PROJECT PLANNING PRODUCING THE PROJECT CONTRACT

  Our “Reality Check” Budget provides our clients
  with the cost framework to choose what to do.

  Once they make that decision we get to work
  clarifying every detail of the real project so that
  you can provide a fixed cost for the scope of
  work items we’ll include in our contract.

  Here is how it works…
          Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT

   Aspirations and projected costs are in balance
                                                     with what it takes
                                                       to accomplish
                                                        those goals




        The features of the project
               are aligned…                                  $
         What’s possible                           At what cost
             NOW WE UNDERSTAND
         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT
Detailed Drawings and Product Schedules are created




The goal is to provide clear
descriptions of the work to be
done, the materials to be used,
and how they’re assembled


                   Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT


                                                    Our goal is to produce a
                                                    fixed price construction
                                                    contract based on a clear
                                                    scope of work for
                                                    everyone involved.

                                                    Here’s what we do to gain
                                                    that clarity…


        Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT
CLIENT NAME                                          VENDOR NAME



                                                                                  If you have provided
                                                                                  preliminary budget
VENDOR NAME
                                                                                  information we will
                                                                                  send you the scope of
                                                                                  work with the costs you
                                                                                  provided

     Quote reference with date



     Quote reference with date




     Quote reference with date



                                 Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT
CLIENT NAME                                              VENDOR NAME

                                                                                      This allows you to review and
                                                                                      update each scope item, its cost,
                                                                                      and add any comments. We provide
                                                             INSTRUCTIONS             clear instructions about what to do.

VENDOR NAME


                       VENDOR NAME




                                                                                   Totals for Project Categories and Phases


                                                      Reference to the
                                                      quote date                    Confirm Each Cost or
                                                                                    Update with comments
     Quote reference with date



     Quote reference with date
                                                                                    Notes are provided for
                                                                                    clarity
     Quote reference with date



                                     Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT
CLIENT NAME                                              VENDOR NAME

                                                                                       Dates on plans for reference

                                                                                      When we are all “on the same page”
                                                            Total Contract Amount
                                                                                      we will send you the final
                                                                                      agreement and ask you to OK each
VENDOR NAME
                                                                                      scope item one last time.
                       VENDOR NAME
                                                                                    FINAL AGREEMENT IS SIGNED BY BOTH PARTIES




                                                                                    For confirmation every item is
                                                                                    OK’d in the final version
     Quote reference with date



     Quote reference with date
                                                                                    Your comments may be
                                                                                    added for clarity
     Quote reference with date



                                     Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT
                                                       If you were not asked for
                                                       an estimate during the
                                                       “reality check” budget
                                                       phase. We will send you
                                                       the budget proposal
                                                       form.

                                                       We create this form to
    TASK ITEMS




                                                       make responding clear
                                                       and easy.
                 Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT
Clear instructions about the purpose                                     The project, who will
                                                                         do the work, the active
and use of the form are provided.                                        plans, and the date




                                                                             A review of what to do



                                                     A reminder about the need to
                                                     respond in a reasonable time

         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT
Then each item is listed with space for
you to provide cost, time, and comments                                          What is the
                                                                                 estimated cost for
                                                                                 each item and how
                                                                                 long might it take



                                                                                 Is this just an
                                                                                 estimated cost or
                                                                                 can it be used to go
                                                                                 to Contract


                                                                                 Comments about
                                                                                 this item that we
                                                                                 need to pay
                                                                                 attention to



         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT

If needed, we provide special notes about the task to
call attention to specific requirements or conditions.




                                                    We add special technical notes,
                                                    site conditions, or comments that
                                                    you have provided about this task

         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT

Those notes then appear in the in the final work
authorization




         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT




We enter cost information
provided by every sub and
product vendor and use
this to determine the final
contract cost for the
project.

            Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT

                                                    Our contract references
                                                    two essential project
                                                    documents
                                                      The Project Plans by title and date


                                                      The Scope of Work that
                                                      includes every item you have
                                                      made a commitment to
                                                      complete at an agreed cost

                                                      A project start date and
                                                      target completion period

                                                    … and a timeframe
        Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT

The client receives the
written scope of work
that includes every
item in each phase and
category in the exact
same language that you
were provided, but
without the special
technical notes.


          Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT




 The system is designed to keep us all aligned
        Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT
                                               By managing information in
                                               this way we are striving to
                                               make the best use of
                                               everybody’s time.

                                               We depend on you to
                                               understand our process so
                                               the work goes smoothly and
                                               we are clear about what we
                                               expect from each other.

        Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT

                     What happens next?

                     Once our client signs the construction
                     contract we will be sending you your
                     signed Independent Contractor Work
                     Authorization (ICWA).

                     You will be notified of the schedule
                     and asked to maintain a commitment
                     to your place in the master plan.

        Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING PRODUCING THE PROJECT CONTRACT




                        MAKE
                        SENSE

        Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants

Weitere ähnliche Inhalte

Andere mochten auch

Contract How To Make An Agreement A Contract Etienne Lawyers
Contract   How To Make An Agreement A Contract Etienne LawyersContract   How To Make An Agreement A Contract Etienne Lawyers
Contract How To Make An Agreement A Contract Etienne LawyersEtienne Lawyers
 
Project evaluation and implementation notes and questions
Project evaluation and implementation   notes and questionsProject evaluation and implementation   notes and questions
Project evaluation and implementation notes and questionsAnirban Chakraborty
 
Ch 9 project monitoring & control updated
Ch 9 project monitoring & control updatedCh 9 project monitoring & control updated
Ch 9 project monitoring & control updatedFarhana Rehman
 
Project Closure Report
Project Closure ReportProject Closure Report
Project Closure ReportAdam Edwards
 
Offer And Acceptance
Offer And AcceptanceOffer And Acceptance
Offer And Acceptanceshweta verma
 
Project monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoringProject monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoringSandeep Kumar
 
Types of contract in Project management
Types of contract in Project managementTypes of contract in Project management
Types of contract in Project managementAli Heydari
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1Craig Brown
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 

Andere mochten auch (12)

Contract How To Make An Agreement A Contract Etienne Lawyers
Contract   How To Make An Agreement A Contract Etienne LawyersContract   How To Make An Agreement A Contract Etienne Lawyers
Contract How To Make An Agreement A Contract Etienne Lawyers
 
Project evaluation and implementation notes and questions
Project evaluation and implementation   notes and questionsProject evaluation and implementation   notes and questions
Project evaluation and implementation notes and questions
 
Project closure and audit
Project closure and auditProject closure and audit
Project closure and audit
 
Ch 9 project monitoring & control updated
Ch 9 project monitoring & control updatedCh 9 project monitoring & control updated
Ch 9 project monitoring & control updated
 
Project Closure Report
Project Closure ReportProject Closure Report
Project Closure Report
 
Project termination, reporting and project closure
Project termination, reporting and project closureProject termination, reporting and project closure
Project termination, reporting and project closure
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Control
 
Offer And Acceptance
Offer And AcceptanceOffer And Acceptance
Offer And Acceptance
 
Project monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoringProject monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoring
 
Types of contract in Project management
Types of contract in Project managementTypes of contract in Project management
Types of contract in Project management
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 

Ă„hnlich wie Project contract

About The Burns Companies
About The Burns CompaniesAbout The Burns Companies
About The Burns CompaniesAndy Burns
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Constructionshillier38
 
iDesignX Presentation
iDesignX PresentationiDesignX Presentation
iDesignX PresentationiDesignX
 
092811 updated contech brochure
092811 updated contech brochure092811 updated contech brochure
092811 updated contech brochurePaul Smith
 
092811 updated contech brochure
092811 updated contech brochure092811 updated contech brochure
092811 updated contech brochurePaul Smith
 
010212 updated contech brochure cta
010212 updated contech brochure cta010212 updated contech brochure cta
010212 updated contech brochure ctaPaul Smith
 
010212 updated contech brochure cta
010212 updated contech brochure cta010212 updated contech brochure cta
010212 updated contech brochure ctaPaul Smith
 
Keikakuin Cost Control
Keikakuin Cost ControlKeikakuin Cost Control
Keikakuin Cost ControlKeikakuin
 
Unit 5 lo1_grid_sheets
Unit 5 lo1_grid_sheetsUnit 5 lo1_grid_sheets
Unit 5 lo1_grid_sheetsbtecmedia12
 
How To Select A Contractor
How To Select A ContractorHow To Select A Contractor
How To Select A ContractorWatermark & Company
 
Collaboration Efforts with LED Specifications - Reducing Confusion During Co...
 Collaboration Efforts with LED Specifications - Reducing Confusion During Co... Collaboration Efforts with LED Specifications - Reducing Confusion During Co...
Collaboration Efforts with LED Specifications - Reducing Confusion During Co...Cindy Foster-Warthen
 
20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement managementraymond_wan2005
 
Product Procurement
Product ProcurementProduct Procurement
Product Procurementbtharp
 
2009 08 25_business value of upgrading to oracle e-business suite contracts r...
2009 08 25_business value of upgrading to oracle e-business suite contracts r...2009 08 25_business value of upgrading to oracle e-business suite contracts r...
2009 08 25_business value of upgrading to oracle e-business suite contracts r...DZee Solutions
 

Ă„hnlich wie Project contract (16)

About the Contractor
About the Contractor About the Contractor
About the Contractor
 
