Percent of work complete
100%
Earned Value
EV= 4,134 X 100% = $4,134
Project Total PV = $4,134
$0.00
$1,250.00
$2,500.00
$3,750.00
$5,000.00
0 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7
PV AC EV
SV= 0
PV = $2574
EV = $2574
Be Careful When
Using Money to
Measure Time
Indexes to Monitor Progress

More Related Content

Viewers also liked

Viewers also liked (14)

S3 ventures profile
S3 ventures profileS3 ventures profile
S3 ventures profile
 
A.MARWA QNET: BOM MONASTIR 02/10/2011
A.MARWA QNET: BOM MONASTIR 02/10/2011A.MARWA QNET: BOM MONASTIR 02/10/2011
A.MARWA QNET: BOM MONASTIR 02/10/2011
 
Npm controllers specsheet
Npm controllers specsheetNpm controllers specsheet
Npm controllers specsheet
 
Fountain Repairs Springfield IL 816-500-4198
Fountain Repairs Springfield IL 816-500-4198Fountain Repairs Springfield IL 816-500-4198
Fountain Repairs Springfield IL 816-500-4198
 
Monitorización de ubuntu 15.04, Vivid Vervet
Monitorización de ubuntu 15.04, Vivid VervetMonitorización de ubuntu 15.04, Vivid Vervet
Monitorización de ubuntu 15.04, Vivid Vervet
 
MDIA201-11
MDIA201-11MDIA201-11
MDIA201-11
 
How to Play Capture the Flag
How to Play Capture the FlagHow to Play Capture the Flag
How to Play Capture the Flag
 
How to Star Jump
How to Star JumpHow to Star Jump
How to Star Jump
 
Syed Shofiul Alom
Syed Shofiul AlomSyed Shofiul Alom
Syed Shofiul Alom
 
Project Management @ Ektoo
Project Management @ EktooProject Management @ Ektoo
Project Management @ Ektoo
 
Basics of PMP Certification
Basics of PMP CertificationBasics of PMP Certification
Basics of PMP Certification
 
How To Upgrade Yourself To The PMBOK Guide 5th Edition
How To Upgrade Yourself To The PMBOK Guide 5th EditionHow To Upgrade Yourself To The PMBOK Guide 5th Edition
How To Upgrade Yourself To The PMBOK Guide 5th Edition
 
Fast Tracking a Project
Fast Tracking a ProjectFast Tracking a Project
Fast Tracking a Project
 
Webinar On Product Backlog
Webinar On Product BacklogWebinar On Product Backlog
Webinar On Product Backlog
 

More from J. Scott Christianson

The Future of Money: Central Bank Digital Currencies
The Future of Money: Central Bank Digital CurrenciesThe Future of Money: Central Bank Digital Currencies
The Future of Money: Central Bank Digital CurrenciesJ. Scott Christianson
 
The Future of Money: Decentralized Finance
The Future of Money: Decentralized FinanceThe Future of Money: Decentralized Finance
The Future of Money: Decentralized FinanceJ. Scott Christianson
 
Turning to Teaching: Going from Industry Leader to Classroom Teacher.
Turning to Teaching: Going from Industry Leader to Classroom Teacher.Turning to Teaching: Going from Industry Leader to Classroom Teacher.
Turning to Teaching: Going from Industry Leader to Classroom Teacher.J. Scott Christianson
 
Meet the Learning Machine: How Artificial Intelligence is transforming our wo...
Meet the Learning Machine: How Artificial Intelligence is transforming our wo...Meet the Learning Machine: How Artificial Intelligence is transforming our wo...
Meet the Learning Machine: How Artificial Intelligence is transforming our wo...J. Scott Christianson
 
Smart Homes, Smart Farms, Smart Cities and the Internet of Things.
Smart Homes, Smart Farms, Smart Cities and the Internet of Things.Smart Homes, Smart Farms, Smart Cities and the Internet of Things.
Smart Homes, Smart Farms, Smart Cities and the Internet of Things.J. Scott Christianson
 
Small Biz vs. Start-Up, Fast Follower vs. First Mover
Small Biz vs. Start-Up, Fast Follower vs. First MoverSmall Biz vs. Start-Up, Fast Follower vs. First Mover
Small Biz vs. Start-Up, Fast Follower vs. First MoverJ. Scott Christianson
 
Agile and Traditional Project Management
Agile and Traditional Project ManagementAgile and Traditional Project Management
Agile and Traditional Project ManagementJ. Scott Christianson
 
Using Print Anything 3D Printing in Your Class
Using Print Anything 3D Printing in Your ClassUsing Print Anything 3D Printing in Your Class
Using Print Anything 3D Printing in Your ClassJ. Scott Christianson
 
