Six Sigma DMAIC Project




                                                GEAE Account




                            Project Leader/Green Belt: Michael Spofford
                            Project Leader Title: Customer Engineer & Certified Green Belt
                            Project Start Date: November 11, 2001




Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                                         Technical Support Web Site
Customer Profile – 18,000-Seat Aircraft Engines Manufacturing and Service Company
                                                                                                Before Sigma =0.79
Business Problem & Impact
Searching for technical information at vendor sites is a long and
tedious process. GE ITS technicians experience a loss of
productivity due to the lack of centralization and non-digitization of
commonly used technical info.

Measure & Analyze
Data Collection: Cycle time and process steps when locating
technical info at vendor sites measured in Excel format by
GEAE technicians.
Root Causes: Long process steps , lack of centralization, and                                           New Sigma = +6
non standard practices were recognized as root causes.                                                         T                          USL


Improve & Control                                                                      10
                                                                                                                                  Units: 40
A web based tool was developed to centralize commonly
needed technical info and to standardize the practice of                                                                        Defects   0




                                                                           Frequency
locating these resources.                                                              5                    Opportunities per unit        1

 Results/Benefits                                                                                                                DPMO     0
 Process steps were reduced to < 3 when locating technical
                                                                                       0
 info reducing cycle time to 10.25 seconds with an
                                                                                            02 46 8 12 16
                                                                                                   10 14
 expected efficiency savings +8k (annually).                                                                       Total Time



                                A savings of US$8.8K in 2003!

More Related Content

More from Kevin Egan

Operating System Six Sigma Case Study
Operating System Six Sigma Case StudyOperating System Six Sigma Case Study
Operating System Six Sigma Case StudyKevin Egan
 
Pc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyPc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyKevin Egan
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudyKevin Egan
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudyKevin Egan
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case StudyKevin Egan
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelsonKevin Egan
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1Kevin Egan
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXNKevin Egan
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS OfferingsKevin Egan
 

More from Kevin Egan (9)

Operating System Six Sigma Case Study
Operating System Six Sigma Case StudyOperating System Six Sigma Case Study
Operating System Six Sigma Case Study
 
Pc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyPc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case Study
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case Study
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case Study
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelson
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXN
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS Offerings
 

Geae Tech Support Website Six Sigma Case Study

  • 1. Six Sigma DMAIC Project GEAE Account Project Leader/Green Belt: Michael Spofford Project Leader Title: Customer Engineer & Certified Green Belt Project Start Date: November 11, 2001 Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action Technical Support Web Site Customer Profile – 18,000-Seat Aircraft Engines Manufacturing and Service Company Before Sigma =0.79 Business Problem & Impact Searching for technical information at vendor sites is a long and tedious process. GE ITS technicians experience a loss of productivity due to the lack of centralization and non-digitization of commonly used technical info. Measure & Analyze Data Collection: Cycle time and process steps when locating technical info at vendor sites measured in Excel format by GEAE technicians. Root Causes: Long process steps , lack of centralization, and New Sigma = +6 non standard practices were recognized as root causes. T USL Improve & Control 10 Units: 40 A web based tool was developed to centralize commonly needed technical info and to standardize the practice of Defects 0 Frequency locating these resources. 5 Opportunities per unit 1 Results/Benefits DPMO 0 Process steps were reduced to < 3 when locating technical 0 info reducing cycle time to 10.25 seconds with an 02 46 8 12 16 10 14 expected efficiency savings +8k (annually). Total Time A savings of US$8.8K in 2003!