Assignment and Transportation Problem Amit Kumar Bardhan Faculty of Management Studies University of Delhi
Step1.  Find a bfs. Find the minimum element in each row of the  mxm  cost matrix. Construct a new matrix by subtracting from each cost the minimum cost in its row. For this new matrix, find the minimum cost in each column. Construct a new matrix (reduced cost matrix) by subtracting from each cost the minimum cost in its column. Step2.  Draw the minimum number of lines (horizontal and/or vertical) that are needed to cover all zeros in the reduced cost matrix. If m lines are required, an optimal solution is available among the covered zeros in the matrix. If fewer than m lines are required, proceed to step 3. Step3.  Find the smallest nonzero element (call its value k) in the reduced cost matrix that is uncovered by the lines drawn in step 2. Now subtract k from each uncovered element of the reduced cost matrix and add k to each element that is covered by two lines. Return to step2. Assignment Problems: Hungarian method
Example 1: Assignment Problem Personnel Assignment: Time (hours) Job 1 Job 2 Job 3 Job 4 Person 1   14   5  8  7 Person 2   2   12    6  5 Person 3   7  8    3   9 Person 4   2   4   6  10
Example 2: Swimmer Selection The coach of a swim team needs to assign swimmers to a 200-meters medley relay team to send to the Olympics. Since most of his best swimmers are very fast in more than one stroke, it is not clear which swimmer should be assigned to each of the four strokes. The five fastest swimmers and the best time (in seconds) they have achieved in each of the strokes (for 50 meters) are: From: Hillier and Hillier
Swimmer Selection  [contd.] 31 28 29 26 29 Freestyle 33 30 38 28 33 Butterfly 41 34 42 33 43 Breaststroke 35 37 33 32 37 Backstroke Vir Ali Vipin Ajay Mark Stroke
The coach wishes to determine how to assign four swimmers to the four different strokes to minimize the sum of corresponding best times. Hest the coach in team selection. Swimmer Selection  [contd.]
Swimmer Selection  [Answer] Freestyle  ->  Mark Butterfly  ->  Ajay Breaststroke  ->  Ali   Backstroke  ->   Vipin
Example:  Flight Assignment ‘ YO Air Co.’ is a small commuter airline running 6 flights per day from New Delhi to surrounding tourist destinations.  Flight crews are all based in New Delhi, working flights to various locations and returning on the next flight home.  Taking into account complex work rules, and pay incentives, YO Air schedulers have constructed the 8 possible work patterns detailed in the following table. Each row of the table marks the flight that could be covered in a particular pattern and the daily cost per crew (in lakhs of Rupees)
Flight Assignment  [contd.] 1.54 √ √ √ 8 0.84 √ √ 7 1.12 √ √ 6 1.32 √ √ √ 5 1.60 √ √ √ 4 1.52 √ √ √ 3 0.96 √ √ 2 1.40 √ √ 1 6 5 4 3 2 1 Cost Flight Work Pattern
Flight Assignment  [contd.] The company wants to choose a minimum total cost collection of work patterns that covers all flights exactly once. How to find the best assignments?
Transportation Problem
Power Co: Shipping costs, Supply, and Demand for Powerco Example Transportation Tableau 30 30 20 45 Demand (Million kwh) 40 5 16 9 14 Plant 3 50 7 13 12 9 Plant 2 35 9 10 6 8 Plant 1 Supply (Million kwh) City 4 City 3 City 2 City 1 To From
Powerco Power Plant: Formulation Define Variables: Let Xij = number of (million kwh) produced at plant i and  sent to city j. Objective Function: Min z = 8*X11 + 6*X12 + 10*X13 + 9*X14   + 9*X21 + 12*X22 + 13*X23 + 7*X24   + 14*X31 + 9*X32 + 16*X33 + 5*X34 Supply Constraints: X11 + X12 + X13 + X14 < = 35  (Plant 1)   X21 + X22 + X23 + X24 < = 50  (Plant 2)   X31 + X32 + X33 + X34 < = 40  (Plant 3)
Powerco Power Plant: Formulation (Cont’d.) Demand Constraints: X11 + X21 +X31 > = 45 (City 1)   X12 + X22 +X32 > = 20 (City 2)   X13 + X23 +X33 > = 30 (City 3)   X14 + X24 +X34 > = 30 (City 4) Nonnegativity Constraints: Xij > = 0  (i=1,..,3; j=1,..,4) Balanced? Total Demand = 45 + 20 + 30 + 30 = 125 Total Supply  = 35 + 50 + 40 = 125 Yes, Balanced Transportation Problem! (If problem is  unbalanced, add dummy supply or demand as required.)
Example: Cost-less Corp Ltd. The Cost-less Corp Ltd. supplies its four retail outlets from its four plants. The shipping cost per shipment from each plant to each retail outlet is given below  200 300 100 200 4 100 200 400 300 3 300 100 900 200 2 200 400 600 500 1 Plant D C B A Retail outlet Unit shipping cost
Example: Cost-less Corp Ltd.  [contd.] Plant 1, 2, 3 and 4 make 10, 20, 20 and 10 shipments respectively. Retail outlets 1, 2, 3 and 4 need to receive 20, 10, 10 and 20 shipments per month respectively. The distribution manager wants to determine the best plan for how many shipments to send from each plant to respective retail outlets each month. The objective is to minimize the total shipping cost.
Solving transportation problem Can be formulated as Linear Program and solved through simplex method / solver Modified Simplex method applied directly on the table Step 1 : Find the Initial basic feasible solution (North-West Corner rule, Least Cost Method,  Vogel’s Approximation method) Step 2 : UV Method / Stepping stone method
Transshipment Problems A transportation problem allows only shipments that go directly from supply points to demand points. In many situations, shipments are allowed between supply points or between demand points. Sometimes there may also be points (called transshipment points) through which goods can be transshipped on their journey from a supply point to a demand point. Fortunately, the optimal solution to a transshipment problem can be found by solving a transportation problem.
The following steps describe how the optimal solution to a transshipment problem can be found by solving a transportation problem. Step 1 : If necessary, add a dummy demand point (with a supply of 0 and a demand equal to the problem’s excess supply) to balance the problem. Shipments to the dummy and from a point to itself will be zero. Let s= total available supply. Step 2 : Construct a transportation tableau as follows: A row in the tableau will be needed for each supply point and transshipment point, and a column will be needed for each demand point and transshipment point. Solving Transshipment Problems
Each supply point will have a supply equal to it’s original supply, and each demand point will have a demand to its original demand. Let s= total available supply. Then each transshipment point will have a supply equal to (point’s original supply)+s and a demand equal to (point’s original demand)+s. This ensures that any transshipment point that is a net supplier will have a net outflow equal to point’s original supply and a net demander will have a net inflow equal to point’s original demand. Although we don’t know how much will be shipped through each transshipment point, we can be sure that the total amount will not exceed s.
Transshipment Example Widgetco manufactures widgets at two factories, one in Memphis and one in Denver. The Memphis factory can produce as 150 widgets, and the Denver factory can produce as many as 200 widgets per day.  Widgets are shipped by air to customers in LA and Boston. The customers in each city require 130 widgets per day. Because of the deregulation of airfares, Widgetco believes that it may be cheaper first fly some widgets to NY or Chicago and then fly them to their final destinations. The cost of flying a widget are shown next. Widgetco wants to minimize the total cost of shipping the required widgets to customers.
Transportation Tableau Associated with the Transshipment Example NY  Chicago  LA  Boston  Dummy  Supply Memphis  $8  $13  $25  $28  $0  150 Denver  $15  $12  $26  $25  $0  200 NY  $0  $6  $16  $17  $0  350 Chicago  $6  $0  $14  $16  $0  350 Demand  350  350  130  130  90   Supply points: Memphis, Denver Demand Points: LA Boston Transshipment Points: NY, Chicago  The problem can be solved using the transportation simplex method
Example - 1 General Motors produces cars at L.A. and Detroit and has a warehouse in Atlanta. The company supplies cars to customers in Houston and Tampa. The cost of shipping a car between points is given in table. (‘-’ means the shipment is not allowed) L.A. can produce as many as 1100 cars and Detroit can produce as many as 2900 cars. Houston must receive 2400 cars and Tampa must receive 1500 cars.  Formulate a balanced transportation problem that can be used to minimize the shipping cost incurred in meeting demands at Houston and Tampa. Modify the answer to (a) If shipments between LA and Detroit are not allowed  Modify the answer to (a) if shipments between Houston and Tampa are allowed at a cost of $5.
Example - 1 - 0 121 109 89 Houston 0 - 82 117 210 Tampa 78 113 0 115 105 Atlanta 119 110 111 0 145 Detroit 225 90 100 140 0 L.A. Tampa Houston Atlanta Detroit L.A. From To ($)
Example – 1a (answer) 100 5,500 6,400 4,000 4,000 4,000 4,000 0 0 M 82 117 210 Tampa 4,000 0 M 0 121 109 89 Houston 4,000 0 78 113 0 115 105 Atlanta 6,900 0 119 110 111 0 145 Detroit 5,100 0 225 90 100 140 0 L.A Dummy Tampa Houston Atlanta Detroit L.A.
Example – 1b (answer) 100 5,500 6,400 4,000 4,000 4,000 4,000 0 0 M 82 117 210 Tampa 4,000 0 M 0 121 109 89 Houston 4,000 0 78 113 0 115 105 Atlanta 6,900 0 119 110 111 0 M Detroit 5,100 0 225 90 100 M 0 L.A Dummy Tampa Houston Atlanta Detroit L.A.
Example – 1c (answer) 100 5,500 6,400 4,000 4,000 4,000 4,000 0 0 5 82 117 210 Tampa 4,000 0 5 0 121 109 89 Houston 4,000 0 78 113 0 115 105 Atlanta 6,900 0 119 110 111 0 145 Detroit 5,100 0 225 90 100 140 0 L.A Dummy Tampa Houston Atlanta Detroit L.A.
Limitations of Transportation Problem One commodity ONLY: any one product supplied and demanded at multiple locations  Merchandise Electricity, water Invalid for multiple commodities: (UNLESS transporting any one of the multiple commodities is completely independent of transporting any other commodity and hence can be treated by itself alone) Example: transporting product 1 and product 2 from the supply points to the demand points where the total amount (of the two products) transported on a link is subject to a capacity constraint Example: where economy of scale can be achieved by transporting the two products on the same link at a larger total volume and at a lower unit cost of transportation
Limitations of Transportation Problem Difficult to generalize the technique to accommodate (these are generic difficulty for “mathematical programming,” including linear and non-linear programming Economy of scale the per-unit cost of transportation on a link decreasing with the volume (nonlinear and concave; there is a trick to convert a “non-linear program with a piecewise linear but convex objective function to a linear program; no such tricks exists for a piecewise linear but concave objective function) Fixed-cost: transportation usually involves fixed charges. For example, the cost of truck rental (or cost of trucking in general) consists of a fixed charge that is independent of the mileage and a mileage charge that is proportional to the total mileage driven. Such fixed charges render the objective function NON-LINEAR and CONCAVE and make the problem much more difficult to solve
Assignment 1 A company must meet the following demands for a product: January 30 units; February, 30 units; March 20 units. Demand may be backlogged at a cost of Rs. 5 per unit per month. All demand must be met by the end of March. Thus, if one unit of January demand is met during March, a backlogging cost of 5 (2) = 10 is incurred. Monthly production capacity and unit production cost during each month are given in the table. A holding cost of Rs. 20 per unit is assessed on the inventory at the end of each month.  Formulate a balanced transportation problem that could be used to determine, how to minimize the total cost (including backlogging, holding and production costs) of meeting demand. Use the transportation simplex to determine how to meet each month’s demand.
Question 1… Rs. 410 35 March Rs. 420 30 February Rs. 400 35 January Unit production cost Production capacity Month
Assignment - 2 Identify the limitations of transportation problem as discussed in the class. How can we overcome these limitations. Give one specific example. (within 350 words)

