1. Experience
Selected works
Work Experience
GITAU JOHN
P.O Box 941
Ruiru
Cell:0712456399
g.huck@live.com
GITAU JOHN
P.O Box 941
Ruiru
Cell:0712456399
g.huck@live.com
2. Experience
Selected works
Work Experience
Project Experience
Loresho villas - Loresho Nairobi
City park Apartmaents-Parklands Nairobi
Shanzu Waterfront - Shanzu
Ravine Park Apartmants - Rhapta rd ,Westlands Nairobi
Terrace Close Apartmants - Terrace Close ,Westlands Nairobi
Karuri Residence - Karen Hills Housing Project, Karen Nairobi
Bros Portico Mall - Juba, South Sudan
George Residence - Kisii Town
Doris wambui residence - Ruiru
Thingira hotel - Ruiru
Kitengela Heights - Kitengela
Professional Experience
STUDIO ARCHITECTTO / ARCAID ARCHITECTS
Architectural Technitian
Utilize Architecture and Landscape Architecture principles/
Concepts on a daily basis in conduction with the interdisplinary team
Research into multiple Green/ Sustainable Materials and technologies
along with integration and coordination with overall project design and team.
Prepare and create all Technical and Coordination documents for integration of interdisciplinary team and
approval for construction process per code and development condotions.
Intergration and research of passive Housing techniques,Systems and materials
ELEGAN T PROPERTIES
Architectural Technitian
Utilize Architecture and Landscape Architecture principles/
Concepts on a daily basis in conduction with the interdisplinary team
Research into multiple Green/ Sustainable Materials and technologies
along with integration and coordination with overall project design and team.
Prepare and create all Technical and Coordination documents for integration of interdisciplinary team and
approval for construction process per code and development condotions.
Intergration and research of passive Housing techniques,Systems and materials
Communication and Organization of Future/ Client Developments
Educational Background
JANUARY 2009 - NOVEMBER 2011 : Student Undertaking Diploma in architecture
at Kenya Polytechnic University College
JANUARY 2006 - NOVEMBER 2007 : Student at Jamhuri High School -
C+ In KENYA CERTIFICATE OF SECONDARY EDUCATION
JANUARY 2004 - NOVEMBER 2005 : Student at Karima Boys High School -
Transferred
JANUARY 1998 - NOVEMBER 2003 : Student at Naivasha Boys Boarding School -
A in KENYA CERTIFICATE OF PRIMARY EDUCATION
JANUARY 1995 - NOVEMBER 1997 : Student at St. Brigids Primary School.
Transferred
Computer skills
Archicad
Autodesk Revit
Artlantis
3ds max
Re commendation
TA L I A N O L A N G (Principal Partner)
ODESEY INTERNATION LTD
0724840050
0724274139
NAIROBI
ARCH REUBEN KABBA U
DREAMS ARCHITECTS
P.O Box 52428 - 00200
NAIROBI
FERUZ ABUBAKAR
VERBATIM CONSORTIUM
0722654499
NAIROBI
4. Experience
Selected works
Email:info @artetoarch.co.ke
Work Experience
GSPublisherEngine 5.0.100.100
NOTES
1.This drawing is protected under the copyright act and cannot be used or
reproduced in part or in whole without authors consent
2.All dimensions to be checked on site,written rule over scaled
dimensions, any discrepancies to be reported to the architect before work
commences
3.All construction work to comply with the latest standard codes of
practice,local authority by-law and fire regulations
4.P.V. denotes permanent ventilation and must be provided above all doors
and windows where indicated or shown
5.All walls less than 200mm thick to be reinforced with hoop iron at every
alternate course
6.Water meter to be 300mm above g.l.
7.D.P.C. denotes one layer of bituminous felt to be provided under all walls
150mm above g.l.
8.All r.c. works to structural engineers details depth of foundation to be
determined on site and should not be less than 1200mm.provide one row of
600x600x50mm precast concrete paving slabs around the building unless
otherwise shown
9.Heavy duty polythene sheeting and anti termite treatment to be provided
under ground floor slab
10.Plinth level to be minimum 300mm from proposed parking level or ground
level
11.All surface beds to be cast on well compacted and well consolidated filling
12.Depth of foundation to be minimum 600mm below reduced ground level
13.All pipes and services to be 450mm minimum below reduced ground level
