Lean thinking aims to remove wastes from work processes. Before diving into the 8 wastes, it is important
to understand what waste is. Waste is any action or step in a process that does not add value to the
customer. In other words, waste is any process that the customer does not want to pay for.
The original seven wastes (Muda) was developed by Taiichi Ohno, the Chief Engineer at Toyota, as part of
the Toyota Production System (TPS). The seven wastes are Transportation, Inventory, Motion, Waiting,
Overproduction, Over-processing and Defects. They are often referred to by the acronym ‘TIMWOOD’.
The 8th waste of non-utilized talent or ‘Skills’ of workers was later introduced in the 1990s when the
Toyota Production System was adopted in the Western world. As a result, the 8 wastes are commonly
referred to as ‘TIMWOODS’. In the following section we will examine each of these wastes in detail.
Transportation
• Waste in transportation includes
movement of people, tools, inventory,
equipment, or products further than
necessary. Excessive movement of
materials can lead to product damage
and defects.
• Additionally, excessive movement of
people and equipment can lead to
unnecessary work, greater wear and
tear, and exhaustion.
• Some of the countermeasures to
transportation waste includes
developing a U-shape production line,
creating flow between processes, and
not over-producing work in process
(WIP) items.
Inventory
• Often times it is difficult to think about excess
inventory as waste. But having more
inventory than necessary to sustain a steady
flow of work can lead to problems including:
product defects or damage materials, greater
lead time in the production process, an
inefficient allocation of capital, and problems
being hidden away in the inventory.
• Excess inventory can be caused by over-
purchasing, overproducing work in process
(WIP), or producing more products than the
customer needs.
• Some countermeasures for inventory include:
purchasing raw materials only when needed
and in the quantity needed, reducing buffers
between production steps, and creating a
queue system to prevent overproduction.
Motion
• The waste in motion includes any
unnecessary movement of people,
equipment, or machinery. This
includes walking, lifting, reaching,
bending, stretching, and moving.
• Tasks that require excessive motion
should be redesigned to enhance the
work of personnel and increase the
health and safety levels.
• Some countermeasures for motion
include making sure the workspace is
well organized, placing equipment
near the production location, and
putting materials at an ergonomic
position to reduce stretching and
straining.
Waiting
• The waste of waiting includes: 1) people
waiting on material or equipment and 2) idle
equipment. Waiting time is often caused by
unevenness in the production stations and can
result in excess inventory and overproduction.
• In the manufacturing facility, waiting waste can
include waiting for materials to arrive, waiting
for the proper instructions to start
manufacturing, and having equipment with
insufficient capacity.
• Some countermeasures for waiting include:
designing processes to ensure continuous
flow or single piece flow, leveling out the
workload by using standardized work
instructions, and developing flexible multi-
skilled workers who can quickly adjust in the
work demands.
Overproduction
• Overproduction occurs when manufacturing a
product or an element of the product before it is
being asked for or required. It may be tempting
to produce as many products as possible when
there is idle worker or equipment time.
• Manufacturing overproduction involves
producing more products than demanded
through a ‘push production system’ or
producing products in higher batch sizes than
needed.
• There are three countermeasures for
overproduction. Firstly, using a ‘Takt Time’
ensures that the rate of manufacturing between
stations are even. Secondly, reducing setup
times enables manufacturing small batches or
single-piece flow. Thirdly, using a pull or
‘Kanban’ system can control the amount of WIP.
Over-processing
• Over-processing refers to doing more work,
adding more components, or having more
steps in a product or service than what is
required by the customer.
• In manufacturing this could include using a
higher precision equipment than necessary,
using components with capacities beyond
what is required, running more analysis than
needed, over-engineering a solution, and
adjusting a component after it has already
been installed.
• One simple way to counter over-processing is
to understand the work requirements from the
standpoint of the customer. Always have a
customer in mind before starting work,
produce to the level of quality and expectation
that the customer desires, and make only the
quantities needed.
Defects
• Defects occurs when the product is not fit
for use. This typically results in either
reworking or scrapping the product. Both
results are wasteful as they add
additional costs to the operations without
delivering any value to the customer.
• Here are four countermeasures for
defects. Firstly, look for the most frequent
defect and focus on it. Secondly, design a
process to detect abnormalities and do
not pass any defective items along the
production process. Thirdly, redesign the
process so that does not lead to defects.
Lastly, use standardize work to ensure a
consistent manufacturing process that is
defect free.
Skills
• Even though it was not part of the
Toyota Production System (TPS), many
people are well aware of the 8th waste
- the waste of human potential. The 8th
waste is also described as the waste of
unused human talent. This waste
occurs when organizations separate
the role of management from
employees.
• In manufacturing, this waste can be
seen when employees are poorly
trained, employees not knowing how to
effectively operate equipment, when
employees are given the wrong tool for
the job, and when employees are not
challenged to come up with ideas to
improve the work.
Timwoods- Lean Manufacturing