Weitere ähnliche Inhalte

Was ist angesagt?

Travelling salesman problem
Travelling salesman problemTravelling salesman problem
Travelling salesman problem
Pradeep Behera
 
Stepping Stone Method
Stepping Stone MethodStepping Stone Method
Stepping Stone Method
Himanshi Gupta
 
GRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERS
GRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERSGRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERS
GRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERS
Akhil Ayyakutty
 
Unit.5. transportation and assignment problems
Unit.5. transportation and assignment problemsUnit.5. transportation and assignment problems
Unit.5. transportation and assignment problems
DagnaygebawGoshme
 
Modified Distribution Method (MODI)
Modified Distribution Method (MODI)Modified Distribution Method (MODI)
Modified Distribution Method (MODI)
Cool Guy
 
Transportation and transshipment problems
Transportation  and transshipment problemsTransportation  and transshipment problems
Transportation and transshipment problems
Dr. Adinath Damale
 
Optimal Solution by MODI Method
Optimal Solution by MODI MethodOptimal Solution by MODI Method
Optimal Solution by MODI Method
DrDeepaChauhan
 
Transportation problem
Transportation problemTransportation problem
Transportation problem
Shubhagata Roy
 
Transportation Problem In Linear Programming
Transportation Problem In Linear ProgrammingTransportation Problem In Linear Programming
Transportation Problem In Linear Programming
Mirza Tanzida
 
Numerical analysis dual, primal, revised simplex
Numerical analysis  dual, primal, revised simplexNumerical analysis  dual, primal, revised simplex
Numerical analysis dual, primal, revised simplex
SHAMJITH KM
 