14.All inspection chambers within building area,drive way and parking areas to
be heavy duty ,double seal air tight covers.Drains under building ,drive way
and parking to be pvc pipes encased in 150mm concrete sorround
PR OPOSED BUILTUP AREA
REVISIONS ADDITIONS & ALTERATIONS
NO DATE DESCRIPTION BY
CONSULTA NTS
DOR IS W A MBUI MWANGI
PR OJECT
Drawing type
DESIGN AND DRAWN
GHETAO J.H (g.huck@live.com)
CHECK ED REG .NO SIGN
01 DRAWING NO SCALE DA TE N.T.S
1 :100
FEB 2014
CLIENT
Client Signature
Contacts :0712456399
PR OPOSED RESIDE NT IAL HOUSE
on p lot no. L .R . RUIR U/ R UIRU
WEST BLOCK 4 /91
1
2
3
4
5
6
A/8
3,700 800 200 3,300 200 700
A A
200 2,800 200 1,000 200 3,500 200
200 2,500 200 3,500 200
200 4,800 200
PV
B 200 1,200 200 1,900 200
B
C C
1
2
3
4
D D
E E
200 3,300 200 3,600 200 1,200 100
200 3,500 200
PANTRY
ff tiles
200 4,000 200
200 4,800 200 3,300 200
F - 150
F
PV
G G
1
1
2
2
3
3
4
4
5
6
A/8
11,900
F
RG
1,700 1,300 3,700 3,500 700 1,000
A A
200 2,000 200 1,300 200 3,300 200 1,400 200
B B
WC/SH
C WC/SH
ff tiles ff tiles
C
PV
1
2
3
4
5
6
D D
E E
2 3
ff tiles PV
F F
G G
1
2
3
4
5
18 x 167 = 3,000
7
8
9
10
11
12
13
14
15
16
17
18
5
1,525 1,500 1,775 350 2,500 350 500 1,000 1,000 375 1,800 375 1,350
200 4,600 200 2,800 200 1,700 200 600 200 2,150 200 1,150 200
1,100 3,800 1,500 1,500 1,500 5,000
14,400
400 1,000 200 6,700 2,700 550 350
200 1,400 200 6,300 200 2,500 200 700 200
1,700 1,300 3,700 3,500 700 1,000
11,900
1,000 375 1,800 375 2,950 1,000 1,500 500 1,525 1,500 1,875
200 800 200 2,150 200 2,750 200 2,800 200 4,700 200
1,100 3,800 1,500 1,500 1,500 5,000
14,400
400 1,000
200
1,300 2,200 200 1,300 200 3,500 250 1,000 350
200 1,400
200
1,100 200 2,000 200 1,300 200 3,300 200 1,400 200
200 6,100 200 2,800 200
200 1,700 200 4,300 200
200 4,800 200
A/8
A/9
A/9
PV
PV
PV
PV PV
PV
PV
PV
PV
PV
PV
BEDROOM
ff tiles
BEDROOM
ff parquet
BALCONY
PV
PV
PV
PV
PV
200 1,400 200 6,300 200 2,600
5
18 x 167 = 3,000
2 3
5
100
3,700 800 200 3,300 200 700
100
3,700 800 200 3,300 200 700
100
9,000
6,300 1,500 1,200 7,900
5,200 200 3,400 200 2,800 200 4,700 200
3,600 3,800 1,500 1,500 1,500 5,000
16,900
700 1,500 500 1,500 1,500 2,700 800 200
200 4,800 200 3,300 200 700
1,300 3,700 3,500 700
200 3,700 1,500 1,900 3,200 500 1,000 2,800 1,500 600
200 3,300 200 3,600 200 2,800 200 2,500 200 3,500 200
3,600 3,800 1,500 1,500 1,500 4,900
9,450
16,900
200 5,000 3,600 200
200 4,800 200 3,300 200
PV PV
PV
PV
PV
PV
PV
PV
BEDROOM
ff tiles
SUNKEN LOUNGE
ff parquet
WC/SH
ff tiles
DINING ROOM
ff parquet
PV
PV
PV
FOYER
ff tiles
PV
PV
PV
PV
PV
PV
PV
PV
PV
PV
PV
PV
PV
DECK
ff tiles
KITCHEN
ff tiles
1
2
3
A/8
A/9
A/9
ELEVATION 01
SCALE 1:100
STEEL C ASEMENT WINDOWS
TO WINDOW & DOOR SCHEDULE
RANDOM RUBBLE CLADDING
TO ARCHITECTS APPROVAL .
COLOURED CONCRETE ROOFING TILES
ON TIMBER TRUSS MEMBERS TO S.E DET
225 X 25mm TIMBER FASCIA BOARD
FINISHED & PAINTED TO ARCHITECT S
APPROVAL
200 mm THICK MEDIUM SIZE MACHINE CUT
MASONRY STONES PLASTERED & PAINTED
TO ARCHITECTS APPROVAL.
YELLOW BUSH HAMMERED STONE
TO ARCHITECTS APPROVAL .
STEEL CASEMENT WINDOWS
TO WINDOW & DOOR SCHEDULE
PV
PV PV
PV
PV PV
PV
ELEVATION 02
SC ALE 1:100
RANDOM RUBBLE CL ADDING
TO ARCHITECT S APPROVAL .
COLOURED CONCRETE ROOFING TILES
ON TIMBER TRUSS MEMBERS TO S.E DET
225 X 25mm TIMBER FASCIA BOARD
FINISHED & PAINTED TO ARCHITECTS
APPROVAL
200 mm THICK MEDIUM SIZE MACHINE CUT
MASONRY STONES PLASTERED & PAINTED
TO ARCHITECT S APPROVAL.
STEEL CASEMENT WINDOWS
TO WINDOW & DOOR SCHEDULE
YELLOW BUSH HAMMERED STONE
TO ARCHITECT S APPROVAL .
PV
PV PV PV
PV
ELEVATION 03
SC ALE 1:100
RANDOM RUBBLE CLADDING
T O ARCHITECTS APPROVAL .
COLOURED CONCRETE ROOFING TILES
ON TIMBER TRUSS MEMBERS TO S.E DET
225 X 25mm TIMBER FASCIA BOARD
FINISHED & PAINTED TO ARCHITECTS
APPROVAL
200 mm THICK MEDIUM SIZE MACHINE CUT
MASONRY STONES PL ASTERED & PAINTED
T O ARCHITECTS APPROVAL.
YELLOW BUSH HAMMERED STONE
T O ARCHITECTS APPROVAL .
PV
PV
PV
ELEVATION 04
SCALE 1:100
RANDOM RUBBLE CLADDING
TO ARCHITECTS APPROVAL .
COLOURED CONCRETE ROOFING TILES
ON TIMBER TRUSS MEMBERS TO S.E DET
225 X 25mm TIMBER FASCIA BOARD
FINISHED & PAINTED TO ARCHITECTS
APPROVAL
200 mm THICK MEDIUM SIZE MACHINE CUT
MASONRY ST ONES PL ASTERED & PAINTED
TO ARCHITECTS APPROVAL.
YELLOW BUSH HAMMERED STONE
TO ARCHITECTS APPROVAL .
