SlideShare ist ein Scribd-Unternehmen logo
1 von 47
Welders Qualification,
According
To
ASME Sec IX
POSITION
AND
DIAMETER LIMITS
(With OtherLimits Qw303)
PLATE - GROOVE
Plate andPipe Over
24 in (610 mm) OD
Pipe <=24 in (610)
mm OD
Pipe and plate
Plate -Groove 1G F F (NOTE 2) F
Plate -Groove 2G F, H F, H (NOTE2) F, H
Plate -Groove 3G F, V F, NOTE2 F, H,V
Plate -Groove 4G F,O F, NOTE2 F, H,O
Plate -Groove 3G& 4G F, V, O F, NOTE2 ALL
Plate -Groove
2G,3G,
&4G
ALL F,H NOTE2 ALL
Plate -Groove
Special
Position
SP,F SP,F SP,F
Groove Fillet
Weld Position
Qualification Test Position And Type Weld Qualified (Note 1)
NOTE1:
1)Position Of Welding As Shown As Shown In QW-461 And QW-461.2
F= Flat,H=Horizontal,V=Vertical,O=Overhead
2)Pipe 2 7/8 in (72mm) OD and over
3) See Diameter Restrictions In Qw-452.3, Qw452.4, Qw452.6
Plate andPipe over
24 in (610 mm) OD
Pipe <=24 in (610)
mm OD
Pipe and plate
Plate -Fillet 1F -- -- F NOTE 2
Plate -Fillet 2F -- -- F, H NOTE2
Plate -Fillet 3F -- -- F, H,V NOTE2
Plate -Fillet 4F -- -- F, H,O NOTE2
Plate -Fillet 3F &4F -- -- ALL NOTE2
Plate -Fillet
Special
Position
-- -- SP,F NOTE2
NOTE
F= Flat H=HorizontalV=Vertical, O=Overhead
3)See Diameter Restrictions In Qw-452.3, Qw452.4, Qw452.6
Groove Fillet
Weld Position
1)Position Of Welding As Shown As Shown In Qw-461 And Qw-461.2
2)Pipe 2 7/8 in (72mm) od and over
Qualification Test Position And Type Weld Qualified (Note 1)
PLATE - FILLET
Plate andPipe Over
24 in (610 mm) OD
Pipe <=24 in (610)
mm OD
Pipe and plate
Pipe-Groove 1G F F F
Pipe-Groove 2G F,H F,H F, H
Pipe-Groove 5G F,V,O F,V,O ALL
Pipe-Groove 6G ALL ALL ALL
Pipe-Groove 2G&5G ALL ALL ALL
Pipe-Groove
Special
Position
SP,F SP,F SP,F
NOTE
F= Flat H=HorizontalV=Vertical,
1)Position Of Welding As Shown As Shown In Qw-461 And Qw-461.2
O=Overhead
2)Pipe 2 7/8 in (72mm) od and over
3)See DiameterRestrictions In Qw-452.3, Qw452.4, Qw452.6
Groove Fillet
Weld Position
Qualification Test Position And Type Weld Qualified (Note 1)
PIPE-GROOVE
Plate and Pipe over
24 in (610 mm) OD
Pipe <=24 in (610)
mm OD
Pipe and plate
Pipe-Fillet 1F -- -- F
Pipe-Fillet 2F -- -- F, H
Pipe-Fillet 2FR -- -- F,H
Pipe-Fillet 4F -- -- F,H,O
Pipe-Fillet 5F -- -- ALL
Pipe-Fillet
Special
Position
-- -- SP,F
NOTE
F= Flat H=HorizontalV=Vertical,
Qualification Test Position And Type Weld Qualified (Note 1)
Groove Fillet
Weld Position
1)Position Of Welding As Shown As Shown In Qw-461 And Qw-461.2
O=Overhead
2)Pipe 2 7/8 in (72mm) od and over
3)See Diameter Restrictions In Qw-452.3, Qw452.4, Qw452.6
PIPE – FILLET
POSITIONS
QW-461
PLATE-GROOVE
QW-461.3
1G
2G
3G
4G
PIPE-GROOVE
QW-461.4
1G
2G
5G
6G
PLATE-FILLET
QW-461.5
1F
2F
3F
4F
PIPE –FILLET
QW-461.6
1F(Rotated)
