SlideShare ist ein Scribd-Unternehmen logo
1 von 59
Process Safety and OSHA,
Seven Keys to Surviving a Chem NEP
Audit
Johnanewquist@gmail.com
NFPA 2013
Session 41
Draft 6 8 2013
Overview
Background on CHEM NEP
 Seven Keys to Surviving a CHEM NEP
Top PSM Cited
National Emphasis Programs
• Provide for planned inspections in high hazard
industries
• Focus efforts on specific hazards
• Refinery NEP focused on implementation of
PSM in Refineries
• Chemical NEP focuses on implementation of
PSM in all other PSM covered facilities
Why an NEP?
• NEPs are the most significant PSM
enforcement actions since the standard was
promulgated in 1992
• Significant differences between current effort
and pre-2007 inspections:
• 73% of early inspections were initiated due to
accidents, complaints or referrals.
• Almost all Refinery NEPs were program
planned
Refinery NEP Origins
• NEP inspections have more violations and
higher penalties than prior PSM OR PQV
inspections:
• 11.2 Violations per inspection
• $76,800
• Chem NEP
• 8.4 Violations per inspection
• $31,600
Refinery NEP
• Originally launched June 7, 2007
• Last inspections completed in 2011
• Combined “static” and “dynamic” question
lists with guidance for compliance officers
(CSHOs)
• Compliance found to be highly uneven
Lessons Learned
• List based approach does find hazards
• The listed questions also result in many “off-
script” citations
• CSHO training works
• OSHA focus on RAGAGEP resulted in large
number of deficiencies
• Facility Siting still a problem 20+ years after
SHELL-Norco
• & Phillips-Pasadena
CHEM NEP
Targeting
– Congress and CSB asked OSHA to focus
programmed chemical inspections on “high risk”
operations
CHEM NEP
• Pilot Chem NEP effective July 27, 2009
• Extended nationwide Nov. 29, 2011
• Less resource-intensive
• State plan participation is required
• CSHO’s check abatement of PSM citations
requiring abatement going back six years
CHEM NEP
• Differs from Refinery NEP
• Intent is to perform a larger number of
shorter, less resource intensive, inspections
• A small number of “dynamic” list questions
are applied to a selected unit or units
• No static list questions
CHEM NEP
• 300-400 Inspections annually
• Violations Most Cited
– 1910.119 – Process Safety
– 1910.147 – LOTO
– 1910.120 – Hazardous waste
emergency response
– 1910.1200 – Hazard Communication
– 1910.146 – Confined Space
CHEM NEP Approach
• Questions are specific and contain compliance
guidance (similar to Refinery NEP)
• Questions differ by type of facility
• Ammonia refrigeration
• General PSM
• Chemical Processing
• Questions change periodically
• CSHO must document the questions in the file.
Sample Questions
• Has the employer revalidated the PHS every
five years?
• Does the MI program ensure that the material
is suitable for the process?
• Are Alarms and Controls enabled and in
service?
• Does the employer have a means to verify
that the employees understood the training?
Sectors
• Ammonia Refrigeration
• Storage Only
• Chemical Processing
• (includes Chlorine)
• Ammonia refrigeration
dynamic list – 10 questions
• PSM General dynamic list – 5
questions
• PSM general dynamic list –
15 questions
• Chemical Process dynamic
list – 10 questions
• PSM general dynamic list –
5 questions
Region V FY 2012 Total
74%
26%
Unprogrammed Programmed
Percentage of Region V CHEM NEP Total Programmed vs. Unprogrammed
Region V FY 2012 Total
31%
58%
11%
Complaint Referral Other
Percentage of Region V CHEM NEP Total Unprogrammed Breakdown
National Comparison
Total of CHEM NEP Inspections Nationally during FY 12
9%
11%
12%
6%
35%
14%
6%
4% 3%
Region 1
Region 2
Region 3
Region 4
Region 5
Region 6
Region 7
Region 8
Region 10
NAICS Codes
60%20%
10%
10%
Chemical Manufacturing
Food Manufacturing
Waste Management and
Remediation
Other
Percentage of CHEM NEP Inspections in Region V during FY 12
PSM A Strong Enforcement Start
Penalty State Major Issues
• $545,000 OH PSM, Chemical comp. release.
• $54,000 IL PSM, Food
• $133,000 MA PSM, candy mfr,
• $46,400 OK PSM contractors, Refinery
• $123,000 NY PSM, Insulation mfr.
• $73,400 MA PSM, food
• $963,200 CA PSM refinery
• $53,000 TX PSM, chem plant
• $99,000 TX PSM, ammonia
• $55,000 AK PSM, Ammonia
• $121,000 TX PSM, Ammonia
• $67,000 LA PSM at VC facility
• $155,000 WY PSM at Refinery
• $51,800 WI PSM at Pharmaceutical
• $121,000 TX PSM Warehouse
Citations Issued
• Citations issued Frequency
– 1910.119(j) – Mechanical Integrity
– 1910.119(e) - Process Hazard Analysis
– 1910.119(l) - Management of Change
– 1910.119(f) - Operating Procedures
– 1910.119(d) – Process Safety Information
– 1910.119(c) - Employee Participation
– 1910.119(g) - Training
– 1910.119(i) – Pre-Startup Safety Review
– 1910.119(m) – Incident Investigation
– 1910.119(n) - Emergency Planning and Response
– 1910.119(o) – Compliance Audits
Plain View Doctrine
– Compliance officer can
issue citations for any
violations in “plain view.”
– If Compliance Officer
doesn’t see it he/she
can’t cite you for it.
P&IDs
• 119(d)(3)(i)(B)
• Relief Valves not in P&ID
• P&ID indicated flame arrestors that did not
exist.
• P&ID did not indicate correct piping
connections to vessels. Incorrect diameters of
piping.
• P&ID did not show LEL detectors and
interlocks.
P&IDs
• 119(d)(3)(i)(B)
• No design basis for relief valves on reactor
• Valve tags were reversed, mislabeled
• HF vent line was not marked
• HF dump tank was not identified.
• Three way valves were not identified
• Equipment were transposed on the diagrams
Process Safety Information
• 119(d)(3)(i)(H)
PSI did not list:
• Cutout devices and Interlocks
• High and low level sensors
• Ammonia detectors
• High and low pressure devices
• Emergency Stop Buttons
• Electrical Classification of Equipment
RAGAGEP
• 119(d)(3)(ii)
• U-1 Form missing for pressure vessel
• Mechanical room for ammonia had no emergency ventilation
• Electrical Classification of equipment missing
• Venting Flanges not meet ANSI/ASME 31.3
• No documentation that piping fit for service per API 570
• Manual block valves were located down stream of automatic dump valves
(Hydrogen Fluoride Industry Practice Institute or HFIPI)
• HF tanks not sized 1.5x for anticipated deliveries. HFIPI
• HF dump tank did not have capacity of largest HF tank. HFIPI
• HF liquid flow velocity exceeded 5.9 feet/second
• Eye wash and shower were not configured to sound in the control room.
HFIPI
• No valve capping kit for HF rail car unloading
• High pressure vent lines were not labeled.
• Relief valve discharge 3.5` above platform vs. 15 feet. (IIAR 2-2008)
PHA
• 119(e)(1)
• No PHA on the Hydrogen Storage tank
• PHA missing several elements
• PHA did not address failure of ventilation
• PHA did not address previous fires.
• PHA did not previous piping failures.
• PHA did not address previous failures of
cooling systems
PHA
• 119(e)(3)(i) The hazards of the process;
• The hazard of power failure was not discussed in the PHA.
• The Hazard of natural gas draining to the surge drum too long.
• The hazard of releasing material in the neutralization pits
• The hazard of weight of hoses on pipe nipples was not
addressed
• The Hazards of venting flanges was not addressed in the PHA.
• The hazard of forklift traffic was not addressed.
PHA
• 119(e)(3)(v)
• No analysis of facility siting issues related to
formaldehyde dispersion
• Building siting and how affected by the
ammonia process
• Ammonia system including
piping, recirculator, chiller, receiver, and
condensors were located to the roadway and
subject to vehicle impact.
PHA
• 119(e)(3)(vi)
• Human factor
• Fatigue
• No consider of opening block valves downstream of
remote operated dump valve
• Second and third shift training
• People on vacation leave
• Operational overload during emergencies
• Operation interactions
PHA
• 119(e)(5)
• PHA items not resolved for years
• PHA did not address team finding and
recommendations such as
• Installing back flow prevention when adding
flammable liquids in a tank
• Automatic Pressure controls for Nitrogen
• Adding relief valves
• Facility siting for control rooms
• Reconfigurations of valves issue on PHA was not
resolved.
Operating Procedures
• 119(f)(1)
• No written procedures for maintaining the ammonia systems
• No procedures for communicating issues during shift changes
• No procedures for upset condition or avoiding deviations
beyond operating limits.
• Transferring chemicals from pit to pit
• Neutralization of chemicals
Operating Procedures
• 119(f)(1)(i)(E)
• No procedures for when discharge pressure, suction
pressure, discharge temperature, lubrication oil pressure, and
lubrication oil temperature exceed normal operating range
• No Specific steps to stop an emergency
• No identification of emergency upset conditions and
procedures to take to resolve it.
• No procedure for emergency operations for transfer of
chemicals out a Surge tank
• No clear procedures for emptying HF tanks with isolating
nitrogen systems
Operating Procedures
• 119(f)(3)
• No certification of operating procedures
annually.
Safe Work Practices
• 119(f)(4)
• No safe work procedures developed for
contractors or maintenance employees
working on PSM covered processes for
• Lockout
• Confined space
• Hot works
Mechanical Integrity
• 119(j)(2) No inspection procedures
• Pressure Vessels
• Piping, components, Hose adapters
• Pump
• Venting Flanges
• Compressors and cutout switches
• Relief Systems and change out schedule
• Emergency Shutdown Systems
• Valves requiring Carseals
• No Procedures for torquing bolts
Mechanical Integrity
• 119(j)(4)(i) No inspection of
• Relief valves
• Pressure vessels (Oil pot, Accumulator, Receiver, and
Transfer Drum)
• Ammonia Feed Pumps
• Venting flanges