American Options with Monte Carlo
American Options with Monte CarloAmerican Options with Monte Carlo
American Options with Monte Carlo
Tommaso Gabbriellini
 
Vogel's Approximation Method & Modified Distribution Method
Vogel's Approximation Method & Modified Distribution MethodVogel's Approximation Method & Modified Distribution Method
Vogel's Approximation Method & Modified Distribution Method
Kaushik Maitra
 
Integer Linear Programming
Integer Linear ProgrammingInteger Linear Programming
Integer Linear Programming
SukhpalRamanand
 
Decision tree example problem
Decision tree example problemDecision tree example problem
Decision tree example problem
SATYABRATA PRADHAN
 
Inventory model (operation research)
Inventory model (operation research)Inventory model (operation research)
Inventory model (operation research)
Amrita Gharti
 
nonlinear programming
nonlinear programmingnonlinear programming
nonlinear programming
AngelineOdaya
 
Transportatopn problm
Transportatopn problmTransportatopn problm
Transportatopn problm
Anshul Singh
 
PRIMAL & DUAL PROBLEMS
PRIMAL & DUAL PROBLEMSPRIMAL & DUAL PROBLEMS
PRIMAL & DUAL PROBLEMS
MayuR Khambhayata
 
The EOQ Formula
The EOQ FormulaThe EOQ Formula
The EOQ Formula
Nilam Kabra
 
Modified distribution method (modi method)
Modified distribution method (modi method)Modified distribution method (modi method)
Modified distribution method (modi method)
Dinesh Suthar
 

Was ist angesagt? (20)

Travelling salesman problem
Travelling salesman problemTravelling salesman problem
Travelling salesman problem
 
Stepping Stone Method
Stepping Stone MethodStepping Stone Method
Stepping Stone Method
 
GRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERS
GRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERSGRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERS
GRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERS
 
Unit.5. transportation and assignment problems
Unit.5. transportation and assignment problemsUnit.5. transportation and assignment problems
Unit.5. transportation and assignment problems
 
Modified Distribution Method (MODI)
Modified Distribution Method (MODI)Modified Distribution Method (MODI)
Modified Distribution Method (MODI)
 
Transportation and transshipment problems
Transportation  and transshipment problemsTransportation  and transshipment problems
Transportation and transshipment problems
 
Optimal Solution by MODI Method
Optimal Solution by MODI MethodOptimal Solution by MODI Method
Optimal Solution by MODI Method
 
Transportation problem
Transportation problemTransportation problem
Transportation problem
 
Transportation Problem In Linear Programming
Transportation Problem In Linear ProgrammingTransportation Problem In Linear Programming
Transportation Problem In Linear Programming
 
Numerical analysis dual, primal, revised simplex
Numerical analysis  dual, primal, revised simplexNumerical analysis  dual, primal, revised simplex
Numerical analysis dual, primal, revised simplex
 
American Options with Monte Carlo
American Options with Monte CarloAmerican Options with Monte Carlo
American Options with Monte Carlo
 
Vogel's Approximation Method & Modified Distribution Method
Vogel's Approximation Method & Modified Distribution MethodVogel's Approximation Method & Modified Distribution Method
Vogel's Approximation Method & Modified Distribution Method
 
Integer Linear Programming
Integer Linear ProgrammingInteger Linear Programming
Integer Linear Programming
 
Decision tree example problem
Decision tree example problemDecision tree example problem
Decision tree example problem
 
Inventory model (operation research)
Inventory model (operation research)Inventory model (operation research)
Inventory model (operation research)
 
nonlinear programming
nonlinear programmingnonlinear programming
nonlinear programming
 
Transportatopn problm
Transportatopn problmTransportatopn problm
Transportatopn problm
 
PRIMAL & DUAL PROBLEMS
PRIMAL & DUAL PROBLEMSPRIMAL & DUAL PROBLEMS
PRIMAL & DUAL PROBLEMS
 
The EOQ Formula
The EOQ FormulaThe EOQ Formula
The EOQ Formula
 
Modified distribution method (modi method)
Modified distribution method (modi method)Modified distribution method (modi method)
Modified distribution method (modi method)
 

Andere mochten auch

Transportation Problem in Operational Research
Transportation Problem in Operational ResearchTransportation Problem in Operational Research
Transportation Problem in Operational Research
Neha Sharma
 
transportation and assignment models
transportation and assignment modelstransportation and assignment models
transportation and assignment models
Anne Lee
 
Assignment Problem
Assignment ProblemAssignment Problem
Assignment Problem
Amit Kumar
 
transporation problem - stepping stone method
transporation problem - stepping stone methodtransporation problem - stepping stone method
transporation problem - stepping stone method
oragon291764
 
Transportation and Assignment
Transportation and AssignmentTransportation and Assignment
Transportation and Assignment
Lokesh Payasi
 
Transportation Assignment
Transportation AssignmentTransportation Assignment
Transportation Assignment
Nilam Kabra
 
Ms(transp.transship,assign) (1)
Ms(transp.transship,assign) (1)Ms(transp.transship,assign) (1)
Ms(transp.transship,assign) (1)
kongara
 
Taylor introms10 ppt_06
Taylor introms10 ppt_06Taylor introms10 ppt_06
Taylor introms10 ppt_06
QA Cmu
 
Transshipment and shipside
Transshipment  and shipsideTransshipment  and shipside
Transshipment and shipside
Danna
 
Mba i qt unit-1.2_transportation, assignment and transshipment problems
Mba i qt unit-1.2_transportation, assignment and transshipment problemsMba i qt unit-1.2_transportation, assignment and transshipment problems
Mba i qt unit-1.2_transportation, assignment and transshipment problems
Rai University
 
T P
T PT P
Transportation and assignment_problem
Transportation and assignment_problemTransportation and assignment_problem
Transportation and assignment_problem
Ankit Katiyar
 
product design and process selection
product design and  process selectionproduct design and  process selection
product design and process selection
LEADS123
 
Lecture 7 transportation problem finding initial basic feasible solution
Lecture 7 transportation problem finding initial basic feasible solutionLecture 7 transportation problem finding initial basic feasible solution
Lecture 7 transportation problem finding initial basic feasible solution
Aathi Suku
 
operation research
operation researchoperation research
operation research
ujal70
 
Transportation problem
Transportation problemTransportation problem
Transportation problem
Mohamed ALobaidly
 
Transportation Problem- Stepping Stone Method
Transportation Problem- Stepping Stone Method Transportation Problem- Stepping Stone Method
Transportation Problem- Stepping Stone Method
Lakshminarayan Ramjee
 
Transportation problem
Transportation problemTransportation problem
Transportation problem
A B
 
Major Transportation Problem in Bangladesh
Major Transportation Problem in BangladeshMajor Transportation Problem in Bangladesh
Major Transportation Problem in Bangladesh
Krishnandu Barma
 
