SlideShare a Scribd company logo
1 of 16
Download to read offline
L-9L-9
Sewage Pumping
Environmental Engineering-II
WET
WELL
Modular
pumppump
well
RISING MAIN
The need for sewer pumping stations
arises when
โ€ข The existing topography and required
minimum sewer grades create deep
sewers that have high construction costs.
The sewage is raised and then conveyedThe sewage is raised and then conveyed
by gravity.
โ€ข Basements are too low to discharge
sewage to the main sewer.
โ€ข Sewage must be conveyed over a ridge.
โ€ข The sewage must be raised to get head
for gravity flow through a treatment
plant.
โ€ข Discharge outlets are below the level
of the receiving body of water.
Problems is sewage pumping
1. Sewage has foul characteristics
2. Sewage has lot of suspended solids and
floating matter. Which may make running of
pumps difficult and may cause frequentpumps difficult and may cause frequent
clogging of pumps.
3. Sewage may contain organic and inorganic
waste, which may cause corrosion and
errosion of parts of the pumps and reduce life
of pumps.
4. Sewage contains pathogens which may cause
health problems to working persons at sewage
pumping station.
5. The rate sewage flow varies hourly hence rate
of pumping has to be adjusted accordingly
6.Size of sump is limited since large size of6.Size of sump is limited since large size of
sump results in settlement of solids and
organic matter at its bottom.
7. Pumps should be of high order reliability
since failure of pumps will lead to flooding of
adjoining areas.
Pumping station
โ€ข Dry well :- For housing the pumps
โ€ข Wet well: - For incoming sewage.
โ€ข Rising main:- To led the pumped sewagetoโ€ข Rising main:- To led the pumped sewageto
high leveled gravity sewer.
โ€ข Pumps used:- Centrifugal, Reciprocating,
Propeller of axial flow, Air pressure pumps
or ejectors
Design criteria
1. Hydraulic retention time HRT:- retention
time of wet well usually does not exceed 20
min.
2. High and low water levels:- These are fixed
in the wet well in order to determine
position of suction pipes for the pumps.
3. Screens :- these are required to remove
floating matter that may clog and damage
the pump
4. Standby pumps :- At least one extra pump
more than the pumps required per design,
should always be provided to act as standby
so that it can be used when one of the workingso that it can be used when one of the working
pimps under maintainance or repair
5. Additional Space :- Provision for extra space
for dy wells in the design of the pump house to
install additional pumps in future should be
kept at initial planning stage itself
Formulae used
1. For finding frictional losses in
pipe
h = (fLv2/2gd)hf= (fLv2/2gd)
v= velocity of flow in rising main
d= dia of rising main
L= length of pipe
2. Power of pump
P=(w.Qp.H)/(75ฮทpฮทm)
w= density of water in kg/m3
Qp=Flow to be lifted by pump
H= total headH= total head
ฮทp ฮทm= Efficiency of pump and driving
motor resp.
Objective Questions
1. _____________________ matter may clog
the pump.
2.________ and_____________ wells are
provided in pumping stations.provided in pumping stations.
3. Dry well is required for
___________________________.
4. Wet well is required for _________________.
Theory questions
Q1. Write short note on
1. Sewage pumping
2. Difficulties in sewage pumping2. Difficulties in sewage pumping
3. Design of sewage pumping station

More Related Content

What's hot

What's hot (20)