• Pipe Nipples, Deadlegs, Inspection ports, hose
adapters
• High Level alarms and emergency shutdown systems.
Mechanical Integrity
• 119(j)(4)(ii)
• No authorized API 570/574 piping inspector or piping
inspections
• No API 510 pressure vessel inspector
• No corrosion rates established for pressure vessels
• Pump not maintained and lubricated per manufacturer’s
recommendations
• Rupture Disk was not replaced per manufacturer’s
recommendations
• No 100% Radiography or Ultrasonic testing on process pipe
weld repair per ANSI B31.1
• No fitness for service for repairs per API 579 for tanks
undergoing repair at head nozzles
Mechanical Integrity
• 119(j)(4)(iii)
• No annual piping inspection
• No API internal pressure vessel inspection
• No inspection testing of the condensate vapor
system for buildup that might clog the system.
• No hydrostatic testing of HF tanks
• No testing or exercising of HF vent valves/dump
valves
• Not testing compressor cutout switches
• Blast Evaporators, heat exchangers not inspected
• No pump inspections
Management of Change
• 119(L)(1)
• No implementation of procedures after
• Replacing manual valves with pneumatic actuated valves.
• Installing a LEL detector
• Disconnection of the Cooling water System
• Installing an alarm on the quench system
• Expanding Toulene tank system
• Leak at Relief Header Rupture disk
• Bolt torquing procedure change
• After making changes in the Ammonia system
• No MOC for condenser removed from process
Copyright - EHS Management
Partners, Inc.
40
Tip 1 Anticipate the NEP Questions
Q: Have appropriate checks and inspections been made to
assure equipment is installed properly and consistent with
design specifications and manufacturer's instructions?
Citation - There is no evidence of a process for installation verification.
Vulnerable - Some staff report that inspections are done, but there is no
consistent documentation or process.
Good - There is evidence of a procedure for equipment installation
checks and inspections, based on review of documentation. Not all new
equipment is consistently reviewed; or, reviews may not be complete.
Tip 2 Designate an OSHA Resource
• Designate a manager to deal with the
inspector in the event of an OSHA inspection.
This person could be the safety or human
resources manager, but the person should be
familiar with OSHA, PSM, company policies
and operations.
Tip 3 Do a Sample PSM audit
• Perform your own periodic audits and
reviews
• Use Corporate or Outside Eyes
• Review of previous citations for last six years
in the corporation.
• Understand that internal reviews are
discoverable by OSHA and others
External Audits
OSHA can subpoena these
audits.
Two Large Penalty cases
used the audit findings
against the company.
– Outside audits are not
privileged unless
directed by a counsel
– Company and Outside
Counsel can retain
consultants to create
arguments the audit may
not be discovered by
OSHA etc.
Tip 3 Do a Sample PSM audit (cont.)
INTERVIEWS
• PSM coordinator
• Operators at all levels
• Process engineers
• Inspection dept
• Operating supervisors
• Instrument technicians
Tip 4 – Organize Required Documents
by Standard
• PSM programs in one location or binder.
• Operating instructions are on computer and
hard copy
• Keep log of all training and missed training
• Put PHA in a separate binder(s)
Tip 5 Take Notes
• Throughout the inspection, the OSHA Designee and
any other employer representatives should
• take copious notes on what the inspector sees,
• who he talks to and
• what is said,
• what samples
• and pictures he takes, (take side by side)
• what documents he reviews.
• Bate Stamp documents given
• Best Practice: Designate a scribe who takes notes
during inspections.
Tip 6 Employee Interviews
Hourly Employee Interviews
• OSHA takes position no management present
• Up to employee – can have Employee Representative
• Advise employee of his/her rights, appreciation of
cooperation, and to tell the truth’
• Management and supervisor interviews
• – Always another management/counsel present –
agent of Company
Tip 7 Correct During Inspections
• Immediately Correct
Unsafe Conditions
Identified by The
Compliance Officer
Without Admitting That
The Condition Constitutes
a Violation
– May avoid the citation
– May lessen the
classification or penalty of
a citation
Letting a violation exist for weeks
during an OSHA inspection can be
used to show duration.
SUMMARY PROCESS SAFETY INFORMATION
paragraph d
• Review all of the information
that exists
• Check for accuracy and
to see if it is up to date
– Where is it located?
– Cross check with procedures
– Does it match the operations
and layout?
• You may have to walk the system through and check
the data.
• Test ventilation systems, check gauges versus
specifications given etc.
SUMMARY PROCESS HAZARD ANALYSIS
paragraph e
• Check the PHA’s for timeliness
– Initial and recertification
• Document the methodology used
– Is it appropriate?
• Who conducted the PHA?
• Was an hourly employee involved?
– Describe.
• Were participants trained in the
methodology, including employee(s)?
– Review the training.
Documentation
• Review the system used to track
action items to closure.
– Are the items tracked and on
schedule?
• Document delays and the reasons
for the delays.
– Are they valid or does it appear
to be procrastination?
• Does anyone assure that the items
were actually corrected or is it just
paper shuffling?
SUMMARY PROCESS HAZARD ANALYSIS
paragraph e (cont’d)
• Review the PHA
– Are all systems analyzed?
– Are all systems identified?
• Check the validity of the
mitigation systems identified in
the PHA
– Relief valve vs. sizing criteria
• Kill systems
– Do they work or is injection
pressure less than operating
pressure?
Documentation • Equipment inspections
– When inspection program is
poor
• Review rejected PHA
recommendations
– Document the rationale and test
it for accuracy
– Were the hazards of rejected
items resolved in another
manner?
• Verify that facility siting and
human factors were
adequately addressed
SUMMARY PROCEDURES
paragraph f (cont’d)
DOCUMENTATION
• Review procedures
– Determine if practice and paper are the same
– Note discrepancies
– Ensure procedures meet the elements of the standard
• Do the operators know the procedures
versus their responsibilities.
– Includes relief operators and subs
– Cross check with training
• Note how the procedures are filed
– Paper or electronic and where they are located
– If computerized check to verify that all employees
who would need access to them have computer skills
and the appropriate logon and password
– Access if the power were to fail?
OSHA
SUMMARY PROCEDURES
paragraph f (cont’d)
DOCUMENTATION (cont’d)
• Review the procedure format and check for
consistency between processes.
• Document the dates of certification and who is the
certifying official.
• Review the certification process to determine
how, or if, the procedures are reviewed prior
to certification.
• Cross check changes made with the Management
of Change procedures.
• Review the safe work practices and verify that they
are being used in the day to day operations. This
includes contractors. Especially note line breaking
activities.
Plant
Operating
Procedures
SUMMARY MECHANICAL INTEGRITY
paragraph j
DOCUMENTATION
• Determine if process vessels including pressure vessels
are inspected according to codes. Includes:
– appropriate corrosion rate calculations
– scheduling inspections at the appropriate intervals
• Determine that piping is inspected properly and timely
• Ensure that inspectors have the proper training and
certifications for the inspections they do
– if NDT is used, determine that the inspectors have ASNT
certification or equivalent.
SUMMARY MECHANICAL INTEGRITY
paragraph j (cont’d)
DOCUMENTATION (cont’d)
• Document the removal from service criteria for pumps
and rotating equipment and verify that they are pulled
before breakdown.
– Preventive maintenance vs. breakdown maintenance.
• Determine if the process instrumentation is
inspected/calibrated according to manufacturers
schedule.
• Do process operators perform maintenance?
– Are they trained?
• Review inspection reports to see if deficiencies are
corrected.
SUMMARY MANAGEMENT OF
CHANGE
paragraph l (cont’d)
DOCUMENTATION
• Verify that all changes to the process were
reviewed through the management of change
procedure.
• Document the system to advise and train
operators in the change.
• Investigate “emergency” management of
changes. Changes that may occur during
second or third shifts.
• How do the P&ID’s and procedures get update?
SUMMARY MANAGEMENT OF CHANGE
paragraph l (cont’d)
Supporting line
before opening
DOCUMENTATION (cont’d)
• Does the company definition
of changes meet the OSHA
definition for MOC?
• Review the MOCs to see if
all provisions were addressed
before the change was made
• Check raw materials for changes
• Check process chemistry conditions vs. practice
(temp, flow, pressure, cooling, solid to solvent ratio
etc), psi information
• Check for controller loop bypasses and MOC
Summary
• Identify the top risks in the facility
• Look at corrosion monitoring on pipes and vessels,
• Pump vibration leads to failures and fires.
• Procedures related to boiler startup, hot works,
• Evaluate hydrogen sulfide monitoring, hydrofluoric acid,
• Address fatigue and control panel alarms during start ups,
• Management of change is slipping.
• Gasket torquing procedures should be reviewed as well as
gasket compatibility for service,
• Relief valve inspection and testing is a must.
• Facility siting is ever present
Facebook….john newquist815-354-6853
LinkedIn is john
newquist
johnanewquist@gmail.com Twitter is johnanewquist