Bba 3274 qm week 9 transportation and assignment models
Bba 3274 qm week 9 transportation and assignment modelsBba 3274 qm week 9 transportation and assignment models
Bba 3274 qm week 9 transportation and assignment models
Stephen Ong
 

Andere mochten auch (20)

Transportation Problem in Operational Research
Transportation Problem in Operational ResearchTransportation Problem in Operational Research
Transportation Problem in Operational Research
 
transportation and assignment models
transportation and assignment modelstransportation and assignment models
transportation and assignment models
 
Assignment Problem
Assignment ProblemAssignment Problem
Assignment Problem
 
transporation problem - stepping stone method
transporation problem - stepping stone methodtransporation problem - stepping stone method
transporation problem - stepping stone method
 
Transportation and Assignment
Transportation and AssignmentTransportation and Assignment
Transportation and Assignment
 
Transportation Assignment
Transportation AssignmentTransportation Assignment
Transportation Assignment
 
Ms(transp.transship,assign) (1)
Ms(transp.transship,assign) (1)Ms(transp.transship,assign) (1)
Ms(transp.transship,assign) (1)
 
Taylor introms10 ppt_06
Taylor introms10 ppt_06Taylor introms10 ppt_06
Taylor introms10 ppt_06
 
Transshipment and shipside
Transshipment  and shipsideTransshipment  and shipside
Transshipment and shipside
 
Mba i qt unit-1.2_transportation, assignment and transshipment problems
Mba i qt unit-1.2_transportation, assignment and transshipment problemsMba i qt unit-1.2_transportation, assignment and transshipment problems
Mba i qt unit-1.2_transportation, assignment and transshipment problems
 
T P
T PT P
T P
 
Transportation and assignment_problem
Transportation and assignment_problemTransportation and assignment_problem
Transportation and assignment_problem
 
product design and process selection
product design and  process selectionproduct design and  process selection
product design and process selection
 
Lecture 7 transportation problem finding initial basic feasible solution
Lecture 7 transportation problem finding initial basic feasible solutionLecture 7 transportation problem finding initial basic feasible solution
Lecture 7 transportation problem finding initial basic feasible solution
 
operation research
operation researchoperation research
operation research
 
Transportation problem
Transportation problemTransportation problem
Transportation problem
 
Transportation Problem- Stepping Stone Method
Transportation Problem- Stepping Stone Method Transportation Problem- Stepping Stone Method
Transportation Problem- Stepping Stone Method
 
Transportation problem
Transportation problemTransportation problem
Transportation problem
 
Major Transportation Problem in Bangladesh
Major Transportation Problem in BangladeshMajor Transportation Problem in Bangladesh
Major Transportation Problem in Bangladesh
 
Bba 3274 qm week 9 transportation and assignment models
Bba 3274 qm week 9 transportation and assignment modelsBba 3274 qm week 9 transportation and assignment models
Bba 3274 qm week 9 transportation and assignment models
 

Ähnlich wie Assign transportation

07. Transportation Problem.pptx
07. Transportation Problem.pptx07. Transportation Problem.pptx
07. Transportation Problem.pptx
SupplierSepitengTerm
 
Productions & Operations Management Chapter 08
Productions & Operations Management Chapter 08Productions & Operations Management Chapter 08
Productions & Operations Management Chapter 08
jncgw5t6xq
 
Rsh qam11 ch09 ge
Rsh qam11 ch09 geRsh qam11 ch09 ge
Rsh qam11 ch09 ge
Firas Husseini
 
Operations Research Project
Operations Research ProjectOperations Research Project
Operations Research Project
Aishwary Kumar Gupta
 
unit2 linear programming problem in .pdf
unit2 linear programming problem in .pdfunit2 linear programming problem in .pdf
unit2 linear programming problem in .pdf
bizuayehuadmasu1
 
unit-5 Transportation problem in operation research ppt.pdf
unit-5 Transportation problem in operation research ppt.pdfunit-5 Transportation problem in operation research ppt.pdf
unit-5 Transportation problem in operation research ppt.pdf
bizuayehuadmasu1
 
Linear Programming.pptx
Linear Programming.pptxLinear Programming.pptx
Linear Programming.pptx
DrBabinDhasD
 
Top school in delhi ncr
Top school in delhi ncrTop school in delhi ncr
Top school in delhi ncr
Edhole.com
 
Deepika(14 mba5012) transportation ppt
Deepika(14 mba5012)  transportation pptDeepika(14 mba5012)  transportation ppt
Deepika(14 mba5012) transportation ppt
Deepika Bansal
 
Chapter 07.ppt
Chapter 07.pptChapter 07.ppt
Chapter 07.ppt
aniket98618
 
QA CHAPTER III and IV(1)(1).pdf
QA CHAPTER III and IV(1)(1).pdfQA CHAPTER III and IV(1)(1).pdf
QA CHAPTER III and IV(1)(1).pdf
Teshome48
 
QABD Transportation problems-UNIT-3.pptx
QABD Transportation problems-UNIT-3.pptxQABD Transportation problems-UNIT-3.pptx
QABD Transportation problems-UNIT-3.pptx
honakjannu789
 
Presentation%20on%20Transportation%20and%20Assignment%20Problem.pptx
Presentation%20on%20Transportation%20and%20Assignment%20Problem.pptxPresentation%20on%20Transportation%20and%20Assignment%20Problem.pptx
Presentation%20on%20Transportation%20and%20Assignment%20Problem.pptx
IBMRD Ahmednagar
 
Transportation model
Transportation modelTransportation model
Transportation model
msn007
 
Chapter 5.TRANSPORTATION PROBLEM.pdf
Chapter 5.TRANSPORTATION PROBLEM.pdfChapter 5.TRANSPORTATION PROBLEM.pdf
Chapter 5.TRANSPORTATION PROBLEM.pdf
Tsegay Berhe
 
Transportation problems
Transportation problemsTransportation problems
Transportation problems
VishalHotchandani2
 
OR presentation.pptx
OR presentation.pptxOR presentation.pptx
OR presentation.pptx
AjinRk2
 
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEMA NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
Journal For Research
 
transportation-model.ppt
transportation-model.ppttransportation-model.ppt
transportation-model.ppt
anubhuti18
 
Transportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsTransportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete Maths
Krupesh Shah
 

Ähnlich wie Assign transportation (20)

07. Transportation Problem.pptx
07. Transportation Problem.pptx07. Transportation Problem.pptx
07. Transportation Problem.pptx
 
Productions & Operations Management Chapter 08
Productions & Operations Management Chapter 08Productions & Operations Management Chapter 08
Productions & Operations Management Chapter 08
 