Energy dissipators
Energy dissipatorsEnergy dissipators
Energy dissipators
ย 
L 51 appurtennances (Valves)
L 51 appurtennances (Valves)L 51 appurtennances (Valves)
L 51 appurtennances (Valves)
ย 
Sludge thickening and stabilization processes
Sludge thickening and stabilization processes  Sludge thickening and stabilization processes
Sludge thickening and stabilization processes
ย 
Intake structures-Introduction
Intake structures-IntroductionIntake structures-Introduction
Intake structures-Introduction
ย 
ogee design
ogee designogee design
ogee design
ย 
Centrifugal Pumps
Centrifugal PumpsCentrifugal Pumps
Centrifugal Pumps
ย 
L4- Water Supply Scheme & Importance.pptx
L4- Water Supply Scheme & Importance.pptxL4- Water Supply Scheme & Importance.pptx
L4- Water Supply Scheme & Importance.pptx
ย 
weir & barrage
weir & barrageweir & barrage
weir & barrage
ย 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
ย 
materials of sewer
materials of sewermaterials of sewer
materials of sewer
ย 
Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
ย 
Unit 3 spillway
Unit 3 spillwayUnit 3 spillway
Unit 3 spillway
ย 
Elements of Water Conductor System
Elements of Water Conductor SystemElements of Water Conductor System
Elements of Water Conductor System
ย 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewer
ย 
Conveyance of-water
Conveyance of-water Conveyance of-water
Conveyance of-water
ย 
design of weirs
design of weirsdesign of weirs
design of weirs
ย 
Introduction of pump
Introduction of pumpIntroduction of pump
Introduction of pump
ย 
Flow through pipes ppt
Flow through pipes pptFlow through pipes ppt
Flow through pipes ppt
ย 
Francis turbine
Francis turbine Francis turbine
Francis turbine
ย 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
ย 

Viewers also liked

water treatment plant
water treatment plantwater treatment plant
water treatment plant
Abdullah Mohammed
ย 
Effluent treatment plant - design, operation and analysis of waste water trea...
Effluent treatment plant - design, operation and analysis of waste water trea...Effluent treatment plant - design, operation and analysis of waste water trea...
Effluent treatment plant - design, operation and analysis of waste water trea...
Shubham Hydrosys Pvt. Ltd
ย 
Effluent Treatment Plant(ETP)
Effluent Treatment Plant(ETP)Effluent Treatment Plant(ETP)
Effluent Treatment Plant(ETP)
Nishith Tripathi
ย 
sewage treatment plant
sewage treatment plantsewage treatment plant
sewage treatment plant
Bhavik Patel
ย 
VISITA DEPURADORA DE CALAHORRA
VISITA DEPURADORA DE CALAHORRAVISITA DEPURADORA DE CALAHORRA
VISITA DEPURADORA DE CALAHORRA
revistacidacos
ย 
Biotechnology in Industrial Waste water Treatment
Biotechnology in Industrial Waste water TreatmentBiotechnology in Industrial Waste water Treatment
Biotechnology in Industrial Waste water Treatment
shuaibumusa2012
ย 
Efflunt treatment plant ppt
Efflunt treatment plant pptEfflunt treatment plant ppt
Efflunt treatment plant ppt
Rajat Thapliyal
ย 

Viewers also liked (20)

MicroFASTยฎ - Advanced Waste Water Treatment System
MicroFASTยฎ - Advanced Waste Water Treatment SystemMicroFASTยฎ - Advanced Waste Water Treatment System
MicroFASTยฎ - Advanced Waste Water Treatment System
ย 
SEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOWSEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOW
ย 
Sewage Treatment Plant Treatment For Wastewater
Sewage Treatment Plant Treatment For WastewaterSewage Treatment Plant Treatment For Wastewater
Sewage Treatment Plant Treatment For Wastewater
ย 
Waste water treatment success story
Waste water treatment success storyWaste water treatment success story
Waste water treatment success story
ย 
water treatment plant
water treatment plantwater treatment plant
water treatment plant
ย 
Effluent treatment plant - design, operation and analysis of waste water trea...
Effluent treatment plant - design, operation and analysis of waste water trea...Effluent treatment plant - design, operation and analysis of waste water trea...
Effluent treatment plant - design, operation and analysis of waste water trea...
ย 
Waste water treatment plant product catalouge 2016
Waste water treatment plant product catalouge 2016Waste water treatment plant product catalouge 2016
Waste water treatment plant product catalouge 2016
ย 
Delay analysis of raw water reservoir and pumping Station
Delay analysis of raw water reservoir and pumping StationDelay analysis of raw water reservoir and pumping Station
Delay analysis of raw water reservoir and pumping Station
ย 
Effluent Treatment Plant(ETP)
Effluent Treatment Plant(ETP)Effluent Treatment Plant(ETP)
Effluent Treatment Plant(ETP)
ย 
Design manual-pump-station
Design manual-pump-stationDesign manual-pump-station
Design manual-pump-station
ย 
sewage treatment plant
sewage treatment plantsewage treatment plant
sewage treatment plant
ย 
VISITA DEPURADORA DE CALAHORRA
VISITA DEPURADORA DE CALAHORRAVISITA DEPURADORA DE CALAHORRA
VISITA DEPURADORA DE CALAHORRA
ย 
Biotechnology in Industrial Waste water Treatment
Biotechnology in Industrial Waste water TreatmentBiotechnology in Industrial Waste water Treatment
Biotechnology in Industrial Waste water Treatment
ย 
S&L Wwmps
S&L WwmpsS&L Wwmps
S&L Wwmps
ย 
Project #2 - Sewer Treatment Plant - Electrical Drawings Upgrade
Project #2 - Sewer Treatment Plant - Electrical Drawings UpgradeProject #2 - Sewer Treatment Plant - Electrical Drawings Upgrade
Project #2 - Sewer Treatment Plant - Electrical Drawings Upgrade
ย 
Wastewater treatment plant
Wastewater treatment plantWastewater treatment plant
Wastewater treatment plant
ย 
Use of microorganisms in wastewater treatment
Use of microorganisms in wastewater treatmentUse of microorganisms in wastewater treatment
Use of microorganisms in wastewater treatment
ย 
ETP- Effluent Treatment Plant
ETP- Effluent Treatment PlantETP- Effluent Treatment Plant
ETP- Effluent Treatment Plant
ย 
Efflunt treatment plant ppt
Efflunt treatment plant pptEfflunt treatment plant ppt
Efflunt treatment plant ppt
ย 
Sewage treatment plant
Sewage treatment plantSewage treatment plant
Sewage treatment plant
ย 