2F
2FR
(ROTATED)
4F
5F
Qualified With
Qualified For
X
X
X
X
F-No5 with out
Backing
X
F-No5 with
Backing
X
F-No4 with out
Backing
F-No 4 with
Backing X
X
F-No3 with out
Backing X
F-No 3 with
Backing X X X
X
F-No 2 with out
Backing X
F-No 2 with
Backing X X X X X
X X
F-No 1 with out
Backing X
F-No5
with
Backing
F-No5
with out
Backing
F-No 1 with
Backing X X X X X X X
F-No 3
with
Backing
F-No3
with out
Backing
F-No 4
with
Backing
F-No4
with out
Backing
F-No 1
with
Backing
F-No 1
with out
Backing
F-No 2
with
Backing
F-No 2
with out
Backing
QUALIFIED WITH QUALIFIED FOR QUALIFIED WITH QUALIFIED FOR
F-NO 1 WITH BACKING F-NO 1 WITH BACKING F-NO 1 WITH BACKING
F-NO 1 WITH BACKING F-NO 2 WITH BACKING
F-NO 1 WITH OUT BACKING F-NO 3 WITH BACKING
F-NO 1 WITH BACKING F-NO 4 WITH BACKING
F-NO 2 WITH BACKING F-NO 1 WITH BACKING
F-NO 1 WITH BACKING F-NO 2 WITH BACKING
F-NO 2 WITH BACKING F-NO 3 WITH BACKING
F-NO 4 WITH BACKING
F-NO 4 WITH OUT BACKING
F-NO 1 WITH BACKING F-NO 1 WITH BACKING
F-NO 2 WITH BACKING F-NO 5 WITH BACKING
F-NO 3 WITH BACKING F-NO 1 WITH BACKING
F-NO 1 WITH BACKING
F-NO 2 WITH BACKING
F-NO 3 WITH BACKING
F-NO 3 WITH OUT BACKING
F-No 2 WITH OUT BACKING
F-No 3 WITH BACKING
F-No5 WITH OUT BACKING
F-No3 WITH OUT BACKING
F-No 4 WITH BACKING
F-NO 5 WITH OUT BACKING
F-NO 5 WITH BACKING
F-NO 1 WITH OUT BACKING
F-No 2 WITH OUT BACKING
F-No 2 WITH BACKING
F-No4 WITH OUT BACKING
F-No5 WITH BACKING
Test Specimens
TEST SPECIMENS [ QW-452.1(a)]
Thickness of
weld metal,
IN(mm)
TYPE AND NUMBER OF EXAMINATIONS AND TEST SPECIMENS
REQUIRED
Visual
Examination per
QW-302.4
Side Bend
QW-462.2
[note (1)]
Face Bend QW-
462.3(a) Or
QW-462.3(b)
[Note (1),(2)]
Root Bend qw-
462.3(a) or QW-
462.3(b) [note(1),(2)]
LESS THAN
3/8 (10)
X --- 1 1
3/8(10) TO LESS
THAN 3/4(19mm)
X 2 [NOTE (3)] NOTE (3) NOTE (3)
3/4(19MM)
AND OVER
X 2 --- ---
Thickness Limits
Thickness of Weld Metal Qualified
Thickness,t,of weld metal inch,
The coupon inch(mm) [Note1&
2]
Thickness of weld metal Qualified
[Note3]
• Up to13 mm
•½(13mm) and over with a
minimum of three layers
•2t
•Maximum to be welded
DIAMETER
LIMITS
QW-452.3
GROOVE WELD DIAMETER
LIMITS QW-452.3
WELDER
PERFORMANCE
ESSENTIAL
VARIABLES
SMAW (QW-353)
PARAGRAPH BREAF OF
VARIABLES
QW-402 JOINTS DELETION OF BACKING
QW-403 BASE METAL
CHANGE OF
PIPEDIA(QW-403.16)
&CHANGE OF
P-NUM(QW-403.18)
QW-404 FILLERMETALS
CHANGE OF
FILLER (QW404.15) &
CHANGEOF
WELD t DEPOSIT (QW404.30)
QW-405 POSITIONS
ADDITION OF POSITION
(QW-405.1) &
VERTI& DOWN WELDING
(QW-405.3)
What Is UNS Number?
(Ans)
Unified Numbering System
What is SFA Number?
(Ans)
Specification of Filler Analysis
What is P-Number?
(Ans)
Material Group Number
Welders qualification

