SlideShare ist ein Scribd-Unternehmen logo
1 von 17
Downloaden Sie, um offline zu lesen
A Liliana Lopez
   Design Portfolio
     2000 – 2010
Objective

Provide expertise in all phases of the
Architectural Practice. Bring a strong
work ethic and persistence to provide
excellence in every Project. Promote
the importance of personal and
professional development as well as
mentor the younger generations, it is in
teaching that we grow and become an
asset to any organization.

Education

Bachelor of Architecture
University of Houston
Fifth Year Design Studio
Ecole dʼArchitecture Paris-Villemin


Skills
         AutoCad
         Photoshop
         Microsoft Office
         Adobe Acrobat
         Design
         Space Planning
         Building Code Review
         Coordination of Disciplines
         Construction Documents
         Bidding and Negotiation
         Construction Administration
         Project Closeout
         Bilingual: English-Spanish


For complete resume:
www.linkedin.com/in/lilianalopez
www.s2-dio.com/Resume.html


                           Overview
                         1998 - 2010
Project Overview

                                     The project consists of a $15,000,000
                                     master planed reconfiguration of the
                                     Marathon operations facilities including
                                     new offices, operations and laboratory
                                     facilities along with a new maintenance
                                     building and security command center.
                                     This project also included a large utility
                                     component where all major utilities
                                     were either relocated or extended.


                                     Role in this Project

                                     Team Leader in the Design, Production
                                     and Construction Administration.
                                     Managed the Project and mentored
                                     young Architects through the process
                                     from Schematic Design through
                                     Construction Administration and
                                     Project Closeout.




Marathon Petroleum Company – Texas Refining Division Facilities Siting
                                                       2007 – 2008
Maintenance Office Building First Floor Plan N.T.S.




Site Plan N.T.S.                   Maintenance Office Building Second Floor Plan N.T.S.


                   Marathon Petroleum Company – Texas Refining Division Facilities Siting
                                                                Architectural Drawings
Employee Facilities / E&I Shops N.T.S.




Machine and Fabrication Shops N.T.S.


                                         Marathon Petroleum Company – Texas Refining Division Facilities Siting
                                                                                      Architectural Drawings
Maintenance Office Building
Display at Lobby




                     Marathon Petroleum Company – Texas Refining Division Facilities Siting
                                                                  Architectural Drawings
Project Overview

       Project Cost: $13,000,000
       Project Size: 100,000 SF

       The High School is designed to provide
       for an optimum capacity of 600
       students. The design consists of
       classrooms supporting the Districtʼs
       required instructional programs.

       A publicly accessible Library and
       Media Center acts as a community-
       wide information and learning center.
       The Commons area/Dinning Hall with a
       capability of 200-300 students.

       The      UIL Competition Gym is
       supported by Athletic and PE dressing
       rooms. The Music, Drama and Art
       programs are enhanced by a formal
       auditorium and stage.

       Role in this Project

       Team Leader in the Design and
       Production of Construction Documents
       and Specifications. The New Franklin
       High School was published in the
       November 2006 Issue of The American
       School and University Magazine as
       part of the “Works in Progress –
       Outstanding Designs”




Franklin ISD – New Franklin High School
                           2005 – 2006
Site Plan N.T.S.

                   Franklin ISD – New Franklin High School
                                     Architectural Drawings
Floor Plan N.T.S.

                    Franklin ISD – New Franklin High School
                                     Architectural Drawings
Exterior Elevation N.T.S.




  Section through Auditorium N.T.S.




    Section through Main Entry N.T.S.   Section through Library N.T.S.


                                             Franklin ISD – New Franklin High School
                                                              Architectural Drawings
Project Overview

                 The project consists of an $8,000,000
                 new Junior High School. The first
                 LEED Certified Public School in the
                 State of Texas. The 92,000 SF school
                                                  th
                 serves 600 students in grades 7 and
                   th
                 8
                 Features include optimal use of natural
                 light throughout the school, exposed
                 structure using glue-lam wood
                 members as well as sustainable
                 materials throughout.

