SlideShare ist ein Scribd-Unternehmen logo
1 von 10
OPS 571 Final Exam
ANSWERS ARE HERE 
1. Which of the following is true about make-to-stock processes?
A. Make-to-stock processes can be controlled based on the actual or anticipated amount of finished
goods
B. Make-to-stock process is used when demand is seasonal and the firm does not have enough
C. Services by their very nature often use make-to-stock processes.
D. A and B
2. According to your text, the most common process metric is:
A. Productivity
B. Utilization
C. Throughput time
D. Efficiency
3. ________ is when the activities in the stage must stop because there is no place to deposit the item
just completed.
A. Buffering
B. Starving
C. None of these answers
D. Blocking
4. According to Hayes and Wheelwright, which of the following is not a major process flow structure?
A. Job Shop
B. Assembly Line
C. Project
D. Batch
5. The most important performance dimension for product development projects is
A. Quality
B. Product flexibility
C. Time-to-market
D. Productivity
6. The major decision variables in equipment selection are:
A. Flexibility
B. Labor requirements
C. Manufacturer
D. Both A and B
7. Quality Function Deployment:
A. is a tool for translating customer requirements into concrete operating and engineering goals.
B. facilitates inter-functional cooperation between marketing, engineering, and manufacturing.
C. provides a better understanding and focus on process characteristics that require improvements.
D both a and B.
8. Which of the following statements is true about value analysis/value engineering?
A. the purpose of VA/VE is to simplify products and processes.
B the objective of VA/VE is to achieve equivalent or better performance at a lower cost.
C. VA is performed before the production stage, while VE deals with products already in production.
D both A and B.
9. In which phase of new-product design process are considerations to target market, desired level of
performance, investment requirements and financial impact made:
A. detailed engineering.
B. Preliminary process design.
C. pilot manufacturing phase.
D. concept development and product planning.
10. Which of the following is not a dimension of design quality?
A. Durability.
B. Serviceability.
C. Customization.
D. Features.
11. Testing is an example of:
A. Prevention costs.
B. Internal Failure costs.
C. External Failure Cost.
D. Appraisal costs.
12. Which Quality Guru advocated that senior management is responsible for 94% of quality problems?
A. Deming.
B. Ishikawa.
C. Juran.
D. Crosby.
13. Independent Demand is:
A. demand that is related to the demand for another item.
B. demand determined by the marketplace that requires forecasting.
C. Inventory whose demand comes from independent suppliers.
D. Inventory that is independent of any known rules of demand and supply.
14. Which of the following statements is true about the Q-system?
A. It does not have an EOQ, since the quality varies according to the demand.
B. The order interval is fixed not the order quanity.
C. It does not have a reorder point but rather a target inventory.
D. The system is completely determined by the two parameters, Q and R.
15. Which of the following is not an assumption of the basic economic-order quantity model?
A. ordering or setup costs are constant.
B. Quantity discounts are available.
C. annual demand is constant and known.
D. lead time is constant.
16. Which of the following is not a principle of work-center scheduling?
A. Schedule jobs as strings, with process steps back to back.
B. Obtain feedback each day on the jobs that are completed at each work center.
C. Once started, a job should not be interrupted.
D. Reschedule every day.
17. The assignment method is appropriate in solving problems that have the following characteristics?
A. There are ‘n’ things to be distributed to ‘n’ destinations.
B. Though each destination may handle all the things, the final assignment has each thing assigned to
one and only one destination.
C. Only one criterion should be used (minimum cost, maximum profit, for example).
D. A and C.
18. The objective of work-center scheduling include(s):
A. To meet due dates.
B. To minimize lead times.
C. To minimize finish goods inventory.
D. Both A and B.
19. The measure of the firm’s ability to make money according to Goldratt include:
A. Net profit.
B. Return on assets.
C. Cash flow.
D. Both A and C.
20. Goldratt’s rule of production scheduling include all but:
A. An hour saved at a non-bottleneck is a marriage.
B. A process batch should be fixed both along its route and in time.
C. Do not balance the capacity-balance the flow.
D. Utilization and activation of a resource is not the same thing.
21. According to Goldratt and Fox, a useful performance measure to treat inventory is:
A. Quick ratio.
B. Dollar days.
C. Inventory turnover.
D. Current ratio.
22. The advantages of pure project include all but:
A. Decisions are made quickly.
B. A team member can work on several projects.
C. The project manager has full authority over the project.
D. Team pride, motivation, and commitments are high.
23. Which of the following is not a typical milestone?
A. Training of project members.
B. Completed testing of the prototype.
C. Completion of design.
D. Production of a prototype.