Weitere ähnliche Inhalte

Was ist angesagt?

Process piping b31.3 detailed
Process piping b31.3 detailedProcess piping b31.3 detailed
Process piping b31.3 detailedAdeel Mazhar
 
0140.10 general welding fabrication and testing
0140.10   general welding fabrication and testing0140.10   general welding fabrication and testing
0140.10 general welding fabrication and testingRamamoorthy Madhan
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wireImran Jamil
 
radiographic-interpretation.pdf
radiographic-interpretation.pdfradiographic-interpretation.pdf
radiographic-interpretation.pdfVENKATESAN S
 
178680732 pipe-hanger-design
178680732 pipe-hanger-design178680732 pipe-hanger-design
178680732 pipe-hanger-designTiago Farinhas
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2Jithu John
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1 MOHAMMAD ATIF ALI
 
Asmesectionix
Asmesectionix Asmesectionix
Asmesectionix Nuri Cesur
 
GTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXGTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXAntonius Pompi Bramono
 
Iso 15608 2000-welding._guidelines_for_a_metallic_material_grouping_system
Iso 15608 2000-welding._guidelines_for_a_metallic_material_grouping_systemIso 15608 2000-welding._guidelines_for_a_metallic_material_grouping_system
Iso 15608 2000-welding._guidelines_for_a_metallic_material_grouping_systemSri Hari Dharani Kumar
 
Weld Defects
Weld DefectsWeld Defects
Weld Defectsadminn2
 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixmayank0738
 
419471094-PIPING-HANDBOOK-pdf.pdf
419471094-PIPING-HANDBOOK-pdf.pdf419471094-PIPING-HANDBOOK-pdf.pdf
419471094-PIPING-HANDBOOK-pdf.pdfmoumo1
 
Asme b31.3 process_piping
Asme b31.3 process_pipingAsme b31.3 process_piping
Asme b31.3 process_pipingdinusim
 
How to review wps part 1 (mau company)
How to review wps part 1 (mau company)How to review wps part 1 (mau company)
How to review wps part 1 (mau company)Mohamed Farouk
 

Was ist angesagt? (20)

Process piping b31.3 detailed
Process piping b31.3 detailedProcess piping b31.3 detailed
Process piping b31.3 detailed
 
Juntas e simbolos
Juntas e simbolosJuntas e simbolos
Juntas e simbolos
 
How to Qualify a Welding Procedure
How to Qualify a Welding ProcedureHow to Qualify a Welding Procedure
How to Qualify a Welding Procedure
 
0140.10 general welding fabrication and testing
0140.10   general welding fabrication and testing0140.10   general welding fabrication and testing
0140.10 general welding fabrication and testing
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wire
 
Valves pipe fittings
Valves pipe fittingsValves pipe fittings
Valves pipe fittings
 
radiographic-interpretation.pdf
radiographic-interpretation.pdfradiographic-interpretation.pdf
radiographic-interpretation.pdf
 
178680732 pipe-hanger-design
178680732 pipe-hanger-design178680732 pipe-hanger-design
178680732 pipe-hanger-design
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1
 
Asme b31,pressure piping code
Asme b31,pressure piping codeAsme b31,pressure piping code
Asme b31,pressure piping code
 
Asmesectionix
Asmesectionix Asmesectionix
Asmesectionix
 
GTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXGTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IX
 
Iso 15608 2000-welding._guidelines_for_a_metallic_material_grouping_system
Iso 15608 2000-welding._guidelines_for_a_metallic_material_grouping_systemIso 15608 2000-welding._guidelines_for_a_metallic_material_grouping_system
Iso 15608 2000-welding._guidelines_for_a_metallic_material_grouping_system
 
Piping Fundamentals .pdf
Piping Fundamentals .pdfPiping Fundamentals .pdf
Piping Fundamentals .pdf
 
Weld Defects
Weld DefectsWeld Defects
Weld Defects
 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ix
 
419471094-PIPING-HANDBOOK-pdf.pdf
419471094-PIPING-HANDBOOK-pdf.pdf419471094-PIPING-HANDBOOK-pdf.pdf
419471094-PIPING-HANDBOOK-pdf.pdf
 