PV PV
PV
PV
PV
PV
PV
15,400
30,800
TO SEPTIC
TANK
SOAK PIT
IC IC IC IC
IC
IC
IC
OFF KIAMBU RUIRU ROAD
WAMBUI RESIDENCE
5. NOTES
1.This drawing is protected under the copyright act and cannot be used or
reproduced in part or in whole without authors consent
2.All dimensions to be checked on site,written rule over scaled
dimensions, any discrepancies to be reported to the architect before work
commences
3.All construction work to comply with the latest standard codes of
practice,local authority by-law and fire regulations
4.P.V. denotes permanent ventilation and must be provided above all doors
and windows where indicated or shown
5.All walls less than 200mm thick to be reinforced with hoop iron at every
alternate course
6.Water meter to be 300mm above g.l.
7.D.P.C. denotes one layer of bituminous felt to be provided under all walls
150mm above g.l.
8.All r.c. works to structural engineers details depth of foundation to be
determined on site and should not be less than 1200mm.provide one row of
600x600x50mm precast concrete paving slabs around the building unless
otherwise shown
9.Heavy duty polythene sheeting and anti termite treatment to be provided
under ground floor slab
10.Plinth level to be minimum 300mm from proposed parking level or ground
level
11.All surface beds to be cast on well compacted and well consolidated filling
12.Depth of foundation to be minimum 600mm below reduced ground level
13.All pipes and services to be 450mm minimum below reduced ground level
14.All inspection ch ambers within building area,drive way and parking areas to
be heavy duty ,double seal air tight covers.Drains under building ,drive way
and parking to be pvc pipes encased in 150mm concrete sorround
PROPOSED BUILTUP AR EA
REVISIONS ADDITIONS & ALTERATIONS
NO DATE DESCRIPTION BY
Experience
CONSULTA NTS
Selected works
PR OJECT
Email:info @artetoarch.co.ke
Work Experience
GSPublisherEngine 5.0.100.100
PR OPOSED RESIDENT IAL HOUSE
on plot no. L.R. RUIRU/RUIRU
W EST BL OC K 4/91
Drawing type
DESIGN AND DRA WN
GHETAO J.H (g.huck@live.com)
CHECKED REG .NO SIGN
02 DRA WING NO SCALE DATE N.T.S
1 :100
FEB 2014
CLIENT
Client Signature
Contacts :0712456399
DORIS WA MBUI MWA NGI
A
A
B
B
C
C
D
D
E
E
F
F
G
G
4,900 1,500 1,500 1,500 3,800 3,600
3,000 2,700
WALL CLADDED TO ARCHITECTS
APPROVAL
PORTUGUESE CLAY ROOFING TILES
ON TIMBER TRUSS MEMBERS TO S.E
DETAILS
225 X 25mm TIMBER FASCIA BOARD
FINISHED & PAINTED TO ARCHITECTS
APPROVAL
ROOF LEVEL
FIRST FLOOR LEVEL
GROUND FLOOR LEVEL
PV PV PV PV PV
PV PV PV PV
PV PV PV PV
PURPOSE MADE S TEEL CASEMENT
WINDOWS TO WINDOW & DOOR
SCHEDULE
PURPOSE MADE SLIDDING
DOOR TO WINDOW & DOOR
SCHEDULE
RC STAIRCASE TO S.E DET
18 RISERS@150MM
TREADS@300MM
150 mm THICK R.C FLOOR SLAB ON
1000g D.P.M TREATED WITH ANTI-TERMITE
SOLUTION ON HARDCORE & BLINDING
LAYER TO S.E DETAILS.
600X 200 mm R.C STRIP FOUNDATION
FOO TING ON BLINDING LAYER &
FOUNDATION DEPTH TO BE
DETERMINED ON SITE TO S.E DETAILS.
5
5
4
4
3
3
2
2
1
PV PV
1
700 3,500 3,700 1,300
3,000 2,700 1,900 2,100
ROOF LEVEL
FIRST FLOOR LEVEL
GROUND FLOOR LEVEL
PV
PORTUGUESE CLAY
ROOFING TILES
ON TIMBER TRUSS
MEMBERS TO S.E
DETAILS
225 X 25mm TIMBER FASCIA
BOARD
FINISHED & PAINTED TO
ARCHITECTS
APPROVAL
WATER TANK LEVEL
PV
PV PV
TOP ROOF LEVEL
POSITION OF COLD WATER TANKS ON
APPROVED TIMBER SUPPORTS TO S.E
DETAILS & TANKS CAPACIT Y TO M.E
SPECIFICATION.
PURPOSE MADE STEEL CASEMENT
WINDOWS TO WINDOW & DOOR
SCHEDULE
150 mm THICK R.C FLOOR SLAB ON
1000g D.P.M TREATED WITH ANTI-TERMITE
SOLUTION ON HARDCORE & BLINDING
LAYER TO S.E DETAILS.
600X 200 mm R.C STRIP FOUNDATION
FOOTING ON BLINDING LAYER &
FOUNDATION DEPTH TO BE
DETERMINED ON SITE TO S.E DETAILS.
RC STAIRCASE TO S.E DET
18 RISERS@150MM
TREADS@300MM
600 600 900 600 600
450
2,400 200
100 100
530 EQ EQ EQ EQ EQ
2,700
3,300
750
165 100 50
485
600
50
640
Extra space to receive a fixed varvished mdf panel to
18mm thick post-formed laminated mdf doors to
20mm dia chrome pipe hanging rail
Door pull handles to schedule
approval.
Mirror fixed on the back side
of door to architect's approval
2no. drawer on unitson rollers,
consisting of 25mm softwood
sides and mdf bottom with 18mm
thick mdf front
Shoe rack to approval
100x12mm skirting
approval.
20mm thick shelving
ELEVATION 01
LOCATION: Bedroom (guest)
Scale 1:25
Light fitting with a pull switch to Eng's details.
Mirror fixed to wall with foam backing to approval
1,200 900 1,200
2,400 200
2,400 200
100 100
100 100
2,700
2,200
L[76]05
550 550 550 550
2no. drawer on unitson rollers,
consisting of 25mm softwood
sides and mdf bottom with 18mm
thick mdf front
Extra space to receive a
fixed varvished mdf panel
to approval.
