Advanced Construction
Equipments
Topic :FORMWORK
What is Formwork?
o It should be capable of carrying all imposed dead and live loads
apart from its own weight.
o Formwork is a mould including all supporting structures, used to
shape and support the concrete until it attains sufficient strength to
carry its own weight.
Formwork is commonly made of
o Steel
o Timber
TIMBER FORMWORK
STEEL FORMWORK
๏ฑ Formwork has been in use since the beginning of concrete
construction.
๏ฑ New materials such as steel, plastics and fibreglass are used in
formwork.
๏ฑ Greater attention is being given to the design, fabrication,
erection and dismantling of formwork
๏ฑ Formwork is designed according to The ACI document SP-4.
Qualities of Formwork
๏ƒ˜ It should be water tight.
๏ƒ˜ It should be strong.
๏ƒ˜ It can be reusable.
๏ƒ˜ Its contact surface should be uniform.
๏ƒ˜ It should be according to the size of member.
๏‚— In order to successfully carry out its function,
formwork must achieve a balance of following
requirements:
โ€ข Containment
โ€ข Strength
โ€ข Resistance To Leakage
โ€ข Accuracy
โ€ข Ease Of Handling
โ€ข Finish And Reuse Potential
โ€ข Access For Concrete
โ€ข Economy
๏‚— Containment: formwork must be capable of shaping and
supporting the fluid concrete until it cures.
๏‚— Strength: formwork must be capable of safely withstanding
without distortion or danger the dead weight of the fluid
concrete is placed on it, labour weight, equipment weight and
any environmental loadings.
๏‚— Ease of Handling: form panels and units should be designed so
that their maximum size does not exceed that which can be easily
handled by hand or mechanical means.
๏‚ก In addition all formwork must also be designed and constructed
to include facilities for adjustments, levelling, easing and
striking without damage to the form work or concrete.
๏‚— Economy: all the formwork is very expensive. On average about 35% of
the total cost of any finished concrete unit or element can be attributed to
its formwork; of this just over 40% can be taken for material for
formwork and 60% for labour.
๏‚ก The formwork designer must therefore not only consider the
maximum number of times that any form can be reused, but also
produce a design that will minimize the time taken for erection and
striking.
Major objectives considered in
formwork:
๏ƒ˜ Quality
๏ƒ˜ Safety
๏ƒ˜ Economy
๏ƒ˜ Quality:
Forms must be designed and built with sufficient stiffness
and accuracy so that the size, shape, position, and finish of the
cast concrete are maintained.
๏ƒ˜Safety:
Forms must be built sufficient strength and factor of safety so
that they have the capable of all supporting loads.
๏ƒ˜ Economy:
Forms must be built efficiently, minimizing time and cost.
Requirements of formwork:
๏ƒ˜ Material should be cheap and re usable,
๏ƒ˜ It should be practically water proof, so that it should not absorb water
from concrete,
๏ƒ˜ Swelling and shrinkage should be minimum,
๏ƒ˜ Strong enough to with stand all external loads,
๏ƒ˜ Deflection should be minimum,
๏ƒ˜ Surface should be smooth, and afford easy striping,
๏ƒ˜ Light in weight, so that easy to transfer,
๏ƒ˜ Joints should be stiff, so that lateral deformation and leak is minimum .
a) Assembly and erection .
b) Concrete placement.
c) Stripping and dismantling.
Three stages in the process :
๏‚— Formwork detail for different
