2. Background - Who is Dasco ?
• 45 years supplying machined parts to the
aerospace industry.
• Recognized as a leader in machining
complex hardware.
• Specialize in machining titanium and other
hard and exotic alloys.
• Strong engineering team utilizing state-of-
art software and hardware.
3. Core Business Strategy
• Support Prime aerospace manufacturers
• Industry leader for titanium machining
• Increase value added product deliveries
• Gold Quality and Delivery recognition
• Offer partner/risk relationships
4. Facilities
Torrance Facility
66,000 sq. ft.
Main facility: machining, sub-assembled
structures and final source inspection.
Long Beach Facility
40,000 sq. ft.
Multi-spindle rough and finish
machining of hard metals
Total 106,000 sq. ft.
11. Assembly Shop
Experienced with riveting, hardware installation, bushing and bearing
installation for small to medium assembled components up to 20 feet in size
18. 6-Axis CNC Tool Grinding
•State-of-the-art CNC equipment.
•Design and Manufacture of high-
precision carbide cutting tools.
•Advanced tool design software.
•Development and test of
advanced geometry tools.
•Highly accurate/repeatable tool
regrinding.
19. CNC Programming
• CATIA V4 and V5
• NCL 502, Version 9.6 CAD/CAM System
• Vericut 6.1 Tool Path Verification
• Postworks, 6-Axis Post-Processor
20. Quality System
• AS9100 – certified third party approved.
• Mitutoyo “Bright 1230” 5-Axis CMM,
118” x 48” x 40” work envelope
• Mitutoyo “Bright 916” 5-Axis CMM,
80” x 36” x 36” work envelope.
21. Management Systems
• “JobBOSS” manufacturing management software
system in use since 1998 – provides real-time data
capture via barcode.
° Quote Processing
° Order Processing
° Material Control
° Shop Floor Control
° Labor Reporting
With over 4,300 installations worldwide,
° Cost Analysis JobBOSS is the established leader in
° Shipping shop management for the machine shops.
° Accounting
22. Production Control System
“JobBOSS” system coordinated with MS Access data base.
Master Ship Plan
PROD. REL.
MASTER MONTHLY SHIP PLAN
PLANNING
NC PROG.
TOOLING
STATUS
Status: 1=On Time, 2=Schedule Concern, 3= Late LATE MAR APR MAY
JOB NO. CUSTOMER P/N DESCRIPTION PM COMMENTS QTY DATE QTY DATE QTY DATE QTY
S2467 BAC MIL-WA 5-96763-19 HINGE ASSY JFK SEAN - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED
S2468 BAC MIL-WA 5-96763-20 HINGE ASSY JFK SEAN TO MACHINE - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED
S2469 BAC MIL-WA 5-96763-23 HINGE ASSY JFK SEAN TO MACHINE - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED
1673 BAC MIL-WA 5HF75308-105 SUPPORT FITTING JFK X X X 1 TMG 2 3/18 2
1883 BAC MIL-WA 5HF75712-105 AFT FRAME JK STAGED FOR CNC 6/5/02
1883-NRE BAC MIL-WA 5HF75712-105 S/UP JK
1884 BAC MIL-WA 5HF75712-107 AFT FRAME JK NEED PROGRAM 2 3/22 2
1884-NRE BAC MIL-WA 5HF75712-107 NRE JK
1727 BAC MIL-WA 5HW82316-101 SUPPORT JK X X X 1 CNC - FADALMATL ON ORDER - DEL'Y 04/01/03
1725 BAC MIL-WA 5HW82316-101 STRUT SUPPORT JK X X X 1 CNC - FADAL(2) PCS STOCK
1726 BAC MIL-WA 5HW82316-102 SUPPORT JK X X X 1 CNC - FADAL(2) PCS. STOCK 5 4/7
1728 BAC MIL-WA 5HW82316-102 SUPPORT JK X X X 1 CNC - FADALMATL ON ORDER - DEL'Y 04/01/03
1873 BAC MIL-WA 5HW82492-103 SPLICE JK
1682 BAC MIL-WA 5HW82492-103 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15
1379 BAC MIL-WA 5HW82492-103 SPLICE JFK X X X X 1 STOCK THRU JULY - AUG/SEP NEED MACHINING
1874 BAC MIL-WA 5HW82492-104 SPLICE JK
1683 BAC MIL-WA 5HW82492-104 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15
1380 BAC MIL-WA 5HW82492-104 SPLICE JFK X X X X 1 STOCK THRU JULY - AUG/SEP NEED MACHINING
1875 BAC MIL-WA 5HW82492-105 SPLICE JK
1684 BAC MIL-WA 5HW82492-105 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15
1381 BAC MIL-WA 5HW82492-105 SPLICE JFK X X X X 1 STOCK THRU SEPT.
1382 BAC MIL-WA 5HW82492-106 SPLICE JFK X X X X 1 STOCK THRU SEPT.
1876 BAC MIL-WA 5HW82492-106 SPLICE JK
Machine Loading
9130 1704 5/24
9430 1749 6/12
9430 1750 6/12
9230 1758 6/18
9330 1766 7/12
9130 1744 7/16
9430 1753 8/12
9430 1754 8/12
9130 1748 8/26
9330 1855 9/25
9330 1856 10/2
9430 1844 10/2
9130 1705 5/24
9130 1706 6/14
9430 1711 5/31
9430 1712 5/31
9430 1751 7/22
9330 1761 6/14
9330 1762 6/18
9330 1765 7/12
9130 1745 7/16
9430 1752 7/22
9330 1854 8/26
7/2
7/9
7/9
8/6
9/4
6/3
6/3
6/5
7/2
8/8
8/6
9/4
9230 1759
9130 1747
9430 1843
9230 1756
9230 1757
9330 1764
9130 1743
9230 1755
9330 1763
9230 1760
9130 1746
9430 1842
KURAKI 05 180'S
SNK 3-SPIND. #1 11 9230/9330 9130/9430 9130/9430 9230/9330 9130/9430 9230/9330
9/4 7/9 7/9 9/4 9/4
9955843-5/-6
CIN. 5-AXIS 04 2305-101 / 1330 S2458-1/-2 2305-101 / 1330 2305-102 / 1331 2305-102 / 1331 2305-102 / 1331
7/13 7/13 9/9 8/25 9/24 10/22 10/22
0055-2013 2685-104 / 2685-104 / 2685-104 / 2685-103 / 2685-103 / 2685-103 / 2685-103 /
SNK 5-AXIS #1 / 1465 1697A 1697B 1697C 1696C 1696D 1696E 1696F
6/16 6/16 6/2 7/27 7/27 6/28 6/30 6/30 6/30 7/13 7/30 7/30 7/30 9/28 8/25 9/14
2675-102 / 2682-103 / 2682-103 / 2682-103 / 2675-101 / 2685-103 / 2685-103 / 2679-104 / 2679-103 / 2675-102 / 2675-102 / 2677-102 / 2677-102 / 2679-104 / 2677-101 /
SNK 5-AXIS #2 1319J 1694A 1694B 1694C 1688B 1696A 1696B 1323J 1692C 1689A 1689B 1691C 1321J 1693C 1690C
2685-103 / 2685-104 / 2677-101 / 2677-102 / 2685-103 / 2685-104 / 2679-103 / 2677-102 / 2677-101 / 2685-103 / 2685-104 / 2682-103 /
SNK 3-SPIND. #2 1696B, C 1697A, B, C 1690C,D 1691C 1696D,E,F 1697D,E,F 1692D,E,F 1691D,E,F 1690E,F,G 1696G,H,I 1697G,H,I 1694D,E,F