Similar to L 9 pumping stations

Preventive Maintenance for CP by Eng. Amer Hamdan
Preventive Maintenance for CP by Eng. Amer HamdanPreventive Maintenance for CP by Eng. Amer Hamdan
Preventive Maintenance for CP by Eng. Amer Hamdan
Eng. Amer Hamdan
ย 
ARTIFICIAL-LIFT-MhndndshhsjhshsndikenETHODS.pptx
ARTIFICIAL-LIFT-MhndndshhsjhshsndikenETHODS.pptxARTIFICIAL-LIFT-MhndndshhsjhshsndikenETHODS.pptx
ARTIFICIAL-LIFT-MhndndshhsjhshsndikenETHODS.pptx
54PeAravindswamy
ย 
Recovery_techniques__1674919213.pdf
Recovery_techniques__1674919213.pdfRecovery_techniques__1674919213.pdf
Recovery_techniques__1674919213.pdf
Ahmed133796
ย 
rain-water-harvesting-Seminar-Report-pdf.pdf
rain-water-harvesting-Seminar-Report-pdf.pdfrain-water-harvesting-Seminar-Report-pdf.pdf
rain-water-harvesting-Seminar-Report-pdf.pdf
shrishridharshri3693
ย 
Penstocks, powerhouse and tailrace
Penstocks, powerhouse and tailracePenstocks, powerhouse and tailrace
Penstocks, powerhouse and tailrace
Rakesh Sunari Magar
ย 

Similar to L 9 pumping stations (20)