structural members
In concrete construction formwork is commonly
provided for the following structural members.
o Wall
o Column
o Slabs & Beams
o Stairs
o Chimneys
o Water tanks
o Cooling Towers
๏ƒ˜It consists of
๏ƒ˜Timber sheeting
๏ƒ˜Vertical posts
๏ƒ˜Horizontal members
๏ƒ˜Stakes
๏ƒ˜Wedges
๏ƒ˜After completing one
side of formwork
reinforcement is provided
at the place then the
second side formwork is
provided.
FORMWORK FOR WALL
๏‚— Formwork for Column
โ€ข It consists of the following
โ€“ Side & End Planks
โ€“ Yoke
โ€“ Nut & Bolts
โ€ข Two end & two side planks
are joined by the yokes and
bolts.
๏‚— Formwork for columns
๏‚— Formwork for Slabs & beams:
โ€ข It consists of
โ€“ Sole plates
โ€“ Wedges
โ€“ Props
โ€“ Head tree
โ€“ Planks
โ€“ Batten
โ€“ Ledgers
โ€ข Beam formwork
rests on head tree
โ€ข Slab form work
rests on battens
and joists
โ€ข If prop height are
more than 8โ€™
provide horizontal
braces.
๏‚— Lintel or Beam Formwork:
๏‚— FORMWORK FOR SLAB:
๏‚— FORMWORK FOR STAIRS:
โ€ข It consists of
โ€“ Vertical & inclined
posts
โ€“ Inclined members
-- Wooden Planks or
sheeting
โ€“ Stringer
โ€“ Riser Planks
๏‚— FORMWORK FOR STAIRS:
๏‚— FORMWORK FOR CHIMNEYS:
For tall chimneys two types of forms
techniques are in generally use in our country
a) Jump form
b) Slip form
๏‚— Removal of formwork:
๏‚— Time of formwork removal depends on the following factors
1. Type of Cement
1. Rapid hardening cements require lesser time as compared to OPC
(Ordinary Portland Cement)
2. Ratio of concrete mix
1. Rich ratio concrete gain strength earlier as compared to weak ratio
concrete.
3. Weather condition
1. Hydration process accelerates in hot weather conditions as compared to
cold and humid weather conditions.
Time of Removal of formwork:
โ€ข First free end's support
should be removed.
โ€ข And then from right to
left it should be proceed.
โ€ข If we are removing from
the mid span then it will
act as a prop cantilever.
Cantilever slab
โ€ข In simply supported we
have to remove the
support from the mid
span to the ends.
๏‚— To meet the design
behavior.
Simply supported slab
๏‚— Maintenance of formwork:
โ€ข Due to continuous use wooden planks & steel plates
surfaces become uneven and require maintenance.
โ€ข For wooden formwork use cardboard or plastic fiber
board. Bolt hole places must also be repaired.
โ€ข For steel formwork plates must be leveled by mallet
and loose corners must be welded.
๏‚— Cost of formwork
๏ƒ˜ For normal works cost of formwork is about 30%-40% of the concrete cost.
๏ƒ˜ For special works cost of formwork is about 50%-60% of the concrete cost.
๏ƒ˜ Formwork cost is controlled by the following factors
โ€ข Formwork Material cost
โ€ข Formwork erecting cost
โ€ข Formwork removal cost
โ€ข Formwork jointing cost (Nails and Cables)
โ€ข Labor charges.
๏‚— Advantages of steel form work:
๏‚ง It can be used for a no. of times.
๏‚ง It is non absorbent.
๏‚ง Smooth finish surface obtained.
๏‚ง No shrinkage of formwork occurs.
๏‚ง Easy to use.
๏‚ง Its volume is less
๏‚ง Its strength is more.
๏‚— LOADS ON FORMWORK:
โ€ข Dead load
๏‚ง Self weight of formwork
๏‚ง Pressure and loads from fresh concrete
๏‚ง Reinforcement
โ€ข Imposed load
๏‚ง Construction workers
๏‚ง Stacking of materials
โ€ข Horizontal loads
โ€ข Environmental loads
๏‚ง Accidental loads
๏‚ง Wind loads
Thank you
THANK YOU