24. “Slack” refers to the difference between:
A. Observed and predicted times.
B. optimistic and pessimistic times.
C. Latest and earliest times.
D. finish and start times.
25. Which of the following statements are true about time-series forcasting?
A. Time series analysis is based on the idea that the history of occurrences over time can be used to
predict the future.
B. Agent liability. Time series analysis tries to understand the system underlying and surrounding the
item being forecast.
C. Under time-series methods, demand is divided into the time-based components such as daily, weekly,
etc.
D. Time series methods are useful for long-range forecasts when the demand pattern is erratic.
26. Which of the following product promotional activities would probably help make the supply chain
more efficient?
A. Special packaging for a specific event that occurs one time each year.
B. A 2 for 1 price promotion.
C. Price promotions that expire on a specific date.
D. An “everyday” low price strategy where prices are not dependent on quantity delivered with a
specific order.
27. According to Hau Lee, which of the following types of products need to be delivered with efficient
supply-chains?
A. Grocery Products.
B. High technology products.
C Customer products.
D. Innovative products.
28. Supply-chain response relates to the following?
A. How quickly a customer order can be filled.
B. How quickly a company can react to a new competing product.
C. How inexpensive the product is.
D. Both A and B.
29. Which of the following statements is not true about capacity management in operations?
A. Capacity planning itself has different meaning to individual at different levels within the operations
management hierarchy.
B. the definition of capacity, in an operations management context, makes a clear distinction between
efficient and inefficient use of capacity.
C. When looking at capacity, operations managers need to look at both resource input and product
outputs.
D. An operations management view also emphasizes the dimension of capacity.
30. Capacity utilization rate can be computed as:
A. Capacity used-best.
B. Capacity used x best.
C. Capacity used/best.
D. Capacity used + best.
31. Lean systems typically require?
A. delivery of large lots at frequent intervals.
B Buyer inspection of goods and materials.
C. multiple sources from which to purchase.
D. long-term relationships and commitments.
32. Which of the following is not true about JIT systems?
A. The JIT system is based on the philosophy of eliminating waste and utilizing the full capacity of the
worker.
B. Under JIT the ideal lot size is one.
C. JIT is typically applied to repetitive manufacturing.
D. The goal of JIT is to drive all inventory queues to a moderate level thus minimizing inventory
investment and shortening lead times.
33. Which of the following is not an element of JIT?
A. small-lot production.
B. quickly changing schedule.
C. Multifunction worker.
D. Kanan pull system.
34. Which of the following would not be classified as a time-series technique?
A. Simple moving average.
B. Exponential smoothing.
C. Box Jenkins technique.
D. Regression model.
35. Which phase most closely describes the Delphi forecasting technique?
A. consumer survey.
B. random individual opinions.
C. group of expert’s opinions.
D. test markets.
36. Aggregate planners balance?
A. demand and costs.
B. demand and inventories.
C. demand and capacity.
D. supply and inventories.
37. Which of the following accurately descrives a chase strategy?
A. The firms produces the same amount each day over the planning period and deals with the variations
in demand through the use of inventory or overtime.
B. The firm produces at the same level for several months, and then adjusts production to another level
and produces at that level for several more months.
C. The firm produces exactly what is needed each month.
D. All of the above could describe the strategy depending on the organization.
38. Which of the following is not a cost relevant to aggregate production planning?
A. Basic production costs.
B. Quantity discounts.
C. Cost associated with changes in the production rate.
D. Inventory holding costs.
39. Which MRP system input element specifies how many and when the firm plans to build each end
item?
A. Master Production schedule.
B. Bill of Material.
C. Inventory records file.
D. Capacity Planning.
40. Which of the following most closely describes net material requirements?
A. gross requirements-on hand-planned order receipts.
B. gross requirements-on-hand+ planned order receipts.
C. gross requirements-planned order receipts.
D. gross requirements-planned order releases.
41. Which of the following is not an advantage of MRP?
A. Reduced idle time.
B. Reduced inventory.
C. Reduced sales price.
D. MRP is flexible-easy to veer away from the schedule is need arises.
42. The steps to determining capacity requirements include:
A. Using decision trees to evaluate capacity alternatives
B. Calculating equipment and labor requirements to meet product line forecasts
C. Projecting labor and equipment availabilities over the planning horizon
D. B and C
43. Service capacity
A. is highly time and location dependent
B. is subject to less volatile demand fluctuations
C. utilization directly impacts service quality
D. A and C