18mm thick post-formed
laminated mdf doors to
approval.
20mm thick shelving
20mm dia chrome
pipe hanging rail
Door pull handles to
schedule
Mirror fixed on the back side
of door to architect's approval
2no. drawer on unitson rollers,
consisting of 25mm softwood
sides and mdf bottom with 18mm
thick mdf front
100x12mm skirting
Shoe rack to approval
LOCATION: Bedroom 2
600
3,300
20mm dia chrome pipe
hanging rail
Shoe rack to det
18mm thick post-formed
laminated mdf doors to approval.
6. LOCATION: Bedroom (guest)
2,200
550 550 550 550
600
01
2no. drawer on unitson rollers,
consisting of 25mm softwood
sides and mdf bottom with 18mm
thick mdf front
20mm dia chrome pipe
hanging rail
Shoe rack to det
7. Scale 1:25
18mm thick post-formed
laminated mdf doors to approval.
LOCATION: Bedroom 2
GSPublisherEngine 0.0.100.100
F1 D
10 800 1000 800 1400
3000 1850 1500 3600 100 F 22500 1.5 800 1800 5600
B
NO. OF
PERSONS
2
2
200 800 200 D 200 800 200
A
A A
B
F1
200 600 200
200
500 200
300
F2
600x450mm MH cover frame
GL GL
E
500
3M
VARIES (3-6M)
150
100 600 150
A 100 B 100 C
Invert level of
incoming drain
125mm RC cover slab
to engineer's detail
600x450mm cover
and frame
Sub-soil drain
190mm thick masonry
stone wall with 10mm
rendering to approval
150mm rc cover slab
150mm thick base slab
600x450mm cover
and frame
140mm thick
masonry wall
1:3:6 conc.
200mm dia. stone blocks
for loose ground or where
specified
12mm dia. ms bars
at 150mm
c/c bothways
Outlet
manhole
Inlet
manhole
TWL
10mm water proofing
rendering to approval
Section A-A
SEPTIC TANK DETAILS
Floor plan
Section B-B
B
SOAK PIT
Floor plan
1.Soak pits o be used
on soils with good absorption
eg sand,red soil etc
2.Depth to be specified
NB.
E A C
B 6000
3000
1400
C
1200
E
3600
F2
800 20 2 1400 1200 1400 1500
1400 4000 2000 2 D
1500 1400
12000
30
DIMENSIONS IN MM
40 800 1600
3000
1400 4000 2400 2 E
1500 1300
15000 50 800
1600
2800
800 1400
CAPACITY
IN
LITRES
8600 3600 1.5 G
1500 1200
45000
DESLUDGING
INTERVAL
(YEARS)
1800 3600 1200
200 800 5600 2040
1500
1000
H 67500 300 7600 3800 4000 2260 1500 11600
I 90000 400 8800 4400 13400 4600
2380
1.5 800
1500 1.5 800
inlet
Typical section
9000
TYPE
WAMBUI RESIDENCE
13. Experience
Selected works
Work Experience
A 2
1,200 800 2,000 1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000
200 1,000 200 1,800 200 6,050 100 2,300 100 3,700 100 2,400 100 6,750 200 1,800 200
W 4 W7 W4 swp
Clk rm wc
Clk rm (ff.cer.tiles)
worktop worktop
F
arch
300 3,600 300
200
W2
600 100 1,900 100 1,500 100
D 2-pv
Lift
Shaft
Dhobi
W 2
Clk rm
(ff. cer.tiles)
Dining
ff.cer.tiles
sh
Clk rm
A B C D E F G H I J K L
1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000
1,200 500 1,200 1,800 1,200 2,000 600 1,650 1,200 1,350 600 1,275 750 2,275 1,200 2,600 1,200 600
(ff.cer.tiles)
worktop worktop
F
Clk rm
4,900 100 1,100 100 600 1,200 600 100
1,200 6,600
W 3 W3
2,050
100
D4-pv
200 3,100 200 2,450 100 2,950 200 1,800 200 7,800 200 3,800 200
22 x 152 = 3,350
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
W DR
L
L
L
L
L
L
L
L
L
25,200
600 100 1,900 100 1,500 100 1,100 100
Clk rm
Clk rm
3,300 200 5,350 100 2,300 100 2,300 100 5,250 200 1,800 200 1,800 200
23,200
20,100
L
L
200 1,000 200 6,050 100 2,300 100 3,700 2,500 100 6,750 200 1,800 200 600 200
1,640 2,760 500 1,775 300 1,750 300 1,775 500 4,400 3,500 1,400
3,900 1,200 1,800 1,200 900 600 3,100 600 1,100 750 2,800 750 500 2,000 2,000
4,400 1,900 2,600 500 1,600 4,400 200 4,700
1,000 3,600 1,400 200 4,700
300
200 4,200 200 1,500 200 2,900 200 1,600 200 2,050 100 2,050 200 4,500 200
500 3,600 1,000 1,000 300 200 300 3,600 300
2,850 100 1,250
200 1,000 200 1,900 200 2,450 100 1,400 100
1,200 200 1,800 200 1,200 200 1,000
