SlideShare a Scribd company logo
1 of 16
HISTORY
 MECC is an approved EPC ( Engineering Procurement
and Construction) Contracts for the Design,
Procurement of Materials and Construction of
Mechanical Engineering Projects like Pipelines, Plant
Installations and associated instrumentation.
 It started in the year 1998.
 Throughout the years MECC has built a team which has
handled many Mechanical Engineering Projects for the
Oil and Gas Companies and completed all the project
within the planned budget and time schedule.
 MECC is further diversified into two:
Pipeline Projects
Duct Factory
MAJOR CLIENTS
 KNPC
 KOC
 HYUNDAI ENGINEERING AND CONSTRUCTION
CO.
 MINISTRY OF DEFENCE
 EQUATE
 PIZZA HUT
 TACO BELL
 BURGER KING
 APPLE BEE’S
OBJECTIVES
 Providing consistent quality of products and services by
employing effective project management skills for ensuring
projects execution as per technical, financial and time
requirements.
 Utilizing appropriate resources including skilled personnel,
equipment and material for fulfilling customer needs.
 Ensuring the level of Customer Service is of the highest order
and that the Customer expectations and needs are fully met.
 Ensuring that all employees are competent and appropriately
trained to provide the desired output expected out of them in
order to improve operational efficiency and achieve customer
satisfaction.
 To be one of the best contracting companies in Kuwait by
developing beneficial long-term relationships with the clients
mainly in Oil &Gas sector through an excellent performance in
core business.
KEY PERFORMANCE INDICATORS
 MECC shareholders support.
 Transparency between MECC management and
the shareholders.
 Financial Incentives for the Team Work.
 Providing the best quality products at the most
competitive pricing.
 Providing full support for projects for client
satisfaction.
ORGANIZATION CHART
MANAGING
DIRECTOR
GM- PROJECT
MANAGEMENT
GM-
PROCUREMENT
GM-ADMIN & HR GM-
PRODUCTION
GM-FINANCE
CHIEF
OPERATING
OFFICER
PROJECT MANAGEMENT DEPARTMENT
 The objective of the Project Management department is
to plan and mobilize projects and ensure execution as
per plans. Project is generally issued to an eligible
contractor through a process called Bidding.
 Tender is a process whereby government invite bids for
large projects that must be submitted within a finite
deadline.
 The Government chooses an eligible contractor in order
to take up the project. Eligible Contractor is chosen
through evaluation. Evaluation is based on the price
offered to complete the project by the Contractor and
the capability of the Contractor.
 Once the eligible contractor is chosen, a kick off meeting
is held where the contractor signs the contract and the
parties discuss the factors of the contract. Important
details are mentioned in the contract such as the date of
commencement and completion.
 The project manager is allotted and his responsibilities
are mentioned in the contract.
 Initially Memorandum of Agreement is prepared by the
parties for mutual understanding where the contractor is
willing and able to perform the works desired by the
Company.
 In case of ambiguity or conflict between any of these
documents priority shall be given to the documents in
the order given. The Contractor agrees to execute and
complete the works in conformity with the Contract.
 The Company or the Government agrees to pay the
Contractor in consideration of the satisfactory execution
and completion of the works, in accordance with terms
of the Contract the sum not exceeding the amount
subject to actual works carried out and such variation
thereof as shall become payable under the terms and
conditions of the Contract.
HR DEPARTMENT
 Human Resource Department of MECC is
committed to serve the Company and assist the
employees by way of creating, interpreting and
implementing the human resource policies within
the limits of Kuwait Labour Law and providing
necessary information on human resources
concerns as and when required.
 The HR Policy Manual is not an all-inclusive
manual and its contents are to be used as
guidelines. It may be changed at any intervals as
per changes in company policies or Kuwait
Municipality, Commercial or Labour Law.
HR Department deals with management of people
within the Company there are numerous
responsibilities that come with this Department. The
major roles and functions of this Department
include but not limited to the following:
 Maintenance of personnel records
 Employment and recruitment
 Hiring and promotions
 Job Classification and grading
 Review of Performance Evaluation
 Rewards and incentives management
 Workers' compensation
 Life, Health & Workmen compensation Insurance
PROCUREMENT DEPARTMENT
 The objective is to define a system such that items
are procured on time, as per requirements and
store them appropriately.
 It related to purchase of Spare parts, Consumables
and other raw material related to Projects &
Equipment Leasing functions.
 The overall responsibility lies with the Commercial
Manager.
PRODUCTION DEPARTMENT
The duct factory started in the year 2006 with the idea of
producing duct for centralized air conditioners. This area of
production is very competitive and the competitors are
Badr-Mulla, Yousuf Al Ghanim & Kharafi. The production
unit further expanded and started producing water coolers
and refrigerators in the year 2013. The production
department later came up with the idea of producing
kitchen appliances that are made of stainless steel for fast
food restaurants such as Burger King, Apple Bee's, Taco
Bell, Pizza Hut in Kuwait. Laying duct for government
hospitals was one of the major projects. The factory
started off with 18 staffs working which has now increased
to 150 staffs.
ADVANTAGES
 They aim at giving the best quality product to the client.
 The pricing is affordable and not too expensive.
 Free delivery offered to customers.
 Invoices are provided as soon as every single payment
is done.
 Credit sales accepted.
 Trustworthy & honest while weighing the metal during
the production of duct.
 The laborers work under three shifts, every shift
comprising of 8 hours.
 The product is checked four times before being
distributed (ISO approval).
FINANCE DEPARTMENT
The finance department is diversified into the following:
 Bank reconciliation
 Salary Accounts
 Fixed Assets & Inventory Accounts
 Receivable Control
 Payable Control
The accompanying financial statements of the company
have been prepared in accordance with the International
Financial Reporting Standards (IFRS) as issued by the
International Accounting Standards Board (IASB).
SWOT ANALYSIS
STRENGTH
 Unique Business Discipline.
 A strong force of manpower, vehicles, equipments & suitable to mobilize in a short notice.
 It has an internal process system in respect with finance, commercial & HR Department.
Effective communication system. The company has provided email address to key
employees.
WEAKNESS
 Lack of key personnel to handle certain duties.
 Unable to complete work due to pressure.
OPPORTUNITIES
 Due to financial shortfall, number of contracting companies at the same level does not
actively participate in tenders.
THREATS
 Competitive market where competitors quote low prices.
 Kuwait faces severe weather condition like very hot summer, sand storms & extremely
cold weather that affect working atmosphere.
REFERENCES
From all the head of the departments and the
company website : www.mecckw.com
Ppt ost