Weitere ähnliche Inhalte

Was ist angesagt?

Introduction to PSM Online Interactive Training
Introduction to PSM Online Interactive TrainingIntroduction to PSM Online Interactive Training
Introduction to PSM Online Interactive TrainingJohn Kingsley
 
Process Safety
Process SafetyProcess Safety
Process SafetyConsultivo
 
Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...Indohaan Technology
 
Management of Change (MOC) Simplified - Infographic
Management of Change (MOC) Simplified - InfographicManagement of Change (MOC) Simplified - Infographic
Management of Change (MOC) Simplified - InfographicIntelex
 
HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)
HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)
HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)Angel Darío González-Delgado
 
Permit to work system
Permit to work systemPermit to work system
Permit to work systemAsif Khan
 
HAZOP AND OPERABILITY STUDY
HAZOP AND OPERABILITY STUDY HAZOP AND OPERABILITY STUDY
HAZOP AND OPERABILITY STUDY damomech92
 
Load restraint Safe (Loading and unloading on vehicles)
Load restraint Safe (Loading and unloading on vehicles)Load restraint Safe (Loading and unloading on vehicles)
Load restraint Safe (Loading and unloading on vehicles)Ammar Abdelgader, Ph.D.
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Worklifecombo
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction TrainingThe Pathway Group
 
Behavior-Based Safety PPT Slide Template
Behavior-Based Safety PPT Slide TemplateBehavior-Based Safety PPT Slide Template
Behavior-Based Safety PPT Slide TemplatePresentationLoad
 

Was ist angesagt? (20)

Introduction to PSM Online Interactive Training
Introduction to PSM Online Interactive TrainingIntroduction to PSM Online Interactive Training
Introduction to PSM Online Interactive Training
 
Process Safety
Process SafetyProcess Safety
Process Safety
 
HSE PRESENTATION
HSE PRESENTATIONHSE PRESENTATION
HSE PRESENTATION
 
Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...
 