200 1,250 2,100
200 600 200 4,200 200 6,400 200 4,200 200 4,500 200 600 200
200 3,800 200
1,250
100
3,150
4,400 4,800 1,200 600 4,400 4,700
1,750 100 300 1,000
1,200
6,600
1,400 1,000 1,200 600
100 600 1,300 1,200
600 600 1,000 450
1,600 100 2,000
1,550 400 900
20,300
x x
01
02
03
04
wc
whb
sh
wrd
wardrobe
sink
dhobi sink
fridge
cooker
Ensuite
Bedroom
Ensuite
Bedroom
Lift Shaft
Kitchen
Dhobi
Pantry
Sitting Room
Ensuite
Bedroom
Master
Bedroom
walk in closet
whb
wc
sh
whb
ff.cer.tiles
ff.cer.tiles
ff.cer.tiles
(ff.cer.tiles)
ff.cer.tiles
(ff.cer.tiles)
arch
arch arch
GROUND FLOOR
W 4
W1
D1-pv
Lobby
ff.cer.tiles
pcc vents
Balcony
Balcony
ic
ic
ic
ic
ic
ic
gt
ic
gt
To Bio-Digester/
Treatment Plant
shelves
3
1
2
3I
4
5
6
C 1 F1 H1
island
wc
sh
Balcony
D2-pv
D2-pv
D2-pv
D3
D 2-pv D2-pv
D3
whb
D4-pv
D6-pv
Clk rm
(ff.cer.tiles)
wc
arch arch arch
W2
W 2
W4 W5
W3 W3
vents vents vents vents
3
W3 W3
W 4
W4
ic
W5 W5
arch
bath tub
D2-pv
W7
ic
gt
Elec Duct
Lobby
sh
(ff.cer.tiles)
(ff.cer.tiles)
D4-pv
arch
Foyer
ff.cer.tiles
Dining
ff.cer.tiles
D3
Void Above
Void Above
Void Above
arch
D7-pv
wrd
tv
ac
ac
tv
tv
ac
tv
ac tv
ac
tv
dryer washer
ac
wardrobe
wardrobe
wardrobe
22 x 152 = 3,350
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
W DR
L
L
L
L
L
x x
01
02
03
04
1,200 600 1,600 1,400 1,200 1,300 600 2,800 600 1,100 750 2,800 750
500
850 1,150 4,000
1,100 200 1,800 1,300 1,200 1,800 1,200 1,450
600
1,400 1,200 1,350
600
1,275 750 2,275 1,200 2,600 1,200 600 2,000
1,640 2,760 500 1,775 300 1,750 300 1,775 500 3,000 1,200 1,400 2,100 1,400
200 4,200 200 6,400 200 4,200 200 4,500 200
200 1,000 200 5,450 100 2,300 100 2,300 100 5,250 200 1,800 200 3,800 200
6,300 200 2,400 200
200 4,200 200 4,600 200 1,000 200 4,800 200 4,500 200
500 3,600 700 1,000 600
4,400 4,800 1,800 4,400 4,700
100
1,750 100 300 1,000
4,900 100 1,100
100
600 1,200 600 100
1,600 100 2,000
2,850 100 1,250
1,450 100 400 900
1,250 100 3,150
20,300
800 25,200
600 1,400 1,000 1,200 600
600 1,300 1,200 1,250 600
200 1,800 200 3,100 200 2,450 100 3,150 1,800 200 7,800 200 5,800
1,200 6,600
Ensuite
Bedroom
Master
Bedroom
ff.cer.tiles ff.cer.tiles
arch
FIRST FLOOR
pcc vents
Balcony
Balcony
Balcony
swp
wp
swp
wp
A B C D E F G H I J K L
C 1 F 1 H 1
fridge
cooker
Kitchen
(ff. cer.tiles)
island
sink
dhobi sink
shelves
D2-pv
vents
W1
Pantry
walk in closet
whb
wc
sh
whb
(ff.cer.tiles)
D2-pv
D3
bath tub
D 2-pv
Lobby
sh
D3
D 6-pv
W3 W 3
W 5
W 3 W 3
Elec
Duct
wc
whb
sh
wardrobe
Ensuite
Bedroom
Ensuite
Bedroom
ff.cer.tiles
ff.cer.tiles
D2 -pv D2-pv
D 3
D4 -pv
W 3 W3 W4 W4 W 5 W 5
swp
vents
D 1- pv
Lobby
ff.cer. tiles
Foyer
ff.cer.tiles
arch
arch arch arch
arch
D4-pv
D4-pv
Sitting Room
ff. cer.tiles
1
2
3 I
4
5
6
A 1
A 4
A 3
Void
Below
Void
Below
Void
Below
wc
whb
( ff.cer. tiles)
D7-pv
tv
ac
ac
tv
tv
ac
tv
ac tv
ac
dryer washer
ac
tv
wardrobe
wardrobe
wardrobe
A B C D E F G H I J K L
1,200 800 1,200 800 1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000
200 1,000 200 8,450 100 3,700 100 2,400 100 6,750 200 1,800 200
1,200 4,050 750 600 750 600 750 1,450 1,200 1,350 600 1,275 750 2,275 1,200 2,600 1,200 600 850 1,150
L
swp 1
1,600 100 2,000
3,150
Clk rm
(ff.cer.tiles)
100 3,100 100 2,450 2,600 100 1,100 100 600 1,200 600 100
arch
worktop worktop
D2-pv
W 2
Dining
ff.cer.tiles
D4-pv
x x
L
pcc vents
Clk rm
(ff.cer.tiles)
sh
Clk rm
Sitting Room
ff.cer.tiles
A B C D E F G H I J K L
C 1 F 1 H 1
Dhobi
2,000 1,200 800 1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000
200 1,000 200 6,050 100 2,300 100 3,700 100 2,400 100 6,750 200 1,800 200
swp swp 1
Clk rm wc
Clk rm (ff.cer.tiles)
worktop worktop
22 x 152 = 3,350
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
F
W DR
L
L
L
L
L
L
L
L
L
arch