Weitere ähnliche Inhalte

Ähnlich wie OPS 571 OPS571 Final EXAM MCQ`s Correct Answers 100%

Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%choices11
 
QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%
QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%
QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%johnMilit
 
QNT 561 QNT/561 Final Exam 100% Correct
QNT 561 QNT/561 Final Exam 100% CorrectQNT 561 QNT/561 Final Exam 100% Correct
QNT 561 QNT/561 Final Exam 100% CorrectRieTian99
 
QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%
QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%
QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%johnMilit
 
Mkt 571 final exam
Mkt 571 final examMkt 571 final exam
Mkt 571 final exambubyslyke
 
Mkt 571 final exam
Mkt 571 final examMkt 571 final exam
Mkt 571 final examgiquickly
 
Mkt 571 final exam
Mkt 571 final examMkt 571 final exam
Mkt 571 final examginistays
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final examginistays
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final exambubyslyke
 
Ops 571 final exam questions and correct answers 100% guaranteed#
Ops 571 final exam questions and correct answers 100% guaranteed#Ops 571 final exam questions and correct answers 100% guaranteed#
Ops 571 final exam questions and correct answers 100% guaranteed#siliverseyr
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final examgiquickly
 
Qnt 561 final exam
Qnt 561 final examQnt 561 final exam
Qnt 561 final examgiquickly
 
Qnt 561 final exam
Qnt 561 final examQnt 561 final exam
Qnt 561 final examginistays
 
Qnt 561 qnt/561 final exam 100% correct answers
Qnt 561 qnt/561 final exam 100% correct answersQnt 561 qnt/561 final exam 100% correct answers
Qnt 561 qnt/561 final exam 100% correct answersGliven
 
Qnt 561 final exam view 369
Qnt 561 final exam view 369Qnt 561 final exam view 369
Qnt 561 final exam view 369forrest44
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%sharing3444
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%singup22
 
1..ops 571 ops571 final exam correct 100%
1..ops 571 ops571 final exam correct 100%1..ops 571 ops571 final exam correct 100%
1..ops 571 ops571 final exam correct 100%Euroday
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%flyperhan
 
(New) ops 571 ops571 final exam entire answers with questions correct 100%
(New) ops 571 ops571 final exam entire answers with questions correct  100%(New) ops 571 ops571 final exam entire answers with questions correct  100%
(New) ops 571 ops571 final exam entire answers with questions correct 100%twiter343r
 

Ähnlich wie OPS 571 OPS571 Final EXAM MCQ`s Correct Answers 100% (20)

Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%
 
QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%
QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%
QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%
 
QNT 561 QNT/561 Final Exam 100% Correct
QNT 561 QNT/561 Final Exam 100% CorrectQNT 561 QNT/561 Final Exam 100% Correct
QNT 561 QNT/561 Final Exam 100% Correct
 
QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%
QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%
QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%
 
Mkt 571 final exam
Mkt 571 final examMkt 571 final exam
Mkt 571 final exam
 
Mkt 571 final exam
Mkt 571 final examMkt 571 final exam
Mkt 571 final exam
 
Mkt 571 final exam
Mkt 571 final examMkt 571 final exam
Mkt 571 final exam
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final exam
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final exam
 