More Related Content

What's hot (17)

Vinod Kumar Thakur.doc
Vinod Kumar Thakur.docVinod Kumar Thakur.doc
Vinod Kumar Thakur.doc
 
Cv
CvCv
Cv
 
sachin resume -001
sachin resume -001sachin resume -001
sachin resume -001
 
AmitCV
AmitCVAmitCV
AmitCV
 
My Resume Jan'15.doc
My Resume Jan'15.docMy Resume Jan'15.doc
My Resume Jan'15.doc
 
Ss 10 cost engineering management training- moustafa sec 5 part iii ch 2...
Ss 10   cost engineering management  training-   moustafa sec 5 part iii ch 2...Ss 10   cost engineering management  training-   moustafa sec 5 part iii ch 2...
Ss 10 cost engineering management training- moustafa sec 5 part iii ch 2...
 
Resume Ramesh
Resume RameshResume Ramesh
Resume Ramesh
 
Cvc guildelines
Cvc guildelinesCvc guildelines
Cvc guildelines
 
Resume
ResumeResume
Resume
 
Ss 07 cost engineering management training- nov 2017 moustafa part ii ch 14...
Ss 07 cost engineering management  training- nov 2017  moustafa part ii ch 14...Ss 07 cost engineering management  training- nov 2017  moustafa part ii ch 14...
Ss 07 cost engineering management training- nov 2017 moustafa part ii ch 14...
 
1217 loc tenders
1217 loc tenders1217 loc tenders
1217 loc tenders
 
Smeta_Audit_Report_of_Omkar_Corporation-2015
Smeta_Audit_Report_of_Omkar_Corporation-2015Smeta_Audit_Report_of_Omkar_Corporation-2015
Smeta_Audit_Report_of_Omkar_Corporation-2015
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Resume_Tyrone Sequeira
Resume_Tyrone SequeiraResume_Tyrone Sequeira
Resume_Tyrone Sequeira
 
KNMURTHY
KNMURTHYKNMURTHY
KNMURTHY
 
Othman CV
Othman CVOthman CV
Othman CV
 
C . Vitay
C . VitayC . Vitay
C . Vitay
 

Similar to Ppt ost

company profile_CHP_english
company profile_CHP_englishcompany profile_CHP_english
company profile_CHP_english
HSKCO .
 