Bottom-up time estimations techiques
Bottom-up time estimations techiquesBottom-up time estimations techiques
Bottom-up time estimations techiquesJ. Scott Christianson
 
Schedule Performance Index (SPI) in Project Management
Schedule Performance Index (SPI) in Project ManagementSchedule Performance Index (SPI) in Project Management
Schedule Performance Index (SPI) in Project ManagementJ. Scott Christianson
 

More from J. Scott Christianson (20)

The Future of Money: Central Bank Digital Currencies
The Future of Money: Central Bank Digital CurrenciesThe Future of Money: Central Bank Digital Currencies
The Future of Money: Central Bank Digital Currencies
 
The Future of Money: Decentralized Finance
The Future of Money: Decentralized FinanceThe Future of Money: Decentralized Finance
The Future of Money: Decentralized Finance
 
Purpose of a grade
Purpose of a gradePurpose of a grade
Purpose of a grade
 
Churn and Customer LIfetime Value
Churn and Customer LIfetime ValueChurn and Customer LIfetime Value
Churn and Customer LIfetime Value
 
Porters 5 forces
Porters 5 forcesPorters 5 forces
Porters 5 forces
 
Turning to Teaching: Going from Industry Leader to Classroom Teacher.
Turning to Teaching: Going from Industry Leader to Classroom Teacher.Turning to Teaching: Going from Industry Leader to Classroom Teacher.
Turning to Teaching: Going from Industry Leader to Classroom Teacher.
 
Meet the Learning Machine: How Artificial Intelligence is transforming our wo...
Meet the Learning Machine: How Artificial Intelligence is transforming our wo...Meet the Learning Machine: How Artificial Intelligence is transforming our wo...
Meet the Learning Machine: How Artificial Intelligence is transforming our wo...
 
Smart Homes, Smart Farms, Smart Cities and the Internet of Things.
Smart Homes, Smart Farms, Smart Cities and the Internet of Things.Smart Homes, Smart Farms, Smart Cities and the Internet of Things.
Smart Homes, Smart Farms, Smart Cities and the Internet of Things.
 
The blockchain game
The blockchain gameThe blockchain game
The blockchain game
 
Crossing the Chasm
Crossing the ChasmCrossing the Chasm
Crossing the Chasm
 
Technology Adoption LifeCycle
Technology Adoption LifeCycle Technology Adoption LifeCycle
Technology Adoption LifeCycle
 
Gartner Hype-Cycle
Gartner Hype-CycleGartner Hype-Cycle
Gartner Hype-Cycle
 
Drivers of Exponential Growth
Drivers of Exponential GrowthDrivers of Exponential Growth
Drivers of Exponential Growth
 
The Six Ds of Exponential Growth
The Six Ds of Exponential GrowthThe Six Ds of Exponential Growth
The Six Ds of Exponential Growth
 
Small Biz vs. Start-Up, Fast Follower vs. First Mover
Small Biz vs. Start-Up, Fast Follower vs. First MoverSmall Biz vs. Start-Up, Fast Follower vs. First Mover
Small Biz vs. Start-Up, Fast Follower vs. First Mover
 
Agile and Traditional Project Management
Agile and Traditional Project ManagementAgile and Traditional Project Management
Agile and Traditional Project Management
 
Copy and Paste Hardware
Copy and Paste Hardware Copy and Paste Hardware
Copy and Paste Hardware
 
Using Print Anything 3D Printing in Your Class
Using Print Anything 3D Printing in Your ClassUsing Print Anything 3D Printing in Your Class
Using Print Anything 3D Printing in Your Class
 
Bottom-up time estimations techiques
Bottom-up time estimations techiquesBottom-up time estimations techiques
Bottom-up time estimations techiques
 
Schedule Performance Index (SPI) in Project Management
Schedule Performance Index (SPI) in Project ManagementSchedule Performance Index (SPI) in Project Management
Schedule Performance Index (SPI) in Project Management
 

Recently uploaded

Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfNainaShrivastava14
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 

Recently uploaded (20)

Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 

Problems using money to measure time

Editor's Notes

  1. Using Money to Measure Time works fine while the activity or project is underway, but once the activity or project is completed, the SPI will be 1.00 regardless of how late the activity or project was delivered.
  2. And overall as a project we have 50% of the work complete:
  3. As you might be able to imagine, we can extrapolate from here. Where will we endup if things keep going the way they are, What will we need to do get thing back on track.
  4. Using Money to Measure Time works fine while the activity or project is underway, but once the activity or project is completed, the SPI will be 1.00 regardless of how late the activity or project was delivered.