Ops 571 final exam questions and correct answers 100% guaranteed#
Ops 571 final exam questions and correct answers 100% guaranteed#Ops 571 final exam questions and correct answers 100% guaranteed#
Ops 571 final exam questions and correct answers 100% guaranteed#
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final exam
 
Qnt 561 final exam
Qnt 561 final examQnt 561 final exam
Qnt 561 final exam
 
Qnt 561 final exam
Qnt 561 final examQnt 561 final exam
Qnt 561 final exam
 
Qnt 561 qnt/561 final exam 100% correct answers
Qnt 561 qnt/561 final exam 100% correct answersQnt 561 qnt/561 final exam 100% correct answers
Qnt 561 qnt/561 final exam 100% correct answers
 
Qnt 561 final exam view 369
Qnt 561 final exam view 369Qnt 561 final exam view 369
Qnt 561 final exam view 369
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%
 
1..ops 571 ops571 final exam correct 100%
1..ops 571 ops571 final exam correct 100%1..ops 571 ops571 final exam correct 100%
1..ops 571 ops571 final exam correct 100%
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%
 
(New) ops 571 ops571 final exam entire answers with questions correct 100%
(New) ops 571 ops571 final exam entire answers with questions correct  100%(New) ops 571 ops571 final exam entire answers with questions correct  100%
(New) ops 571 ops571 final exam entire answers with questions correct 100%
 

Mehr von johnMilit

ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%
ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%
ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%johnMilit
 
ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%
ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%
ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%johnMilit
 
OPS 571 OPS571 Final EXAM MCQ`s Correct Answers 100%
OPS 571 OPS571 Final EXAM MCQ`s Correct Answers 100%OPS 571 OPS571 Final EXAM MCQ`s Correct Answers 100%
OPS 571 OPS571 Final EXAM MCQ`s Correct Answers 100%johnMilit
 
MGT 498 MGT498 Final EXAM MCQ`s Correct Answers 100%
MGT 498 MGT498 Final EXAM MCQ`s Correct Answers 100%MGT 498 MGT498 Final EXAM MCQ`s Correct Answers 100%
MGT 498 MGT498 Final EXAM MCQ`s Correct Answers 100%johnMilit
 
ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%
ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%
ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%johnMilit
 
ACC 423 ACC423 Final EXAM MCQ`s Correct Answers 100%
ACC 423 ACC423 Final EXAM MCQ`s Correct Answers 100%ACC 423 ACC423 Final EXAM MCQ`s Correct Answers 100%
ACC 423 ACC423 Final EXAM MCQ`s Correct Answers 100%johnMilit
 
ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%
ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%
ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%johnMilit
 
OPS 571 OPS/571 Final EXAM MCQ\s Correct Answers 100%
OPS 571 OPS/571 Final EXAM MCQ\s Correct Answers 100%OPS 571 OPS/571 Final EXAM MCQ\s Correct Answers 100%
OPS 571 OPS/571 Final EXAM MCQ\s Correct Answers 100%johnMilit
 
MKT 571 MKT/571 Final EXAM MCQ\s Correct Answers 100%
MKT 571 MKT/571 Final EXAM MCQ\s Correct Answers 100%MKT 571 MKT/571 Final EXAM MCQ\s Correct Answers 100%
MKT 571 MKT/571 Final EXAM MCQ\s Correct Answers 100%johnMilit
 
MGT 498 MGT/498 Final EXAM MCQ\s Correct Answers 100%
MGT 498 MGT/498 Final EXAM MCQ\s Correct Answers 100%MGT 498 MGT/498 Final EXAM MCQ\s Correct Answers 100%
MGT 498 MGT/498 Final EXAM MCQ\s Correct Answers 100%johnMilit
 
MGT 230 MGT/230 Final EXAM MCQ\s Correct Answers 100%
MGT 230 MGT/230 Final EXAM MCQ\s Correct Answers 100%MGT 230 MGT/230 Final EXAM MCQ\s Correct Answers 100%
MGT 230 MGT/230 Final EXAM MCQ\s Correct Answers 100%johnMilit
 