Process safety managment
Process safety managmentProcess safety managment
Process safety managment
 
Management of Change (MOC) Simplified - Infographic
Management of Change (MOC) Simplified - InfographicManagement of Change (MOC) Simplified - Infographic
Management of Change (MOC) Simplified - Infographic
 
HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)
HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)
HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)
 
Permit to work system
Permit to work systemPermit to work system
Permit to work system
 
Hazop method
Hazop methodHazop method
Hazop method
 
HAZOP AND OPERABILITY STUDY
HAZOP AND OPERABILITY STUDY HAZOP AND OPERABILITY STUDY
HAZOP AND OPERABILITY STUDY
 
Introduction to oil & gas health safety environment
Introduction to oil & gas health safety environmentIntroduction to oil & gas health safety environment
Introduction to oil & gas health safety environment
 
Process safety management system
Process safety management systemProcess safety management system
Process safety management system
 
International technical certificate in oil and gas operational safety revisio...
International technical certificate in oil and gas operational safety revisio...International technical certificate in oil and gas operational safety revisio...
International technical certificate in oil and gas operational safety revisio...
 
Workplace hazards
Workplace hazardsWorkplace hazards
Workplace hazards
 
Load restraint Safe (Loading and unloading on vehicles)
Load restraint Safe (Loading and unloading on vehicles)Load restraint Safe (Loading and unloading on vehicles)
Load restraint Safe (Loading and unloading on vehicles)
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Work
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction Training
 
Building a Safety Culture
Building a Safety CultureBuilding a Safety Culture
Building a Safety Culture
 
Behavior-Based Safety PPT Slide Template
Behavior-Based Safety PPT Slide TemplateBehavior-Based Safety PPT Slide Template
Behavior-Based Safety PPT Slide Template
 
7 Keys for Creating A Safety Culture
7 Keys for Creating A Safety Culture7 Keys for Creating A Safety Culture
7 Keys for Creating A Safety Culture
 

Andere mochten auch

Senior Consultant - Internal Audit & Compliance CV
Senior Consultant - Internal Audit  & Compliance CVSenior Consultant - Internal Audit  & Compliance CV
Senior Consultant - Internal Audit & Compliance CVHala Mohamed
 
fall protection 2015
 fall protection 2015 fall protection 2015
fall protection 2015John Newquist
 
Applying Process-based Analytics to Audit Results for Process Management and...
Applying Process-based Analytics to Audit Results for Process Management and...Applying Process-based Analytics to Audit Results for Process Management and...
Applying Process-based Analytics to Audit Results for Process Management and...Jeffery Cawley
 
Gi forklift and material handling 2015
Gi forklift and material handling 2015Gi forklift and material handling 2015
Gi forklift and material handling 2015John Newquist
 
How To Survive An OSHA Audit
How To Survive An OSHA AuditHow To Survive An OSHA Audit
How To Survive An OSHA AuditJames Rhoad
 
Asset Integrity Management approach to achieve excellence in Process Safety
Asset Integrity Management approach to achieve excellence in Process SafetyAsset Integrity Management approach to achieve excellence in Process Safety
Asset Integrity Management approach to achieve excellence in Process SafetyChandrashekhar Kulkarni
 
0100 panorama de la industria offshore - versión 2
0100   panorama de la industria offshore - versión 20100   panorama de la industria offshore - versión 2
0100 panorama de la industria offshore - versión 2Juan J. Elwart
 
0000 introducción al curso - versión 2
0000   introducción al curso - versión 20000   introducción al curso - versión 2
0000 introducción al curso - versión 2Juan J. Elwart
 
Green Chemistry & Engineering
Green Chemistry & EngineeringGreen Chemistry & Engineering
Green Chemistry & Engineeringernestvictor
 
Risk Management June 2010 V2
Risk Management June 2010 V2Risk Management June 2010 V2
Risk Management June 2010 V2James Adenuga
 

Andere mochten auch (18)

Ladders 2014
Ladders 2014Ladders 2014
Ladders 2014
 
Senior Consultant - Internal Audit & Compliance CV
Senior Consultant - Internal Audit  & Compliance CVSenior Consultant - Internal Audit  & Compliance CV
Senior Consultant - Internal Audit & Compliance CV
 
Gi 2016 fall
Gi 2016 fallGi 2016 fall
Gi 2016 fall
 
Webinar - OSHA Compliance Made Simple
Webinar - OSHA Compliance Made SimpleWebinar - OSHA Compliance Made Simple
Webinar - OSHA Compliance Made Simple
 
fall protection 2015
 fall protection 2015 fall protection 2015
fall protection 2015
 
Applying Process-based Analytics to Audit Results for Process Management and...
Applying Process-based Analytics to Audit Results for Process Management and...Applying Process-based Analytics to Audit Results for Process Management and...
Applying Process-based Analytics to Audit Results for Process Management and...
 
Gi forklift and material handling 2015
Gi forklift and material handling 2015Gi forklift and material handling 2015
Gi forklift and material handling 2015
 
How To Survive An OSHA Audit
How To Survive An OSHA AuditHow To Survive An OSHA Audit
How To Survive An OSHA Audit
 
OSHA Compliance Update
OSHA Compliance UpdateOSHA Compliance Update
OSHA Compliance Update
 
Asset Integrity Management approach to achieve excellence in Process Safety
Asset Integrity Management approach to achieve excellence in Process SafetyAsset Integrity Management approach to achieve excellence in Process Safety
Asset Integrity Management approach to achieve excellence in Process Safety
 
Presentation PX
Presentation PXPresentation PX
Presentation PX
 
0100 panorama de la industria offshore - versión 2
0100   panorama de la industria offshore - versión 20100   panorama de la industria offshore - versión 2
0100 panorama de la industria offshore - versión 2
 
0000 introducción al curso - versión 2
0000   introducción al curso - versión 20000   introducción al curso - versión 2
0000 introducción al curso - versión 2
 
Green Chemistry & Engineering
Green Chemistry & EngineeringGreen Chemistry & Engineering
Green Chemistry & Engineering
 
Hr jobanalysis
Hr jobanalysisHr jobanalysis
Hr jobanalysis
 
Risk Management June 2010 V2
Risk Management June 2010 V2Risk Management June 2010 V2
Risk Management June 2010 V2
 
HEMP
HEMPHEMP
HEMP
 
UOP Transcrips
UOP TranscripsUOP Transcrips
UOP Transcrips
 

Ähnlich wie Nfpa Process Safety Management and osha 6 8 2013

Psm vpppa reg v
Psm vpppa reg vPsm vpppa reg v
Psm vpppa reg vvtsiri
 
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...Kevin Perry
 
Statistical process control
Statistical process controlStatistical process control
Statistical process controlShankha Goswami
 
