F hcom kaizenforms
1. B A S IC
K A IZ E N
TO O L S
1. TA R G E T P R O G R E S S R E P O R T
2. S T A N D A R D IZ E D W O R K S H E E T
3. T IM E O B S E R V A T IO N S H E E T
4. C YC L E T IM E / T A K T T IM E B A R C H A R T
5. YA M A Z U M I ( S T A C K ) C H A R T
6. S T A N D A R D IZ E D W O R K C O M B IN A T IO N
S HEET
7. C A P A C IT Y S H E E T
8. K A IZ E N P R O P O S A L S H E E T
9. K A IZ E N N E W S P A P E R
2. U s in g t h e
B a s ic K a iz e n
T o o ls
3
1 2
Calculate Takt Time. Pair up 2 for each process.
Identify problems. Observe site. One times w/ stopwatch, other
Set targets and enter on Identify Process. jots down times.
Target Progress Report Prepare Standardized Find best times.
Plan initiate Kaizen Work Sheet Verify if Cycle Time meets Takt
Workshop. Time.
4
5 6
If equipment seems to lack
Note long times on Combination Try out ideas for kaizen
in capacity, use Capacity
Sheet, there are opportunities for immediately, verify results.
Sheet to define problems.
Kaizen. Prepare Kaizen Proposal
Fill out Standardized Work
Continue to observe site, note Sheets for effective kaizen
Combination Sheet with best
problems on Kaizen Newspaper ideas.
times.
7 ∞
Update Kaizen newspaper. Kaizen EVERY
Update Target Progress
Report. DAY!!.
3. TA R G E T P R O G R E S S
REPORT
Department / Section / Site Date: ___/____/____/____/__________
Takt Time: _______________________
CATEGORY CURRENT TARGET DAY 1 DAY 2 DAY 3 DAY 4 FINAL RESULT % CHANGE
SPACE (sq. ft.)
INVENTORY
WALKING DISTANCE
MATERIAL TRAVEL DISTANCE
LEAD TIME (sec.)
CYCLE TIME (sec.)
OUTPUT (units / day)
CREW SIZE
PRODUCTIVITY
CHANGEOVER TIME (sec.)
REMARKS:
4. S T A N D A R D IZ E D W O R K DATE: _____/____/____
Process: __________________________ S HEET Approvals:
Part # ____________________________ Scope of
FROM:
Operation
Part Name: ________________________ TO:
SYMBOLS Quality Safety Standard Work Total Pcs of Std Takt Cycle Operators
NOTE: Takt Time, Work Sequence (same as numbers in “Step” column on BASIC
Check Precaution In Process Work in Process Time Time this op/line total
Combination Sheet), and numbers of Standard Work in Process must be
known to define Standardized Work. Identify all safety concerns, points where DATA
quality must be verified (go/no-go) and numbers of pieces of standard work in 1/
sec.
process using the symbols to the right.
5. Page _____ of _____
T IM E O B S E R V A T IO N S H E E T
Date / Time: ___/____/____/_________________:________
Line / Process: __________________________________________________
Observed by: _____________________________________
# Step 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Best Time Observations (changeover time)
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Complete Cycle Time
6. C y c l e Ty ci lmi m e / /a kTTa ekB t r CTairm len k Bh aat ) r C h a
C e T
e T t im a h t ( B a C r
C y c le T im e
1 2 3 4 5
6 7 8 9
P roc e s s
7. C y c le T im e / T a k t
T im e B a r C h a r t
( w iTime / G r Time BariChart
Cycle t h Takt a p h n g
1.2 F e a ture )
1 T /T
0.8
0.6
0.4
Cycle Time
0.2
0
1 2 3 4 5 6 7
Before
After Process
8. Y a mY a m azz uu imt aic k() Sh atr ta( B ca nk C)h a C) h a r t
a m (S C l k rt
C y c le T im e
1 2 3 4 5
6 7 8 9
P roc e s s
9. Ya m a z u m i ( S t a c k )
C h a r t ( w it h
G r a p h in g F e a t u r e )
Yamazumi (Stack) Chart
Task 1 Task 2 Task 3 Task 4 Task 5 Task 6
1
0.8 T /T
0.6
0.4
0.2
Cycle Time
0
1 2 3 4 5 6 7
Process
10. Operator _____ of _____
S T A N D A R D IZ E D
Line: ____________________________
WO R K Date: ______/______/_______ Quota / Shift: ____________ MANUAL:
AUTO:
Process: _________________________
C O M B I N A T I O N Section: __________________ Takt Time: ______________ sec. WALKING:
Time S HEET TIME (unit: 1 sec.)
Step Description
Man Auto Walk 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90
1
Waiting
Totals
11. Page ____ of ____
New / Revised as of (date): ___/___/___
Current Output
Authorizations: Part No. Line pieces
C A P A C IT Y Part Name
Max Output
pieces
Per Day
Workers
S HEET Base Times Tools
per Day Needed
Times: Manual
Machine
Step Description Capacity Remarks Automatic
ID Walking Time Manual Time Auto Run Time Completion Time Pieces/Run Change Time Time/Piece Walking
1
Subtotal NOTE
Update times when improvements are achieved through kaizen, and detail reasons for improvement in “Remarks” column.
Total
12. K A IZ E N P R O P O S A L S H E E T
Location Objective Date Operator
Before After
Problem Effects (cycle time / inventory / changeover time reduction,poka yoke etc.)