                 Role in this Project

                 As a Junior Designer for the West
                 Brazos Junior High, I implemented my
                 knowledge and experience to
                 coordinate Consultants and Engineers
                 in order to comply with the Design
                 intent. Provided Design presentations
                 and assisted the Owner in material and
                 color selections for the Project. I
                 coordinated efforts with the Project
                 Architect and LEED AP to create a
                 school that promoted Sustainability, as
                 well as excellent Design features..




Columbia Brazoria ISD – West Brazos Junior High
                                   2004 – 2005
Site Plan N.T.S




                  Columbia Brazoria ISD – West Brazos Junior High
                                           Architectural Drawings
Exterior Elevations N.T.S




                            Columbia Brazoria ISD – West Brazos Junior High
                                                     Architectural Drawings
Project Overview

         The project consists of a $2,000,000
         New Support Facilities for the
         Columbia-Brazoria Independent School
         District. This included Offices, Training
         Kitchen, Bus Parking and Service bays
         and a Fueling Station


         Role in this Project

         Project Architect and Designer.
         Responsible for Coordination of
         Disciplines.     Provided      Design
         presentations and assisted the Owner
         in material and color selections for the
         Project




Columbia Brazoria ISD – Support Facilities
                                   2004
Floor Plan N.T.S




Exterior Elevations N.T.S


                            Columbia Brazoria ISD – Support Facilities
                                               Architectural Drawings
Project Overview

                                A New Elementary School in
                                Monterrey Mexico.          The school
                                consists of a two story building housing
                                classrooms cafeteria, and support. A
                                two story parking area is provided.

                                Role in this Project

                                Project Architect for the Design of the
                                American       School     Foundation
                                Elementary School in Monterrey. My
                                role in this project was key to the
                                communication between our team of
                                Architects and Engineers and the
                                Construction Manager in Mexico.
                                Provided services through Design
                                Development.




American School Foundation of Monterrey – New Elementary School
                                                          2005
Project Overview

                                                                                   Various Projects throughout the District
                                                                                   including, but not limited to Seabrook
                                                                                   Intermediate School Renovations,
                                                                                   Casework Replacement at Various
                                                                                   Campuses, Clearview Center, ESC
                                                                                   Office and Lobby Renovations,


                                                                                   Role in this Project

                                                                                   Acted as Project Architect / Project
                                                                                   Manager and Designer for various
                                                                                   Projects throughout the District.
                                                                                   Provided client meetings, color
                                                                                   selections, coordination of disciplines
                                                                                   among other roles.


Education Support Center N.T.S        Seabrook Intermediate School N.T.S




 Seabrook Intermediate School N.T.S


                                                                           Clear Creek ISD – Miscellaneous Projects
                                                                                                       2007 – 2010

Weitere ähnliche Inhalte

Was ist angesagt?

Dgraves 2012 Portfolio Online S
Dgraves 2012 Portfolio Online SDgraves 2012 Portfolio Online S
Dgraves 2012 Portfolio Online Sdahagraves
 
Portfolio Design Center Erica Byrd 2011
Portfolio Design Center Erica Byrd 2011Portfolio Design Center Erica Byrd 2011
Portfolio Design Center Erica Byrd 2011eybyrd
 
Summer Fall2008
Summer Fall2008Summer Fall2008
Summer Fall2008mklein5156
 
CBSI Brochure
CBSI BrochureCBSI Brochure
CBSI Brochuredsuter
 
Michael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera
 
Proposal for Renovation of Culinary Arts School at Los Angeles Trade Technica...
Proposal for Renovation of Culinary Arts School at Los Angeles Trade Technica...Proposal for Renovation of Culinary Arts School at Los Angeles Trade Technica...
Proposal for Renovation of Culinary Arts School at Los Angeles Trade Technica...Jennifer MacIsaac
 
cms-resume
cms-resumecms-resume
cms-resumecmstrang
 
LEED Canada Buildings Review 2002-2009
LEED Canada Buildings Review 2002-2009LEED Canada Buildings Review 2002-2009
LEED Canada Buildings Review 2002-2009scottbrooker
 