Asme b31.3 process_piping
Asme b31.3 process_pipingAsme b31.3 process_piping
Asme b31.3 process_piping
 
How to review wps part 1 (mau company)
How to review wps part 1 (mau company)How to review wps part 1 (mau company)
How to review wps part 1 (mau company)
 

Ähnlich wie Welders qualification

WPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfWPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfmounirbonnois
 
BURNDY CABLE LUG YA36
BURNDY CABLE LUG YA36BURNDY CABLE LUG YA36
BURNDY CABLE LUG YA36AKBAR TRADING
 
BURNDY CABLE LUG YA32 ( mail@akbartrading.com )
BURNDY CABLE LUG YA32 ( mail@akbartrading.com )BURNDY CABLE LUG YA32 ( mail@akbartrading.com )
BURNDY CABLE LUG YA32 ( mail@akbartrading.com )AKBAR TRADING
 
BURNDY YA302N (mail@akbartrading.com)
BURNDY YA302N (mail@akbartrading.com)BURNDY YA302N (mail@akbartrading.com)
BURNDY YA302N (mail@akbartrading.com)AKBAR TRADING
 
Spencer Turbine - Vacuum and Low Pressure Air Tubing
Spencer Turbine - Vacuum and Low Pressure Air TubingSpencer Turbine - Vacuum and Low Pressure Air Tubing
Spencer Turbine - Vacuum and Low Pressure Air TubingJeremy J. Manning
 
welding procedure-P F number And WPS.ppt
welding procedure-P  F number And WPS.pptwelding procedure-P  F number And WPS.ppt
welding procedure-P F number And WPS.pptmrujjavalsinghvarana
 
BURNDY CABLE LUG YA34N
BURNDY CABLE LUG YA34N BURNDY CABLE LUG YA34N
BURNDY CABLE LUG YA34N AKBAR TRADING
 
Pqr asme ix completed
Pqr asme ix  completed Pqr asme ix  completed
Pqr asme ix completed CEDEYN
 
Bubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement InstrumentsBubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement InstrumentsMiller Energy, Inc.
 
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IXA QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IXWeld Maniac
 
vdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdfvdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdfHadiSwts
 
PFS Flange Stock
PFS Flange StockPFS Flange Stock
PFS Flange StockAli Faben
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-addmozsubasi
 

Ähnlich wie Welders qualification (20)

Welder_Quals smaw IX.ppt
Welder_Quals smaw IX.pptWelder_Quals smaw IX.ppt
Welder_Quals smaw IX.ppt
 
WPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfWPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdf
 
BURNDY CABLE LUG YA36
BURNDY CABLE LUG YA36BURNDY CABLE LUG YA36
BURNDY CABLE LUG YA36
 
wps_variable
wps_variablewps_variable
wps_variable
 
BURNDY CABLE LUG YA32 ( mail@akbartrading.com )
BURNDY CABLE LUG YA32 ( mail@akbartrading.com )BURNDY CABLE LUG YA32 ( mail@akbartrading.com )
BURNDY CABLE LUG YA32 ( mail@akbartrading.com )
 
BURNDY YA302N (mail@akbartrading.com)
BURNDY YA302N (mail@akbartrading.com)BURNDY YA302N (mail@akbartrading.com)
BURNDY YA302N (mail@akbartrading.com)
 
Spencer Turbine - Vacuum and Low Pressure Air Tubing
Spencer Turbine - Vacuum and Low Pressure Air TubingSpencer Turbine - Vacuum and Low Pressure Air Tubing
Spencer Turbine - Vacuum and Low Pressure Air Tubing
 
welding procedure-P F number And WPS.ppt
welding procedure-P  F number And WPS.pptwelding procedure-P  F number And WPS.ppt
welding procedure-P F number And WPS.ppt
 
BURNDY CABLE LUG YA34N
BURNDY CABLE LUG YA34N BURNDY CABLE LUG YA34N
BURNDY CABLE LUG YA34N
 
Asme wps-demo
Asme wps-demoAsme wps-demo
Asme wps-demo
 
Aws d1.1 guides
Aws d1.1 guidesAws d1.1 guides
Aws d1.1 guides
 
Pqr asme ix completed
Pqr asme ix  completed Pqr asme ix  completed
Pqr asme ix completed
 
Bubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement InstrumentsBubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement Instruments
 
Conexoes
ConexoesConexoes
Conexoes
 
Infinitidesign 2013 a
Infinitidesign 2013 aInfinitidesign 2013 a
Infinitidesign 2013 a
 
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IXA QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
 
vdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdfvdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdf
 
Wellhead Valves Technical Data
Wellhead Valves Technical DataWellhead Valves Technical Data
Wellhead Valves Technical Data
 
PFS Flange Stock
PFS Flange StockPFS Flange Stock
PFS Flange Stock
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
 

Kürzlich hochgeladen

TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 

Kürzlich hochgeladen (20)

TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 

Welders qualification

  • 3. PLATE - GROOVE Plate andPipe Over 24 in (610 mm) OD Pipe <=24 in (610) mm OD Pipe and plate Plate -Groove 1G F F (NOTE 2) F Plate -Groove 2G F, H F, H (NOTE2) F, H Plate -Groove 3G F, V F, NOTE2 F, H,V Plate -Groove 4G F,O F, NOTE2 F, H,O Plate -Groove 3G& 4G F, V, O F, NOTE2 ALL Plate -Groove 2G,3G, &4G ALL F,H NOTE2 ALL Plate -Groove Special Position SP,F SP,F SP,F Groove Fillet Weld Position Qualification Test Position And Type Weld Qualified (Note 1) NOTE1: 1)Position Of Welding As Shown As Shown In QW-461 And QW-461.2 F= Flat,H=Horizontal,V=Vertical,O=Overhead 2)Pipe 2 7/8 in (72mm) OD and over 3) See Diameter Restrictions In Qw-452.3, Qw452.4, Qw452.6
  • 4. Plate andPipe over 24 in (610 mm) OD Pipe <=24 in (610) mm OD Pipe and plate Plate -Fillet 1F -- -- F NOTE 2 Plate -Fillet 2F -- -- F, H NOTE2 Plate -Fillet 3F -- -- F, H,V NOTE2 Plate -Fillet 4F -- -- F, H,O NOTE2 Plate -Fillet 3F &4F -- -- ALL NOTE2 Plate -Fillet Special Position -- -- SP,F NOTE2 NOTE F= Flat H=HorizontalV=Vertical, O=Overhead 3)See Diameter Restrictions In Qw-452.3, Qw452.4, Qw452.6 Groove Fillet Weld Position 1)Position Of Welding As Shown As Shown In Qw-461 And Qw-461.2 2)Pipe 2 7/8 in (72mm) od and over Qualification Test Position And Type Weld Qualified (Note 1) PLATE - FILLET
  • 5. Plate andPipe Over 24 in (610 mm) OD Pipe <=24 in (610) mm OD Pipe and plate Pipe-Groove 1G F F F Pipe-Groove 2G F,H F,H F, H Pipe-Groove 5G F,V,O F,V,O ALL Pipe-Groove 6G ALL ALL ALL Pipe-Groove 2G&5G ALL ALL ALL Pipe-Groove Special Position SP,F SP,F SP,F NOTE F= Flat H=HorizontalV=Vertical, 1)Position Of Welding As Shown As Shown In Qw-461 And Qw-461.2 O=Overhead 2)Pipe 2 7/8 in (72mm) od and over 3)See DiameterRestrictions In Qw-452.3, Qw452.4, Qw452.6 Groove Fillet Weld Position Qualification Test Position And Type Weld Qualified (Note 1) PIPE-GROOVE