ACC 460 ACC/460 Final EXAM MCQ\s Correct Answers 100%
ACC 460 ACC/460 Final EXAM MCQ\s Correct Answers 100%ACC 460 ACC/460 Final EXAM MCQ\s Correct Answers 100%
ACC 460 ACC/460 Final EXAM MCQ\s Correct Answers 100%johnMilit
 
ACC 423 ACC/423 Final EXAM MCQ\s Correct Answers 100%
ACC 423 ACC/423 Final EXAM MCQ\s Correct Answers 100%ACC 423 ACC/423 Final EXAM MCQ\s Correct Answers 100%
ACC 423 ACC/423 Final EXAM MCQ\s Correct Answers 100%johnMilit
 
ACC 422 ACC/422 Final EXAM MCQ\s Correct Answers 100%
ACC 422 ACC/422 Final EXAM MCQ\s Correct Answers 100%ACC 422 ACC/422 Final EXAM MCQ\s Correct Answers 100%
ACC 422 ACC/422 Final EXAM MCQ\s Correct Answers 100%johnMilit
 

Mehr von johnMilit (14)

ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%
ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%
ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%
 
ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%
ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%
ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%
 
OPS 571 OPS571 Final EXAM MCQ`s Correct Answers 100%
OPS 571 OPS571 Final EXAM MCQ`s Correct Answers 100%OPS 571 OPS571 Final EXAM MCQ`s Correct Answers 100%
OPS 571 OPS571 Final EXAM MCQ`s Correct Answers 100%
 
MGT 498 MGT498 Final EXAM MCQ`s Correct Answers 100%
MGT 498 MGT498 Final EXAM MCQ`s Correct Answers 100%MGT 498 MGT498 Final EXAM MCQ`s Correct Answers 100%
MGT 498 MGT498 Final EXAM MCQ`s Correct Answers 100%
 
ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%
ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%
ACC 460 ACC460 Final EXAM MCQ`s Correct Answers 100%
 
ACC 423 ACC423 Final EXAM MCQ`s Correct Answers 100%
ACC 423 ACC423 Final EXAM MCQ`s Correct Answers 100%ACC 423 ACC423 Final EXAM MCQ`s Correct Answers 100%
ACC 423 ACC423 Final EXAM MCQ`s Correct Answers 100%
 
ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%
ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%
ACC 422 ACC422 Final EXAM MCQ`s Correct Answers 100%
 
OPS 571 OPS/571 Final EXAM MCQ\s Correct Answers 100%
OPS 571 OPS/571 Final EXAM MCQ\s Correct Answers 100%OPS 571 OPS/571 Final EXAM MCQ\s Correct Answers 100%
OPS 571 OPS/571 Final EXAM MCQ\s Correct Answers 100%
 
MKT 571 MKT/571 Final EXAM MCQ\s Correct Answers 100%
MKT 571 MKT/571 Final EXAM MCQ\s Correct Answers 100%MKT 571 MKT/571 Final EXAM MCQ\s Correct Answers 100%
MKT 571 MKT/571 Final EXAM MCQ\s Correct Answers 100%
 
MGT 498 MGT/498 Final EXAM MCQ\s Correct Answers 100%
MGT 498 MGT/498 Final EXAM MCQ\s Correct Answers 100%MGT 498 MGT/498 Final EXAM MCQ\s Correct Answers 100%
MGT 498 MGT/498 Final EXAM MCQ\s Correct Answers 100%
 
MGT 230 MGT/230 Final EXAM MCQ\s Correct Answers 100%
MGT 230 MGT/230 Final EXAM MCQ\s Correct Answers 100%MGT 230 MGT/230 Final EXAM MCQ\s Correct Answers 100%
MGT 230 MGT/230 Final EXAM MCQ\s Correct Answers 100%
 
ACC 460 ACC/460 Final EXAM MCQ\s Correct Answers 100%
ACC 460 ACC/460 Final EXAM MCQ\s Correct Answers 100%ACC 460 ACC/460 Final EXAM MCQ\s Correct Answers 100%
ACC 460 ACC/460 Final EXAM MCQ\s Correct Answers 100%
 