Newea 2014 - Strengthening Treatment Facility Chemical Process Safety
Newea 2014 - Strengthening Treatment Facility Chemical Process SafetyNewea 2014 - Strengthening Treatment Facility Chemical Process Safety
Newea 2014 - Strengthening Treatment Facility Chemical Process SafetyDavid Horowitz
 
Risk management in complex changeovers through cfmea
Risk management in complex changeovers through cfmeaRisk management in complex changeovers through cfmea
Risk management in complex changeovers through cfmeaDr. Bikram Jit Singh
 
Safe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to FieldSafe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to FieldDesign World
 
7-4-aseptic-process-validation.pdf
7-4-aseptic-process-validation.pdf7-4-aseptic-process-validation.pdf
7-4-aseptic-process-validation.pdflinh838802
 
PREDICTING FAILURES_AUGUST2007
PREDICTING FAILURES_AUGUST2007PREDICTING FAILURES_AUGUST2007
PREDICTING FAILURES_AUGUST2007Gan Chun Chet
 
Seminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptxSeminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptxMoonJ3
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityRicky Smith CMRP, CMRT
 
CF Regional Conference PPT template - Lillie
CF Regional Conference PPT template - LillieCF Regional Conference PPT template - Lillie
CF Regional Conference PPT template - LillieDoug Lillie, CIRO
 

Ähnlich wie Nfpa Process Safety Management and osha 6 8 2013 (20)

Psm vpppa reg v
Psm vpppa reg vPsm vpppa reg v
Psm vpppa reg v
 
PSM-1.pdf
PSM-1.pdfPSM-1.pdf
PSM-1.pdf
 
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
 
Air brake system
Air brake systemAir brake system
Air brake system
 
Rod Cumming, ARC (Australian Refrigeration Council)
Rod Cumming, ARC (Australian Refrigeration Council)Rod Cumming, ARC (Australian Refrigeration Council)
Rod Cumming, ARC (Australian Refrigeration Council)
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
Lp2007 216
Lp2007 216Lp2007 216
Lp2007 216
 
Newea 2014 - Strengthening Treatment Facility Chemical Process Safety
Newea 2014 - Strengthening Treatment Facility Chemical Process SafetyNewea 2014 - Strengthening Treatment Facility Chemical Process Safety
Newea 2014 - Strengthening Treatment Facility Chemical Process Safety
 
PSMtalk (1).ppt
PSMtalk (1).pptPSMtalk (1).ppt
PSMtalk (1).ppt
 
Risk management in complex changeovers through cfmea
Risk management in complex changeovers through cfmeaRisk management in complex changeovers through cfmea
Risk management in complex changeovers through cfmea
 
Oms
OmsOms
Oms
 
INTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.pptINTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.ppt
 
Safe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to FieldSafe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to Field
 
7-4-aseptic-process-validation.pdf
7-4-aseptic-process-validation.pdf7-4-aseptic-process-validation.pdf
7-4-aseptic-process-validation.pdf
 
PREDICTING FAILURES_AUGUST2007
PREDICTING FAILURES_AUGUST2007PREDICTING FAILURES_AUGUST2007
PREDICTING FAILURES_AUGUST2007
 
Bow tie.pdf
Bow tie.pdfBow tie.pdf
Bow tie.pdf
 
Seminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptxSeminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptx
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and Reliability
 
CF Regional Conference PPT template - Lillie
CF Regional Conference PPT template - LillieCF Regional Conference PPT template - Lillie
CF Regional Conference PPT template - Lillie
 
COMPL OF WORKS1
COMPL OF WORKS1COMPL OF WORKS1
COMPL OF WORKS1
 

Mehr von John Newquist

1926 motor vechicles and struck by 2021
1926 motor vechicles and struck by 20211926 motor vechicles and struck by 2021
1926 motor vechicles and struck by 2021John Newquist
 
Circular saw safety 2021
Circular saw safety 2021Circular saw safety 2021
Circular saw safety 2021John Newquist
 
Fy20 Most Frequently Cited OSHA Standards in Construction
Fy20 Most Frequently Cited OSHA Standards in ConstructionFy20 Most Frequently Cited OSHA Standards in Construction
Fy20 Most Frequently Cited OSHA Standards in ConstructionJohn Newquist
 
Fy20 most frequently cited manufacturing OSHA
Fy20 most frequently cited manufacturing OSHA Fy20 most frequently cited manufacturing OSHA
Fy20 most frequently cited manufacturing OSHA John Newquist
 
Cy19 gi most freq cited general industry
Cy19 gi most freq cited general industryCy19 gi most freq cited general industry
Cy19 gi most freq cited general industryJohn Newquist
 
Gi 2018 subpart h hazardous materials
Gi 2018 subpart h hazardous materialsGi 2018 subpart h hazardous materials
Gi 2018 subpart h hazardous materialsJohn Newquist
 
Silica 2018 construction
Silica 2018 constructionSilica 2018 construction
Silica 2018 constructionJohn Newquist
 
Gi 2017 loto seven hour
Gi 2017 loto seven hourGi 2017 loto seven hour
Gi 2017 loto seven hourJohn Newquist
 
Combustible Dust Safety 2017
Combustible Dust Safety 2017Combustible Dust Safety 2017
Combustible Dust Safety 2017John Newquist
 
Safety Training Techniques 2017
Safety Training Techniques 2017Safety Training Techniques 2017
Safety Training Techniques 2017John Newquist
 
Outreach Training Requirements 2017 new
Outreach Training Requirements 2017 newOutreach Training Requirements 2017 new
Outreach Training Requirements 2017 newJohn Newquist
 
Safety and Health Training
Safety and Health Training Safety and Health Training
Safety and Health Training John Newquist
 
Swimming Pool Safety 2017
Swimming Pool Safety 2017 Swimming Pool Safety 2017
Swimming Pool Safety 2017 John Newquist
 
Lockout Minor Servicing Exceptions
Lockout Minor Servicing ExceptionsLockout Minor Servicing Exceptions
Lockout Minor Servicing ExceptionsJohn Newquist
 
Osha Update 2017 July 2017
Osha Update 2017 July 2017Osha Update 2017 July 2017
Osha Update 2017 July 2017John Newquist
 
Extreme Weather 2017
Extreme Weather 2017Extreme Weather 2017
Extreme Weather 2017John Newquist
 

Mehr von John Newquist (20)

1926 motor vechicles and struck by 2021
1926 motor vechicles and struck by 20211926 motor vechicles and struck by 2021
1926 motor vechicles and struck by 2021
 
Circular saw safety 2021
Circular saw safety 2021Circular saw safety 2021
Circular saw safety 2021
 
Fy20 Most Frequently Cited OSHA Standards in Construction
Fy20 Most Frequently Cited OSHA Standards in ConstructionFy20 Most Frequently Cited OSHA Standards in Construction
Fy20 Most Frequently Cited OSHA Standards in Construction
 
Fy20 most frequently cited manufacturing OSHA
Fy20 most frequently cited manufacturing OSHA Fy20 most frequently cited manufacturing OSHA
Fy20 most frequently cited manufacturing OSHA
 