  • 6. Plate and Pipe over 24 in (610 mm) OD Pipe <=24 in (610) mm OD Pipe and plate Pipe-Fillet 1F -- -- F Pipe-Fillet 2F -- -- F, H Pipe-Fillet 2FR -- -- F,H Pipe-Fillet 4F -- -- F,H,O Pipe-Fillet 5F -- -- ALL Pipe-Fillet Special Position -- -- SP,F NOTE F= Flat H=HorizontalV=Vertical, Qualification Test Position And Type Weld Qualified (Note 1) Groove Fillet Weld Position 1)Position Of Welding As Shown As Shown In Qw-461 And Qw-461.2 O=Overhead 2)Pipe 2 7/8 in (72mm) od and over 3)See Diameter Restrictions In Qw-452.3, Qw452.4, Qw452.6 PIPE – FILLET
  • 9. 1G
  • 10. 2G
  • 11. 3G
  • 12. 4G
  • 14. 1G
  • 15. 2G
  • 16. 5G
  • 17. 6G
  • 19. 1F
  • 20. 2F
  • 21. 3F
  • 22. 4F
  • 25. 2F
  • 27. 4F
  • 28. 5F
  • 29.
  • 30.
  • 31. Qualified With Qualified For X X X X F-No5 with out Backing X F-No5 with Backing X F-No4 with out Backing F-No 4 with Backing X X F-No3 with out Backing X F-No 3 with Backing X X X X F-No 2 with out Backing X F-No 2 with Backing X X X X X X X F-No 1 with out Backing X F-No5 with Backing F-No5 with out Backing F-No 1 with Backing X X X X X X X F-No 3 with Backing F-No3 with out Backing F-No 4 with Backing F-No4 with out Backing F-No 1 with Backing F-No 1 with out Backing F-No 2 with Backing F-No 2 with out Backing
  • 32. QUALIFIED WITH QUALIFIED FOR QUALIFIED WITH QUALIFIED FOR F-NO 1 WITH BACKING F-NO 1 WITH BACKING F-NO 1 WITH BACKING F-NO 1 WITH BACKING F-NO 2 WITH BACKING F-NO 1 WITH OUT BACKING F-NO 3 WITH BACKING F-NO 1 WITH BACKING F-NO 4 WITH BACKING F-NO 2 WITH BACKING F-NO 1 WITH BACKING F-NO 1 WITH BACKING F-NO 2 WITH BACKING F-NO 2 WITH BACKING F-NO 3 WITH BACKING F-NO 4 WITH BACKING F-NO 4 WITH OUT BACKING F-NO 1 WITH BACKING F-NO 1 WITH BACKING F-NO 2 WITH BACKING F-NO 5 WITH BACKING F-NO 3 WITH BACKING F-NO 1 WITH BACKING F-NO 1 WITH BACKING F-NO 2 WITH BACKING F-NO 3 WITH BACKING F-NO 3 WITH OUT BACKING F-No 2 WITH OUT BACKING F-No 3 WITH BACKING F-No5 WITH OUT BACKING F-No3 WITH OUT BACKING F-No 4 WITH BACKING F-NO 5 WITH OUT BACKING F-NO 5 WITH BACKING F-NO 1 WITH OUT BACKING F-No 2 WITH OUT BACKING F-No 2 WITH BACKING F-No4 WITH OUT BACKING F-No5 WITH BACKING
  • 34. TEST SPECIMENS [ QW-452.1(a)] Thickness of weld metal, IN(mm) TYPE AND NUMBER OF EXAMINATIONS AND TEST SPECIMENS REQUIRED Visual Examination per QW-302.4 Side Bend QW-462.2 [note (1)] Face Bend QW- 462.3(a) Or QW-462.3(b) [Note (1),(2)] Root Bend qw- 462.3(a) or QW- 462.3(b) [note(1),(2)] LESS THAN 3/8 (10) X --- 1 1 3/8(10) TO LESS THAN 3/4(19mm) X 2 [NOTE (3)] NOTE (3) NOTE (3) 3/4(19MM) AND OVER X 2 --- ---
  • 36. Thickness of Weld Metal Qualified Thickness,t,of weld metal inch, The coupon inch(mm) [Note1& 2] Thickness of weld metal Qualified [Note3] • Up to13 mm •½(13mm) and over with a minimum of three layers •2t •Maximum to be welded
  • 40. SMAW (QW-353) PARAGRAPH BREAF OF VARIABLES QW-402 JOINTS DELETION OF BACKING QW-403 BASE METAL CHANGE OF PIPEDIA(QW-403.16) &CHANGE OF P-NUM(QW-403.18) QW-404 FILLERMETALS CHANGE OF FILLER (QW404.15) & CHANGEOF WELD t DEPOSIT (QW404.30) QW-405 POSITIONS ADDITION OF POSITION (QW-405.1) & VERTI& DOWN WELDING (QW-405.3)
  • 41. What Is UNS Number?
  • 43. What is SFA Number?