More Related Content

What's hot

Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction Industry
Abhishek Shah
ย 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar raut
SAGAR RAUT
ย 
04. superstructure
04. superstructure04. superstructure
04. superstructure
Thien Hee
ย 
Structure Reinforced Concrete
Structure Reinforced ConcreteStructure Reinforced Concrete
Structure Reinforced Concrete
Nik M Farid
ย 

What's hot (20)

Reinforcement steel
Reinforcement steelReinforcement steel
Reinforcement steel
ย 
FormWork
FormWork FormWork
FormWork
ย 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction Industry
ย 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
ย 
A presentation on Formwork
A presentation on FormworkA presentation on Formwork
A presentation on Formwork
ย 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineering
ย 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar raut
ย 
Design of concrete Structure 2
Design of concrete Structure 2Design of concrete Structure 2
Design of concrete Structure 2
ย 
Design and Detailing of RC structures
Design and Detailing of RC structuresDesign and Detailing of RC structures
Design and Detailing of RC structures
ย 
Types of construction
Types of constructionTypes of construction
Types of construction
ย 
UNIT-1 PSC.pptx
UNIT-1 PSC.pptxUNIT-1 PSC.pptx
UNIT-1 PSC.pptx
ย 
Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)
ย 
04. superstructure
04. superstructure04. superstructure
04. superstructure
ย 
1. Pile foundations (SL 1-143).pdf
1. Pile foundations (SL 1-143).pdf1. Pile foundations (SL 1-143).pdf
1. Pile foundations (SL 1-143).pdf
ย 
Column design: as per bs code
Column design: as per bs codeColumn design: as per bs code
Column design: as per bs code
ย 
Formwork
FormworkFormwork
Formwork
ย 
Structure Reinforced Concrete
Structure Reinforced ConcreteStructure Reinforced Concrete
Structure Reinforced Concrete
ย 
Composite construction and cambering
Composite construction and camberingComposite construction and cambering
Composite construction and cambering
ย 
Introduction of Reinforced Concrete Design
Introduction of Reinforced Concrete DesignIntroduction of Reinforced Concrete Design
Introduction of Reinforced Concrete Design
ย 
Reinforced column design
Reinforced column design Reinforced column design
Reinforced column design
ย 

Similar to Formwork

Formwork
FormworkFormwork
Formwork
Sneha Kaira
ย 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
FaizanSolanki
ย 
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
FaizanSolanki
ย 
Formwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfFormwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdf
LiesaStone
ย 

Similar to Formwork (20)

Formwork
FormworkFormwork
Formwork
ย 
Formwork
FormworkFormwork
Formwork
ย 
FORMWORK.pptx
FORMWORK.pptxFORMWORK.pptx
FORMWORK.pptx
ย 
Formwork
FormworkFormwork
Formwork
ย 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
ย 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
ย 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
ย 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
ย 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
ย 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction Formwork
ย 
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
ย 
Form Work
Form Work Form Work
Form Work
ย 
CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)
ย 
Formwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfFormwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdf
ย 
types of formwork.pdf
types of formwork.pdftypes of formwork.pdf
types of formwork.pdf
ย 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
ย 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities
ย 
Steel formwork
Steel formworkSteel formwork
Steel formwork
ย 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU
ย 
Formwork For Structural Member.pptx
Formwork For Structural Member.pptxFormwork For Structural Member.pptx
Formwork For Structural Member.pptx
ย 

More from kajol panchal

More from kajol panchal (12)

Heat transfer
Heat transferHeat transfer
Heat transfer
ย 
Basics of civil engineering Induction Type
Basics of civil engineering Induction TypeBasics of civil engineering Induction Type
Basics of civil engineering Induction Type
ย 
Basics of Transportation Engineering
Basics of Transportation EngineeringBasics of Transportation Engineering
Basics of Transportation Engineering
ย 
Basics of Water supply and sanitation Engineering
Basics of Water supply and sanitation Engineering Basics of Water supply and sanitation Engineering
Basics of Water supply and sanitation Engineering
ย 
Surveying
SurveyingSurveying
Surveying
ย 
Component of building
Component of buildingComponent of building
Component of building
ย 
Introduction of various civil engineering structures
Introduction of various civil engineering structuresIntroduction of various civil engineering structures
Introduction of various civil engineering structures
ย 
Guntry girder
Guntry girderGuntry girder
Guntry girder
ย 
Lintel and arches
Lintel and archesLintel and arches
Lintel and arches
ย 
Water resourcs engineering
Water resourcs engineeringWater resourcs engineering
Water resourcs engineering
ย 
Valuation
ValuationValuation
Valuation
ย 
Hydrlelectric power
Hydrlelectric powerHydrlelectric power
Hydrlelectric power
ย 