Cy19 gi most freq cited general industry
Cy19 gi most freq cited general industryCy19 gi most freq cited general industry
Cy19 gi most freq cited general industry
 
Gi 2018 subpart h hazardous materials
Gi 2018 subpart h hazardous materialsGi 2018 subpart h hazardous materials
Gi 2018 subpart h hazardous materials
 
Respirators 2018
Respirators 2018Respirators 2018
Respirators 2018
 
Silica 2018 construction
Silica 2018 constructionSilica 2018 construction
Silica 2018 construction
 
Gi 2017 loto seven hour
Gi 2017 loto seven hourGi 2017 loto seven hour
Gi 2017 loto seven hour
 
Combustible Dust Safety 2017
Combustible Dust Safety 2017Combustible Dust Safety 2017
Combustible Dust Safety 2017
 
Hepatitis c
Hepatitis cHepatitis c
Hepatitis c
 
Gi 2017 lockout 503
Gi 2017 lockout 503Gi 2017 lockout 503
Gi 2017 lockout 503
 
Safety Training Techniques 2017
Safety Training Techniques 2017Safety Training Techniques 2017
Safety Training Techniques 2017
 
Outreach Training Requirements 2017 new
Outreach Training Requirements 2017 newOutreach Training Requirements 2017 new
Outreach Training Requirements 2017 new
 
Safety and Health Training
Safety and Health Training Safety and Health Training
Safety and Health Training
 
Swimming Pool Safety 2017
Swimming Pool Safety 2017 Swimming Pool Safety 2017
Swimming Pool Safety 2017
 
Pesticide safety
Pesticide safetyPesticide safety
Pesticide safety
 
Lockout Minor Servicing Exceptions
Lockout Minor Servicing ExceptionsLockout Minor Servicing Exceptions
Lockout Minor Servicing Exceptions
 
Osha Update 2017 July 2017
Osha Update 2017 July 2017Osha Update 2017 July 2017
Osha Update 2017 July 2017
 
Extreme Weather 2017
Extreme Weather 2017Extreme Weather 2017
Extreme Weather 2017
 

Kürzlich hochgeladen

Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI AgeCprime
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesKari Kakkonen
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesThousandEyes
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterMydbops
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Scott Andery
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...AliaaTarek5
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Alkin Tezuysal
 

Kürzlich hochgeladen (20)

Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI Age
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examples
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL Router
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
 