Rsh qam11 ch09 ge
Rsh qam11 ch09 geRsh qam11 ch09 ge
Rsh qam11 ch09 ge
 
Operations Research Project
Operations Research ProjectOperations Research Project
Operations Research Project
 
unit2 linear programming problem in .pdf
unit2 linear programming problem in .pdfunit2 linear programming problem in .pdf
unit2 linear programming problem in .pdf
 
unit-5 Transportation problem in operation research ppt.pdf
unit-5 Transportation problem in operation research ppt.pdfunit-5 Transportation problem in operation research ppt.pdf
unit-5 Transportation problem in operation research ppt.pdf
 
Linear Programming.pptx
Linear Programming.pptxLinear Programming.pptx
Linear Programming.pptx
 
Top school in delhi ncr
Top school in delhi ncrTop school in delhi ncr
Top school in delhi ncr
 
Deepika(14 mba5012) transportation ppt
Deepika(14 mba5012)  transportation pptDeepika(14 mba5012)  transportation ppt
Deepika(14 mba5012) transportation ppt
 
Chapter 07.ppt
Chapter 07.pptChapter 07.ppt
Chapter 07.ppt
 
QA CHAPTER III and IV(1)(1).pdf
QA CHAPTER III and IV(1)(1).pdfQA CHAPTER III and IV(1)(1).pdf
QA CHAPTER III and IV(1)(1).pdf
 
QABD Transportation problems-UNIT-3.pptx
QABD Transportation problems-UNIT-3.pptxQABD Transportation problems-UNIT-3.pptx
QABD Transportation problems-UNIT-3.pptx
 
Presentation%20on%20Transportation%20and%20Assignment%20Problem.pptx
Presentation%20on%20Transportation%20and%20Assignment%20Problem.pptxPresentation%20on%20Transportation%20and%20Assignment%20Problem.pptx
Presentation%20on%20Transportation%20and%20Assignment%20Problem.pptx
 
Transportation model
Transportation modelTransportation model
Transportation model
 
Chapter 5.TRANSPORTATION PROBLEM.pdf
Chapter 5.TRANSPORTATION PROBLEM.pdfChapter 5.TRANSPORTATION PROBLEM.pdf
Chapter 5.TRANSPORTATION PROBLEM.pdf
 
Transportation problems
Transportation problemsTransportation problems
Transportation problems
 
OR presentation.pptx
OR presentation.pptxOR presentation.pptx
OR presentation.pptx
 
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEMA NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
 
transportation-model.ppt
transportation-model.ppttransportation-model.ppt
transportation-model.ppt
 
Transportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsTransportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete Maths
 

Mehr von Kinshook Chaturvedi

Working and functions_of_rbi[1]
Working and functions_of_rbi[1]Working and functions_of_rbi[1]
Working and functions_of_rbi[1]
Kinshook Chaturvedi
 
Role of idfc_in_infrastucture_finance
Role of idfc_in_infrastucture_financeRole of idfc_in_infrastucture_finance
Role of idfc_in_infrastucture_finance
Kinshook Chaturvedi
 
Mutual funds
Mutual fundsMutual funds
Mutual funds
Kinshook Chaturvedi
 
Iifcl ppt
Iifcl pptIifcl ppt
Basel ii norms.ppt
Basel ii norms.pptBasel ii norms.ppt
Basel ii norms.ppt
Kinshook Chaturvedi
 
Retail banking pres
Retail banking presRetail banking pres
Retail banking pres
Kinshook Chaturvedi
 
Presentation on lic of india
Presentation on lic of indiaPresentation on lic of india
Presentation on lic of india
Kinshook Chaturvedi
 
Mfi dfi
Mfi dfiMfi dfi
Management of np as imt
Management of np as imtManagement of np as imt
Management of np as imt
Kinshook Chaturvedi
 
Life insurance in india final raja
Life insurance in india final rajaLife insurance in india final raja
Life insurance in india final raja
Kinshook Chaturvedi
 
Financial inclusion
Financial inclusionFinancial inclusion
Financial inclusion
Kinshook Chaturvedi
 
Corporate banking v2
Corporate banking v2Corporate banking v2
Corporate banking v2
Kinshook Chaturvedi
 
Corporate banking latest
Corporate banking latestCorporate banking latest
Corporate banking latest
Kinshook Chaturvedi
 
Financial mgt exercises
Financial mgt exercisesFinancial mgt exercises
Financial mgt exercises
Kinshook Chaturvedi
 
Csac10[1].p
Csac10[1].pCsac10[1].p
Csac10[1].p
Kinshook Chaturvedi
 
Csac08[1].p
Csac08[1].pCsac08[1].p
Csac08[1].p
Kinshook Chaturvedi
 
Csac05[1].p
Csac05[1].pCsac05[1].p
Csac05[1].p
Kinshook Chaturvedi
 
Csac14[1].p
Csac14[1].pCsac14[1].p
Csac14[1].p
Kinshook Chaturvedi
 
Csac06[1].p
Csac06[1].pCsac06[1].p
Csac06[1].p
Kinshook Chaturvedi
 

Mehr von Kinshook Chaturvedi (20)

Working and functions_of_rbi[1]
Working and functions_of_rbi[1]Working and functions_of_rbi[1]
Working and functions_of_rbi[1]
 
Role of idfc_in_infrastucture_finance
Role of idfc_in_infrastucture_financeRole of idfc_in_infrastucture_finance
Role of idfc_in_infrastucture_finance
 
Mutual funds
Mutual fundsMutual funds
Mutual funds
 
Iifcl ppt
Iifcl pptIifcl ppt
Iifcl ppt
 
Basel ii norms.ppt
Basel ii norms.pptBasel ii norms.ppt
Basel ii norms.ppt
 
Retail banking pres
Retail banking presRetail banking pres
Retail banking pres
 
Presentation on lic of india
Presentation on lic of indiaPresentation on lic of india
Presentation on lic of india
 
Mfi dfi
Mfi dfiMfi dfi
Mfi dfi
 
Management of np as imt
Management of np as imtManagement of np as imt
Management of np as imt
 
Life insurance in india final raja
Life insurance in india final rajaLife insurance in india final raja
Life insurance in india final raja
 
Financial inclusion
Financial inclusionFinancial inclusion
Financial inclusion
 
Corporate banking v2
Corporate banking v2Corporate banking v2
Corporate banking v2
 
Corporate banking latest
Corporate banking latestCorporate banking latest
Corporate banking latest
 
Financial mgt exercises
Financial mgt exercisesFinancial mgt exercises
Financial mgt exercises
 
Csac10[1].p
Csac10[1].pCsac10[1].p
Csac10[1].p
 
Csac08[1].p
Csac08[1].pCsac08[1].p
Csac08[1].p
 
Csac05[1].p
Csac05[1].pCsac05[1].p
Csac05[1].p
 
Csac14[1].p
Csac14[1].pCsac14[1].p
Csac14[1].p
 
Csac06[1].p
Csac06[1].pCsac06[1].p
Csac06[1].p
 
Xyber001 16 12_09 (2)
Xyber001 16 12_09 (2)Xyber001 16 12_09 (2)
Xyber001 16 12_09 (2)
 

Kürzlich hochgeladen

WAM Corporate Presentation July 2024.pdf
WAM Corporate Presentation July 2024.pdfWAM Corporate Presentation July 2024.pdf
WAM Corporate Presentation July 2024.pdf
Western Alaska Minerals Corp.
 