PLANNING & DESIGN OF LIFT IRRIGATION.pptx
PLANNING & DESIGN OF LIFT IRRIGATION.pptxPLANNING & DESIGN OF LIFT IRRIGATION.pptx
PLANNING & DESIGN OF LIFT IRRIGATION.pptx
ย 
Artificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfArtificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdf
ย 
Pumping Equipment
Pumping Equipment Pumping Equipment
Pumping Equipment
ย 
Unit I Water Distribution System.pdf
Unit I Water Distribution System.pdfUnit I Water Distribution System.pdf
Unit I Water Distribution System.pdf
ย 
Hydraulic Ram Pump Mini-Project Report - Agriculture and Rural Development, A...
Hydraulic Ram Pump Mini-Project Report - Agriculture and Rural Development, A...Hydraulic Ram Pump Mini-Project Report - Agriculture and Rural Development, A...
Hydraulic Ram Pump Mini-Project Report - Agriculture and Rural Development, A...
ย 
Types of pumping equipements
Types of pumping equipementsTypes of pumping equipements
Types of pumping equipements
ย 
Water transportation to drilling sites
Water transportation to drilling sitesWater transportation to drilling sites
Water transportation to drilling sites
ย 
5 Pumps Product Training March 2022.pptx
5 Pumps Product Training March 2022.pptx5 Pumps Product Training March 2022.pptx
5 Pumps Product Training March 2022.pptx
ย 
Preventive Maintenance for CP by Eng. Amer Hamdan
Preventive Maintenance for CP by Eng. Amer HamdanPreventive Maintenance for CP by Eng. Amer Hamdan
Preventive Maintenance for CP by Eng. Amer Hamdan
ย 
Wastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutionsWastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutions
ย 
GWHMODULE5.pptx
GWHMODULE5.pptxGWHMODULE5.pptx
GWHMODULE5.pptx
ย 
Mine dewatering techniques
Mine dewatering techniquesMine dewatering techniques
Mine dewatering techniques
ย 
237978847 pipin-study-7
237978847 pipin-study-7237978847 pipin-study-7
237978847 pipin-study-7
ย 
ARTIFICIAL-LIFT-MhndndshhsjhshsndikenETHODS.pptx
ARTIFICIAL-LIFT-MhndndshhsjhshsndikenETHODS.pptxARTIFICIAL-LIFT-MhndndshhsjhshsndikenETHODS.pptx
ARTIFICIAL-LIFT-MhndndshhsjhshsndikenETHODS.pptx
ย 
Rooftop rainwater harvesting system.
Rooftop rainwater harvesting system.Rooftop rainwater harvesting system.
Rooftop rainwater harvesting system.
ย 
Recovery_techniques__1674919213.pdf
Recovery_techniques__1674919213.pdfRecovery_techniques__1674919213.pdf
Recovery_techniques__1674919213.pdf
ย 
sewage and sewer.pptx
sewage and sewer.pptxsewage and sewer.pptx
sewage and sewer.pptx
ย 
rain-water-harvesting-Seminar-Report-pdf.pdf
rain-water-harvesting-Seminar-Report-pdf.pdfrain-water-harvesting-Seminar-Report-pdf.pdf
rain-water-harvesting-Seminar-Report-pdf.pdf
ย 
Penstocks, powerhouse and tailrace
Penstocks, powerhouse and tailracePenstocks, powerhouse and tailrace
Penstocks, powerhouse and tailrace
ย 
C3.2.3&4. Fluid Recovery _2020
C3.2.3&4. Fluid Recovery _2020C3.2.3&4. Fluid Recovery _2020
C3.2.3&4. Fluid Recovery _2020
ย 

More from Dr. shrikant jahagirdar

Indoor Air Pollution .......................
Indoor Air Pollution .......................Indoor Air Pollution .......................
Indoor Air Pollution .......................
Dr. shrikant jahagirdar
ย 

More from Dr. shrikant jahagirdar (20)

Indoor Air Pollution .......................
Indoor Air Pollution .......................Indoor Air Pollution .......................
Indoor Air Pollution .......................
ย 
06 Filtration.ppt
06 Filtration.ppt06 Filtration.ppt
06 Filtration.ppt
ย 
Oxidation pond problem
Oxidation pond problemOxidation pond problem
Oxidation pond problem
ย 
Module v Environmental Sanitation
Module v Environmental SanitationModule v Environmental Sanitation
Module v Environmental Sanitation
ย 
Module VI Rural Sanitation
Module VI Rural SanitationModule VI Rural Sanitation
Module VI Rural Sanitation
ย 
Module IV Wastewater treatment methods
Module IV Wastewater treatment methodsModule IV Wastewater treatment methods
Module IV Wastewater treatment methods
ย 
Hw2 do sag curve
Hw2 do sag curveHw2 do sag curve
Hw2 do sag curve
ย 
Do sag problems
Do sag problemsDo sag problems
Do sag problems
ย 
Do sag curve
Do sag curveDo sag curve
Do sag curve
ย 
Module iii
Module iiiModule iii
Module iii
ย 
Septic tank
Septic tankSeptic tank
Septic tank
ย 
Unit viii
Unit viiiUnit viii
Unit viii
ย 
Unit vii
Unit viiUnit vii
Unit vii
ย 
L tannery industry
L tannery industryL tannery industry
L tannery industry
ย 
L sugar industry
L sugar industryL sugar industry
L sugar industry
ย 
L distillery industry
L distillery industryL distillery industry
L distillery industry
ย 
L dairy industry
L dairy industryL dairy industry
L dairy industry
ย 
L 31 Water Pollution act and other topics
L 31 Water Pollution act and other topicsL 31 Water Pollution act and other topics
L 31 Water Pollution act and other topics
ย 
L 30 fertilizer industry
L 30 fertilizer industryL 30 fertilizer industry
L 30 fertilizer industry
ย 
L 29 steel industry
L 29 steel industryL 29 steel industry
L 29 steel industry
ย 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
ย 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
ย 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 