Recently uploaded

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
ย 
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 

Recently uploaded (20)

Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
ย 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
ย 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
ย 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
ย 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
ย 

Formwork

  • 2. What is Formwork? o It should be capable of carrying all imposed dead and live loads apart from its own weight. o Formwork is a mould including all supporting structures, used to shape and support the concrete until it attains sufficient strength to carry its own weight. Formwork is commonly made of o Steel o Timber
  • 5. ๏ฑ Formwork has been in use since the beginning of concrete construction. ๏ฑ New materials such as steel, plastics and fibreglass are used in formwork. ๏ฑ Greater attention is being given to the design, fabrication, erection and dismantling of formwork ๏ฑ Formwork is designed according to The ACI document SP-4.
  • 6. Qualities of Formwork ๏ƒ˜ It should be water tight. ๏ƒ˜ It should be strong. ๏ƒ˜ It can be reusable. ๏ƒ˜ Its contact surface should be uniform. ๏ƒ˜ It should be according to the size of member.
  • 7. ๏‚— In order to successfully carry out its function, formwork must achieve a balance of following requirements: โ€ข Containment โ€ข Strength โ€ข Resistance To Leakage โ€ข Accuracy โ€ข Ease Of Handling โ€ข Finish And Reuse Potential โ€ข Access For Concrete โ€ข Economy
  • 8. ๏‚— Containment: formwork must be capable of shaping and supporting the fluid concrete until it cures. ๏‚— Strength: formwork must be capable of safely withstanding without distortion or danger the dead weight of the fluid concrete is placed on it, labour weight, equipment weight and any environmental loadings.
  • 9. ๏‚— Ease of Handling: form panels and units should be designed so that their maximum size does not exceed that which can be easily handled by hand or mechanical means. ๏‚ก In addition all formwork must also be designed and constructed to include facilities for adjustments, levelling, easing and striking without damage to the form work or concrete.
  • 10. ๏‚— Economy: all the formwork is very expensive. On average about 35% of the total cost of any finished concrete unit or element can be attributed to its formwork; of this just over 40% can be taken for material for formwork and 60% for labour. ๏‚ก The formwork designer must therefore not only consider the maximum number of times that any form can be reused, but also produce a design that will minimize the time taken for erection and striking.
  • 11. Major objectives considered in formwork: ๏ƒ˜ Quality ๏ƒ˜ Safety ๏ƒ˜ Economy
  • 12. ๏ƒ˜ Quality: Forms must be designed and built with sufficient stiffness and accuracy so that the size, shape, position, and finish of the cast concrete are maintained. ๏ƒ˜Safety: Forms must be built sufficient strength and factor of safety so that they have the capable of all supporting loads. ๏ƒ˜ Economy: Forms must be built efficiently, minimizing time and cost.
  • 13. Requirements of formwork: ๏ƒ˜ Material should be cheap and re usable, ๏ƒ˜ It should be practically water proof, so that it should not absorb water from concrete, ๏ƒ˜ Swelling and shrinkage should be minimum, ๏ƒ˜ Strong enough to with stand all external loads, ๏ƒ˜ Deflection should be minimum, ๏ƒ˜ Surface should be smooth, and afford easy striping, ๏ƒ˜ Light in weight, so that easy to transfer, ๏ƒ˜ Joints should be stiff, so that lateral deformation and leak is minimum .