Business Model Canvas for Successful Business
Business Model Canvas for Successful BusinessBusiness Model Canvas for Successful Business
Business Model Canvas for Successful Business
SuganthiPrakash1
 
10 Barriers to Effective Communications.
10 Barriers to Effective Communications.10 Barriers to Effective Communications.
10 Barriers to Effective Communications.
Cora335316
 
YouTube Automation Step-by-step Guide.pdf
YouTube Automation Step-by-step Guide.pdfYouTube Automation Step-by-step Guide.pdf
YouTube Automation Step-by-step Guide.pdf
grizzyhuncho
 
Girls Call Andheri West 9910780858 Provide Best And Top Girl Service And No1 ...
Girls Call Andheri West 9910780858 Provide Best And Top Girl Service And No1 ...Girls Call Andheri West 9910780858 Provide Best And Top Girl Service And No1 ...
Girls Call Andheri West 9910780858 Provide Best And Top Girl Service And No1 ...
margaretblush
 
21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf
21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf
21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf
emmanuelpulido003
 
The Power of Digital Marketing in the Modern Age.pdf
The Power of Digital Marketing in the Modern Age.pdfThe Power of Digital Marketing in the Modern Age.pdf
The Power of Digital Marketing in the Modern Age.pdf
David Thomson
 
TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...
TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...
TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...
kevinkariuki227
 
Growth Buyouts - The Dawn of the GBO (Slow Ventures)
Growth Buyouts - The  Dawn of the GBO (Slow Ventures)Growth Buyouts - The  Dawn of the GBO (Slow Ventures)
Growth Buyouts - The Dawn of the GBO (Slow Ventures)
Razin Mustafiz
 
Top five predictions today, .
Top five predictions today,            .Top five predictions today,            .
Top five predictions today, .
Rupasingh82
 
Path to the next normal collection McKinsey
Path to the next normal collection McKinseyPath to the next normal collection McKinsey
Path to the next normal collection McKinsey
MajIman2
 
United Kingdom's Real Estate Mogul: Newman George Leech's Impact on the Swiss...
United Kingdom's Real Estate Mogul: Newman George Leech's Impact on the Swiss...United Kingdom's Real Estate Mogul: Newman George Leech's Impact on the Swiss...
United Kingdom's Real Estate Mogul: Newman George Leech's Impact on the Swiss...
Newman George Leech
 
Test Bank For Principles Of Cost Accounting, 17th Edition Edward J. Vander...
Test Bank For Principles Of Cost Accounting, 	  17th Edition Edward J. Vander...Test Bank For Principles Of Cost Accounting, 	  17th Edition Edward J. Vander...
Test Bank For Principles Of Cost Accounting, 17th Edition Edward J. Vander...
kevinkariuki227
 
Zodiac Signs and Fashion: Dressing to Suit Your Astrological Style
Zodiac Signs and Fashion: Dressing to Suit Your Astrological StyleZodiac Signs and Fashion: Dressing to Suit Your Astrological Style
Zodiac Signs and Fashion: Dressing to Suit Your Astrological Style
my Pandit
 
Connected Small Boat Protection Solution | July 2024
Connected Small Boat Protection Solution | July  2024Connected Small Boat Protection Solution | July  2024
Connected Small Boat Protection Solution | July 2024
Hector Del Castillo, CPM, CPMM
 
Apparel Sourcing Week 2024 DelegateDeck.pdf
Apparel Sourcing Week 2024 DelegateDeck.pdfApparel Sourcing Week 2024 DelegateDeck.pdf
Apparel Sourcing Week 2024 DelegateDeck.pdf
Apparel Sourcing Week
 
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
Aggregage
 
Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...
Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...
Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...
Philip M Caputo
 
ShotOniPhone campaign by Vancy macwan.pptx
ShotOniPhone campaign by Vancy macwan.pptxShotOniPhone campaign by Vancy macwan.pptx
ShotOniPhone campaign by Vancy macwan.pptx
macwanvancy
 
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
dimplekumaridk322
 

Kürzlich hochgeladen (20)

WAM Corporate Presentation July 2024.pdf
WAM Corporate Presentation July 2024.pdfWAM Corporate Presentation July 2024.pdf
WAM Corporate Presentation July 2024.pdf
 
Business Model Canvas for Successful Business
Business Model Canvas for Successful BusinessBusiness Model Canvas for Successful Business
Business Model Canvas for Successful Business
 
10 Barriers to Effective Communications.
10 Barriers to Effective Communications.10 Barriers to Effective Communications.
10 Barriers to Effective Communications.
 
YouTube Automation Step-by-step Guide.pdf
YouTube Automation Step-by-step Guide.pdfYouTube Automation Step-by-step Guide.pdf
YouTube Automation Step-by-step Guide.pdf
 
Girls Call Andheri West 9910780858 Provide Best And Top Girl Service And No1 ...
Girls Call Andheri West 9910780858 Provide Best And Top Girl Service And No1 ...Girls Call Andheri West 9910780858 Provide Best And Top Girl Service And No1 ...
Girls Call Andheri West 9910780858 Provide Best And Top Girl Service And No1 ...
 
21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf
21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf
21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf
 
The Power of Digital Marketing in the Modern Age.pdf
The Power of Digital Marketing in the Modern Age.pdfThe Power of Digital Marketing in the Modern Age.pdf
The Power of Digital Marketing in the Modern Age.pdf
 
TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...
TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...
TEST BANK For Auditing & Assurance Services A Systematic Approach, 12th Editi...
 
Growth Buyouts - The Dawn of the GBO (Slow Ventures)
Growth Buyouts - The  Dawn of the GBO (Slow Ventures)Growth Buyouts - The  Dawn of the GBO (Slow Ventures)
Growth Buyouts - The Dawn of the GBO (Slow Ventures)
 
Top five predictions today, .
Top five predictions today,            .Top five predictions today,            .
Top five predictions today, .
 
Path to the next normal collection McKinsey
Path to the next normal collection McKinseyPath to the next normal collection McKinsey
Path to the next normal collection McKinsey
 
United Kingdom's Real Estate Mogul: Newman George Leech's Impact on the Swiss...
United Kingdom's Real Estate Mogul: Newman George Leech's Impact on the Swiss...United Kingdom's Real Estate Mogul: Newman George Leech's Impact on the Swiss...
United Kingdom's Real Estate Mogul: Newman George Leech's Impact on the Swiss...
 
