3. Labor Missionaries followed the plans
• Increasing evidence that the labor missionaries and their
supervisors followed the plans will:
• Continue to unravel the various layers of deception and
misinformation
• Provide Church auditors with a clearer view of methods
and motives.
• Dispel the many enabling myths that have perpetuated
this fraud over 15 years.
• Require Beca to reciprocate with plan details and
pictures or retract
• Warrants a call to the CEO of Beca to voluntarily come
forward and make things right.
4. What of the plan details?
• The 10 seismic claims do not reference any related plan details or
pictures
• They are not specific to any particular location
• These unsubstantiated seismic assumptions have cast a wide net
over the David O McKay Building, the Temple and the Fosters Road
chapel
• They have become the basis of all past, present and future
decisions
• Including the already approved and planned $4 million expenditure
on the Temple and Fosters Road chapel.
• One positive result of the decision to demolish the school is that
these consulting companies will not enjoy their biggest pay day.
• The $60 million estimate to repair the David O McKay Building
5. Integrity
• These seismic claims are a summary of all of the reports
over a 15 year time span.
• They are broad and sweeping with little to no plan details
and pictures.
• The mounting evidence will expose the guilty parties to
the light of day
• The seismic claims are not tied to any code issues.
• Statements such as “the walls are not connected to the
foundations or the columns” are statements of assumed
fact.
• Our evidence turns these facts to fiction
6.
7.
8.
9.
10.
11.
12.
13. The labor missionaries followed the detailed plans and
strongly tied the gymnasium floors to the foundations.