  • 14. a) Assembly and erection . b) Concrete placement. c) Stripping and dismantling. Three stages in the process :
  • 15. ๏‚— Formwork detail for different structural members In concrete construction formwork is commonly provided for the following structural members. o Wall o Column o Slabs & Beams o Stairs o Chimneys o Water tanks o Cooling Towers
  • 16. ๏ƒ˜It consists of ๏ƒ˜Timber sheeting ๏ƒ˜Vertical posts ๏ƒ˜Horizontal members ๏ƒ˜Stakes ๏ƒ˜Wedges ๏ƒ˜After completing one side of formwork reinforcement is provided at the place then the second side formwork is provided. FORMWORK FOR WALL
  • 17. ๏‚— Formwork for Column โ€ข It consists of the following โ€“ Side & End Planks โ€“ Yoke โ€“ Nut & Bolts โ€ข Two end & two side planks are joined by the yokes and bolts.
  • 19. ๏‚— Formwork for Slabs & beams: โ€ข It consists of โ€“ Sole plates โ€“ Wedges โ€“ Props โ€“ Head tree โ€“ Planks โ€“ Batten โ€“ Ledgers โ€ข Beam formwork rests on head tree โ€ข Slab form work rests on battens and joists โ€ข If prop height are more than 8โ€™ provide horizontal braces.
  • 20. ๏‚— Lintel or Beam Formwork:
  • 22. ๏‚— FORMWORK FOR STAIRS: โ€ข It consists of โ€“ Vertical & inclined posts โ€“ Inclined members -- Wooden Planks or sheeting โ€“ Stringer โ€“ Riser Planks
  • 24. ๏‚— FORMWORK FOR CHIMNEYS: For tall chimneys two types of forms techniques are in generally use in our country a) Jump form b) Slip form
  • 25. ๏‚— Removal of formwork: ๏‚— Time of formwork removal depends on the following factors 1. Type of Cement 1. Rapid hardening cements require lesser time as compared to OPC (Ordinary Portland Cement) 2. Ratio of concrete mix 1. Rich ratio concrete gain strength earlier as compared to weak ratio concrete. 3. Weather condition 1. Hydration process accelerates in hot weather conditions as compared to cold and humid weather conditions.
  • 26. Time of Removal of formwork:
  • 27. โ€ข First free end's support should be removed. โ€ข And then from right to left it should be proceed. โ€ข If we are removing from the mid span then it will act as a prop cantilever. Cantilever slab
  • 28. โ€ข In simply supported we have to remove the support from the mid span to the ends. ๏‚— To meet the design behavior. Simply supported slab
  • 29. ๏‚— Maintenance of formwork: โ€ข Due to continuous use wooden planks & steel plates surfaces become uneven and require maintenance. โ€ข For wooden formwork use cardboard or plastic fiber board. Bolt hole places must also be repaired. โ€ข For steel formwork plates must be leveled by mallet and loose corners must be welded.
  • 30. ๏‚— Cost of formwork ๏ƒ˜ For normal works cost of formwork is about 30%-40% of the concrete cost. ๏ƒ˜ For special works cost of formwork is about 50%-60% of the concrete cost. ๏ƒ˜ Formwork cost is controlled by the following factors โ€ข Formwork Material cost โ€ข Formwork erecting cost โ€ข Formwork removal cost โ€ข Formwork jointing cost (Nails and Cables) โ€ข Labor charges.
  • 31. ๏‚— Advantages of steel form work: ๏‚ง It can be used for a no. of times. ๏‚ง It is non absorbent. ๏‚ง Smooth finish surface obtained. ๏‚ง No shrinkage of formwork occurs. ๏‚ง Easy to use. ๏‚ง Its volume is less ๏‚ง Its strength is more.
  • 32. ๏‚— LOADS ON FORMWORK: โ€ข Dead load ๏‚ง Self weight of formwork ๏‚ง Pressure and loads from fresh concrete ๏‚ง Reinforcement โ€ข Imposed load ๏‚ง Construction workers ๏‚ง Stacking of materials โ€ข Horizontal loads โ€ข Environmental loads ๏‚ง Accidental loads ๏‚ง Wind loads