LECTURE OBJECTIVES
Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
By the end of the lecture, participants are expected to:
 Explain the importance and functions of project
management and the project management cycle
 Understand the different stages of the project
management cycle
2
PROJECT MANAGEMENT
• The application of knowledge, skills, tools and
techniques to project activities to meet the
project requirements
• A set of principles, methods and techniques
used to effectively plan and control project
work
3Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
BENEFITS OF
PROJECT MANAGEMENT
• Defined goal and objectives
• Specified measurement of achievement
• Planned processes and decision-making
routes
• Allocated and coordinated use of resources
• Identified and managed risks, bottlenecks
• Better prospect of achieving the planned
outcome
4Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
PROJECT MANAGEMENT
Introduction/ History of project management
5Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
FUNCTIONS OF PM
Planning Directing Organizing
Staffing Controlling Coordinating
6Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
FUNCTIONS OF PM
7Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
• As a process, (1) identify the
gap between the current
state and the desired future,
(2) evaluate alternative
approaches, and (3)
recommend a preferred
course of action into a viable
plan
Planning
FUNCTIONS OF PM
8Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
• Communicates goals, purposes, procedures
and means to those who will do the work
Directing
FUNCTIONS OF PM
9Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
• Brings together non-human
resources to achieve the
project objectives
• Manages procurement life
cycle of the project
Organizing
FUNCTIONS OF PM
10Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
• Brings together the human resources (number
and mix of individuals in terms of skills,
competency levels, costs per unit of time, etc
Staffing
FUNCTIONS OF PM
11Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
• Process of measuring progress toward an
objective, evaluating what remains to be done,
and taking the necessary corrective action to
achieve the objectives
Controlling
FUNCTIONS OF PM
12Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
• Act of synchronizing activities
to ensure they are carried out
in relation to their importance
and with a minimum of conflict
Coordinating
AREAS OF PM
13Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Integration
management
Scope
management
Time
management
Cost
management
Quality
management
Human
resources
management
Communications
management
Risk
management
Procurement
management
AREAS OF PM
14Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Integration management: identifying, defining,
combining and coordinating various processes
and PM activities
Scope management: collecting requirements,
defining scope, creating a work breakdown
structure, verifying scope and controlling scope
Time management: managing timely completion
of the project
AREAS OF PM
15Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Cost management: estimating, budgeting and
controlling costs to complete the project within
the approved budget
Quality management: determining quality
policies, objectives and responsibilities to satisfy
the project objectives and needs
Human resources management: organizing,
managing and leading the project team
AREAS OF PM
16Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Communications management: Ensuring timely
and appropriate project information – from
generation, collection, storage to disposition
Risk management: conducting risks planning,
identification, analysis, response planning and
monitoring and control on a project
Procurement management: purchasing or
acquiring products, services or results needed
from outside the project team
PROJECT
MANAGEMENT CYCLE (PCM)
17Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
• A methodology for the preparation,
implementation and evaluation of projects
based on the principles of the logical
framework approach
• Describes activities of the management and
procedures in decision-making during the
project life
PROJECT
MANAGEMENT CYCLE (PCM)
18Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Answers the questions:
How will the project work?
What will the project achieve?
What factors can contribute to its success?
How to address risks and bottlenecks?
How progress will be measured?
PROJECT MANAGEMENT CYCLE
PLANNING
Set Objective
Survey Resources
Formulate Strategy
EXECUTION
Allocate Resources
Guide Execution
Coordinate Efforts
Motivate Staff
CONTROL
Measure Achievement
Compare with Goal
Report
Resolve Problems
Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
19
PROJECT MANAGEMENT CYCLE
PLANNING
Set Objective
Survey Resources
Formulate Strategy
EXECUTION
Allocate Resources
Guide Execution
Coordinate Efforts
Motivate Staff
CONTROL
Measure Achievement
Compare with Goal
Report
Resolve Problems
Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
20
PLANNING:
SETTING OBJECTIVES
Includes initiating and defining the project and
its subprojects
- Nature and scope of the project
- What, why, how, where, how much, who
Subprojects can be classified based on
chronological time, geographical location,
physical units, departments, or using a work
breakdown schedule (WBS)
21Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
PLANNING:
SETTING OBJECTIVES
Common Levels of Program or Project Logic
22Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Impact: The ultimate durable change, long-term condition,
or end-state being sought
Outcomes: Intended results – can be short or long-term
Outputs: What is produced through the activities
Activities: Development of materials or training programs,
construction of infrastructure, etc.
Resources: Financial resources, staff and equipment
PLANNING:
SETTING OBJECTIVES
Goal Breakdown Structure
Hierarchy of Goal
23Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Goal
Purpose
Outputs
Activities
PLANNING:
SETTING OBJECTIVES
Results Chain
24Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
PLANNING:
SETTING OBJECTIVES
Logical Framework
25Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Project
Description
Objectively
verifiable
indicators
Sources and
means of
verification
Risks and
assumptions
Goal
Purpose
Outputs
Activities Means and Costs
PLANNING:
SETTING OBJECTIVES
Project Triangle
26Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Time Cost
Scope
PLANNING:
SETTING OBJECTIVES
Work breakdown schedule (WBS)
• Describes the work needed to create the
project deliverables that will meet the
determined requirements
• Defines and organizes the total scope of a
project in a hierarchical breakdown of
activities and end products
• Work package is a deliverable component at
the lowest level of each branch of a WBS
27Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
PLANNING:
SETTING OBJECTIVES
Sample WBS in list/outline format
1. Formulate testable hypothesis and research design
1.1 Conduct literature search
1.2 Identify design variables
1.2.1 Experimental group
1.2.2 Control Group
1.3 Construct research protocol
1.4 Secure necessary approvals
1.4.1 Institutional approvals
1.4.2 Patients
1.4.3 Participating clinicians
1.4.4 Oversight and regulatory bodies
28Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
PLANNING:
SETTING OBJECTIVES
Sample WBS in graphical/chart form
29Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Process
improvement
project
Phase 1:
Research
Component 1.1
WP 1.1.1 WP 1.1.2 WP 1.1.3
Component 1.2
Phase 2:
Implementation
Component 2.1
WP 2.1.1
Component 2.2
WP 2.2.1 WP 2.2.2
Component 2.3
WP 2.3.1
PLANNING:
SETTING OBJECTIVES
Sample Work Package Detail
30Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Project: Expansion to Full Scale
Production
Work Package: Test Assembly
Hardware
Description: Plan, conduct, evaluate, and
report results of tests to ensure proper
function of the assembly hardware
Deliverable: Test results summary
Inputs: Assembly hardware prototype
Activities Resource Expected duration Cost ($)
Prepare test plan Production analyst 8 h 720.00
Conduct test Production analyst 16 h 1,440.00