Munk Resume 2016 DC KM 10-9-16
Munk Resume 2016 DC KM 10-9-16Munk Resume 2016 DC KM 10-9-16
Munk Resume 2016 DC KM 10-9-16Kevin Munkittrick
 
Construction Management Resume 9.30.12
Construction Management Resume 9.30.12Construction Management Resume 9.30.12
Construction Management Resume 9.30.12cdelisi3386
 
Gbf newsletter-first-issue
Gbf newsletter-first-issueGbf newsletter-first-issue
Gbf newsletter-first-issuegbfengineering
 
Portfolio 2011 11 29 11 Optimized
Portfolio 2011 11 29 11 OptimizedPortfolio 2011 11 29 11 Optimized
Portfolio 2011 11 29 11 Optimizedlittlsparrow
 

Was ist angesagt? (19)

Dgraves 2012 Portfolio Online S
Dgraves 2012 Portfolio Online SDgraves 2012 Portfolio Online S
Dgraves 2012 Portfolio Online S
 
Portfolio Design Center Erica Byrd 2011
Portfolio Design Center Erica Byrd 2011Portfolio Design Center Erica Byrd 2011
Portfolio Design Center Erica Byrd 2011
 
013112 mds resume9
013112 mds resume9013112 mds resume9
013112 mds resume9
 
Summer Fall2008
Summer Fall2008Summer Fall2008
Summer Fall2008
 
CBSI Brochure
CBSI BrochureCBSI Brochure
CBSI Brochure
 
Michael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-na
 
James Brew Portfolio Small
James Brew Portfolio SmallJames Brew Portfolio Small
James Brew Portfolio Small
 
Proposal for Renovation of Culinary Arts School at Los Angeles Trade Technica...
Proposal for Renovation of Culinary Arts School at Los Angeles Trade Technica...Proposal for Renovation of Culinary Arts School at Los Angeles Trade Technica...
Proposal for Renovation of Culinary Arts School at Los Angeles Trade Technica...
 
cms-resume
cms-resumecms-resume
cms-resume
 
LEED Canada Buildings Review 2002-2009
LEED Canada Buildings Review 2002-2009LEED Canada Buildings Review 2002-2009
LEED Canada Buildings Review 2002-2009
 
Munk Resume 2016 DC KM 10-9-16
Munk Resume 2016 DC KM 10-9-16Munk Resume 2016 DC KM 10-9-16
Munk Resume 2016 DC KM 10-9-16
 
Portfolio
PortfolioPortfolio
Portfolio
 
20100730 Jordan Cv
20100730 Jordan Cv20100730 Jordan Cv
20100730 Jordan Cv
 
RACC - Duggan Morris Presentation
RACC - Duggan Morris PresentationRACC - Duggan Morris Presentation
RACC - Duggan Morris Presentation
 
Construction Management Resume 9.30.12
Construction Management Resume 9.30.12Construction Management Resume 9.30.12
Construction Management Resume 9.30.12
 
Gbf newsletter-first-issue
Gbf newsletter-first-issueGbf newsletter-first-issue
Gbf newsletter-first-issue
 
Sdc Leed V3 Workshop F1
Sdc   Leed V3 Workshop F1Sdc   Leed V3 Workshop F1
Sdc Leed V3 Workshop F1
 
SPD Brochure
SPD BrochureSPD Brochure
SPD Brochure
 
Portfolio 2011 11 29 11 Optimized
Portfolio 2011 11 29 11 OptimizedPortfolio 2011 11 29 11 Optimized
Portfolio 2011 11 29 11 Optimized
 

Andere mochten auch

10 airway-management-suction-ett
10 airway-management-suction-ett10 airway-management-suction-ett
10 airway-management-suction-ettsojhk
 
ロケタッチの裏側
ロケタッチの裏側ロケタッチの裏側
ロケタッチの裏側livedoor
 
カンタン画像サムネイル作成「Smalllight」
カンタン画像サムネイル作成「Smalllight」カンタン画像サムネイル作成「Smalllight」
カンタン画像サムネイル作成「Smalllight」livedoor
 
HTML5 Animation in Mobile Web Games
HTML5 Animation in Mobile Web GamesHTML5 Animation in Mobile Web Games
HTML5 Animation in Mobile Web Gameslivedoor
 

Andere mochten auch (7)

Accelerated Facilitation Workshop Final To Print
Accelerated Facilitation Workshop   Final To PrintAccelerated Facilitation Workshop   Final To Print
Accelerated Facilitation Workshop Final To Print
 
10 airway-management-suction-ett
10 airway-management-suction-ett10 airway-management-suction-ett
10 airway-management-suction-ett
 
Liliana Lopez Work
Liliana Lopez WorkLiliana Lopez Work
Liliana Lopez Work
 
ロケタッチの裏側
ロケタッチの裏側ロケタッチの裏側
ロケタッチの裏側
 
カンタン画像サムネイル作成「Smalllight」
カンタン画像サムネイル作成「Smalllight」カンタン画像サムネイル作成「Smalllight」
カンタン画像サムネイル作成「Smalllight」
 
Franklin HIgh Shool
Franklin HIgh ShoolFranklin HIgh Shool
Franklin HIgh Shool
 
HTML5 Animation in Mobile Web Games
HTML5 Animation in Mobile Web GamesHTML5 Animation in Mobile Web Games
HTML5 Animation in Mobile Web Games
 

Ähnlich wie A Liliana Lopez 2010

Liliana Lopez Resume
Liliana Lopez ResumeLiliana Lopez Resume
Liliana Lopez ResumeLiliana Lopez
 
Nicholas S. Emma - Professional Work Portfolio
Nicholas S. Emma - Professional Work PortfolioNicholas S. Emma - Professional Work Portfolio
Nicholas S. Emma - Professional Work PortfolioNicholas Emma
 
Renee m thomas resume
Renee m thomas resumeRenee m thomas resume
Renee m thomas resumeRenee Thomas
 
Kaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 webKaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 webKaustav Gupta
 
John R. Gustafson P.E.'s Resume
John R. Gustafson P.E.'s ResumeJohn R. Gustafson P.E.'s Resume
John R. Gustafson P.E.'s ResumeJohn Gustafson
 
Josh Carson Resume
Josh Carson ResumeJosh Carson Resume
Josh Carson Resumejoshcarson
 
Renee M Thomas Resume
Renee M Thomas ResumeRenee M Thomas Resume
Renee M Thomas Resumermthomas
 
Leyma Resume_2015
Leyma Resume_2015Leyma Resume_2015
Leyma Resume_2015LEYMA TAPIA
 
Final portfolio michael voit 140130
Final portfolio michael voit 140130Final portfolio michael voit 140130
Final portfolio michael voit 140130voit1
 
Ruby Montalbo -Architect.updated
Ruby Montalbo -Architect.updatedRuby Montalbo -Architect.updated
Ruby Montalbo -Architect.updatedMontalbo Ruby
 
Ruby montalbo architect.updated
Ruby montalbo  architect.updatedRuby montalbo  architect.updated
Ruby montalbo architect.updatedMontalbo Ruby
 
Resume_Katrina Lasco_2015
Resume_Katrina Lasco_2015Resume_Katrina Lasco_2015
Resume_Katrina Lasco_2015Katrina Lasco
 
Stan Shipley Resume, Projects 11mr18
Stan Shipley   Resume, Projects 11mr18Stan Shipley   Resume, Projects 11mr18
Stan Shipley Resume, Projects 11mr18stan_shipley
 
Resume gail brody april 2013
Resume gail brody april 2013Resume gail brody april 2013
Resume gail brody april 2013Gail S. Brody
 

Ähnlich wie A Liliana Lopez 2010 (20)

Liliana Lopez Resume
Liliana Lopez ResumeLiliana Lopez Resume
Liliana Lopez Resume
 