Nfpa Process Safety Management and osha 6 8 2013

  • 1. Process Safety and OSHA, Seven Keys to Surviving a Chem NEP Audit Johnanewquist@gmail.com NFPA 2013 Session 41 Draft 6 8 2013
  • 2. Overview Background on CHEM NEP  Seven Keys to Surviving a CHEM NEP Top PSM Cited
  • 3. National Emphasis Programs • Provide for planned inspections in high hazard industries • Focus efforts on specific hazards • Refinery NEP focused on implementation of PSM in Refineries • Chemical NEP focuses on implementation of PSM in all other PSM covered facilities
  • 4. Why an NEP? • NEPs are the most significant PSM enforcement actions since the standard was promulgated in 1992 • Significant differences between current effort and pre-2007 inspections: • 73% of early inspections were initiated due to accidents, complaints or referrals. • Almost all Refinery NEPs were program planned
  • 5. Refinery NEP Origins • NEP inspections have more violations and higher penalties than prior PSM OR PQV inspections: • 11.2 Violations per inspection • $76,800 • Chem NEP • 8.4 Violations per inspection • $31,600
  • 6. Refinery NEP • Originally launched June 7, 2007 • Last inspections completed in 2011 • Combined “static” and “dynamic” question lists with guidance for compliance officers (CSHOs) • Compliance found to be highly uneven
  • 7. Lessons Learned • List based approach does find hazards • The listed questions also result in many “off- script” citations • CSHO training works • OSHA focus on RAGAGEP resulted in large number of deficiencies • Facility Siting still a problem 20+ years after SHELL-Norco • & Phillips-Pasadena
  • 8. CHEM NEP Targeting – Congress and CSB asked OSHA to focus programmed chemical inspections on “high risk” operations
  • 9. CHEM NEP • Pilot Chem NEP effective July 27, 2009 • Extended nationwide Nov. 29, 2011 • Less resource-intensive • State plan participation is required • CSHO’s check abatement of PSM citations requiring abatement going back six years
  • 10. CHEM NEP • Differs from Refinery NEP • Intent is to perform a larger number of shorter, less resource intensive, inspections • A small number of “dynamic” list questions are applied to a selected unit or units • No static list questions
  • 11. CHEM NEP • 300-400 Inspections annually • Violations Most Cited – 1910.119 – Process Safety – 1910.147 – LOTO – 1910.120 – Hazardous waste emergency response – 1910.1200 – Hazard Communication – 1910.146 – Confined Space
  • 12. CHEM NEP Approach • Questions are specific and contain compliance guidance (similar to Refinery NEP) • Questions differ by type of facility • Ammonia refrigeration • General PSM • Chemical Processing • Questions change periodically • CSHO must document the questions in the file.
  • 13. Sample Questions • Has the employer revalidated the PHS every five years? • Does the MI program ensure that the material is suitable for the process? • Are Alarms and Controls enabled and in service? • Does the employer have a means to verify that the employees understood the training?
  • 14. Sectors • Ammonia Refrigeration • Storage Only • Chemical Processing • (includes Chlorine) • Ammonia refrigeration dynamic list – 10 questions • PSM General dynamic list – 5 questions • PSM general dynamic list – 15 questions • Chemical Process dynamic list – 10 questions • PSM general dynamic list – 5 questions
  • 15. Region V FY 2012 Total 74% 26% Unprogrammed Programmed Percentage of Region V CHEM NEP Total Programmed vs. Unprogrammed
  • 16. Region V FY 2012 Total 31% 58% 11% Complaint Referral Other Percentage of Region V CHEM NEP Total Unprogrammed Breakdown
  • 17. National Comparison Total of CHEM NEP Inspections Nationally during FY 12 9% 11% 12% 6% 35% 14% 6% 4% 3% Region 1 Region 2 Region 3 Region 4 Region 5 Region 6 Region 7 Region 8 Region 10
  • 18. NAICS Codes 60%20% 10% 10% Chemical Manufacturing Food Manufacturing Waste Management and Remediation Other Percentage of CHEM NEP Inspections in Region V during FY 12
  • 19. PSM A Strong Enforcement Start Penalty State Major Issues • $545,000 OH PSM, Chemical comp. release. • $54,000 IL PSM, Food • $133,000 MA PSM, candy mfr, • $46,400 OK PSM contractors, Refinery • $123,000 NY PSM, Insulation mfr. • $73,400 MA PSM, food • $963,200 CA PSM refinery • $53,000 TX PSM, chem plant • $99,000 TX PSM, ammonia • $55,000 AK PSM, Ammonia • $121,000 TX PSM, Ammonia • $67,000 LA PSM at VC facility • $155,000 WY PSM at Refinery • $51,800 WI PSM at Pharmaceutical • $121,000 TX PSM Warehouse
  • 20. Citations Issued • Citations issued Frequency – 1910.119(j) – Mechanical Integrity – 1910.119(e) - Process Hazard Analysis – 1910.119(l) - Management of Change – 1910.119(f) - Operating Procedures – 1910.119(d) – Process Safety Information – 1910.119(c) - Employee Participation – 1910.119(g) - Training – 1910.119(i) – Pre-Startup Safety Review – 1910.119(m) – Incident Investigation – 1910.119(n) - Emergency Planning and Response – 1910.119(o) – Compliance Audits
  • 21. Plain View Doctrine – Compliance officer can issue citations for any violations in “plain view.” – If Compliance Officer doesn’t see it he/she can’t cite you for it.
  • 22. P&IDs • 119(d)(3)(i)(B) • Relief Valves not in P&ID • P&ID indicated flame arrestors that did not exist. • P&ID did not indicate correct piping connections to vessels. Incorrect diameters of piping. • P&ID did not show LEL detectors and interlocks.
  • 23. P&IDs • 119(d)(3)(i)(B) • No design basis for relief valves on reactor • Valve tags were reversed, mislabeled • HF vent line was not marked • HF dump tank was not identified. • Three way valves were not identified • Equipment were transposed on the diagrams
  • 24. Process Safety Information • 119(d)(3)(i)(H) PSI did not list: • Cutout devices and Interlocks • High and low level sensors • Ammonia detectors • High and low pressure devices • Emergency Stop Buttons • Electrical Classification of Equipment
  • 25. RAGAGEP • 119(d)(3)(ii) • U-1 Form missing for pressure vessel • Mechanical room for ammonia had no emergency ventilation • Electrical Classification of equipment missing • Venting Flanges not meet ANSI/ASME 31.3 • No documentation that piping fit for service per API 570 • Manual block valves were located down stream of automatic dump valves (Hydrogen Fluoride Industry Practice Institute or HFIPI) • HF tanks not sized 1.5x for anticipated deliveries. HFIPI • HF dump tank did not have capacity of largest HF tank. HFIPI • HF liquid flow velocity exceeded 5.9 feet/second • Eye wash and shower were not configured to sound in the control room. HFIPI • No valve capping kit for HF rail car unloading • High pressure vent lines were not labeled. • Relief valve discharge 3.5` above platform vs. 15 feet. (IIAR 2-2008)
  • 26. PHA • 119(e)(1) • No PHA on the Hydrogen Storage tank • PHA missing several elements • PHA did not address failure of ventilation • PHA did not address previous fires. • PHA did not previous piping failures. • PHA did not address previous failures of cooling systems
  • 27. PHA • 119(e)(3)(i) The hazards of the process; • The hazard of power failure was not discussed in the PHA. • The Hazard of natural gas draining to the surge drum too long. • The hazard of releasing material in the neutralization pits • The hazard of weight of hoses on pipe nipples was not addressed • The Hazards of venting flanges was not addressed in the PHA. • The hazard of forklift traffic was not addressed.
  • 28. PHA • 119(e)(3)(v) • No analysis of facility siting issues related to formaldehyde dispersion • Building siting and how affected by the ammonia process • Ammonia system including piping, recirculator, chiller, receiver, and condensors were located to the roadway and subject to vehicle impact.
  • 29. PHA • 119(e)(3)(vi) • Human factor • Fatigue • No consider of opening block valves downstream of remote operated dump valve • Second and third shift training • People on vacation leave • Operational overload during emergencies • Operation interactions
  • 30. PHA • 119(e)(5) • PHA items not resolved for years • PHA did not address team finding and recommendations such as • Installing back flow prevention when adding flammable liquids in a tank • Automatic Pressure controls for Nitrogen • Adding relief valves • Facility siting for control rooms • Reconfigurations of valves issue on PHA was not resolved.
  • 31. Operating Procedures • 119(f)(1) • No written procedures for maintaining the ammonia systems • No procedures for communicating issues during shift changes • No procedures for upset condition or avoiding deviations beyond operating limits. • Transferring chemicals from pit to pit • Neutralization of chemicals
  • 32. Operating Procedures • 119(f)(1)(i)(E) • No procedures for when discharge pressure, suction pressure, discharge temperature, lubrication oil pressure, and lubrication oil temperature exceed normal operating range • No Specific steps to stop an emergency • No identification of emergency upset conditions and procedures to take to resolve it. • No procedure for emergency operations for transfer of chemicals out a Surge tank • No clear procedures for emptying HF tanks with isolating nitrogen systems
  • 33. Operating Procedures • 119(f)(3) • No certification of operating procedures annually.
  • 34. Safe Work Practices • 119(f)(4) • No safe work procedures developed for contractors or maintenance employees working on PSM covered processes for • Lockout • Confined space • Hot works
  • 35. Mechanical Integrity • 119(j)(2) No inspection procedures • Pressure Vessels • Piping, components, Hose adapters • Pump • Venting Flanges • Compressors and cutout switches • Relief Systems and change out schedule • Emergency Shutdown Systems • Valves requiring Carseals • No Procedures for torquing bolts
  • 36. Mechanical Integrity • 119(j)(4)(i) No inspection of • Relief valves • Pressure vessels (Oil pot, Accumulator, Receiver, and Transfer Drum) • Ammonia Feed Pumps • Venting flanges • Pipe Nipples, Deadlegs, Inspection ports, hose adapters • High Level alarms and emergency shutdown systems.