Recently uploaded (20)

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ย 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
ย 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
ย 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
ย 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
ย 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
ย 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
ย 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
ย 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
ย 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
ย 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
ย 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
ย 

L 9 pumping stations

  • 5. The need for sewer pumping stations arises when โ€ข The existing topography and required minimum sewer grades create deep sewers that have high construction costs. The sewage is raised and then conveyedThe sewage is raised and then conveyed by gravity. โ€ข Basements are too low to discharge sewage to the main sewer. โ€ข Sewage must be conveyed over a ridge.
  • 6. โ€ข The sewage must be raised to get head for gravity flow through a treatment plant. โ€ข Discharge outlets are below the level of the receiving body of water.
  • 7. Problems is sewage pumping 1. Sewage has foul characteristics 2. Sewage has lot of suspended solids and floating matter. Which may make running of pumps difficult and may cause frequentpumps difficult and may cause frequent clogging of pumps. 3. Sewage may contain organic and inorganic waste, which may cause corrosion and errosion of parts of the pumps and reduce life of pumps.
  • 8. 4. Sewage contains pathogens which may cause health problems to working persons at sewage pumping station. 5. The rate sewage flow varies hourly hence rate of pumping has to be adjusted accordingly 6.Size of sump is limited since large size of6.Size of sump is limited since large size of sump results in settlement of solids and organic matter at its bottom. 7. Pumps should be of high order reliability since failure of pumps will lead to flooding of adjoining areas.
  • 9.
  • 10. Pumping station โ€ข Dry well :- For housing the pumps โ€ข Wet well: - For incoming sewage. โ€ข Rising main:- To led the pumped sewagetoโ€ข Rising main:- To led the pumped sewageto high leveled gravity sewer. โ€ข Pumps used:- Centrifugal, Reciprocating, Propeller of axial flow, Air pressure pumps or ejectors
  • 11. Design criteria 1. Hydraulic retention time HRT:- retention time of wet well usually does not exceed 20 min. 2. High and low water levels:- These are fixed in the wet well in order to determine position of suction pipes for the pumps. 3. Screens :- these are required to remove floating matter that may clog and damage the pump
  • 12. 4. Standby pumps :- At least one extra pump more than the pumps required per design, should always be provided to act as standby so that it can be used when one of the workingso that it can be used when one of the working pimps under maintainance or repair 5. Additional Space :- Provision for extra space for dy wells in the design of the pump house to install additional pumps in future should be kept at initial planning stage itself
  • 13. Formulae used 1. For finding frictional losses in pipe h = (fLv2/2gd)hf= (fLv2/2gd) v= velocity of flow in rising main d= dia of rising main L= length of pipe
  • 14. 2. Power of pump P=(w.Qp.H)/(75ฮทpฮทm) w= density of water in kg/m3 Qp=Flow to be lifted by pump H= total headH= total head ฮทp ฮทm= Efficiency of pump and driving motor resp.
  • 15. Objective Questions 1. _____________________ matter may clog the pump. 2.________ and_____________ wells are provided in pumping stations.provided in pumping stations. 3. Dry well is required for ___________________________. 4. Wet well is required for _________________.
  • 16. Theory questions Q1. Write short note on 1. Sewage pumping 2. Difficulties in sewage pumping2. Difficulties in sewage pumping 3. Design of sewage pumping station