Evaluate result Production analyst 6 h 540.00
Prepare result
summary
Production analyst 8 h 720.00
Total 38 h $ 3,420.00
PLANNING:
SURVEYING RESOURCES
• Includes preparing list of organizational
responsibilities for each sub-project in terms of
all the activities and resource requirements
• Identification of what the project needs in terms
of people, materials, equipment, supplies, travel
and other anticipated expenses
• Resource and budget plans are prepared and
linked to project schedules
31Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
PLANNING:
SURVEYING RESOURCES
Project schedule shows the roll-up of all work
items to indicate total duration and the
scheduled project completion date
32Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
PLANNING:
SURVEYING RESOURCES
33Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Sample Project Schedule as a Table
ID Task Name Duration
(days)
Lead
staff
Early
Start
Early
Finish
Late
Start
Late
Finish
Total
Slack
1 Project 60
2 WP 1 10 2
3 WP 2 2 2
4 WP 3 15 4,5,6
5 WP 4 3 3
6 WP 5 12 2,3,4,5
7 WP 6 5 7
8 WP 7 5 5,6
9 WP 8 8 8
10 EOP 0
PLANNING:
SURVEYING RESOURCES
34Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Sample Project Schedule
PLANNING:
SURVEYING RESOURCES
35Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Sample Monthly Project Budget Template
Tasks Month 1 Month 2 Month 3 Month 4 Month 5
Work package 1
Labor
Labor overhead
Materials
Work package 1
Labor
Labor overhead
Materials
Total
PLANNING:
SURVEYING RESOURCES
0
1
2
3
4
5
6
7
8
9
10
June July August September
Senior engineers
General contractors
Carpenters
Laborers
36Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Sample Resource Histogram
PLANNING:
SURVEYING RESOURCES
37Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Sample Work Package and Activity List with Duration and Resource
Work Package WBS
ID
Activity Lead
staff
Duration
(weeks)
Resource
Type
Focus group 1.1.1.1 Identify focus group
targets
Focus group 1.1.1.2 Prepare FG
objectives
Surveys 1.1.2 Perform survey
Research
Analysis
1.1.3 Perform analysis
Market research
findings
1.1.4 Create market
research findings
Research
evaluation
1.2.1.1 Review and develop
design options
PLANNING:
FORMULATING STRATEGIES
• Includes preparing, reviewing, scheduling and
approving network plan
• Network plans show logic inter-relationships
of project activities to obtain project duration
and critical path
• Needs reviewing and approval to confirm logic
and acceptability of project duration estimates
prior to execution of the project
38Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
PLANNING:
FORMULATING STRATEGIES
39Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Sample Network Plan/ Diagram
PLANNING:
FORMULATING STRATEGIES
Resource
utilization plan
Budget plan Milestone plan
Organizational
plan
Risk
management
plan
Communication
plan
40Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
PLANNING:
FORMULATING STRATEGIES
Resource
utilization plan
Budget plan Milestone plan
Organizational
plan
Risk management
plan
Communication
plan
41Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
distribution of people,
equipment, material,
supplies and other assets
cost plan of budget,
revenue projection, etc
key deliverables, due dates,
responsible persons/lead
relationships between
departments and work items
risk identification, qualitative and
quantitative assessments,
strategies, recovery and
restoration functions
how information flowing during
the project should be kept,
reported and cascaded
PROJECT MANAGEMENT CYCLE
PLANNING
Set Objective
Survey Resources
Formulate Strategy
EXECUTION
Allocate Resources
Guide Execution
Coordinate Efforts
Motivate Staff
CONTROL
Measure Achievement
Compare with Goal
Report
Resolve Problems
Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
42
EXECUTION
Execution stage include the following:
• Work is authorized and performed according
to plan
• Variances between plan and actual are
detected promptly
• Causes of variances are identified and
provided with alternative correction actions
• Plan document is updated to reflect reality
43Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
EXECUTION:
LEADING AND DIRECTING
Project Manager Leadership Roles
44Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Communicate
Solve
Problems
Motivate
EXECUTION:
LEADING AND DIRECTING
Project Management Skills for Success
RECENT PAST
45Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Expertise
PM Tools
and
Techniques
Project
Leadership
EXECUTION:
LEADING AND DIRECTING
Project Management Skills for Success
CURRENT ENVIRONMENT
46Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Expertise
PM Tools
and
Techniques
Project
Leadership
EXECUTION:
LEADING AND DIRECTING
Project Management Skills for Success
VISION FOR THE FUTURE
47Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Expertise
PM Tools
and
Techniques
Project
Leadership
PROJECT MANAGEMENT CYCLE
PLANNING
Set Objective
Survey Resources
Formulate Strategy
EXECUTION
Allocate Resources
Guide Execution
Coordinate Efforts
Motivate Staff
CONTROL
Measure Achievement
Compare with Goal
Report
Resolve Problems
Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
48
CONTROL
• Designed to make reality conform to what
was planned and, if not possible, a new plan
conform to reality
• Include tools such as approved plan, current
status information, current and future
variances with impact assessment,
completion estimates, alternative solutions
with evaluation and recommendations
49Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
CONTROL
• A project baseline should be established as a
control point
• The elements of the project triangle served as
the project performance baselines
• Project change management is the practice of
controlling and documenting changes to the
baseline project plan
50Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
TYPES OF PROJECT CONTROL
51Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Formal Informal
• Formal peer review
results
• Q/A reports
• Formal technical
reviews
• Deliverables reviews
and approvals
• Updated and
distributed project plan
• Weekly status
meetings
• Management by
wandering around
• Action item list
• Informal peer reviews
PROJECT CONTROL PROCESS
52Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
1. Determine the
most recently
approved version of
the execution plan
2. Collect current
status information
for open work
packages
3. Collect estimates-
to-complete for
open work
packages
4. Determine current
and forecast
variances from the
plan
PROJECT CONTROL PROCESS
53Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
5. Determine
impact of
variances, decide
whether corrective
action is required
6. Identify
alternatives for
corrective
action
7. Select
preferred
alternative
8. Secure
necessary
approvals and
authorizations
9. Update plan
10. Publish
and distribute
revised plan
SOURCES OF CHANGES
54Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
• Changes to project may come from several
sources that has to be anticipated
• It may be internal or external to the project, or
in terms of scope, schedule or budget
SOURCES OF CHANGES
55Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Scope
• User change mind
• User identifies new requirements
• Design review uncovers unsolvable problem
• Market conditions change
• Strategy changes or priorities change
• Organizational changes rearrange reporting
relationships and hierarchies
• Technology changes
• Public policy changes (e.g. election, law, regulations)
SOURCES OF CHANGES
56Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
Schedule (shortened) Budget (cut)
• Market conditions
change
• Management
commitments change
• Key team members get
pulled
• Previously committed
member no longer
available
• Expense budget is cut
Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
REFERENCES
CERP 152: Environmental Project Planning and Administration Lecture
Materials
Kloppenborg, TJ. Contemporary Project Management: Organize, Plan,
Perform. 2nd Edition. 2012
Larson, EW and Gray CF. Project Management: The Managerial Process.
Richman, L. Improving your Project Management Skills. 2nd Edition. 2012.
57
THANK YOU!
Short Course on Environmental Planning
DCERP & HUMEIN Phils. Inc.
58