Test Bank For Principles Of Cost Accounting, 17th Edition Edward J. Vander...
Test Bank For Principles Of Cost Accounting, 	  17th Edition Edward J. Vander...Test Bank For Principles Of Cost Accounting, 	  17th Edition Edward J. Vander...
Test Bank For Principles Of Cost Accounting, 17th Edition Edward J. Vander...
 
Zodiac Signs and Fashion: Dressing to Suit Your Astrological Style
Zodiac Signs and Fashion: Dressing to Suit Your Astrological StyleZodiac Signs and Fashion: Dressing to Suit Your Astrological Style
Zodiac Signs and Fashion: Dressing to Suit Your Astrological Style
 
Connected Small Boat Protection Solution | July 2024
Connected Small Boat Protection Solution | July  2024Connected Small Boat Protection Solution | July  2024
Connected Small Boat Protection Solution | July 2024
 
Apparel Sourcing Week 2024 DelegateDeck.pdf
Apparel Sourcing Week 2024 DelegateDeck.pdfApparel Sourcing Week 2024 DelegateDeck.pdf
Apparel Sourcing Week 2024 DelegateDeck.pdf
 
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
 
Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...
Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...
Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...
 
ShotOniPhone campaign by Vancy macwan.pptx
ShotOniPhone campaign by Vancy macwan.pptxShotOniPhone campaign by Vancy macwan.pptx
ShotOniPhone campaign by Vancy macwan.pptx
 