1,250 2,100 1,250 200 2,100 3,900
W2 Pantry
D2 -pv
D4 -pv
Dining
ff.cer.tiles
x x
01
1,200 6,600
825 100 1,250
100
02
03
04
1,200 1,300 1,200 1,800 1,200 1,200
600
1,650 1,200 1,350
600
1,275 750 2,275 1,200 2,600 1,200 600 2,000
2,150 300 1,900 550 1,775 300 1,750 300 1,775 500 4,200 200 2,100 300 2,100 200
4,750 600 100 1,900 100 1,500 100
Clk rm
(ff.cer.tiles)
sh
Clk rm
900 1,200 1,400 1,200 1,250 600 2,850 600 1,100 750 2,800 750 500 2,000 6,000
200 5,350 100 2,300 100 2,300 100 5,250 200 1,800 200 5,800 200
1,600 1,400 1,600 4,700
600
4,600 1,700 2,600 500 1,000
200 4,200 200 4,600 200 6,000 200 4,500 200
Dhobi
200 3,100 200 2,450 100 2,950 200 1,800 200 7,800 200 3,800 4,000 200
4,400 4,800 1,800 4,400 4,700
100
1,750 100 300 1,000
4,900 100 1,100
100
600 1,200 600 100
1,600 100 2,000
1,250 100 3,150
600 1,400 1,000 1,200
600 1,300 1,200 1,250 600
825 100 1,000
1,550 400 900
25,200
200 4,150 250 6,400 200 4,200 200 4,500 200
20,300
arch
Lift
Shaft
SECOND FLOOR
pcc vents
Balcony
Balcony
Balcony
swp
wp
2
3
4
5
6
wp
Ensuite
Bedroom
Master
Bedroom
ff.cer. tiles ff.cer.tiles
fridge
cooker
Kitchen
(ff.cer.tiles)
island
sink
dhobi sink
shelves
D2- pv
walk in closet
whb
wc
sh
whb
(ff.cer.tiles)
D2- pv
D3
bath tub
D2 -pv
Lobby
sh
D3
D6-pv
vents
arch
arch arch
A 2
A 1
A 4
arch
A 3
wc
whb
sh
wardrobe
Ensuite
Bedroom
Ensuite
Bedroom
ff.cer.tiles
ff.cer. tiles
D2 -pv D2- pv
D 3
D4 -pv
W 3 W3 W4 W4 W 5 W 5
swp
D4 -pv
wc
whb
(ff.cer. tiles)
D7 -pv
Elec
Duct
Sitting Room
ff.cer.tiles
W 4 W 7 W 4
W 3 W3
W5
W3 W 3
D1-pv
W 1 W 2
tv
ac
ac
tv
tv
ac
tv
ac tv
ac
dryer washer
ac
tv
wardrobe
wardrobe
wardrobe
22 x 152 = 3,350
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
F
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
W DR
L
L
01
02
03
04
05
1,640 2,760 6,800 1,966 300 1,934 2,860 2,040
900 1,200 1,400 1,200 1,300 600 2,800 600 1,100 750 2,800 750 300 200 1,800 200 6,000
200 5,350 100 2,300 100 7,650 200 1,800 200 5,800 200
4,600 1,700 2,600 500 1,000 600 3,000 1,400 200 4,700
200 3,100 200 1,750 100 3,650
200 6,400 200 4,200 200
825 100 1,000 100 825 100
600 100 1,900 100 1,500 100
600 1,400 1,000 1,200 600 200 1,600 100
200 1,750 100 600 1,250 1,950 1,250 600 200
1,250 100 3,150
200 4,200 200 6,400 200 4,200 200 4,500 200
20,300
1,550 400 900
200 4,200 200 4,600 200 1,600 200 4,200 200 4,500 200
25,200
4,400 4,800 1,800 4,400 4,700
arch
Lift Shaft
PENT HOUSE LOWER FLOOR
Balcony
Balcony
Balcony
swp
wp
2
3
4
5
6
wp
wc
whb
sh
wardrobe
Ensuite
Bedroom
Ensuite
Bedroom
ff. cer.tiles
ff.cer.tiles
D2-pv D 2-pv
D3
D4-pv
W3 W3 W 4 W 4 W5 W5
swp
C1 F1 H1
A2
A 1
A 4
A3
fridge
cooker
Kitchen
(ff.cer.tiles)
island
sin
k
dhobi sink
shelves
D 2-pv
Pantry
vents
arch
arch
arch
arch
Ensuite
Bedroom
ff.cer.tiles
walk in closet
wc
whb
D 2-pv
bath tub
Lobby
sh
D3
D6- pv
Study
arch
wc
whb
(ff.cer.tiles)
D7-pv
W7
W4 W 5
W3
W 5 W 5 W 5
W 3
D1-pv
W1
W2
D4-pv
tv
ac
ac
tv
tv
ac
tv
ac tv
ac
dryer washer
ac
Elec
Duct
wardrobe
wardrobe
GENERAL NOTES
1.This drawing is protected under the copyright act and cannot be
used or reproduced in part or in whole without authors consent
2.All dimensions to be checked on site,written rule over scaled
dimensions, any discrepancies to be reported to the architect before
work commences
3.All construction work to comply with the latest standard codes of
practice,local authority by-law and fire regulations
4.P.V. denotes permanent ventilation and must be provided above all
doors and windows where indicated or shown
5.All walls less than 200mm thick to be reinforced with hoop iron at
every alternate course
6.Water meter to be 300mm above g.l.
7.D.P.C. denotes one layer of bituminous felt to be provided under all
walls 150mm above g.l.