About The Burns Companies
About The Burns CompaniesAbout The Burns Companies
About The Burns Companies
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Construction
 
iDesignX Presentation
iDesignX PresentationiDesignX Presentation
iDesignX Presentation
 
Agile Contracts
Agile ContractsAgile Contracts
Agile Contracts
 
092811 updated contech brochure
092811 updated contech brochure092811 updated contech brochure
092811 updated contech brochure
 
092811 updated contech brochure
092811 updated contech brochure092811 updated contech brochure
092811 updated contech brochure
 
010212 updated contech brochure cta
010212 updated contech brochure cta010212 updated contech brochure cta
010212 updated contech brochure cta
 
010212 updated contech brochure cta
010212 updated contech brochure cta010212 updated contech brochure cta
010212 updated contech brochure cta
 
Keikakuin Cost Control
Keikakuin Cost ControlKeikakuin Cost Control
Keikakuin Cost Control
 
Unit 5 lo1_grid_sheets
Unit 5 lo1_grid_sheetsUnit 5 lo1_grid_sheets
Unit 5 lo1_grid_sheets
 
How To Select A Contractor
How To Select A ContractorHow To Select A Contractor
How To Select A Contractor
 
Collaboration Efforts with LED Specifications - Reducing Confusion During Co...
 Collaboration Efforts with LED Specifications - Reducing Confusion During Co... Collaboration Efforts with LED Specifications - Reducing Confusion During Co...
Collaboration Efforts with LED Specifications - Reducing Confusion During Co...
 
20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management
 
Product Procurement
Product ProcurementProduct Procurement
Product Procurement
 
2009 08 25_business value of upgrading to oracle e-business suite contracts r...
2009 08 25_business value of upgrading to oracle e-business suite contracts r...2009 08 25_business value of upgrading to oracle e-business suite contracts r...
2009 08 25_business value of upgrading to oracle e-business suite contracts r...
 

Mehr von Jamie Wolf

Wolfpack at Emerald Builders Orientation
Wolfpack at Emerald Builders OrientationWolfpack at Emerald Builders Orientation
Wolfpack at Emerald Builders OrientationJamie Wolf
 
Wolfpack at building shelter orientation
Wolfpack at building shelter orientationWolfpack at building shelter orientation
Wolfpack at building shelter orientationJamie Wolf
 
Wolfpack at lewis creek orientation
Wolfpack at lewis creek orientationWolfpack at lewis creek orientation
Wolfpack at lewis creek orientationJamie Wolf
 
Up and to the right!
Up and to the right!Up and to the right!
Up and to the right!Jamie Wolf
 
Board leadership
Board leadershipBoard leadership
Board leadershipJamie Wolf
 
Thinking about the BE365 System
Thinking about the BE365 SystemThinking about the BE365 System
Thinking about the BE365 SystemJamie Wolf
 
Ph coffee cup metaphor
Ph coffee cup metaphorPh coffee cup metaphor
Ph coffee cup metaphorJamie Wolf
 
Collaboration workgroup
Collaboration workgroupCollaboration workgroup
Collaboration workgroupJamie Wolf
 
Systems primer intro 10.24.11
Systems primer intro 10.24.11Systems primer intro 10.24.11
Systems primer intro 10.24.11Jamie Wolf
 
Thermal Comfort
Thermal ComfortThermal Comfort
Thermal ComfortJamie Wolf
 
BE10 Meta Patterns of Sustainability
BE10 Meta Patterns of SustainabilityBE10 Meta Patterns of Sustainability
BE10 Meta Patterns of SustainabilityJamie Wolf
 
Be10 Awards
Be10 AwardsBe10 Awards
Be10 AwardsJamie Wolf
 
Open Source Practice Intro
Open Source Practice IntroOpen Source Practice Intro
Open Source Practice IntroJamie Wolf
 
Wolfworks Cambium 2010
Wolfworks Cambium 2010Wolfworks Cambium 2010
Wolfworks Cambium 2010Jamie Wolf
 
Remodeling Budget Think
Remodeling Budget ThinkRemodeling Budget Think
Remodeling Budget ThinkJamie Wolf
 

Mehr von Jamie Wolf (16)

Wolfpack at Emerald Builders Orientation
Wolfpack at Emerald Builders OrientationWolfpack at Emerald Builders Orientation
Wolfpack at Emerald Builders Orientation
 
Wolfpack at building shelter orientation
Wolfpack at building shelter orientationWolfpack at building shelter orientation
Wolfpack at building shelter orientation
 
Wolfpack at lewis creek orientation
Wolfpack at lewis creek orientationWolfpack at lewis creek orientation
Wolfpack at lewis creek orientation
 
Up and to the right!
Up and to the right!Up and to the right!
Up and to the right!
 