13. K A IZ E N N E W S P A P E R
TEAM: __________________________________ DATE: _______/_______/_______/___________
No. PROBLEM WHO BY WHEN CHECK
14. Kaizen License
[ N a m e o f R e c ip ie n t ]
改 In recognition of your earnest efforts to learn and
practice kaizen during the [XXX] Kaizen
Workshop held at [XXX] factory during the week
善
of [Date], you have been granted this license to
practice kaizen daily in accordance with the
principles of Just in Time, Quality in Station,
Production leveling, and Production Preparation.
John Doe John Doe John Doe
Plant Manager Kaizen Promotion Leader Consultant
Expiration Date: [1 year from date of issuance]
Editor's Notes
With the Basic Kaizen Tools and a stopwatch, anyone can improve any process.
There is no set order to using the basic kaizen tools, but there is a normal pattern.
Quantify current state and target state. Add relevant categories when necessary. Write improvements (lowered inventory, shorter walking distance, etc.) in RED INK. Use the target progress report to report on status of activities at the end of each day and at the presentation at the end of the week-long workshop.
Use grid to express site to scale accurately and remember to include “real world” aspects such as posts, trash cans, tool boxes, break areas -- whatever is truly in the area. Do not forget to fill out the “BASIC DATA,” without it Standardized Work cannot be defined. Try to break up the process into the shortest steps possible. Each step of the operation sequence must be shown where it is done and given a sequence number. These numbers are identical to those entered in the Standardized Work Combination Sheet in the “Step” column. Connect the sequence numbers with solid lines that truly express the route traveled by the operator. Do not use arrows. The sequence numbers express the direction of movement. Do not forget to express the path the operator takes to return to the first step with a dotted line.
Time many cycles to increase accuracy. “ Step” column entries are identical to sequence numbers on Standardized Work Sheet and Standardized Work Combination Sheet. Partner with another person - one runs stopwatch and calls times for each step while observing the process, the other writes down times on sheet. Keep stopwatch running, write times called for steps above dotted line. After observation has been completed, subtract to calculate splits for each step and write below dotted line. Calculate complete times for each cycle observed and enter at bottom of column. Find best time for each step and enter in “Best Time” column. Total best times and enter in bottom row (“Complete Cycle Time”). ALWAYS USE THE BEST TIMES FOR CALCULATING CYCLE TIME. DO NOT AVERAGE TIMES.
Print out a hard copy for use in your workshop. Denote takt time with a horizontal red line across the length of the chart. Denote the length of the cycle time for each process with a vertical bar over the corresponding process number. Cycle times that are longer than takt time are candidates for kaizen or re-balancing of tasks.
Double-click on the graph and use the graph editor to enter the cycle times for each process in the spreadsheet provided. Quit the graph editor and the bar chart will be generated automatically. Place the red line at the appropriate height in on the chart to denote takt time. Click after the red “T/T” to enter the takt time value. Cycle times that are longer than takt time are candidates for kaizen or re-balancing of tasks. While it is better to hand write the Kaizen tools during activities (for speed and flexibility) this slide is handy for presentations and recording final results.
Print out a hard copy for use in your workshop. Denote takt time with a horizontal red line across the length of the chart. Denote the length of the cycle time for each element of each process with a vertical stack chart over the corresponding process number. The Yamazumi chart aids in targeting tasks for kaizen in a process that does not meet takt time, and as a last resort for re-balancing (re-assigning) tasks to meet takt time.
Double-click on the graph and use the graph editor to enter the cycle times for each task of process in the spreadsheet provided. Add more tasks as needed. The graph editor will automatically chose colors and calculate. Quit the graph editor and the bar chart will be generated automatically. Place the red line at the appropriate height in on the chart to denote takt time. Click after the red “T/T” to enter the takt time value. The Yamazumi chart aids in targeting tasks for kaizen in a process that does not meet takt time, and as a last resort for re-balancing (re-assigning) tasks to meet takt time. While it is better to hand write the Kaizen tools during activities (for speed and flexibility) this slide is handy for presentations and recording final results.
BE CERTAIN TO SHOW TAKT TIME by drawing a straight, vertical line in RED INK at the appropriate point along the time line. Try to break up the process into the shortest steps possible. End each line with a short vertical line. Don’t forget to connect the end of one step with a the next step using the wavy line when there is walking between steps. Don’t forget to connect the end of the final step with the beginning of the next cycle, this time going up to the first row, when there is walking to return to begin the cycle again. If automatic run times (dotted line) run past takt time, finish them by drawing the remainder of the line from the 0 line. Any long lines are likely to be opportunities for kaizen.
Use pictures (sketches, photos, cartoons, etc.) in “Before and “After” boxes. Express proposal visually as much as possible and avoid verbal descriptions. Quantify “Problem” and “Effects” whenever possible. Examples: “Cycle time is 4 seconds over takt time.” “Standard Work in Process: 3 pcs., should be 1 pc.” “Searching for adhesive: 5 secs.” “5 instances of wrong bolt/hr. observed.”
Use pictures (sketches, photos, cartoons, etc.) -- express visually and avoid verbal descriptions. Post in the area and check for completion deadlines at meeting at beginning of every shift. Add kaizen proposals as they are offered. The Kaizen Newspaper should change every day.
The Kaizen License is granted to those who have learned and applied kaizen – customarily after participation in a kaizen workshop.Note that it has an expiration date. It is not a certification or qualification, it merely acknowledges that the recipient has made an effort to learn and practice. It is customarily signed by the factory manager, the kaizen promotion leader, and the consultant who guided the workshop.