Weitere ähnliche Inhalte

Was ist angesagt?

5.0 Overview of the NAP Process
5.0 Overview of the NAP Process5.0 Overview of the NAP Process
5.0 Overview of the NAP ProcessNAP Events
 
Applying Strategic Environmental Assessment - OECD
Applying Strategic Environmental Assessment - OECDApplying Strategic Environmental Assessment - OECD
Applying Strategic Environmental Assessment - OECDzubeditufail
 
Green Agenda for Climate Change Strategies
Green Agenda for Climate Change StrategiesGreen Agenda for Climate Change Strategies
Green Agenda for Climate Change StrategiesStole GEORGIEV
 
Phoenix Icf Energy Efficiency Manual Presentation
Phoenix   Icf Energy Efficiency Manual PresentationPhoenix   Icf Energy Efficiency Manual Presentation
Phoenix Icf Energy Efficiency Manual PresentationICF_HCD
 
ICF - EE in HOME Workshop
ICF - EE in HOME WorkshopICF - EE in HOME Workshop
ICF - EE in HOME WorkshopICF_HCD
 
Looking to a Future Climate-Smart Development in Bangladesh
Looking to a Future Climate-Smart Development in BangladeshLooking to a Future Climate-Smart Development in Bangladesh
Looking to a Future Climate-Smart Development in BangladeshPolicy Adda
 
EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...
EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...
EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...U.S. Water Alliance
 
From BCCSAP to Climate-smart Development in Bangladesh
From BCCSAP to Climate-smart Development in Bangladesh�From BCCSAP to Climate-smart Development in Bangladesh�
From BCCSAP to Climate-smart Development in BangladeshOxfam in Bangladesh
 
Effectiveness of Environmental Impact Assessment (EIA): Bangladesh Perspective
Effectiveness of Environmental Impact Assessment (EIA):  Bangladesh PerspectiveEffectiveness of Environmental Impact Assessment (EIA):  Bangladesh Perspective
Effectiveness of Environmental Impact Assessment (EIA): Bangladesh PerspectiveShahadat Hossain Shakil
 
Integrated design and performance target of conceptual architecture design
Integrated design and performance target of conceptual architecture designIntegrated design and performance target of conceptual architecture design
Integrated design and performance target of conceptual architecture designPutika Ashfar Khoiri
 
The Need for Prioritization of BCCSAP identified adaptation actions and appro...
The Need for Prioritization of BCCSAP identified adaptation actions and appro...The Need for Prioritization of BCCSAP identified adaptation actions and appro...
The Need for Prioritization of BCCSAP identified adaptation actions and appro...Oxfam in Bangladesh
 
Friday Night Forum, Febraury 2016 - Sep planning framework for restoration pr...
Friday Night Forum, Febraury 2016 - Sep planning framework for restoration pr...Friday Night Forum, Febraury 2016 - Sep planning framework for restoration pr...
Friday Night Forum, Febraury 2016 - Sep planning framework for restoration pr...PatM56
 
Nbi draft 00 presentation oct 23 25, 2017
Nbi draft 00 presentation oct 23 25, 2017Nbi draft 00 presentation oct 23 25, 2017
Nbi draft 00 presentation oct 23 25, 2017Ogaro Lugard
 
Thinley Namgyel, Member of the LEG: Introducing the NAP Process and the NAP Expo
Thinley Namgyel, Member of the LEG: Introducing the NAP Process and the NAP ExpoThinley Namgyel, Member of the LEG: Introducing the NAP Process and the NAP Expo
Thinley Namgyel, Member of the LEG: Introducing the NAP Process and the NAP ExpoNAPExpo 2014
 

Was ist angesagt? (20)

24. Strategic Environmental Assessment & Appropriate Assessment
24. Strategic Environmental Assessment & Appropriate Assessment24. Strategic Environmental Assessment & Appropriate Assessment
24. Strategic Environmental Assessment & Appropriate Assessment
 
Strategic Environmental Assessment in Thailand - a tool to promote ecological...
Strategic Environmental Assessment in Thailand - a tool to promote ecological...Strategic Environmental Assessment in Thailand - a tool to promote ecological...
Strategic Environmental Assessment in Thailand - a tool to promote ecological...
 