8.All r.c. works to structural engineers details depth of foundation to
be determined on site and should not be less than 1200mm.provide
one row of 600x600x50mm precast concrete paving slabs around the
building unless otherwise shown
9.Heavy duty polythene sheeting and anti termite treatment to be
provided under ground floor slab
10.Plinth level to be minimum 300mm from proposed parking level
or ground level
11.All surface beds to be cast on well compacted and well consolidated
filling
12.Depth of foundation to be minimum 600mm below reduced ground
level
13.All pipes and services to be 450mm minimum below reduced
ground level
14.All inspection chambers within building area,drive way and
parking areas to be heavy duty ,double seal air tight covers.Drains
under building ,drive way and parking to be pvc pipes encased in
150mm concrete sorround
REVISIONS ADDITIONS ALTERATIONS
NO DATE DESCRIPTION BY
CONSULTANTS
client
client signature
project
PROPOSED APARTMENTS ON
PLOT No. MN/ I /16633
SHANZU,MOMBASA
drawing type
DESIGN DRAWN BY
floor plans
CHECKED REG NO. SIGN
JOB NO. DRAWING NO . SCALE DATE
1: 100
Dec 2012 20 -12 -01
SHANZU WATERFRONT
14. Experience
Selected works
Work Experience
pcc coping on 900mm high parapet wall
pcc coping on 900mm
high parapet wall
pcc coping on 900mm high parapet wall
300 3,350 3,350 3,350 3,350 3,350
pcc vents
sliding windows to schedule
ground floor level
ground level
pv pv
pv
pv
FRO NT ELEVATION 01
Terrace Level
Terrace Level
Upper Pent House Floor
Lower Pent House Floor
Second Floor
First Floor
Upper Pent House Floor
Lower Pent House Floor
Second Floor
First Floor
Ground Floor
pv
pv
pv pv
3,350 3,350 3,350 3,350 3,350
pcc coping on 900mm
high parapet wall
top hang windows to schedule
ground floor level
ground level
water tanks
pv pv
pv pv
pv pv
pv pv
SIDE ELEVATION 02
Ground Floor
pv pv pv pv
pv pv pv pv
pv pv pv pv
pv pv pv pv
pcc coping on 900mm high parapet wall
pcc coping on 900mm
high parapet wall
sliding door to schedule
ground floor level
ground level
pv pv
pv
pv
pv pv
pv pv pv
pv pv
pv
pv
pv pv pv
pv
pv
pv
REAR ELEVATION 03
pcc coping on 900mm high parapet wall
pcc coping on 900mm
high parapet wall
ground floor level
ground level
pv pv pv
pv pv pv
pv pv pv
pv pv pv
SIDE ELEVATION 04
GENERAL NOTES
1.This drawing is protected under the copyright act and cannot be
used or reproduced in part or in whole without authors consent
2.All dimensions to be checked on site,written rule over scaled
dimensions, any discrepancies to be reported to the architect before
work commences
3.All const ruction work to comply with the latest standard codes of
practice,local authority by-law and fire regulations
4.P.V. denotes permanent ventilation and must be provided above all
doors and windows where indicated or shown
5.All walls less than 200mm thick to be reinforced with hoop iron at
every alternate course
6.Water meter to be 300mm above g.l.
7.D.P.C. denotes one layer of bituminous felt to be provided under all
walls 150mm above g.l.
8.All r.c. works to structural engineers details depth of foundation to
be determined on site and should not be less than 1200mm.provide
one row of 600x600x50mm precast concrete paving slabs around the
building unless otherwise shown
9.Heavy duty polythene sheeting and anti termite treatment to be
provided under ground floor slab
10.Plinth level to be minimum 300mm from proposed parking level
or ground level
11.All surface beds to be cast on well compacted and well consolidated
filling
12.Depth of foundation to be minimum 600mm below reduced ground
level
13.All pipes and services to be 450mm minimum below reduced
ground level
14.All inspection chambers within building area,drive way and
parking areas to be heavy duty ,double seal air tight covers.Drains
under building ,drive way and parking to be pvc pipes encased in
150mm concrete sorround
REVISIONS ADDITIONS ALTERATIONS
NO DATE DESCRIPTION BY
CONSULTANTS
client
client signature
project
PROPOSED APARTMENTS ON
PLOT No. MN/ I /16633
SHANZU, MOMBASA
drawing type
DESIGN DRAWN BY
elevations
CHECKED REG NO. SIGN
JOB NO. DRAWING NO. SCALE DATE
1:100 Dec 2012
20 -12 - 02
SHANZU WATERFRONT
15. PROPOSED BUILT UP AREA IN sq m .
10 blocks X 2,163.22
Experience
Selected works
Work Experience
B 1 B 2
23,200
20,100
Gym
Dustbin
Cubicles
200 1,000 200 8,450 100 5,050 200 7,800 200
750
600
750 3,400 750 2,350 8,000
W5 W 5 W5 W 5
bath tub
Wash Room
22 x 152 = 3,350
1
2
3
4
5
6
600
7
04
ff. cer.tiles
D2- pv arch
1,000 200 4,800 200
200
1,200 4,050 750
Master Bedroom
ff. cer.tiles
arch arch
D4-pv
WINDOW SCHEDULLE
x x
8
9
10
11
12
13
14
15
16
Lift
Shaft
17
18
19
20
21
22
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
L
L
L
L
L L
02
200 4,200 200 5,800 200 4,800 200 4,500 200
1,000 1,600 1,000 700 4,600
600 300
800 3,000 800 1,700 2,600 500 1,000
200 1,800 200 6,800 200 1,800 200 3,800 200 3,800 200 3,800 200
200 1,150 2,100 1,350
200 1,000 200 5,600 200 7,800
200
200 11,500 200 3,800 200 1,900 200 1,700 200
20,300
200 4,200 200 10,800 200 4,500 200
4,400 500 1,774 300 1,747 300 1,774 200 400 1,774 300 1,774 360 4,700
5,807 1,774 300 1,747 300 1,772 200 4,000 2,100 1,900