  • 37. Mechanical Integrity • 119(j)(4)(ii) • No authorized API 570/574 piping inspector or piping inspections • No API 510 pressure vessel inspector • No corrosion rates established for pressure vessels • Pump not maintained and lubricated per manufacturer’s recommendations • Rupture Disk was not replaced per manufacturer’s recommendations • No 100% Radiography or Ultrasonic testing on process pipe weld repair per ANSI B31.1 • No fitness for service for repairs per API 579 for tanks undergoing repair at head nozzles
  • 38. Mechanical Integrity • 119(j)(4)(iii) • No annual piping inspection • No API internal pressure vessel inspection • No inspection testing of the condensate vapor system for buildup that might clog the system. • No hydrostatic testing of HF tanks • No testing or exercising of HF vent valves/dump valves • Not testing compressor cutout switches • Blast Evaporators, heat exchangers not inspected • No pump inspections
  • 39. Management of Change • 119(L)(1) • No implementation of procedures after • Replacing manual valves with pneumatic actuated valves. • Installing a LEL detector • Disconnection of the Cooling water System • Installing an alarm on the quench system • Expanding Toulene tank system • Leak at Relief Header Rupture disk • Bolt torquing procedure change • After making changes in the Ammonia system • No MOC for condenser removed from process
  • 40. Copyright - EHS Management Partners, Inc. 40 Tip 1 Anticipate the NEP Questions Q: Have appropriate checks and inspections been made to assure equipment is installed properly and consistent with design specifications and manufacturer's instructions? Citation - There is no evidence of a process for installation verification. Vulnerable - Some staff report that inspections are done, but there is no consistent documentation or process. Good - There is evidence of a procedure for equipment installation checks and inspections, based on review of documentation. Not all new equipment is consistently reviewed; or, reviews may not be complete.
  • 41. Tip 2 Designate an OSHA Resource • Designate a manager to deal with the inspector in the event of an OSHA inspection. This person could be the safety or human resources manager, but the person should be familiar with OSHA, PSM, company policies and operations.
  • 42. Tip 3 Do a Sample PSM audit • Perform your own periodic audits and reviews • Use Corporate or Outside Eyes • Review of previous citations for last six years in the corporation. • Understand that internal reviews are discoverable by OSHA and others
  • 43. External Audits OSHA can subpoena these audits. Two Large Penalty cases used the audit findings against the company. – Outside audits are not privileged unless directed by a counsel – Company and Outside Counsel can retain consultants to create arguments the audit may not be discovered by OSHA etc.
  • 44. Tip 3 Do a Sample PSM audit (cont.) INTERVIEWS • PSM coordinator • Operators at all levels • Process engineers • Inspection dept • Operating supervisors • Instrument technicians
  • 45. Tip 4 – Organize Required Documents by Standard • PSM programs in one location or binder. • Operating instructions are on computer and hard copy • Keep log of all training and missed training • Put PHA in a separate binder(s)
  • 46. Tip 5 Take Notes • Throughout the inspection, the OSHA Designee and any other employer representatives should • take copious notes on what the inspector sees, • who he talks to and • what is said, • what samples • and pictures he takes, (take side by side) • what documents he reviews. • Bate Stamp documents given • Best Practice: Designate a scribe who takes notes during inspections.
  • 47. Tip 6 Employee Interviews Hourly Employee Interviews • OSHA takes position no management present • Up to employee – can have Employee Representative • Advise employee of his/her rights, appreciation of cooperation, and to tell the truth’ • Management and supervisor interviews • – Always another management/counsel present – agent of Company
  • 48. Tip 7 Correct During Inspections • Immediately Correct Unsafe Conditions Identified by The Compliance Officer Without Admitting That The Condition Constitutes a Violation – May avoid the citation – May lessen the classification or penalty of a citation Letting a violation exist for weeks during an OSHA inspection can be used to show duration.
  • 49. SUMMARY PROCESS SAFETY INFORMATION paragraph d • Review all of the information that exists • Check for accuracy and to see if it is up to date – Where is it located? – Cross check with procedures – Does it match the operations and layout? • You may have to walk the system through and check the data. • Test ventilation systems, check gauges versus specifications given etc.
  • 50. SUMMARY PROCESS HAZARD ANALYSIS paragraph e • Check the PHA’s for timeliness – Initial and recertification • Document the methodology used – Is it appropriate? • Who conducted the PHA? • Was an hourly employee involved? – Describe. • Were participants trained in the methodology, including employee(s)? – Review the training. Documentation • Review the system used to track action items to closure. – Are the items tracked and on schedule? • Document delays and the reasons for the delays. – Are they valid or does it appear to be procrastination? • Does anyone assure that the items were actually corrected or is it just paper shuffling?
  • 51. SUMMARY PROCESS HAZARD ANALYSIS paragraph e (cont’d) • Review the PHA – Are all systems analyzed? – Are all systems identified? • Check the validity of the mitigation systems identified in the PHA – Relief valve vs. sizing criteria • Kill systems – Do they work or is injection pressure less than operating pressure? Documentation • Equipment inspections – When inspection program is poor • Review rejected PHA recommendations – Document the rationale and test it for accuracy – Were the hazards of rejected items resolved in another manner? • Verify that facility siting and human factors were adequately addressed
  • 52. SUMMARY PROCEDURES paragraph f (cont’d) DOCUMENTATION • Review procedures – Determine if practice and paper are the same – Note discrepancies – Ensure procedures meet the elements of the standard • Do the operators know the procedures versus their responsibilities. – Includes relief operators and subs – Cross check with training • Note how the procedures are filed – Paper or electronic and where they are located – If computerized check to verify that all employees who would need access to them have computer skills and the appropriate logon and password – Access if the power were to fail? OSHA
  • 53. SUMMARY PROCEDURES paragraph f (cont’d) DOCUMENTATION (cont’d) • Review the procedure format and check for consistency between processes. • Document the dates of certification and who is the certifying official. • Review the certification process to determine how, or if, the procedures are reviewed prior to certification. • Cross check changes made with the Management of Change procedures. • Review the safe work practices and verify that they are being used in the day to day operations. This includes contractors. Especially note line breaking activities. Plant Operating Procedures
  • 54. SUMMARY MECHANICAL INTEGRITY paragraph j DOCUMENTATION • Determine if process vessels including pressure vessels are inspected according to codes. Includes: – appropriate corrosion rate calculations – scheduling inspections at the appropriate intervals • Determine that piping is inspected properly and timely • Ensure that inspectors have the proper training and certifications for the inspections they do – if NDT is used, determine that the inspectors have ASNT certification or equivalent.
  • 55. SUMMARY MECHANICAL INTEGRITY paragraph j (cont’d) DOCUMENTATION (cont’d) • Document the removal from service criteria for pumps and rotating equipment and verify that they are pulled before breakdown. – Preventive maintenance vs. breakdown maintenance. • Determine if the process instrumentation is inspected/calibrated according to manufacturers schedule. • Do process operators perform maintenance? – Are they trained? • Review inspection reports to see if deficiencies are corrected.
  • 56. SUMMARY MANAGEMENT OF CHANGE paragraph l (cont’d) DOCUMENTATION • Verify that all changes to the process were reviewed through the management of change procedure. • Document the system to advise and train operators in the change. • Investigate “emergency” management of changes. Changes that may occur during second or third shifts. • How do the P&ID’s and procedures get update?
  • 57. SUMMARY MANAGEMENT OF CHANGE paragraph l (cont’d) Supporting line before opening DOCUMENTATION (cont’d) • Does the company definition of changes meet the OSHA definition for MOC? • Review the MOCs to see if all provisions were addressed before the change was made • Check raw materials for changes • Check process chemistry conditions vs. practice (temp, flow, pressure, cooling, solid to solvent ratio etc), psi information • Check for controller loop bypasses and MOC
  • 58. Summary • Identify the top risks in the facility • Look at corrosion monitoring on pipes and vessels, • Pump vibration leads to failures and fires. • Procedures related to boiler startup, hot works, • Evaluate hydrogen sulfide monitoring, hydrofluoric acid, • Address fatigue and control panel alarms during start ups, • Management of change is slipping. • Gasket torquing procedures should be reviewed as well as gasket compatibility for service, • Relief valve inspection and testing is a must. • Facility siting is ever present
  • 59. Facebook….john newquist815-354-6853 LinkedIn is john newquist johnanewquist@gmail.com Twitter is johnanewquist

Hinweis der Redaktion

  1. Region V accounts fornearly 35% of all National CHEM NEP inspections