ACC 423 ACC/423 Final EXAM MCQ\s Correct Answers 100%
ACC 423 ACC/423 Final EXAM MCQ\s Correct Answers 100%ACC 423 ACC/423 Final EXAM MCQ\s Correct Answers 100%
ACC 423 ACC/423 Final EXAM MCQ\s Correct Answers 100%
 
ACC 422 ACC/422 Final EXAM MCQ\s Correct Answers 100%
ACC 422 ACC/422 Final EXAM MCQ\s Correct Answers 100%ACC 422 ACC/422 Final EXAM MCQ\s Correct Answers 100%
ACC 422 ACC/422 Final EXAM MCQ\s Correct Answers 100%
 

Kürzlich hochgeladen

Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 

Kürzlich hochgeladen (20)

Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 

OPS 571 OPS571 Final EXAM MCQ`s Correct Answers 100%

  • 1. OPS 571 Final Exam ANSWERS ARE HERE  1. Which of the following is true about make-to-stock processes? A. Make-to-stock processes can be controlled based on the actual or anticipated amount of finished goods B. Make-to-stock process is used when demand is seasonal and the firm does not have enough C. Services by their very nature often use make-to-stock processes. D. A and B 2. According to your text, the most common process metric is: A. Productivity B. Utilization C. Throughput time D. Efficiency 3. ________ is when the activities in the stage must stop because there is no place to deposit the item just completed. A. Buffering B. Starving C. None of these answers D. Blocking 4. According to Hayes and Wheelwright, which of the following is not a major process flow structure? A. Job Shop B. Assembly Line C. Project D. Batch 5. The most important performance dimension for product development projects is A. Quality B. Product flexibility C. Time-to-market
  • 2. D. Productivity 6. The major decision variables in equipment selection are: A. Flexibility B. Labor requirements C. Manufacturer D. Both A and B 7. Quality Function Deployment: A. is a tool for translating customer requirements into concrete operating and engineering goals. B. facilitates inter-functional cooperation between marketing, engineering, and manufacturing. C. provides a better understanding and focus on process characteristics that require improvements. D both a and B. 8. Which of the following statements is true about value analysis/value engineering? A. the purpose of VA/VE is to simplify products and processes. B the objective of VA/VE is to achieve equivalent or better performance at a lower cost. C. VA is performed before the production stage, while VE deals with products already in production. D both A and B. 9. In which phase of new-product design process are considerations to target market, desired level of performance, investment requirements and financial impact made: A. detailed engineering. B. Preliminary process design. C. pilot manufacturing phase. D. concept development and product planning. 10. Which of the following is not a dimension of design quality? A. Durability.
  • 3. B. Serviceability. C. Customization. D. Features. 11. Testing is an example of: A. Prevention costs. B. Internal Failure costs. C. External Failure Cost. D. Appraisal costs. 12. Which Quality Guru advocated that senior management is responsible for 94% of quality problems? A. Deming. B. Ishikawa. C. Juran. D. Crosby. 13. Independent Demand is: A. demand that is related to the demand for another item. B. demand determined by the marketplace that requires forecasting. C. Inventory whose demand comes from independent suppliers. D. Inventory that is independent of any known rules of demand and supply. 14. Which of the following statements is true about the Q-system? A. It does not have an EOQ, since the quality varies according to the demand. B. The order interval is fixed not the order quanity. C. It does not have a reorder point but rather a target inventory. D. The system is completely determined by the two parameters, Q and R. 15. Which of the following is not an assumption of the basic economic-order quantity model?
  • 4. A. ordering or setup costs are constant. B. Quantity discounts are available. C. annual demand is constant and known. D. lead time is constant. 16. Which of the following is not a principle of work-center scheduling? A. Schedule jobs as strings, with process steps back to back. B. Obtain feedback each day on the jobs that are completed at each work center. C. Once started, a job should not be interrupted. D. Reschedule every day. 17. The assignment method is appropriate in solving problems that have the following characteristics? A. There are ‘n’ things to be distributed to ‘n’ destinations. B. Though each destination may handle all the things, the final assignment has each thing assigned to one and only one destination. C. Only one criterion should be used (minimum cost, maximum profit, for example). D. A and C. 18. The objective of work-center scheduling include(s): A. To meet due dates. B. To minimize lead times. C. To minimize finish goods inventory. D. Both A and B. 19. The measure of the firm’s ability to make money according to Goldratt include: A. Net profit. B. Return on assets. C. Cash flow. D. Both A and C.