Resume Kenneth Johnson
Resume Kenneth JohnsonResume Kenneth Johnson
Resume Kenneth Johnson
 
Nicholas S. Emma - Professional Work Portfolio
Nicholas S. Emma - Professional Work PortfolioNicholas S. Emma - Professional Work Portfolio
Nicholas S. Emma - Professional Work Portfolio
 
Professional Portfolio
Professional PortfolioProfessional Portfolio
Professional Portfolio
 
Renee m thomas resume
Renee m thomas resumeRenee m thomas resume
Renee m thomas resume
 
Kaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 webKaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 web
 
John R. Gustafson P.E.'s Resume
John R. Gustafson P.E.'s ResumeJohn R. Gustafson P.E.'s Resume
John R. Gustafson P.E.'s Resume
 
Hollingsworth Resume
Hollingsworth ResumeHollingsworth Resume
Hollingsworth Resume
 
Josh Carson Resume
Josh Carson ResumeJosh Carson Resume
Josh Carson Resume
 
Renee M Thomas Resume
Renee M Thomas ResumeRenee M Thomas Resume
Renee M Thomas Resume
 
Leyma Resume_2015
Leyma Resume_2015Leyma Resume_2015
Leyma Resume_2015
 
CRESAAlbanyINTRO
CRESAAlbanyINTROCRESAAlbanyINTRO
CRESAAlbanyINTRO
 
Final portfolio michael voit 140130
Final portfolio michael voit 140130Final portfolio michael voit 140130
Final portfolio michael voit 140130
 
Ruby Montalbo -Architect.updated
Ruby Montalbo -Architect.updatedRuby Montalbo -Architect.updated
Ruby Montalbo -Architect.updated
 
Ruby montalbo architect.updated
Ruby montalbo  architect.updatedRuby montalbo  architect.updated
Ruby montalbo architect.updated
 
Resume_Katrina Lasco_2015
Resume_Katrina Lasco_2015Resume_Katrina Lasco_2015
Resume_Katrina Lasco_2015
 
A+ work
A+ workA+ work
A+ work
 
Stan Shipley Resume, Projects 11mr18
Stan Shipley   Resume, Projects 11mr18Stan Shipley   Resume, Projects 11mr18
Stan Shipley Resume, Projects 11mr18
 
Resume gail brody april 2013
Resume gail brody april 2013Resume gail brody april 2013
Resume gail brody april 2013
 