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
 

Assign transportation

  • 1. Assignment and Transportation Problem Amit Kumar Bardhan Faculty of Management Studies University of Delhi
  • 2. Step1. Find a bfs. Find the minimum element in each row of the mxm cost matrix. Construct a new matrix by subtracting from each cost the minimum cost in its row. For this new matrix, find the minimum cost in each column. Construct a new matrix (reduced cost matrix) by subtracting from each cost the minimum cost in its column. Step2. Draw the minimum number of lines (horizontal and/or vertical) that are needed to cover all zeros in the reduced cost matrix. If m lines are required, an optimal solution is available among the covered zeros in the matrix. If fewer than m lines are required, proceed to step 3. Step3. Find the smallest nonzero element (call its value k) in the reduced cost matrix that is uncovered by the lines drawn in step 2. Now subtract k from each uncovered element of the reduced cost matrix and add k to each element that is covered by two lines. Return to step2. Assignment Problems: Hungarian method
  • 3. Example 1: Assignment Problem Personnel Assignment: Time (hours) Job 1 Job 2 Job 3 Job 4 Person 1 14 5 8 7 Person 2 2 12 6 5 Person 3 7 8 3 9 Person 4 2 4 6 10
  • 4. Example 2: Swimmer Selection The coach of a swim team needs to assign swimmers to a 200-meters medley relay team to send to the Olympics. Since most of his best swimmers are very fast in more than one stroke, it is not clear which swimmer should be assigned to each of the four strokes. The five fastest swimmers and the best time (in seconds) they have achieved in each of the strokes (for 50 meters) are: From: Hillier and Hillier
  • 5. Swimmer Selection [contd.] 31 28 29 26 29 Freestyle 33 30 38 28 33 Butterfly 41 34 42 33 43 Breaststroke 35 37 33 32 37 Backstroke Vir Ali Vipin Ajay Mark Stroke
  • 6. The coach wishes to determine how to assign four swimmers to the four different strokes to minimize the sum of corresponding best times. Hest the coach in team selection. Swimmer Selection [contd.]
  • 7. Swimmer Selection [Answer] Freestyle -> Mark Butterfly -> Ajay Breaststroke -> Ali Backstroke -> Vipin
  • 8. Example: Flight Assignment ‘ YO Air Co.’ is a small commuter airline running 6 flights per day from New Delhi to surrounding tourist destinations. Flight crews are all based in New Delhi, working flights to various locations and returning on the next flight home. Taking into account complex work rules, and pay incentives, YO Air schedulers have constructed the 8 possible work patterns detailed in the following table. Each row of the table marks the flight that could be covered in a particular pattern and the daily cost per crew (in lakhs of Rupees)
  • 9. Flight Assignment [contd.] 1.54 √ √ √ 8 0.84 √ √ 7 1.12 √ √ 6 1.32 √ √ √ 5 1.60 √ √ √ 4 1.52 √ √ √ 3 0.96 √ √ 2 1.40 √ √ 1 6 5 4 3 2 1 Cost Flight Work Pattern
  • 10. Flight Assignment [contd.] The company wants to choose a minimum total cost collection of work patterns that covers all flights exactly once. How to find the best assignments?
  • 12. Power Co: Shipping costs, Supply, and Demand for Powerco Example Transportation Tableau 30 30 20 45 Demand (Million kwh) 40 5 16 9 14 Plant 3 50 7 13 12 9 Plant 2 35 9 10 6 8 Plant 1 Supply (Million kwh) City 4 City 3 City 2 City 1 To From
  • 13. Powerco Power Plant: Formulation Define Variables: Let Xij = number of (million kwh) produced at plant i and sent to city j. Objective Function: Min z = 8*X11 + 6*X12 + 10*X13 + 9*X14 + 9*X21 + 12*X22 + 13*X23 + 7*X24 + 14*X31 + 9*X32 + 16*X33 + 5*X34 Supply Constraints: X11 + X12 + X13 + X14 < = 35 (Plant 1) X21 + X22 + X23 + X24 < = 50 (Plant 2) X31 + X32 + X33 + X34 < = 40 (Plant 3)
  • 14. Powerco Power Plant: Formulation (Cont’d.) Demand Constraints: X11 + X21 +X31 > = 45 (City 1) X12 + X22 +X32 > = 20 (City 2) X13 + X23 +X33 > = 30 (City 3) X14 + X24 +X34 > = 30 (City 4) Nonnegativity Constraints: Xij > = 0 (i=1,..,3; j=1,..,4) Balanced? Total Demand = 45 + 20 + 30 + 30 = 125 Total Supply = 35 + 50 + 40 = 125 Yes, Balanced Transportation Problem! (If problem is unbalanced, add dummy supply or demand as required.)
  • 15. Example: Cost-less Corp Ltd. The Cost-less Corp Ltd. supplies its four retail outlets from its four plants. The shipping cost per shipment from each plant to each retail outlet is given below 200 300 100 200 4 100 200 400 300 3 300 100 900 200 2 200 400 600 500 1 Plant D C B A Retail outlet Unit shipping cost
  • 16. Example: Cost-less Corp Ltd. [contd.] Plant 1, 2, 3 and 4 make 10, 20, 20 and 10 shipments respectively. Retail outlets 1, 2, 3 and 4 need to receive 20, 10, 10 and 20 shipments per month respectively. The distribution manager wants to determine the best plan for how many shipments to send from each plant to respective retail outlets each month. The objective is to minimize the total shipping cost.
  • 17. Solving transportation problem Can be formulated as Linear Program and solved through simplex method / solver Modified Simplex method applied directly on the table Step 1 : Find the Initial basic feasible solution (North-West Corner rule, Least Cost Method, Vogel’s Approximation method) Step 2 : UV Method / Stepping stone method
  • 18. Transshipment Problems A transportation problem allows only shipments that go directly from supply points to demand points. In many situations, shipments are allowed between supply points or between demand points. Sometimes there may also be points (called transshipment points) through which goods can be transshipped on their journey from a supply point to a demand point. Fortunately, the optimal solution to a transshipment problem can be found by solving a transportation problem.
  • 19. The following steps describe how the optimal solution to a transshipment problem can be found by solving a transportation problem. Step 1 : If necessary, add a dummy demand point (with a supply of 0 and a demand equal to the problem’s excess supply) to balance the problem. Shipments to the dummy and from a point to itself will be zero. Let s= total available supply. Step 2 : Construct a transportation tableau as follows: A row in the tableau will be needed for each supply point and transshipment point, and a column will be needed for each demand point and transshipment point. Solving Transshipment Problems
  • 20. Each supply point will have a supply equal to it’s original supply, and each demand point will have a demand to its original demand. Let s= total available supply. Then each transshipment point will have a supply equal to (point’s original supply)+s and a demand equal to (point’s original demand)+s. This ensures that any transshipment point that is a net supplier will have a net outflow equal to point’s original supply and a net demander will have a net inflow equal to point’s original demand. Although we don’t know how much will be shipped through each transshipment point, we can be sure that the total amount will not exceed s.
  • 21. Transshipment Example Widgetco manufactures widgets at two factories, one in Memphis and one in Denver. The Memphis factory can produce as 150 widgets, and the Denver factory can produce as many as 200 widgets per day. Widgets are shipped by air to customers in LA and Boston. The customers in each city require 130 widgets per day. Because of the deregulation of airfares, Widgetco believes that it may be cheaper first fly some widgets to NY or Chicago and then fly them to their final destinations. The cost of flying a widget are shown next. Widgetco wants to minimize the total cost of shipping the required widgets to customers.
  • 22. Transportation Tableau Associated with the Transshipment Example NY Chicago LA Boston Dummy Supply Memphis $8 $13 $25 $28 $0 150 Denver $15 $12 $26 $25 $0 200 NY $0 $6 $16 $17 $0 350 Chicago $6 $0 $14 $16 $0 350 Demand 350 350 130 130 90 Supply points: Memphis, Denver Demand Points: LA Boston Transshipment Points: NY, Chicago The problem can be solved using the transportation simplex method
  • 23. Example - 1 General Motors produces cars at L.A. and Detroit and has a warehouse in Atlanta. The company supplies cars to customers in Houston and Tampa. The cost of shipping a car between points is given in table. (‘-’ means the shipment is not allowed) L.A. can produce as many as 1100 cars and Detroit can produce as many as 2900 cars. Houston must receive 2400 cars and Tampa must receive 1500 cars. Formulate a balanced transportation problem that can be used to minimize the shipping cost incurred in meeting demands at Houston and Tampa. Modify the answer to (a) If shipments between LA and Detroit are not allowed Modify the answer to (a) if shipments between Houston and Tampa are allowed at a cost of $5.
  • 24. Example - 1 - 0 121 109 89 Houston 0 - 82 117 210 Tampa 78 113 0 115 105 Atlanta 119 110 111 0 145 Detroit 225 90 100 140 0 L.A. Tampa Houston Atlanta Detroit L.A. From To ($)
  • 25. Example – 1a (answer) 100 5,500 6,400 4,000 4,000 4,000 4,000 0 0 M 82 117 210 Tampa 4,000 0 M 0 121 109 89 Houston 4,000 0 78 113 0 115 105 Atlanta 6,900 0 119 110 111 0 145 Detroit 5,100 0 225 90 100 140 0 L.A Dummy Tampa Houston Atlanta Detroit L.A.
  • 26. Example – 1b (answer) 100 5,500 6,400 4,000 4,000 4,000 4,000 0 0 M 82 117 210 Tampa 4,000 0 M 0 121 109 89 Houston 4,000 0 78 113 0 115 105 Atlanta 6,900 0 119 110 111 0 M Detroit 5,100 0 225 90 100 M 0 L.A Dummy Tampa Houston Atlanta Detroit L.A.
  • 27. Example – 1c (answer) 100 5,500 6,400 4,000 4,000 4,000 4,000 0 0 5 82 117 210 Tampa 4,000 0 5 0 121 109 89 Houston 4,000 0 78 113 0 115 105 Atlanta 6,900 0 119 110 111 0 145 Detroit 5,100 0 225 90 100 140 0 L.A Dummy Tampa Houston Atlanta Detroit L.A.
  • 28. Limitations of Transportation Problem One commodity ONLY: any one product supplied and demanded at multiple locations Merchandise Electricity, water Invalid for multiple commodities: (UNLESS transporting any one of the multiple commodities is completely independent of transporting any other commodity and hence can be treated by itself alone) Example: transporting product 1 and product 2 from the supply points to the demand points where the total amount (of the two products) transported on a link is subject to a capacity constraint Example: where economy of scale can be achieved by transporting the two products on the same link at a larger total volume and at a lower unit cost of transportation
  • 29. Limitations of Transportation Problem Difficult to generalize the technique to accommodate (these are generic difficulty for “mathematical programming,” including linear and non-linear programming Economy of scale the per-unit cost of transportation on a link decreasing with the volume (nonlinear and concave; there is a trick to convert a “non-linear program with a piecewise linear but convex objective function to a linear program; no such tricks exists for a piecewise linear but concave objective function) Fixed-cost: transportation usually involves fixed charges. For example, the cost of truck rental (or cost of trucking in general) consists of a fixed charge that is independent of the mileage and a mileage charge that is proportional to the total mileage driven. Such fixed charges render the objective function NON-LINEAR and CONCAVE and make the problem much more difficult to solve
  • 30. Assignment 1 A company must meet the following demands for a product: January 30 units; February, 30 units; March 20 units. Demand may be backlogged at a cost of Rs. 5 per unit per month. All demand must be met by the end of March. Thus, if one unit of January demand is met during March, a backlogging cost of 5 (2) = 10 is incurred. Monthly production capacity and unit production cost during each month are given in the table. A holding cost of Rs. 20 per unit is assessed on the inventory at the end of each month. Formulate a balanced transportation problem that could be used to determine, how to minimize the total cost (including backlogging, holding and production costs) of meeting demand. Use the transportation simplex to determine how to meet each month’s demand.
  • 31. Question 1… Rs. 410 35 March Rs. 420 30 February Rs. 400 35 January Unit production cost Production capacity Month
  • 32. Assignment - 2 Identify the limitations of transportation problem as discussed in the class. How can we overcome these limitations. Give one specific example. (within 350 words)