More Related Content

What's hot

Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
mahawar1987
 

What's hot (20)

8 Wastes of Lean
8 Wastes of Lean8 Wastes of Lean
8 Wastes of Lean
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
The Seven Wastes
The Seven WastesThe Seven Wastes
The Seven Wastes
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
7 Types of Muda
7 Types of Muda7 Types of Muda
7 Types of Muda
 
Manufacturing wastes
Manufacturing wastesManufacturing wastes
Manufacturing wastes
 
Hourly Lean Introduction
Hourly Lean IntroductionHourly Lean Introduction
Hourly Lean Introduction
 
Muri-Mura-Muda
Muri-Mura-MudaMuri-Mura-Muda
Muri-Mura-Muda
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Elimination of 7 types of Waste (MUDA)
Elimination of 7 types of Waste (MUDA)Elimination of 7 types of Waste (MUDA)
Elimination of 7 types of Waste (MUDA)
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
16 lean manufacturing
16 lean manufacturing16 lean manufacturing
16 lean manufacturing
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Identify 7 Wastes
Identify 7 WastesIdentify 7 Wastes
Identify 7 Wastes
 

Similar to Timwoods- Lean Manufacturing

Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)
Blankdevil
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
Margi Shah
 

Similar to Timwoods- Lean Manufacturing (20)

Chapter-Two-Lean.pdf
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdf
 
BASICS OF LEAN MANUFACTURING
BASICS OF LEAN MANUFACTURINGBASICS OF LEAN MANUFACTURING
BASICS OF LEAN MANUFACTURING
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
 
Module 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations ManagementModule 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations Management
 
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
 
Gagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmt
 
Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)
 
Waste Mgt.pptx
Waste Mgt.pptxWaste Mgt.pptx
Waste Mgt.pptx
 
Lean System
Lean SystemLean System
Lean System
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and Principles
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in Time
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
 
TPN-LOM - IIM(R).pptx
TPN-LOM - IIM(R).pptxTPN-LOM - IIM(R).pptx
TPN-LOM - IIM(R).pptx
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
 
Muda
MudaMuda
Muda
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
Lean means eliminating wasting
Lean means eliminating wastingLean means eliminating wasting
Lean means eliminating wasting
 
Waste management
Waste managementWaste management
Waste management
 

Recently uploaded

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 

Recently uploaded (20)

Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 

Timwoods- Lean Manufacturing

  • 1.
  • 2. Lean thinking aims to remove wastes from work processes. Before diving into the 8 wastes, it is important to understand what waste is. Waste is any action or step in a process that does not add value to the customer. In other words, waste is any process that the customer does not want to pay for. The original seven wastes (Muda) was developed by Taiichi Ohno, the Chief Engineer at Toyota, as part of the Toyota Production System (TPS). The seven wastes are Transportation, Inventory, Motion, Waiting, Overproduction, Over-processing and Defects. They are often referred to by the acronym ‘TIMWOOD’. The 8th waste of non-utilized talent or ‘Skills’ of workers was later introduced in the 1990s when the Toyota Production System was adopted in the Western world. As a result, the 8 wastes are commonly referred to as ‘TIMWOODS’. In the following section we will examine each of these wastes in detail.
  • 3.
  • 4. Transportation • Waste in transportation includes movement of people, tools, inventory, equipment, or products further than necessary. Excessive movement of materials can lead to product damage and defects. • Additionally, excessive movement of people and equipment can lead to unnecessary work, greater wear and tear, and exhaustion. • Some of the countermeasures to transportation waste includes developing a U-shape production line, creating flow between processes, and not over-producing work in process (WIP) items.
  • 5. Inventory • Often times it is difficult to think about excess inventory as waste. But having more inventory than necessary to sustain a steady flow of work can lead to problems including: product defects or damage materials, greater lead time in the production process, an inefficient allocation of capital, and problems being hidden away in the inventory. • Excess inventory can be caused by over- purchasing, overproducing work in process (WIP), or producing more products than the customer needs. • Some countermeasures for inventory include: purchasing raw materials only when needed and in the quantity needed, reducing buffers between production steps, and creating a queue system to prevent overproduction.
  • 6. Motion • The waste in motion includes any unnecessary movement of people, equipment, or machinery. This includes walking, lifting, reaching, bending, stretching, and moving. • Tasks that require excessive motion should be redesigned to enhance the work of personnel and increase the health and safety levels. • Some countermeasures for motion include making sure the workspace is well organized, placing equipment near the production location, and putting materials at an ergonomic position to reduce stretching and straining.
  • 7. Waiting • The waste of waiting includes: 1) people waiting on material or equipment and 2) idle equipment. Waiting time is often caused by unevenness in the production stations and can result in excess inventory and overproduction. • In the manufacturing facility, waiting waste can include waiting for materials to arrive, waiting for the proper instructions to start manufacturing, and having equipment with insufficient capacity. • Some countermeasures for waiting include: designing processes to ensure continuous flow or single piece flow, leveling out the workload by using standardized work instructions, and developing flexible multi- skilled workers who can quickly adjust in the work demands.
  • 8. Overproduction • Overproduction occurs when manufacturing a product or an element of the product before it is being asked for or required. It may be tempting to produce as many products as possible when there is idle worker or equipment time. • Manufacturing overproduction involves producing more products than demanded through a ‘push production system’ or producing products in higher batch sizes than needed. • There are three countermeasures for overproduction. Firstly, using a ‘Takt Time’ ensures that the rate of manufacturing between stations are even. Secondly, reducing setup times enables manufacturing small batches or single-piece flow. Thirdly, using a pull or ‘Kanban’ system can control the amount of WIP.
  • 9. Over-processing • Over-processing refers to doing more work, adding more components, or having more steps in a product or service than what is required by the customer. • In manufacturing this could include using a higher precision equipment than necessary, using components with capacities beyond what is required, running more analysis than needed, over-engineering a solution, and adjusting a component after it has already been installed. • One simple way to counter over-processing is to understand the work requirements from the standpoint of the customer. Always have a customer in mind before starting work, produce to the level of quality and expectation that the customer desires, and make only the quantities needed.
  • 10. Defects • Defects occurs when the product is not fit for use. This typically results in either reworking or scrapping the product. Both results are wasteful as they add additional costs to the operations without delivering any value to the customer. • Here are four countermeasures for defects. Firstly, look for the most frequent defect and focus on it. Secondly, design a process to detect abnormalities and do not pass any defective items along the production process. Thirdly, redesign the process so that does not lead to defects. Lastly, use standardize work to ensure a consistent manufacturing process that is defect free.
  • 11. Skills • Even though it was not part of the Toyota Production System (TPS), many people are well aware of the 8th waste - the waste of human potential. The 8th waste is also described as the waste of unused human talent. This waste occurs when organizations separate the role of management from employees. • In manufacturing, this waste can be seen when employees are poorly trained, employees not knowing how to effectively operate equipment, when employees are given the wrong tool for the job, and when employees are not challenged to come up with ideas to improve the work.