Robert Bazewicz
Robert BazewiczRobert Bazewicz
Robert Bazewicz
 

A Liliana Lopez 2010

  • 1. A Liliana Lopez Design Portfolio 2000 – 2010
  • 2. Objective Provide expertise in all phases of the Architectural Practice. Bring a strong work ethic and persistence to provide excellence in every Project. Promote the importance of personal and professional development as well as mentor the younger generations, it is in teaching that we grow and become an asset to any organization. Education Bachelor of Architecture University of Houston Fifth Year Design Studio Ecole dʼArchitecture Paris-Villemin Skills AutoCad Photoshop Microsoft Office Adobe Acrobat Design Space Planning Building Code Review Coordination of Disciplines Construction Documents Bidding and Negotiation Construction Administration Project Closeout Bilingual: English-Spanish For complete resume: www.linkedin.com/in/lilianalopez www.s2-dio.com/Resume.html Overview 1998 - 2010
  • 3. Project Overview The project consists of a $15,000,000 master planed reconfiguration of the Marathon operations facilities including new offices, operations and laboratory facilities along with a new maintenance building and security command center. This project also included a large utility component where all major utilities were either relocated or extended. Role in this Project Team Leader in the Design, Production and Construction Administration. Managed the Project and mentored young Architects through the process from Schematic Design through Construction Administration and Project Closeout. Marathon Petroleum Company – Texas Refining Division Facilities Siting 2007 – 2008
  • 4. Maintenance Office Building First Floor Plan N.T.S. Site Plan N.T.S. Maintenance Office Building Second Floor Plan N.T.S. Marathon Petroleum Company – Texas Refining Division Facilities Siting Architectural Drawings
  • 5. Employee Facilities / E&I Shops N.T.S. Machine and Fabrication Shops N.T.S. Marathon Petroleum Company – Texas Refining Division Facilities Siting Architectural Drawings
  • 6. Maintenance Office Building Display at Lobby Marathon Petroleum Company – Texas Refining Division Facilities Siting Architectural Drawings
  • 7. Project Overview Project Cost: $13,000,000 Project Size: 100,000 SF The High School is designed to provide for an optimum capacity of 600 students. The design consists of classrooms supporting the Districtʼs required instructional programs. A publicly accessible Library and Media Center acts as a community- wide information and learning center. The Commons area/Dinning Hall with a capability of 200-300 students. The UIL Competition Gym is supported by Athletic and PE dressing rooms. The Music, Drama and Art programs are enhanced by a formal auditorium and stage. Role in this Project Team Leader in the Design and Production of Construction Documents and Specifications. The New Franklin High School was published in the November 2006 Issue of The American School and University Magazine as part of the “Works in Progress – Outstanding Designs” Franklin ISD – New Franklin High School 2005 – 2006
  • 8. Site Plan N.T.S. Franklin ISD – New Franklin High School Architectural Drawings
  • 9. Floor Plan N.T.S. Franklin ISD – New Franklin High School Architectural Drawings
  • 10. Exterior Elevation N.T.S. Section through Auditorium N.T.S. Section through Main Entry N.T.S. Section through Library N.T.S. Franklin ISD – New Franklin High School Architectural Drawings
  • 11. Project Overview The project consists of an $8,000,000 new Junior High School. The first LEED Certified Public School in the State of Texas. The 92,000 SF school th serves 600 students in grades 7 and th 8 Features include optimal use of natural light throughout the school, exposed structure using glue-lam wood members as well as sustainable materials throughout. Role in this Project As a Junior Designer for the West Brazos Junior High, I implemented my knowledge and experience to coordinate Consultants and Engineers in order to comply with the Design intent. Provided Design presentations and assisted the Owner in material and color selections for the Project. I coordinated efforts with the Project Architect and LEED AP to create a school that promoted Sustainability, as well as excellent Design features.. Columbia Brazoria ISD – West Brazos Junior High 2004 – 2005
  • 12. Site Plan N.T.S Columbia Brazoria ISD – West Brazos Junior High Architectural Drawings
  • 13. Exterior Elevations N.T.S Columbia Brazoria ISD – West Brazos Junior High Architectural Drawings
  • 14. Project Overview The project consists of a $2,000,000 New Support Facilities for the Columbia-Brazoria Independent School District. This included Offices, Training Kitchen, Bus Parking and Service bays and a Fueling Station Role in this Project Project Architect and Designer. Responsible for Coordination of Disciplines. Provided Design presentations and assisted the Owner in material and color selections for the Project Columbia Brazoria ISD – Support Facilities 2004
  • 15. Floor Plan N.T.S Exterior Elevations N.T.S Columbia Brazoria ISD – Support Facilities Architectural Drawings
  • 16. Project Overview A New Elementary School in Monterrey Mexico. The school consists of a two story building housing classrooms cafeteria, and support. A two story parking area is provided. Role in this Project Project Architect for the Design of the American School Foundation Elementary School in Monterrey. My role in this project was key to the communication between our team of Architects and Engineers and the Construction Manager in Mexico. Provided services through Design Development. American School Foundation of Monterrey – New Elementary School 2005
  • 17. Project Overview Various Projects throughout the District including, but not limited to Seabrook Intermediate School Renovations, Casework Replacement at Various Campuses, Clearview Center, ESC Office and Lobby Renovations, Role in this Project Acted as Project Architect / Project Manager and Designer for various Projects throughout the District. Provided client meetings, color selections, coordination of disciplines among other roles. Education Support Center N.T.S Seabrook Intermediate School N.T.S Seabrook Intermediate School N.T.S Clear Creek ISD – Miscellaneous Projects 2007 – 2010