PENT HOUSE UPPER FLOOR
Open
Terrace
Balcony
Bar Area
pcc vents
Closet
Open
Terrace
wardrobe
wardrobe
Walk-in- closet
arch
ff.cer. tiles
D1-pv
D8 -pv
D2 -pv
D2 -pv D2-pv
arch arch
arch arch arch
arch arch
arch
wc
whb
sh
W1 W2
D4-pv
W 6
arch arch arch
W8
W8
ac
tv
ac
ac walkway
Elec
Duct
Aluminium framed Double Hung window
350 3,350 3,350 3,350 3,350 3,350
350 3,000 350 3,000 350 3,000 350 3,000 350 3,000 350 900
( MN/I/16633 )
9263 9264 9265
OCEAN
DOOR SCHEDULLE
300mm hollow pot rc. slab with 50mm cover
to str. eng's details
300mm hollow pot rc. slab with 50mm cover
to str. eng's details
150mm rc. slab to str. eng's details
900mm high balustrades
on rc stair to str. eng's details
pcc vents
Terrace Level
Upper Pent House Floor
Lower Pent House Floor
Second Floor
First Floor
floor slab with BRC mesh
on 50mm blinding
on well compacted hardcore Ground Floor
SEC TION X -X
HIGH OCEAN WATER MARK
1625
1085
1622
1623
1624
1086 1087
10002
10003
10004
10942
10943
9262
9266
9267
9268
4885
4886
4889
4890
MURRAM ROAD MURRAM ROAD
9127
8799 8802
8803
8801
8800
8804 8811 8812
8805
LOCATION PLAN (scale;; 1 :2500)
1,200
1,200
1,200
12,238
5,400
1,415
26,255 32,330
20,100
23,000
32,585
34,400 8,175
23,000
20,100
23,000
23,000
20,100
2,960
2,970
6,380
23,000
20,100
15,400
8,422
20,100
23,000
23,000
20,100
20,100
23,000
7,580
7,580
7,580
21,000
20,100
3,000
3,000
5,000 5,000 5,000 5,000 5,000 5,000
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
16° 15° 20°
18°
16°
16°
166°
166°
1 A
2 A 3 A 4 A
5 A
1 B
2 B 3 B
4 B
5 B
SITE PLAN( scale;; 1 : 500)
swimming pool
to later detail
landscaped garden
footpath
footpath
footpath
footpath
parking parking parking
parking
parking
parking
parking
parking parking
gate to
detail
B 3 B 4 B 5
B 6
B 7
192. 38M
89.07M
12.29M 27. 21M 57.83M
90. 96M
108.05M
sewer
treatment
plant D . S.Q
landscaped garden
PRIVATE
BEACH
PRIVATE
BEACH
Transformer,Generator
Switch room to
E .E.D' s
Guard
houseAdmin
Offices
GENERAL NOTES
1.This drawing is protected under the copyright act and cannot be
used or reproduced in part or in whole without authors consent
2.All dimensions to be checked on site,written rule over scaled
dimensions, any discrepancies to be reported to the architect before
work commences
3.All construction work to comply with the latest standard codes of
practice,local authority by-law and fire regulations
4.P.V. denotes permanent ventilation and must be provi ded above all
doors and windows where indicated or shown
5.All walls less than 200mm thick to be reinforced with hoop iron at
every alternate course
6.Water meter to be 300mm above g.l.
7.D.P.C. denotes one layer of bituminous felt to be provided under all
walls 150mm above g.l.
8.All r.c. works to structural engineers details depth of foundation to
be determined on site and should not be less than 1200mm.provide
one row of 600x600x50mm precast concrete paving slabs around the
building unless otherwise shown
9.Heavy duty polythene sheeting and anti termite treatment to be
provided under ground floor slab
10.Plinth level to be minimum 300mm from proposed parking level
or ground level
11.All surface beds to be cast on well compacted and well
consolidated filling
12.Depth of foundation to be minimum 600mm below reduced
ground level
13.All pipes and services to be 450mm minimum below reduced
ground level
14.All inspection chambers wi thin building area,drive way and
parking areas to be heavy duty ,double seal air tight covers.Drains
under building ,drive way and parking to be pvc pipes encased in
150mm concrete sorround
REVISIONS ADDITIONS ALTERATIONS
NO DATE DESCRIPTION BY
CONSULTANTS
client
client signature
project
PROPOSED APARTMENTS ON
PLOT No. MN/ I /16633
SHANZU,MOMBASA
drawing type
DESIGN DRAWN BY
site location plan
pent house upper floor section
CHECKED REG NO. SIGN
JOB NO. DRAWING NO . SCALE DATE
1:100
1.744Ha (approx)
440.08 sq m.
439.55 sq m.
442.85 sq m.
443.27 sq m.
397.47 sq m.
2,163.22 sq m.
21,632.2 sq m.
Dec 2012
20 -12 -03
existing main building
and pool for demolition
Plot Area
Apartments Blocks
Ground Floor
First Floor
Second Floor
Lower Penthouse
Upper Penthouse
TOTAL PER BLOCK
No. of Blocks
GENERAL TOTAL
D.S.Q Total
Guard House and Office Total
GYM Total
Power room Total
887.22 sq m.
24.40 sq m.
79.95 sq m.
82.58 sq m.
CODE SIZE( MM) DESCRIPTION
GRAND TOTAL 22,706.35 sq m. W 1
2000X 1500
Aluminium framed Sliding window
W 2
1000X 1500
Aluminium framed Sliding window
W 3
1200X 1500
Aluminium framed Sliding window
W 4
600X 1200
Aluminium framed Double Hung window
W 5
750X 2000
W 6
3000X 1500
Aluminium framed Sliding window
W 7
1200X 1600
Aluminium framed Double Hung window
W 8
1000X 1000
Aluminium framed Double Hung window
CODE SIZE( MM) DESCRIPTION
D1 - PV 2100X 2400
900X 2400
800X 2100
4200X 2400
6400X 2400
4500X 2400
1000X 2400
1800X 2400
Solid Panel h/ wood door
D2 - PV
D3
D4 - PV
D5 - PV
D6 - PV
D7 - PV
D8 - PV
Solid Panel h/ wood door
Solid Panel h/ wood door
Aluminium framed sliding door
Aluminium framed sliding door
Aluminium framed sliding door
H /wood framed with louvered panelled sliding door
Solid Panel h/ wood door
existing staff quarters
building for demolition
SHANZU WATERFRONT