Board leadership
Board leadershipBoard leadership
Board leadership
 
Thinking about the BE365 System
Thinking about the BE365 SystemThinking about the BE365 System
Thinking about the BE365 System
 
Be365
Be365Be365
Be365
 
Ph coffee cup metaphor
Ph coffee cup metaphorPh coffee cup metaphor
Ph coffee cup metaphor
 
Collaboration workgroup
Collaboration workgroupCollaboration workgroup
Collaboration workgroup
 
Systems primer intro 10.24.11
Systems primer intro 10.24.11Systems primer intro 10.24.11
Systems primer intro 10.24.11
 
Thermal Comfort
Thermal ComfortThermal Comfort
Thermal Comfort
 
BE10 Meta Patterns of Sustainability
BE10 Meta Patterns of SustainabilityBE10 Meta Patterns of Sustainability
BE10 Meta Patterns of Sustainability
 
Be10 Awards
Be10 AwardsBe10 Awards
Be10 Awards
 
Open Source Practice Intro
Open Source Practice IntroOpen Source Practice Intro
Open Source Practice Intro
 
Wolfworks Cambium 2010
Wolfworks Cambium 2010Wolfworks Cambium 2010
Wolfworks Cambium 2010
 
Remodeling Budget Think
Remodeling Budget ThinkRemodeling Budget Think
Remodeling Budget Think
 

KĂĽrzlich hochgeladen

PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandSharisaBethune
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524najka9823
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCRalexsharmaa01
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 

KĂĽrzlich hochgeladen (20)

PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal Brand
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 

Project contract

  • 1. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT Our “Reality Check” Budget provides our clients with the cost framework to choose what to do. Once they make that decision we get to work clarifying every detail of the real project so that you can provide a fixed cost for the scope of work items we’ll include in our contract. Here is how it works… Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 2. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT Aspirations and projected costs are in balance with what it takes to accomplish those goals The features of the project are aligned… $ What’s possible At what cost NOW WE UNDERSTAND Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 3. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT Detailed Drawings and Product Schedules are created The goal is to provide clear descriptions of the work to be done, the materials to be used, and how they’re assembled Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 4. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT Our goal is to produce a fixed price construction contract based on a clear scope of work for everyone involved. Here’s what we do to gain that clarity… Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 5. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT CLIENT NAME VENDOR NAME If you have provided preliminary budget VENDOR NAME information we will send you the scope of work with the costs you provided Quote reference with date Quote reference with date Quote reference with date Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 6. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT CLIENT NAME VENDOR NAME This allows you to review and update each scope item, its cost, and add any comments. We provide INSTRUCTIONS clear instructions about what to do. VENDOR NAME VENDOR NAME Totals for Project Categories and Phases Reference to the quote date Confirm Each Cost or Update with comments Quote reference with date Quote reference with date Notes are provided for clarity Quote reference with date Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 7. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT CLIENT NAME VENDOR NAME Dates on plans for reference When we are all “on the same page” Total Contract Amount we will send you the final agreement and ask you to OK each VENDOR NAME scope item one last time. VENDOR NAME FINAL AGREEMENT IS SIGNED BY BOTH PARTIES For confirmation every item is OK’d in the final version Quote reference with date Quote reference with date Your comments may be added for clarity Quote reference with date Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 8. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT If you were not asked for an estimate during the “reality check” budget phase. We will send you the budget proposal form. We create this form to TASK ITEMS make responding clear and easy. Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 9. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT Clear instructions about the purpose The project, who will do the work, the active and use of the form are provided. plans, and the date A review of what to do A reminder about the need to respond in a reasonable time Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 10. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT Then each item is listed with space for you to provide cost, time, and comments What is the estimated cost for each item and how long might it take Is this just an estimated cost or can it be used to go to Contract Comments about this item that we need to pay attention to Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 11. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT If needed, we provide special notes about the task to call attention to specific requirements or conditions. We add special technical notes, site conditions, or comments that you have provided about this task Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 12. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT Those notes then appear in the in the final work authorization Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 13. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT We enter cost information provided by every sub and product vendor and use this to determine the final contract cost for the project. Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 14. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT Our contract references two essential project documents The Project Plans by title and date The Scope of Work that includes every item you have made a commitment to complete at an agreed cost A project start date and target completion period … and a timeframe Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 15. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT The client receives the written scope of work that includes every item in each phase and category in the exact same language that you were provided, but without the special technical notes. Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 16. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT The system is designed to keep us all aligned Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 17. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT By managing information in this way we are striving to make the best use of everybody’s time. We depend on you to understand our process so the work goes smoothly and we are clear about what we expect from each other. Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 18. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT What happens next? Once our client signs the construction contract we will be sending you your signed Independent Contractor Work Authorization (ICWA). You will be notified of the schedule and asked to maintain a commitment to your place in the master plan. Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 19. PROJECT PLANNING PRODUCING THE PROJECT CONTRACT MAKE SENSE Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants