The Seven Wastes

J

Value" is any action or process that a customer would be willing to pay for. Lean manufacturing is a management philosophy focused on the reduction of the "seven wastes in" order to improve overall customer value.

14/07/2009




          Topics on Quality, Lean
       Manufacturing and Productivity
               Improvement



                THE SEVEN
                 WASTES
                                 Presented by
                              JORGE ROS




                         Lean Definitions

 Waste: Anything other than the exact amount of equipment, materials, parts,
  space, and workers' efforts that are absolutely essential to add value to a
  product.
           This is: Everything that increases production costs without
            adding value to what is being produced.
 Value-Added: Anything that the customer wants and is willing to pay for it.

 Non-Value-Added: Anything that the customer doesn't wants and won’t
  pay for it.


       CUSTOMERS WILL ONLY PAY FOR THOSE THINGS THAT HE
       NEEDS AND ITS USEFUL FOR HIM. ANY OTHER THING WE DO IS
       A WASTE, A DISPEND OR WHATEVER WAY WE WANT TO NAME
       IT.
                              ¿WHO PAYS FOR IT?




                                                                                        1
14/07/2009




       The Toyota Production System




The Toyota Production System definition states that it is:
“A philosophical approach to business that is based on satisfying the
customer (internal or external) by producing quality products that are
just what they need, when they need them, in the quantity required
using a minimum of materials, equipment, space, labor and time (in
summary: To eliminate wastes).”




           Lean System Components


PHILOSOPHY: To Eliminate Waste, Human Development,
Teamwork, Quality, Continuous Improvement, Problem
Solving, JIT, etc.
TOOLS: Kanban, TPM, 5-S, Mistake proofing, Cellular
Manufacturing, One Piece Flow, Quick Changeover,
Standardization, Value Chain Mapping, etc.
ACTION: Problem Solving, Brainstorming, Root Cause
Analysis, Implementation, Process Improvement Teams,
Training & Learning, etc.




                                                                                 2
14/07/2009




  Lean Philosophy Basics: for a new Culture


 JIT - Build to order. Produce     CUSTOMER FOCUS -
  only what is needed.                Satisfy customer needs.

 QUALITY - Don’t pass a bad        TRAINING - Everyone
  part to the next process.           knows what is normal or a
                                      special variation.
 STANDARDIZATION -
  Standardize processes.            COMMUNICATIONS -
                                      Communicate all useful
 LEAN - Eliminate all waste.
                                      information in a usable form.




Lean Philosophy Basics for a new Culture


 PRODUCE WITH QUALITY              VOICE OF THE CUSTOMER
  –Think of a production system,     - Learn from customers.
  not a quality system
                                    MORE TRAINING - Team
 INNOVATION - Try new ideas.        training & Problem Solving.
  Change. Improve.
                                    KAIZEN - Continuous
 TEAM WORK - Everyone               Improvement (PDCA).
  participates. Management
                                    PROCESS ORIENTED -
  supports workers.
                                     Focus on the process not the
                                     results.




                                                                              3
14/07/2009




                       The Seven Wastes

   1. Overproduction.


                                          2. Wait Time.


   3. Transportation waste.


                                   4. Processing waste.


   5. Motion/Movement waste.


                                    6. Inventory waste.


   7. Defects waste.




                        Overproduction
Producing more products than is needed, faster than needed
or before they are needed is a waste.
Adding extra units to the quantity needed “just in case” or building to a
pre-defined lot or batch size is also wasteful.




                                                                                    4
14/07/2009




        Consequences of Over-Production

 Loss of Production Control.
 Fixing rejects becomes a low priority.
 Increased Mix-ups, mistakes and confusion.
 Valuable time and resources consumed (wasted) building
 products that are not a priority.




                 Overproduction Causes


• Poor Planning Process.
• “Just-in-case” instead of “Just-in-time” production.
• Poor communications between departments.
• Low Capability Processes, that are unable of producing the quantity
  and/or quality required in a consistent basis.
• Prolonged setup and cycle times.
• Sub-optimization caused by local optimization (Processes that
  benefits a single department’s interests against the organization’s
  interests).
• Low equipment reliability.




                                                                                5
14/07/2009




                           Wait Time

Wait time waste occurs when a worker cannot proceed with
the next task in a process.
There are workers waiting and doing nothing (wasting their time or
making others waste theirs) while others workload is excessive.




                    Wait Time causes


    Lack of an adequate maintenance.
    Need of proper tools or materials.
    Lengthy setup times.
    Lack of cross training.
    Lack of SOP or undocumented work methods.
    Production bottle necks.
    Irregular distribution of training.




                                                                             6
14/07/2009




        Consequences of Wait Time waste


•   Personnel that cost doing nothing (adding no value).
•   Delays that lead to overtime to conclude what was programmed.
•   Costs due to inefficient processes that exceed the standard costs.
•   Loss of motivation; Low morale.




                  Transportation Waste
Any material movement that does not directly support
immediate production.
When product is transported to a place other than the next process
location or, the next process is not located adjacent to the current one.




                                                                                    7
14/07/2009




         Examples of Transportation waste

      Units are parked off the production floor to gather a
        “full lot” for a batch operation.
      Production Lots that are sent off to the other side of
        the plant for the next process step.
      This can occur, either between operations or within
        an operation where workstations are not properly laid
        off.
      Containers that are too big and difficult to open or
        close.
      Excess of material handling equipment. Lift-trucks
        that travel empty.




             Transportation waste causes

• Improper Facility Layout
• Large buffers .
• Large lot purchasing or processing.
• Poor production planning.
• Poor scheduling.
• Poor work place organization.




                                                                        8
14/07/2009




                    Processing waste

Any unnecessary step, either production or communication,
that adds no value to a product or service.
Occurs when we execute an operations, and the customer is not willing
to pay for what is being done.




               Processing waste causes

 Lack of a concurrent design.
 Processes poorly documented (Lack of SOP’s).
 Lack of customer input concerning requirements.
 Poor configuration control.
 Quality Standards not related to customer needs.
 Redundant inspections and approvals.




                                                                                9
14/07/2009




         Consequences of Processing waste


•   Time spent building a feature that is irrelevant to the
    customer and that the customer will not pay for.
•   Additional costs for materials used in excess.
•   Lack of control because improper use of design documents.
•   Products that either, exceed the requirements of the
    customer or fail to comply with them.




                Motion/Movement waste

Any movement of people which does not contribute to add value to
the product or service.
Persons moving from one place to another create a false impression of being
working, while in reality, are doing nothing. They are costing while adding no
value.




                                                                                        10
14/07/2009




 Consequences of Motion/Movement waste

  Employees move from one workstation to another, doing
     nothing.
    They are unnecessary trips.
    No value is added during this process.
    Include time spent looking for parts, tools, fixtures, etc.
    Include time spent going to/from a warehouse.




         Motion/Movement waste Causes


• Ineffective Layouts (equipment, office and plant).
• Lack of Visual controls.
• Poor Process Documentation.
• Poor work place organization.




                                                                          11
14/07/2009




                      Inventory waste

Any supply (Materials or Goods) in excess of what is required
to deliver products in a Just-In-Time manner.
These parts will need to be processed, moved, counted, stored, etc. Will
add to costs and can not be shipped to our customers.




                Inventory waste causes

 Poor sales forecasting (Demand Forecasting).
 Long lead times (set-up and cycle times).
 Poor inventory planning.
 Poor inventory tracking.
 Unbalanced production processes.
 Processes that can not produce the required quantity or quality of
  products in a consistent manner.
 Suppliers that can not supply the required quantity or quality of
  products in a consistent manner.




                                                                                  12
14/07/2009




            Consequences of Inventory waste

•      Large lot purchases of raw materials, only to be stored for
       weeks or months.
•      Very large WIP’s inventories.
•      Low inventory turnover. Need of large working capital to
       finance inventories.
•      Damaged Products.
•      Obsolete products.




                             Defects waste

    Costs due to sorting, repairing and/or repairing products.
    Include cost of materials scrapped due to defects.
    Also consist in the cost of goods returned by customers, recall
    campaigns.
    Recycling part of the products is also a waste.




                                                                             13
14/07/2009




                   Defects waste causes

 Too many product models.
 High inventory levels.
 Inadequate tools/equipment.
 Poor employee training.
 Poor layouts.
 Unnecessary handling.
 Poor process documentation.
 Processes that can not produce the required quantity or quality of
    products in a consistent manner.
 Suppliers that can not supply the required quantity or quality of
    products in a consistent manner.




           Consequences of Defects waste


•   Excessive processing costs.
•   Many additional non-value-added processes or operations.
•   Additional quality control inspections needed.
•   Damaged relations with customers.




                                                                              14

Recomendados

8 muda waste_identifying_preview von
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_previewJaroslaw Gadek, MBA
5K views46 Folien
Identify 7 Wastes von
Identify 7 WastesIdentify 7 Wastes
Identify 7 WastesLean for U
19.7K views11 Folien
8 Wastes of Lean von
8 Wastes of Lean8 Wastes of Lean
8 Wastes of LeanPraneet Surti
3K views25 Folien
Types of waste - lean Concept Krishna Heda von
Types of waste - lean Concept Krishna HedaTypes of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna Hedakrishnaheda
11.1K views22 Folien
Manufacturing wastes von
Manufacturing wastesManufacturing wastes
Manufacturing wastesMohamed EL-Sayed
4.3K views34 Folien
History of Lean manufacturing & TPS 14 Principal von
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalSumon Kumar Kundu
3.6K views29 Folien

Más contenido relacionado

Was ist angesagt?

Lean Manufacturing - An Overview von
Lean Manufacturing - An OverviewLean Manufacturing - An Overview
Lean Manufacturing - An OverviewKanzen Institute Asia-Pacific
1.1K views26 Folien
Lean basics von
Lean basicsLean basics
Lean basicsAryan Viswakarma
1.4K views55 Folien
The 8 waste in Lean Manufacturing - Lean Six Sigma Training von
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingAnkit Sharma
2K views23 Folien
Mura muri muda von
Mura muri mudaMura muri muda
Mura muri mudaSwapnil Chavan
1K views32 Folien
7 waste in the production von
7 waste in the production7 waste in the production
7 waste in the productionBCC-Consulting FM
4.2K views11 Folien
A training on 3 m’s in lean management von
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean managementPramod A
3.4K views22 Folien

Was ist angesagt?(20)

The 8 waste in Lean Manufacturing - Lean Six Sigma Training von Ankit Sharma
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
Ankit Sharma2K views
A training on 3 m’s in lean management von Pramod A
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean management
Pramod A3.4K views
Lean manufacturing overview von Pruek Pinyo
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
Pruek Pinyo1.5K views
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa... von SN Panigrahi, PMP
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
SN Panigrahi, PMP3.7K views
Ian's 7 wastes of production von Ian Timm
Ian's 7 wastes of productionIan's 7 wastes of production
Ian's 7 wastes of production
Ian Timm559 views
Lean manufacturing von skchawla4
Lean manufacturingLean manufacturing
Lean manufacturing
skchawla42.6K views
Muda von kushal56
MudaMuda
Muda
kushal5610.5K views
Seven wastes of lean operations management von Hriday Bora
Seven wastes of lean operations managementSeven wastes of lean operations management
Seven wastes of lean operations management
Hriday Bora5.1K views
Lean manufacturing basics von sarah bridge
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
sarah bridge3.6K views
Muda,Mura & Muri von manijayjay
Muda,Mura & MuriMuda,Mura & Muri
Muda,Mura & Muri
manijayjay41.6K views
New Employee Lean Orientation von flevko
New Employee Lean OrientationNew Employee Lean Orientation
New Employee Lean Orientation
flevko5.4K views
Lean Manufacturing PowerPoint Presentation Sample von Andrew Schwartz
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
Andrew Schwartz101K views

Destacado

Negotiation skills von
Negotiation skillsNegotiation skills
Negotiation skillsVijay Anand L V
6.1K views7 Folien
Persuading, influencing and negotiating skills von
Persuading, influencing and negotiating skillsPersuading, influencing and negotiating skills
Persuading, influencing and negotiating skillsMohammed Gamal
8.4K views15 Folien
Leadership Is A Conversation By Kartik Baug von
Leadership Is A Conversation   By Kartik BaugLeadership Is A Conversation   By Kartik Baug
Leadership Is A Conversation By Kartik BaugKartik Baug
3.7K views12 Folien
Process F.M.E.A von
Process F.M.E.AProcess F.M.E.A
Process F.M.E.APankaj Nalwa
16.5K views21 Folien
Fmea presentation von
Fmea presentationFmea presentation
Fmea presentationMurat Terzi
28.1K views74 Folien
FMEA Presentation von
FMEA PresentationFMEA Presentation
FMEA PresentationGaurav Sharma
17K views28 Folien

Destacado(18)

Persuading, influencing and negotiating skills von Mohammed Gamal
Persuading, influencing and negotiating skillsPersuading, influencing and negotiating skills
Persuading, influencing and negotiating skills
Mohammed Gamal8.4K views
Leadership Is A Conversation By Kartik Baug von Kartik Baug
Leadership Is A Conversation   By Kartik BaugLeadership Is A Conversation   By Kartik Baug
Leadership Is A Conversation By Kartik Baug
Kartik Baug3.7K views
Fmea presentation von Murat Terzi
Fmea presentationFmea presentation
Fmea presentation
Murat Terzi28.1K views
Training 7 waste (7 pemborosan) von Titip Novika
Training 7 waste (7 pemborosan)Training 7 waste (7 pemborosan)
Training 7 waste (7 pemborosan)
Titip Novika18.7K views
Influencing skills von Alan Barker
Influencing skillsInfluencing skills
Influencing skills
Alan Barker30.9K views
Negotiation,Definition,Types, Preparation Of Negotiation,Duties Of Negotiator von SEBIN CHACKO
Negotiation,Definition,Types, Preparation Of Negotiation,Duties Of NegotiatorNegotiation,Definition,Types, Preparation Of Negotiation,Duties Of Negotiator
Negotiation,Definition,Types, Preparation Of Negotiation,Duties Of Negotiator
SEBIN CHACKO83.3K views
FMEA Introduction.ppt von bowerj
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.ppt
bowerj109.7K views
Decision making & problem solving von ashish1afmi
Decision making & problem solvingDecision making & problem solving
Decision making & problem solving
ashish1afmi120.6K views
Decision making ppt von ashgrover
Decision making pptDecision making ppt
Decision making ppt
ashgrover214.2K views
Presentation [Full] Effective Communication Skills von Paven Garibandi
Presentation [Full]  Effective Communication SkillsPresentation [Full]  Effective Communication Skills
Presentation [Full] Effective Communication Skills
Paven Garibandi136.6K views
Effective Communication Skills von Ashit Jain
Effective Communication SkillsEffective Communication Skills
Effective Communication Skills
Ashit Jain120.4K views

Similar a The Seven Wastes

Process optimization & innovation in fabrication von
Process optimization & innovation in fabricationProcess optimization & innovation in fabrication
Process optimization & innovation in fabricationnaddirpatel
535 views29 Folien
Lean startup von
Lean startupLean startup
Lean startupSiddhartha Harit
198 views9 Folien
Lean manufanturing von
Lean manufanturingLean manufanturing
Lean manufanturingshahrool
320 views25 Folien
Waste in production von
Waste in productionWaste in production
Waste in productionProsenjit Banerjee
1.2K views24 Folien
Gagan toyota jit_production_mgmt von
Gagan toyota jit_production_mgmtGagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan Pareek, PMP
1.7K views14 Folien

Similar a The Seven Wastes(20)

Process optimization & innovation in fabrication von naddirpatel
Process optimization & innovation in fabricationProcess optimization & innovation in fabrication
Process optimization & innovation in fabrication
naddirpatel535 views
Lean manufanturing von shahrool
Lean manufanturingLean manufanturing
Lean manufanturing
shahrool320 views
M U D A Ellimination von DMR Panda
M U D A  ElliminationM U D A  Ellimination
M U D A Ellimination
DMR Panda5.3K views
Chapter-Two-Lean.pdf von mengist4
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdf
mengist47 views
Toyota Production System & 7 Muda von NED UET KHI
Toyota Production System & 7 MudaToyota Production System & 7 Muda
Toyota Production System & 7 Muda
NED UET KHI16K views
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM von SedhuSiddarth
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
SedhuSiddarth624 views
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnban von Akansha Jha
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnbanTQM, 5S, Kaizen, Poka-yoke, JIT, KAnban
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnban
Akansha Jha40.5K views

The Seven Wastes

  • 1. 14/07/2009 Topics on Quality, Lean Manufacturing and Productivity Improvement THE SEVEN WASTES Presented by JORGE ROS Lean Definitions  Waste: Anything other than the exact amount of equipment, materials, parts, space, and workers' efforts that are absolutely essential to add value to a product.  This is: Everything that increases production costs without adding value to what is being produced.  Value-Added: Anything that the customer wants and is willing to pay for it.  Non-Value-Added: Anything that the customer doesn't wants and won’t pay for it. CUSTOMERS WILL ONLY PAY FOR THOSE THINGS THAT HE NEEDS AND ITS USEFUL FOR HIM. ANY OTHER THING WE DO IS A WASTE, A DISPEND OR WHATEVER WAY WE WANT TO NAME IT. ¿WHO PAYS FOR IT? 1
  • 2. 14/07/2009 The Toyota Production System The Toyota Production System definition states that it is: “A philosophical approach to business that is based on satisfying the customer (internal or external) by producing quality products that are just what they need, when they need them, in the quantity required using a minimum of materials, equipment, space, labor and time (in summary: To eliminate wastes).” Lean System Components PHILOSOPHY: To Eliminate Waste, Human Development, Teamwork, Quality, Continuous Improvement, Problem Solving, JIT, etc. TOOLS: Kanban, TPM, 5-S, Mistake proofing, Cellular Manufacturing, One Piece Flow, Quick Changeover, Standardization, Value Chain Mapping, etc. ACTION: Problem Solving, Brainstorming, Root Cause Analysis, Implementation, Process Improvement Teams, Training & Learning, etc. 2
  • 3. 14/07/2009 Lean Philosophy Basics: for a new Culture  JIT - Build to order. Produce  CUSTOMER FOCUS - only what is needed. Satisfy customer needs.  QUALITY - Don’t pass a bad  TRAINING - Everyone part to the next process. knows what is normal or a special variation.  STANDARDIZATION - Standardize processes.  COMMUNICATIONS - Communicate all useful  LEAN - Eliminate all waste. information in a usable form. Lean Philosophy Basics for a new Culture  PRODUCE WITH QUALITY  VOICE OF THE CUSTOMER –Think of a production system, - Learn from customers. not a quality system  MORE TRAINING - Team  INNOVATION - Try new ideas. training & Problem Solving. Change. Improve.  KAIZEN - Continuous  TEAM WORK - Everyone Improvement (PDCA). participates. Management  PROCESS ORIENTED - supports workers. Focus on the process not the results. 3
  • 4. 14/07/2009 The Seven Wastes 1. Overproduction. 2. Wait Time. 3. Transportation waste. 4. Processing waste. 5. Motion/Movement waste. 6. Inventory waste. 7. Defects waste. Overproduction Producing more products than is needed, faster than needed or before they are needed is a waste. Adding extra units to the quantity needed “just in case” or building to a pre-defined lot or batch size is also wasteful. 4
  • 5. 14/07/2009 Consequences of Over-Production  Loss of Production Control.  Fixing rejects becomes a low priority.  Increased Mix-ups, mistakes and confusion.  Valuable time and resources consumed (wasted) building products that are not a priority. Overproduction Causes • Poor Planning Process. • “Just-in-case” instead of “Just-in-time” production. • Poor communications between departments. • Low Capability Processes, that are unable of producing the quantity and/or quality required in a consistent basis. • Prolonged setup and cycle times. • Sub-optimization caused by local optimization (Processes that benefits a single department’s interests against the organization’s interests). • Low equipment reliability. 5
  • 6. 14/07/2009 Wait Time Wait time waste occurs when a worker cannot proceed with the next task in a process. There are workers waiting and doing nothing (wasting their time or making others waste theirs) while others workload is excessive. Wait Time causes  Lack of an adequate maintenance.  Need of proper tools or materials.  Lengthy setup times.  Lack of cross training.  Lack of SOP or undocumented work methods.  Production bottle necks.  Irregular distribution of training. 6
  • 7. 14/07/2009 Consequences of Wait Time waste • Personnel that cost doing nothing (adding no value). • Delays that lead to overtime to conclude what was programmed. • Costs due to inefficient processes that exceed the standard costs. • Loss of motivation; Low morale. Transportation Waste Any material movement that does not directly support immediate production. When product is transported to a place other than the next process location or, the next process is not located adjacent to the current one. 7
  • 8. 14/07/2009 Examples of Transportation waste  Units are parked off the production floor to gather a “full lot” for a batch operation.  Production Lots that are sent off to the other side of the plant for the next process step.  This can occur, either between operations or within an operation where workstations are not properly laid off.  Containers that are too big and difficult to open or close.  Excess of material handling equipment. Lift-trucks that travel empty. Transportation waste causes • Improper Facility Layout • Large buffers . • Large lot purchasing or processing. • Poor production planning. • Poor scheduling. • Poor work place organization. 8
  • 9. 14/07/2009 Processing waste Any unnecessary step, either production or communication, that adds no value to a product or service. Occurs when we execute an operations, and the customer is not willing to pay for what is being done. Processing waste causes  Lack of a concurrent design.  Processes poorly documented (Lack of SOP’s).  Lack of customer input concerning requirements.  Poor configuration control.  Quality Standards not related to customer needs.  Redundant inspections and approvals. 9
  • 10. 14/07/2009 Consequences of Processing waste • Time spent building a feature that is irrelevant to the customer and that the customer will not pay for. • Additional costs for materials used in excess. • Lack of control because improper use of design documents. • Products that either, exceed the requirements of the customer or fail to comply with them. Motion/Movement waste Any movement of people which does not contribute to add value to the product or service. Persons moving from one place to another create a false impression of being working, while in reality, are doing nothing. They are costing while adding no value. 10
  • 11. 14/07/2009 Consequences of Motion/Movement waste  Employees move from one workstation to another, doing nothing.  They are unnecessary trips.  No value is added during this process.  Include time spent looking for parts, tools, fixtures, etc.  Include time spent going to/from a warehouse. Motion/Movement waste Causes • Ineffective Layouts (equipment, office and plant). • Lack of Visual controls. • Poor Process Documentation. • Poor work place organization. 11
  • 12. 14/07/2009 Inventory waste Any supply (Materials or Goods) in excess of what is required to deliver products in a Just-In-Time manner. These parts will need to be processed, moved, counted, stored, etc. Will add to costs and can not be shipped to our customers. Inventory waste causes  Poor sales forecasting (Demand Forecasting).  Long lead times (set-up and cycle times).  Poor inventory planning.  Poor inventory tracking.  Unbalanced production processes.  Processes that can not produce the required quantity or quality of products in a consistent manner.  Suppliers that can not supply the required quantity or quality of products in a consistent manner. 12
  • 13. 14/07/2009 Consequences of Inventory waste • Large lot purchases of raw materials, only to be stored for weeks or months. • Very large WIP’s inventories. • Low inventory turnover. Need of large working capital to finance inventories. • Damaged Products. • Obsolete products. Defects waste Costs due to sorting, repairing and/or repairing products. Include cost of materials scrapped due to defects. Also consist in the cost of goods returned by customers, recall campaigns. Recycling part of the products is also a waste. 13
  • 14. 14/07/2009 Defects waste causes  Too many product models.  High inventory levels.  Inadequate tools/equipment.  Poor employee training.  Poor layouts.  Unnecessary handling.  Poor process documentation.  Processes that can not produce the required quantity or quality of products in a consistent manner.  Suppliers that can not supply the required quantity or quality of products in a consistent manner. Consequences of Defects waste • Excessive processing costs. • Many additional non-value-added processes or operations. • Additional quality control inspections needed. • Damaged relations with customers. 14