-Floor-ManagementShop-Floor-Management
Shop-Floor-Management
 
Shop Floor Planning & Control
Shop Floor Planning & ControlShop Floor Planning & Control
Shop Floor Planning & Control
 
What is TPS - Toyota Production System
What is TPS - Toyota Production SystemWhat is TPS - Toyota Production System
What is TPS - Toyota Production System
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Master production schedule
Master production scheduleMaster production schedule
Master production schedule
 
Effective shop floor oranization
Effective shop floor oranizationEffective shop floor oranization
Effective shop floor oranization
 

Kürzlich hochgeladen

8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCRashishs7044
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 

Kürzlich hochgeladen (20)

8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 

Pfep introduction

  • 1. Materials Strategy - PFEP Plan for Every Part Marek Piatkowski December 2010 Marek Piatkowski – FSP Consulting 1
  • 2. 1. Creating Plan-for-Every- Part PFEP 1. Plan-for-Every-Part 2. Parts Storage - Supermarkets Creating Purchased Parts Supermarket Kanban Material 3. Based 4. Delivery Pull Signal Systems Marek Piatkowski – FSP Consulting 2
  • 3. Start collecting Information for (PFEP)  PFEP is a data base.  For every part, gather information related to:  Part identification – part #, description, unique features …  Storage information – container type, pieces/container …  Transportation - what equipment needed to move parts  Delivery – how frequently do we ship and deliver  Production capabilities – daily or hourly production rates  Customer Requirements – forecast and actual shipments  Group every part into one of the three categories:  Runners (A), Repeaters (B), or Strangers © Marek Piatkowski – FSP Consulting 3
  • 4. Establishing PFEP – How much detail?  Part number  Container type  Description  Length  Daily usage  Width  Point of use location  Height  Storage location  Weight  Order frequency  Standard pack quantity  Supplier name  Delivery frequency  Supplier city  Carrier  Supplier country  Transit time  …  … Marek Piatkowski – FSP Consulting 4
  • 5. Develop the PFEP Plan Identify if each container is “Line Ready” – YES or NO  Small box, easy to lift  Less than 12 KG (30 lbs) Marek Piatkowski – FSP Consulting 5
  • 6. Does the part need Repacking ? Marek Piatkowski – FSP Consulting 6
  • 7. Si o No ? Marek Piatkowski – FSP Consulting 7
  • 8. Marek Piatkowski – FSP Consulting 8
  • 9. Develop the PFEP Plan  For every part identify inventory levels required at each machine and work station - how many boxes / containers? - Min = 2 hours of inventory  If parts must be re-packaged - select a new container type - define and minimize Standard Pack Quantities  Identify inventory levels (min/max) at each storage location and Supermarket Marek Piatkowski – FSP Consulting 9
  • 10. Plan-for-Every-Part - Data Base PN-150 Part Supl. Supplier Press Wheel Part's 1=Line #1 Used on # Parts / Kanban System Part Type Hand Description Model Number Type Name Line Base Weight 2=Both Oper. # Frame Routing FU-31301* Bracket RH Front End Sheet Metal Ext Ridgeview 1.12 2 220 1 PN-150 Supplier FU-31302* Bracket LH Front End Sheet Metal Ext Ridgeview 1.12 2 220 1 PN-150 Supplier FU-31304-220 Bracket #1 Body Bracket Ext Acemco 4x2 1.4 2 220 2 PN-150 Supplier FU-31307 Bracket RH Lower Control Arm Ext Tecumseh 4x4 3.1 1 245 1 PN-150 Supplier FU-31308 Bracket LH Lower Control Arm Ext Tecumseh 4x4 3.1 1 245 1 PN-150 Supplier FU-31313* Bracket RH Front Shock Ext Metal Form N. 4x4 2.9 1 255 1 PN-150 Supplier FU-31314* Bracket LH Front Shock Ext Metal Form N. 4x4 2.9 1 255 1 PN-150 Supplier FU-31319-10* Bracket RH Front Upper Control Arm Ext Ridgeview 4x4 1.3 1 245 2 PN-150 Supplier FU-31320* Bracket LH Rear Upper Control Arm Ext Ridgeview 4x4 1.1 1 245 2 PN-150 Supplier FU-31323-10 Bracket RH Front Jounce Bracket Ext Tecumseh 4x4 2.3 1 280 1 PN-150 Supplier FU-31324-10 Bracket LH Front Jounce Bracket Ext Tecumseh 4x4 2.3 1 280 1 PN-150 Supplier FU-31569* Bracket RH Engine Differential Ext Hamlin 4x4 2.2 1 255 1 PN-150 Supplier FU-31570* Bracket LH Engine Ext Hamlin 4x4 2.2 1 255 1 PN-150 Supplier FU-31595 Bracket RH T-Bar Sub-assembly Ext Tecumseh 4x4 0.8 1 20 1 PN-150 Supplier FU-31596 Bracket LH T-Bar Sub-assembly Ext Tecumseh 4x4 0.8 1 20 1 PN-150 Supplier FU-31599 Reinforcement RH # 1 Cross Bar Ext Luitink 4x4 0.9 1 50 1 PN-150 Supplier FU-31600 Reinforcement LH # 1 Cross Bar Ext Luitink 4x4 0.9 1 50 1 PN-150 Supplier FU-31601 Bracket RH Lower Control Arm Ext Tecumseh 4x2 4.2 2 240 1 PN-150 Supplier FU-31602 Bracket LH Lower Control Arm Ext Tecumseh 4x2 4.2 2 240 1 PN-150 Supplier FU-31603 Bracket Cab Mounting Rear Ext Tower-Upper SW & LW 1.9 2 220 2 PN-150 Supplier FU-31604 Bracket Cab Mounting Rear Ext Tower-Upper SC 1.9 2 220 2 PN-150 Supplier FU-31605 Bracket Upper Control Arm Ext Luitink 4x2 2 2 240 4 PN-150 Supplier FU-31607 Reinforcement RH Lower Control Arm Bracket 4x2 2 1 FU-31608 Reinforcement LH Lower Control Arm Bracket Ext Tecumseh 4x2 1.5 2 285 1 PN-150 Supplier FU-31609 Bracket RH Front Jounce Bracket Ext Ridgeview 4x2 0.88 2 250 1 PN-150 Supplier FU-31610 Bracket LH Front JNC Ext Ridgeview 4x2 0.88 2 250 1 PN-150 Supplier FU-31639 Bracket RH Tire Stop Ext Ridgeview 0.4 2 30 1 PN-150 Supplier FU-31640 Bracket LH Tire Stop Ext Ridgeview 0.4 2 30 1 PN-150 Supplier FU-31641 Reinforcement RH Center Side Bar Ext Ridgeview SWB 1.3 2 Sub 1 PN-150 Supplier FU-31642 Reinforcement LH Center Side Bar Ext Ridgeview SWB 1.3 2 Sub 1 PN-150 Supplier FU-31648 Reinforcement Center Side Bar Ext Ridgeview SC 0.2 2 255 1 PN-150 Supplier Marek Piatkowski – FSP Consulting 10
  • 11. Lean Transformation Solutions Marek Piatkowski F.S.P. Consulting Inc. F.S.P. VM: 416-235-2631 416-235- Cell: 248-207-0416 248-207- Marek.Piatkowski@rogers.com www.TWI- www.TWI-Network.com Marek Piatkowski – FSP Consulting 11