5.0 Overview of the NAP Process
5.0 Overview of the NAP Process5.0 Overview of the NAP Process
5.0 Overview of the NAP Process
 
Applying Strategic Environmental Assessment - OECD
Applying Strategic Environmental Assessment - OECDApplying Strategic Environmental Assessment - OECD
Applying Strategic Environmental Assessment - OECD
 
Green Agenda for Climate Change Strategies
Green Agenda for Climate Change StrategiesGreen Agenda for Climate Change Strategies
Green Agenda for Climate Change Strategies
 
Phoenix Icf Energy Efficiency Manual Presentation
Phoenix   Icf Energy Efficiency Manual PresentationPhoenix   Icf Energy Efficiency Manual Presentation
Phoenix Icf Energy Efficiency Manual Presentation
 
ICF - EE in HOME Workshop
ICF - EE in HOME WorkshopICF - EE in HOME Workshop
ICF - EE in HOME Workshop
 
Looking to a Future Climate-Smart Development in Bangladesh
Looking to a Future Climate-Smart Development in BangladeshLooking to a Future Climate-Smart Development in Bangladesh
Looking to a Future Climate-Smart Development in Bangladesh
 
EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...
EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...
EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...
 
From BCCSAP to Climate-smart Development in Bangladesh
From BCCSAP to Climate-smart Development in Bangladesh�From BCCSAP to Climate-smart Development in Bangladesh�
From BCCSAP to Climate-smart Development in Bangladesh
 
Implementing the PR&G at usda gollehon
Implementing the PR&G at usda   gollehonImplementing the PR&G at usda   gollehon
Implementing the PR&G at usda gollehon
 
Effectiveness of Environmental Impact Assessment (EIA): Bangladesh Perspective
Effectiveness of Environmental Impact Assessment (EIA):  Bangladesh PerspectiveEffectiveness of Environmental Impact Assessment (EIA):  Bangladesh Perspective
Effectiveness of Environmental Impact Assessment (EIA): Bangladesh Perspective
 
Integrated design and performance target of conceptual architecture design
Integrated design and performance target of conceptual architecture designIntegrated design and performance target of conceptual architecture design
Integrated design and performance target of conceptual architecture design
 
National Climate Change Adaptation Plan for Sri Lanka
National Climate Change Adaptation Plan for Sri Lanka�National Climate Change Adaptation Plan for Sri Lanka�
National Climate Change Adaptation Plan for Sri Lanka
 
The Need for Prioritization of BCCSAP identified adaptation actions and appro...
The Need for Prioritization of BCCSAP identified adaptation actions and appro...The Need for Prioritization of BCCSAP identified adaptation actions and appro...
The Need for Prioritization of BCCSAP identified adaptation actions and appro...
 
Planning climate adaptation in agriculture
Planning climate adaptation in agriculturePlanning climate adaptation in agriculture
Planning climate adaptation in agriculture
 
Friday Night Forum, Febraury 2016 - Sep planning framework for restoration pr...
Friday Night Forum, Febraury 2016 - Sep planning framework for restoration pr...Friday Night Forum, Febraury 2016 - Sep planning framework for restoration pr...
Friday Night Forum, Febraury 2016 - Sep planning framework for restoration pr...
 
Nbi draft 00 presentation oct 23 25, 2017
Nbi draft 00 presentation oct 23 25, 2017Nbi draft 00 presentation oct 23 25, 2017
Nbi draft 00 presentation oct 23 25, 2017
 
Thinley Namgyel, Member of the LEG: Introducing the NAP Process and the NAP Expo
Thinley Namgyel, Member of the LEG: Introducing the NAP Process and the NAP ExpoThinley Namgyel, Member of the LEG: Introducing the NAP Process and the NAP Expo
Thinley Namgyel, Member of the LEG: Introducing the NAP Process and the NAP Expo
 
Local agenda 21
Local agenda 21Local agenda 21
Local agenda 21
 

Ähnlich wie project mgt. cycle

ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTJohn Macasio
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6Amit Gupta
 
Project Design and System Life Cycle Methodologies
Project Design and System Life Cycle MethodologiesProject Design and System Life Cycle Methodologies
Project Design and System Life Cycle MethodologiesShivi Kashyap
 
Pmbok Training for pmo
Pmbok Training for pmoPmbok Training for pmo
Pmbok Training for pmoErin Jones
 
NCET Biz Bite | Project Management Tips and Tools | January 2018
NCET Biz Bite | Project Management Tips and Tools | January 2018NCET Biz Bite | Project Management Tips and Tools | January 2018
NCET Biz Bite | Project Management Tips and Tools | January 2018Archersan
 
Project / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsProject / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsAhmed Alageed
 
ProjectManagementforNGOs
ProjectManagementforNGOsProjectManagementforNGOs
ProjectManagementforNGOswebuploader
 
Planning process group
Planning process groupPlanning process group
Planning process groupMudassir Iqbal
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptxFawadAfridi6
 
Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Managementchaitanyakrsk
 
Project management for instructional designers
Project management for instructional designersProject management for instructional designers
Project management for instructional designersKimberly Klotz
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project ManagementRodolfo Siles
 

Ähnlich wie project mgt. cycle (20)

project dev't cycle
project dev't cycleproject dev't cycle
project dev't cycle
 
ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENT
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6
 
Project Design and System Life Cycle Methodologies
Project Design and System Life Cycle MethodologiesProject Design and System Life Cycle Methodologies
Project Design and System Life Cycle Methodologies
 
Pmbok Training for pmo
Pmbok Training for pmoPmbok Training for pmo
Pmbok Training for pmo
 
NCET Biz Bite | Project Management Tips and Tools | January 2018
NCET Biz Bite | Project Management Tips and Tools | January 2018NCET Biz Bite | Project Management Tips and Tools | January 2018
NCET Biz Bite | Project Management Tips and Tools | January 2018
 
Project / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsProject / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes Groups
 
ProjectManagementforNGOs
ProjectManagementforNGOsProjectManagementforNGOs
ProjectManagementforNGOs
 
PART- 2: Engineering Project Management
PART- 2: Engineering Project Management PART- 2: Engineering Project Management
PART- 2: Engineering Project Management
 
unit-3.pptx
unit-3.pptxunit-3.pptx
unit-3.pptx
 
Project planning: A career path
Project planning: A career pathProject planning: A career path
Project planning: A career path
 
Planning process group
Planning process groupPlanning process group
Planning process group
 
Project Management
Project ManagementProject Management
Project Management
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 
Project Management V1
Project Management V1Project Management V1
Project Management V1
 
Project Management Methodologies
Project Management MethodologiesProject Management Methodologies
Project Management Methodologies
 
Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Management
 
Project management for instructional designers
Project management for instructional designersProject management for instructional designers
Project management for instructional designers
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 

Mehr von Primum Nocere

prof. chaves population projections
prof. chaves population projectionsprof. chaves population projections
prof. chaves population projectionsPrimum Nocere
 
dr. morales planning system
dr. morales planning systemdr. morales planning system
dr. morales planning systemPrimum Nocere
 
dr. morales planning process
 dr. morales planning process dr. morales planning process
dr. morales planning processPrimum Nocere
 
(integrated area development)
(integrated area development)(integrated area development)
(integrated area development)Primum Nocere
 
demographic analysis)
demographic analysis)demographic analysis)
demographic analysis)Primum Nocere
 
project fin_budgeting
project fin_budgetingproject fin_budgeting
project fin_budgetingPrimum Nocere
 
Comprehensive planning atty. dagnalan, en.p.
Comprehensive planning atty. dagnalan, en.p.Comprehensive planning atty. dagnalan, en.p.
Comprehensive planning atty. dagnalan, en.p.Primum Nocere
 
Public sector led planning pwg
Public  sector led planning pwg Public  sector led planning pwg
Public sector led planning pwg Primum Nocere
 
Zoning ordinance may2015
Zoning ordinance may2015 Zoning ordinance may2015
Zoning ordinance may2015 Primum Nocere
 
03 diagnostic exam sample questions
03 diagnostic exam sample questions 03 diagnostic exam sample questions
03 diagnostic exam sample questions Primum Nocere
 
Enhanced clu pandzo_llmh_
Enhanced clu pandzo_llmh_Enhanced clu pandzo_llmh_
Enhanced clu pandzo_llmh_Primum Nocere
 

Mehr von Primum Nocere (20)

usec. lontoc
usec. lontocusec. lontoc
usec. lontoc
 
prof. chaves population projections
prof. chaves population projectionsprof. chaves population projections
prof. chaves population projections
 
prof. chaves
prof. chavesprof. chaves
prof. chaves
 
dr. morales planning system
dr. morales planning systemdr. morales planning system
dr. morales planning system
 
dr. morales planning process
 dr. morales planning process dr. morales planning process
dr. morales planning process
 
dr. yap
 dr. yap dr. yap
dr. yap
 
dr. regunay enr
dr. regunay enrdr. regunay enr
dr. regunay enr
 
dr. napalang
 dr. napalang dr. napalang
dr. napalang
 
dr. cal
dr. caldr. cal
dr. cal
 
(integrated area development)
(integrated area development)(integrated area development)
(integrated area development)
 
(gis)
 (gis) (gis)
(gis)
 
demographic analysis)
demographic analysis)demographic analysis)
demographic analysis)
 
project fin_budgeting
project fin_budgetingproject fin_budgeting
project fin_budgeting
 
feasibility study
 feasibility study feasibility study
feasibility study
 
Comprehensive planning atty. dagnalan, en.p.
Comprehensive planning atty. dagnalan, en.p.Comprehensive planning atty. dagnalan, en.p.
Comprehensive planning atty. dagnalan, en.p.
 
Rlps
Rlps Rlps
Rlps
 
Public sector led planning pwg
Public  sector led planning pwg Public  sector led planning pwg
Public sector led planning pwg
 
Zoning ordinance may2015
Zoning ordinance may2015 Zoning ordinance may2015
Zoning ordinance may2015
 
03 diagnostic exam sample questions
03 diagnostic exam sample questions 03 diagnostic exam sample questions
03 diagnostic exam sample questions
 
Enhanced clu pandzo_llmh_
Enhanced clu pandzo_llmh_Enhanced clu pandzo_llmh_
Enhanced clu pandzo_llmh_
 

Kürzlich hochgeladen

Nathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editorNathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editorNathanBaughman3
 
加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作
加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作
加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作rpb5qxou
 
4. Biomechanical Preparation INTRO AND TECHNIQUES
4. Biomechanical Preparation INTRO AND TECHNIQUES4. Biomechanical Preparation INTRO AND TECHNIQUES
4. Biomechanical Preparation INTRO AND TECHNIQUESaishwaryakhare5
 
Crack JAG. Guidance program for entry to JAG Dept. & SSB interview
Crack JAG. Guidance program for entry to JAG Dept. & SSB interviewCrack JAG. Guidance program for entry to JAG Dept. & SSB interview
Crack JAG. Guidance program for entry to JAG Dept. & SSB interviewNilendra Kumar
 
How to prepare yourself for a job interview.pptx
How to prepare yourself for a job interview.pptxHow to prepare yourself for a job interview.pptx
How to prepare yourself for a job interview.pptxJohnreyFalsarioBasid
 
Banged Dubai Call Girls O525547819 Call Girls Dubai
Banged Dubai Call Girls O525547819 Call Girls DubaiBanged Dubai Call Girls O525547819 Call Girls Dubai
Banged Dubai Call Girls O525547819 Call Girls Dubaikojalkojal131
 
Spanish Classes Online In India With Tutor At Affordable Price
Spanish Classes Online In India With Tutor At Affordable PriceSpanish Classes Online In India With Tutor At Affordable Price
Spanish Classes Online In India With Tutor At Affordable PriceFluent Fast Academy
 
APSC Motor Vechile Inspector 18 Posts.pdf
APSC Motor Vechile Inspector 18 Posts.pdfAPSC Motor Vechile Inspector 18 Posts.pdf
APSC Motor Vechile Inspector 18 Posts.pdfsoumita869
 
Senior IT Professional with Master’s Degree with 21+ years of experience is...
Senior IT Professional with Master’s Degree with 21+ years of experience   is...Senior IT Professional with Master’s Degree with 21+ years of experience   is...
Senior IT Professional with Master’s Degree with 21+ years of experience is...Anas Acharath Parakat
 
美国SU学位证,雪城大学毕业证书1:1制作
美国SU学位证,雪城大学毕业证书1:1制作美国SU学位证,雪城大学毕业证书1:1制作
美国SU学位证,雪城大学毕业证书1:1制作ss846v0c
 