Rupak das , Procurement Head
Rupak das , Procurement HeadRupak das , Procurement Head
Rupak das , Procurement Head
RUPAK DAS
 
RFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docxRFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docx
healdkathaleen
 
Powerhouse Museum Communication planThe following communicatio.docx
Powerhouse Museum Communication planThe following communicatio.docxPowerhouse Museum Communication planThe following communicatio.docx
Powerhouse Museum Communication planThe following communicatio.docx
harrisonhoward80223
 
Pm610 1103 b-02-schwappach-loren-p5-gp5
Pm610 1103 b-02-schwappach-loren-p5-gp5Pm610 1103 b-02-schwappach-loren-p5-gp5
Pm610 1103 b-02-schwappach-loren-p5-gp5
Loren Schwappach
 
Mss Presentation 2009 Master
Mss Presentation 2009 MasterMss Presentation 2009 Master
Mss Presentation 2009 Master
gordy1976
 
SUDIPTA CHAUDHURI_ July015_v3
SUDIPTA CHAUDHURI_ July015_v3SUDIPTA CHAUDHURI_ July015_v3
SUDIPTA CHAUDHURI_ July015_v3
Sudipta Chaudhuri
 

Similar to Ppt ost (20)

company profile_CHP_english
company profile_CHP_englishcompany profile_CHP_english
company profile_CHP_english
 
Rupak das , Procurement Head
Rupak das , Procurement HeadRupak das , Procurement Head
Rupak das , Procurement Head
 
RFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docxRFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docx
 
Powerhouse Museum Communication planThe following communicatio.docx
Powerhouse Museum Communication planThe following communicatio.docxPowerhouse Museum Communication planThe following communicatio.docx
Powerhouse Museum Communication planThe following communicatio.docx
 
Pm610 1103 b-02-schwappach-loren-p5-gp5
Pm610 1103 b-02-schwappach-loren-p5-gp5Pm610 1103 b-02-schwappach-loren-p5-gp5
Pm610 1103 b-02-schwappach-loren-p5-gp5
 
Ms compiled report
Ms compiled reportMs compiled report
Ms compiled report
 
MSS Presentation 2009 Linkedin
MSS Presentation 2009 LinkedinMSS Presentation 2009 Linkedin
MSS Presentation 2009 Linkedin
 
Mss Presentation 2009 Master
Mss Presentation 2009 MasterMss Presentation 2009 Master
Mss Presentation 2009 Master
 
Credicon Introduction
Credicon  IntroductionCredicon  Introduction
Credicon Introduction
 
CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016
 
My CV
My CVMy CV
My CV
 
0601048 evaluation of contractors and transporters for the period
0601048 evaluation of contractors and transporters for the period0601048 evaluation of contractors and transporters for the period
0601048 evaluation of contractors and transporters for the period
 
SUDIPTA CHAUDHURI_ July015_v3
SUDIPTA CHAUDHURI_ July015_v3SUDIPTA CHAUDHURI_ July015_v3
SUDIPTA CHAUDHURI_ July015_v3
 
Sumit 4041.pptx
Sumit 4041.pptxSumit 4041.pptx
Sumit 4041.pptx
 
SKC ENGINEERING_Company Profile (Sep-2020).pptx
SKC ENGINEERING_Company Profile    (Sep-2020).pptxSKC ENGINEERING_Company Profile    (Sep-2020).pptx
SKC ENGINEERING_Company Profile (Sep-2020).pptx
 
osama cv
osama cvosama cv
osama cv
 
Resume Mech (1)
Resume Mech (1)Resume Mech (1)
Resume Mech (1)
 
Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.
 
IOW NHS Trust Building Controls Proposal
IOW NHS Trust Building Controls ProposalIOW NHS Trust Building Controls Proposal
IOW NHS Trust Building Controls Proposal
 
Internal audit
Internal audit Internal audit
Internal audit
 

Recently uploaded

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 

Recently uploaded (20)

WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 

Ppt ost

  • 1. HISTORY  MECC is an approved EPC ( Engineering Procurement and Construction) Contracts for the Design, Procurement of Materials and Construction of Mechanical Engineering Projects like Pipelines, Plant Installations and associated instrumentation.  It started in the year 1998.  Throughout the years MECC has built a team which has handled many Mechanical Engineering Projects for the Oil and Gas Companies and completed all the project within the planned budget and time schedule.  MECC is further diversified into two: Pipeline Projects Duct Factory
  • 2. MAJOR CLIENTS  KNPC  KOC  HYUNDAI ENGINEERING AND CONSTRUCTION CO.  MINISTRY OF DEFENCE  EQUATE  PIZZA HUT  TACO BELL  BURGER KING  APPLE BEE’S
  • 3. OBJECTIVES  Providing consistent quality of products and services by employing effective project management skills for ensuring projects execution as per technical, financial and time requirements.  Utilizing appropriate resources including skilled personnel, equipment and material for fulfilling customer needs.  Ensuring the level of Customer Service is of the highest order and that the Customer expectations and needs are fully met.  Ensuring that all employees are competent and appropriately trained to provide the desired output expected out of them in order to improve operational efficiency and achieve customer satisfaction.  To be one of the best contracting companies in Kuwait by developing beneficial long-term relationships with the clients mainly in Oil &Gas sector through an excellent performance in core business.
  • 4. KEY PERFORMANCE INDICATORS  MECC shareholders support.  Transparency between MECC management and the shareholders.  Financial Incentives for the Team Work.  Providing the best quality products at the most competitive pricing.  Providing full support for projects for client satisfaction.
  • 5. ORGANIZATION CHART MANAGING DIRECTOR GM- PROJECT MANAGEMENT GM- PROCUREMENT GM-ADMIN & HR GM- PRODUCTION GM-FINANCE CHIEF OPERATING OFFICER
  • 6. PROJECT MANAGEMENT DEPARTMENT  The objective of the Project Management department is to plan and mobilize projects and ensure execution as per plans. Project is generally issued to an eligible contractor through a process called Bidding.  Tender is a process whereby government invite bids for large projects that must be submitted within a finite deadline.  The Government chooses an eligible contractor in order to take up the project. Eligible Contractor is chosen through evaluation. Evaluation is based on the price offered to complete the project by the Contractor and the capability of the Contractor.  Once the eligible contractor is chosen, a kick off meeting is held where the contractor signs the contract and the parties discuss the factors of the contract. Important details are mentioned in the contract such as the date of commencement and completion.
  • 7.  The project manager is allotted and his responsibilities are mentioned in the contract.  Initially Memorandum of Agreement is prepared by the parties for mutual understanding where the contractor is willing and able to perform the works desired by the Company.  In case of ambiguity or conflict between any of these documents priority shall be given to the documents in the order given. The Contractor agrees to execute and complete the works in conformity with the Contract.  The Company or the Government agrees to pay the Contractor in consideration of the satisfactory execution and completion of the works, in accordance with terms of the Contract the sum not exceeding the amount subject to actual works carried out and such variation thereof as shall become payable under the terms and conditions of the Contract.
  • 8. HR DEPARTMENT  Human Resource Department of MECC is committed to serve the Company and assist the employees by way of creating, interpreting and implementing the human resource policies within the limits of Kuwait Labour Law and providing necessary information on human resources concerns as and when required.  The HR Policy Manual is not an all-inclusive manual and its contents are to be used as guidelines. It may be changed at any intervals as per changes in company policies or Kuwait Municipality, Commercial or Labour Law.
  • 9. HR Department deals with management of people within the Company there are numerous responsibilities that come with this Department. The major roles and functions of this Department include but not limited to the following:  Maintenance of personnel records  Employment and recruitment  Hiring and promotions  Job Classification and grading  Review of Performance Evaluation  Rewards and incentives management  Workers' compensation  Life, Health & Workmen compensation Insurance
  • 10. PROCUREMENT DEPARTMENT  The objective is to define a system such that items are procured on time, as per requirements and store them appropriately.  It related to purchase of Spare parts, Consumables and other raw material related to Projects & Equipment Leasing functions.  The overall responsibility lies with the Commercial Manager.
  • 11. PRODUCTION DEPARTMENT The duct factory started in the year 2006 with the idea of producing duct for centralized air conditioners. This area of production is very competitive and the competitors are Badr-Mulla, Yousuf Al Ghanim & Kharafi. The production unit further expanded and started producing water coolers and refrigerators in the year 2013. The production department later came up with the idea of producing kitchen appliances that are made of stainless steel for fast food restaurants such as Burger King, Apple Bee's, Taco Bell, Pizza Hut in Kuwait. Laying duct for government hospitals was one of the major projects. The factory started off with 18 staffs working which has now increased to 150 staffs.
  • 12. ADVANTAGES  They aim at giving the best quality product to the client.  The pricing is affordable and not too expensive.  Free delivery offered to customers.  Invoices are provided as soon as every single payment is done.  Credit sales accepted.  Trustworthy & honest while weighing the metal during the production of duct.  The laborers work under three shifts, every shift comprising of 8 hours.  The product is checked four times before being distributed (ISO approval).
  • 13. FINANCE DEPARTMENT The finance department is diversified into the following:  Bank reconciliation  Salary Accounts  Fixed Assets & Inventory Accounts  Receivable Control  Payable Control The accompanying financial statements of the company have been prepared in accordance with the International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board (IASB).
  • 14. SWOT ANALYSIS STRENGTH  Unique Business Discipline.  A strong force of manpower, vehicles, equipments & suitable to mobilize in a short notice.  It has an internal process system in respect with finance, commercial & HR Department. Effective communication system. The company has provided email address to key employees. WEAKNESS  Lack of key personnel to handle certain duties.  Unable to complete work due to pressure. OPPORTUNITIES  Due to financial shortfall, number of contracting companies at the same level does not actively participate in tenders. THREATS  Competitive market where competitors quote low prices.  Kuwait faces severe weather condition like very hot summer, sand storms & extremely cold weather that affect working atmosphere.
  • 15. REFERENCES From all the head of the departments and the company website : www.mecckw.com