Network to Success - Using Social Media in Job Search
Network to Success - Using Social Media in Job SearchNetwork to Success - Using Social Media in Job Search
Network to Success - Using Social Media in Job SearchBruce Bennett
 
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024Hector Del Castillo, CPM, CPMM
 
What is the career path of a VFX artist?
What is the career path of a VFX artist?What is the career path of a VFX artist?
What is the career path of a VFX artist?santoshjadhav126
 
Back on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental LeaveBack on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental LeaveMarharyta Nedzelska
 
LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024Bruce Bennett
 
The Next Things To Immediately Do About Mating Press
The Next Things To Immediately Do About Mating PressThe Next Things To Immediately Do About Mating Press
The Next Things To Immediately Do About Mating Pressmatingpress170
 
How to make career in advance 3d animation
How to make career in advance 3d animationHow to make career in advance 3d animation
How to make career in advance 3d animationsantoshjadhav126
 
Complete Benefits of career counseling in India
Complete Benefits of career counseling in IndiaComplete Benefits of career counseling in India
Complete Benefits of career counseling in IndiaMere Mentor
 
Jumark Morit Diezmo- Career portfolio- BPED 3A
Jumark Morit Diezmo- Career portfolio- BPED 3AJumark Morit Diezmo- Career portfolio- BPED 3A
Jumark Morit Diezmo- Career portfolio- BPED 3Ajumarkdiezmo1
 
LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024Bruce Bennett
 

Kürzlich hochgeladen (20)

Nathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editorNathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editor
 
加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作
加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作
加拿大MUN学位证,纽芬兰纪念大学毕业证书1:1制作
 
4. Biomechanical Preparation INTRO AND TECHNIQUES
4. Biomechanical Preparation INTRO AND TECHNIQUES4. Biomechanical Preparation INTRO AND TECHNIQUES
4. Biomechanical Preparation INTRO AND TECHNIQUES
 
Crack JAG. Guidance program for entry to JAG Dept. & SSB interview
Crack JAG. Guidance program for entry to JAG Dept. & SSB interviewCrack JAG. Guidance program for entry to JAG Dept. & SSB interview
Crack JAG. Guidance program for entry to JAG Dept. & SSB interview
 
How to prepare yourself for a job interview.pptx
How to prepare yourself for a job interview.pptxHow to prepare yourself for a job interview.pptx
How to prepare yourself for a job interview.pptx
 
Banged Dubai Call Girls O525547819 Call Girls Dubai
Banged Dubai Call Girls O525547819 Call Girls DubaiBanged Dubai Call Girls O525547819 Call Girls Dubai
Banged Dubai Call Girls O525547819 Call Girls Dubai
 
Spanish Classes Online In India With Tutor At Affordable Price
Spanish Classes Online In India With Tutor At Affordable PriceSpanish Classes Online In India With Tutor At Affordable Price
Spanish Classes Online In India With Tutor At Affordable Price
 
APSC Motor Vechile Inspector 18 Posts.pdf
APSC Motor Vechile Inspector 18 Posts.pdfAPSC Motor Vechile Inspector 18 Posts.pdf
APSC Motor Vechile Inspector 18 Posts.pdf
 
Senior IT Professional with Master’s Degree with 21+ years of experience is...
Senior IT Professional with Master’s Degree with 21+ years of experience   is...Senior IT Professional with Master’s Degree with 21+ years of experience   is...
Senior IT Professional with Master’s Degree with 21+ years of experience is...
 
美国SU学位证,雪城大学毕业证书1:1制作
美国SU学位证,雪城大学毕业证书1:1制作美国SU学位证,雪城大学毕业证书1:1制作
美国SU学位证,雪城大学毕业证书1:1制作
 
Network to Success - Using Social Media in Job Search
Network to Success - Using Social Media in Job SearchNetwork to Success - Using Social Media in Job Search
Network to Success - Using Social Media in Job Search
 
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024
 
What is the career path of a VFX artist?
What is the career path of a VFX artist?What is the career path of a VFX artist?
What is the career path of a VFX artist?
 
Back on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental LeaveBack on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental Leave
 
LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024
 
The Next Things To Immediately Do About Mating Press
The Next Things To Immediately Do About Mating PressThe Next Things To Immediately Do About Mating Press
The Next Things To Immediately Do About Mating Press
 
How to make career in advance 3d animation
How to make career in advance 3d animationHow to make career in advance 3d animation
How to make career in advance 3d animation
 
Complete Benefits of career counseling in India
Complete Benefits of career counseling in IndiaComplete Benefits of career counseling in India
Complete Benefits of career counseling in India
 
Jumark Morit Diezmo- Career portfolio- BPED 3A
Jumark Morit Diezmo- Career portfolio- BPED 3AJumark Morit Diezmo- Career portfolio- BPED 3A
Jumark Morit Diezmo- Career portfolio- BPED 3A
 
LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024
 

project mgt. cycle

  • 1. PROJECT MANAGEMENT CYCLE Christine Joyce B. Mendoza Assisstant Professor DCERP, College of Human Ecology University of the Philippines Los Baños 20 January 2017 Calapan City Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. 1
  • 2. LECTURE OBJECTIVES Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. By the end of the lecture, participants are expected to:  Explain the importance and functions of project management and the project management cycle  Understand the different stages of the project management cycle 2
  • 3. PROJECT MANAGEMENT • The application of knowledge, skills, tools and techniques to project activities to meet the project requirements • A set of principles, methods and techniques used to effectively plan and control project work 3Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc.
  • 4. BENEFITS OF PROJECT MANAGEMENT • Defined goal and objectives • Specified measurement of achievement • Planned processes and decision-making routes • Allocated and coordinated use of resources • Identified and managed risks, bottlenecks • Better prospect of achieving the planned outcome 4Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc.
  • 5. PROJECT MANAGEMENT Introduction/ History of project management 5Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc.
  • 6. FUNCTIONS OF PM Planning Directing Organizing Staffing Controlling Coordinating 6Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc.
  • 7. FUNCTIONS OF PM 7Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. • As a process, (1) identify the gap between the current state and the desired future, (2) evaluate alternative approaches, and (3) recommend a preferred course of action into a viable plan Planning
  • 8. FUNCTIONS OF PM 8Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. • Communicates goals, purposes, procedures and means to those who will do the work Directing
  • 9. FUNCTIONS OF PM 9Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. • Brings together non-human resources to achieve the project objectives • Manages procurement life cycle of the project Organizing
  • 10. FUNCTIONS OF PM 10Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. • Brings together the human resources (number and mix of individuals in terms of skills, competency levels, costs per unit of time, etc Staffing
  • 11. FUNCTIONS OF PM 11Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. • Process of measuring progress toward an objective, evaluating what remains to be done, and taking the necessary corrective action to achieve the objectives Controlling
  • 12. FUNCTIONS OF PM 12Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. • Act of synchronizing activities to ensure they are carried out in relation to their importance and with a minimum of conflict Coordinating
  • 13. AREAS OF PM 13Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Integration management Scope management Time management Cost management Quality management Human resources management Communications management Risk management Procurement management
  • 14. AREAS OF PM 14Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Integration management: identifying, defining, combining and coordinating various processes and PM activities Scope management: collecting requirements, defining scope, creating a work breakdown structure, verifying scope and controlling scope Time management: managing timely completion of the project
  • 15. AREAS OF PM 15Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Cost management: estimating, budgeting and controlling costs to complete the project within the approved budget Quality management: determining quality policies, objectives and responsibilities to satisfy the project objectives and needs Human resources management: organizing, managing and leading the project team
  • 16. AREAS OF PM 16Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Communications management: Ensuring timely and appropriate project information – from generation, collection, storage to disposition Risk management: conducting risks planning, identification, analysis, response planning and monitoring and control on a project Procurement management: purchasing or acquiring products, services or results needed from outside the project team
  • 17. PROJECT MANAGEMENT CYCLE (PCM) 17Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. • A methodology for the preparation, implementation and evaluation of projects based on the principles of the logical framework approach • Describes activities of the management and procedures in decision-making during the project life
  • 18. PROJECT MANAGEMENT CYCLE (PCM) 18Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Answers the questions: How will the project work? What will the project achieve? What factors can contribute to its success? How to address risks and bottlenecks? How progress will be measured?
  • 19. PROJECT MANAGEMENT CYCLE PLANNING Set Objective Survey Resources Formulate Strategy EXECUTION Allocate Resources Guide Execution Coordinate Efforts Motivate Staff CONTROL Measure Achievement Compare with Goal Report Resolve Problems Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. 19
  • 20. PROJECT MANAGEMENT CYCLE PLANNING Set Objective Survey Resources Formulate Strategy EXECUTION Allocate Resources Guide Execution Coordinate Efforts Motivate Staff CONTROL Measure Achievement Compare with Goal Report Resolve Problems Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. 20
  • 21. PLANNING: SETTING OBJECTIVES Includes initiating and defining the project and its subprojects - Nature and scope of the project - What, why, how, where, how much, who Subprojects can be classified based on chronological time, geographical location, physical units, departments, or using a work breakdown schedule (WBS) 21Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc.
  • 22. PLANNING: SETTING OBJECTIVES Common Levels of Program or Project Logic 22Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Impact: The ultimate durable change, long-term condition, or end-state being sought Outcomes: Intended results – can be short or long-term Outputs: What is produced through the activities Activities: Development of materials or training programs, construction of infrastructure, etc. Resources: Financial resources, staff and equipment
  • 23. PLANNING: SETTING OBJECTIVES Goal Breakdown Structure Hierarchy of Goal 23Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Goal Purpose Outputs Activities
  • 24. PLANNING: SETTING OBJECTIVES Results Chain 24Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc.
  • 25. PLANNING: SETTING OBJECTIVES Logical Framework 25Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Project Description Objectively verifiable indicators Sources and means of verification Risks and assumptions Goal Purpose Outputs Activities Means and Costs
  • 26. PLANNING: SETTING OBJECTIVES Project Triangle 26Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Time Cost Scope
  • 27. PLANNING: SETTING OBJECTIVES Work breakdown schedule (WBS) • Describes the work needed to create the project deliverables that will meet the determined requirements • Defines and organizes the total scope of a project in a hierarchical breakdown of activities and end products • Work package is a deliverable component at the lowest level of each branch of a WBS 27Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc.
  • 28. PLANNING: SETTING OBJECTIVES Sample WBS in list/outline format 1. Formulate testable hypothesis and research design 1.1 Conduct literature search 1.2 Identify design variables 1.2.1 Experimental group 1.2.2 Control Group 1.3 Construct research protocol 1.4 Secure necessary approvals 1.4.1 Institutional approvals 1.4.2 Patients 1.4.3 Participating clinicians 1.4.4 Oversight and regulatory bodies 28Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc.
  • 29. PLANNING: SETTING OBJECTIVES Sample WBS in graphical/chart form 29Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Process improvement project Phase 1: Research Component 1.1 WP 1.1.1 WP 1.1.2 WP 1.1.3 Component 1.2 Phase 2: Implementation Component 2.1 WP 2.1.1 Component 2.2 WP 2.2.1 WP 2.2.2 Component 2.3 WP 2.3.1
  • 30. PLANNING: SETTING OBJECTIVES Sample Work Package Detail 30Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Project: Expansion to Full Scale Production Work Package: Test Assembly Hardware Description: Plan, conduct, evaluate, and report results of tests to ensure proper function of the assembly hardware Deliverable: Test results summary Inputs: Assembly hardware prototype Activities Resource Expected duration Cost ($) Prepare test plan Production analyst 8 h 720.00 Conduct test Production analyst 16 h 1,440.00 Evaluate result Production analyst 6 h 540.00 Prepare result summary Production analyst 8 h 720.00 Total 38 h $ 3,420.00
  • 31. PLANNING: SURVEYING RESOURCES • Includes preparing list of organizational responsibilities for each sub-project in terms of all the activities and resource requirements • Identification of what the project needs in terms of people, materials, equipment, supplies, travel and other anticipated expenses • Resource and budget plans are prepared and linked to project schedules 31Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc.
  • 32. PLANNING: SURVEYING RESOURCES Project schedule shows the roll-up of all work items to indicate total duration and the scheduled project completion date 32Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc.
  • 33. PLANNING: SURVEYING RESOURCES 33Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Sample Project Schedule as a Table ID Task Name Duration (days) Lead staff Early Start Early Finish Late Start Late Finish Total Slack 1 Project 60 2 WP 1 10 2 3 WP 2 2 2 4 WP 3 15 4,5,6 5 WP 4 3 3 6 WP 5 12 2,3,4,5 7 WP 6 5 7 8 WP 7 5 5,6 9 WP 8 8 8 10 EOP 0
  • 34. PLANNING: SURVEYING RESOURCES 34Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Sample Project Schedule
  • 35. PLANNING: SURVEYING RESOURCES 35Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Sample Monthly Project Budget Template Tasks Month 1 Month 2 Month 3 Month 4 Month 5 Work package 1 Labor Labor overhead Materials Work package 1 Labor Labor overhead Materials Total
  • 36. PLANNING: SURVEYING RESOURCES 0 1 2 3 4 5 6 7 8 9 10 June July August September Senior engineers General contractors Carpenters Laborers 36Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Sample Resource Histogram
  • 37. PLANNING: SURVEYING RESOURCES 37Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Sample Work Package and Activity List with Duration and Resource Work Package WBS ID Activity Lead staff Duration (weeks) Resource Type Focus group 1.1.1.1 Identify focus group targets Focus group 1.1.1.2 Prepare FG objectives Surveys 1.1.2 Perform survey Research Analysis 1.1.3 Perform analysis Market research findings 1.1.4 Create market research findings Research evaluation 1.2.1.1 Review and develop design options
  • 38. PLANNING: FORMULATING STRATEGIES • Includes preparing, reviewing, scheduling and approving network plan • Network plans show logic inter-relationships of project activities to obtain project duration and critical path • Needs reviewing and approval to confirm logic and acceptability of project duration estimates prior to execution of the project 38Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc.
  • 39. PLANNING: FORMULATING STRATEGIES 39Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Sample Network Plan/ Diagram
  • 40. PLANNING: FORMULATING STRATEGIES Resource utilization plan Budget plan Milestone plan Organizational plan Risk management plan Communication plan 40Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc.
  • 41. PLANNING: FORMULATING STRATEGIES Resource utilization plan Budget plan Milestone plan Organizational plan Risk management plan Communication plan 41Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. distribution of people, equipment, material, supplies and other assets cost plan of budget, revenue projection, etc key deliverables, due dates, responsible persons/lead relationships between departments and work items risk identification, qualitative and quantitative assessments, strategies, recovery and restoration functions how information flowing during the project should be kept, reported and cascaded
  • 42. PROJECT MANAGEMENT CYCLE PLANNING Set Objective Survey Resources Formulate Strategy EXECUTION Allocate Resources Guide Execution Coordinate Efforts Motivate Staff CONTROL Measure Achievement Compare with Goal Report Resolve Problems Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. 42
  • 43. EXECUTION Execution stage include the following: • Work is authorized and performed according to plan • Variances between plan and actual are detected promptly • Causes of variances are identified and provided with alternative correction actions • Plan document is updated to reflect reality 43Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc.
  • 44. EXECUTION: LEADING AND DIRECTING Project Manager Leadership Roles 44Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Communicate Solve Problems Motivate
  • 45. EXECUTION: LEADING AND DIRECTING Project Management Skills for Success RECENT PAST 45Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Expertise PM Tools and Techniques Project Leadership
  • 46. EXECUTION: LEADING AND DIRECTING Project Management Skills for Success CURRENT ENVIRONMENT 46Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Expertise PM Tools and Techniques Project Leadership
  • 47. EXECUTION: LEADING AND DIRECTING Project Management Skills for Success VISION FOR THE FUTURE 47Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Expertise PM Tools and Techniques Project Leadership
  • 48. PROJECT MANAGEMENT CYCLE PLANNING Set Objective Survey Resources Formulate Strategy EXECUTION Allocate Resources Guide Execution Coordinate Efforts Motivate Staff CONTROL Measure Achievement Compare with Goal Report Resolve Problems Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. 48
  • 49. CONTROL • Designed to make reality conform to what was planned and, if not possible, a new plan conform to reality • Include tools such as approved plan, current status information, current and future variances with impact assessment, completion estimates, alternative solutions with evaluation and recommendations 49Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc.
  • 50. CONTROL • A project baseline should be established as a control point • The elements of the project triangle served as the project performance baselines • Project change management is the practice of controlling and documenting changes to the baseline project plan 50Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc.
  • 51. TYPES OF PROJECT CONTROL 51Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Formal Informal • Formal peer review results • Q/A reports • Formal technical reviews • Deliverables reviews and approvals • Updated and distributed project plan • Weekly status meetings • Management by wandering around • Action item list • Informal peer reviews
  • 52. PROJECT CONTROL PROCESS 52Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. 1. Determine the most recently approved version of the execution plan 2. Collect current status information for open work packages 3. Collect estimates- to-complete for open work packages 4. Determine current and forecast variances from the plan
  • 53. PROJECT CONTROL PROCESS 53Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. 5. Determine impact of variances, decide whether corrective action is required 6. Identify alternatives for corrective action 7. Select preferred alternative 8. Secure necessary approvals and authorizations 9. Update plan 10. Publish and distribute revised plan
  • 54. SOURCES OF CHANGES 54Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. • Changes to project may come from several sources that has to be anticipated • It may be internal or external to the project, or in terms of scope, schedule or budget
  • 55. SOURCES OF CHANGES 55Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Scope • User change mind • User identifies new requirements • Design review uncovers unsolvable problem • Market conditions change • Strategy changes or priorities change • Organizational changes rearrange reporting relationships and hierarchies • Technology changes • Public policy changes (e.g. election, law, regulations)
  • 56. SOURCES OF CHANGES 56Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. Schedule (shortened) Budget (cut) • Market conditions change • Management commitments change • Key team members get pulled • Previously committed member no longer available • Expense budget is cut
  • 57. Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. REFERENCES CERP 152: Environmental Project Planning and Administration Lecture Materials Kloppenborg, TJ. Contemporary Project Management: Organize, Plan, Perform. 2nd Edition. 2012 Larson, EW and Gray CF. Project Management: The Managerial Process. Richman, L. Improving your Project Management Skills. 2nd Edition. 2012. 57
  • 58. THANK YOU! Short Course on Environmental Planning DCERP & HUMEIN Phils. Inc. 58