  • 5. 20. Goldratt’s rule of production scheduling include all but: A. An hour saved at a non-bottleneck is a marriage. B. A process batch should be fixed both along its route and in time. C. Do not balance the capacity-balance the flow. D. Utilization and activation of a resource is not the same thing. 21. According to Goldratt and Fox, a useful performance measure to treat inventory is: A. Quick ratio. B. Dollar days. C. Inventory turnover. D. Current ratio. 22. The advantages of pure project include all but: A. Decisions are made quickly. B. A team member can work on several projects. C. The project manager has full authority over the project. D. Team pride, motivation, and commitments are high. 23. Which of the following is not a typical milestone? A. Training of project members. B. Completed testing of the prototype. C. Completion of design. D. Production of a prototype. 24. “Slack” refers to the difference between: A. Observed and predicted times. B. optimistic and pessimistic times. C. Latest and earliest times.
  • 6. D. finish and start times. 25. Which of the following statements are true about time-series forcasting? A. Time series analysis is based on the idea that the history of occurrences over time can be used to predict the future. B. Agent liability. Time series analysis tries to understand the system underlying and surrounding the item being forecast. C. Under time-series methods, demand is divided into the time-based components such as daily, weekly, etc. D. Time series methods are useful for long-range forecasts when the demand pattern is erratic. 26. Which of the following product promotional activities would probably help make the supply chain more efficient? A. Special packaging for a specific event that occurs one time each year. B. A 2 for 1 price promotion. C. Price promotions that expire on a specific date. D. An “everyday” low price strategy where prices are not dependent on quantity delivered with a specific order. 27. According to Hau Lee, which of the following types of products need to be delivered with efficient supply-chains? A. Grocery Products. B. High technology products. C Customer products. D. Innovative products. 28. Supply-chain response relates to the following? A. How quickly a customer order can be filled. B. How quickly a company can react to a new competing product. C. How inexpensive the product is. D. Both A and B.
  • 7. 29. Which of the following statements is not true about capacity management in operations? A. Capacity planning itself has different meaning to individual at different levels within the operations management hierarchy. B. the definition of capacity, in an operations management context, makes a clear distinction between efficient and inefficient use of capacity. C. When looking at capacity, operations managers need to look at both resource input and product outputs. D. An operations management view also emphasizes the dimension of capacity. 30. Capacity utilization rate can be computed as: A. Capacity used-best. B. Capacity used x best. C. Capacity used/best. D. Capacity used + best. 31. Lean systems typically require? A. delivery of large lots at frequent intervals. B Buyer inspection of goods and materials. C. multiple sources from which to purchase. D. long-term relationships and commitments. 32. Which of the following is not true about JIT systems? A. The JIT system is based on the philosophy of eliminating waste and utilizing the full capacity of the worker. B. Under JIT the ideal lot size is one. C. JIT is typically applied to repetitive manufacturing. D. The goal of JIT is to drive all inventory queues to a moderate level thus minimizing inventory investment and shortening lead times. 33. Which of the following is not an element of JIT?
  • 8. A. small-lot production. B. quickly changing schedule. C. Multifunction worker. D. Kanan pull system. 34. Which of the following would not be classified as a time-series technique? A. Simple moving average. B. Exponential smoothing. C. Box Jenkins technique. D. Regression model. 35. Which phase most closely describes the Delphi forecasting technique? A. consumer survey. B. random individual opinions. C. group of expert’s opinions. D. test markets. 36. Aggregate planners balance? A. demand and costs. B. demand and inventories. C. demand and capacity. D. supply and inventories. 37. Which of the following accurately descrives a chase strategy? A. The firms produces the same amount each day over the planning period and deals with the variations in demand through the use of inventory or overtime. B. The firm produces at the same level for several months, and then adjusts production to another level and produces at that level for several more months. C. The firm produces exactly what is needed each month.
  • 9. D. All of the above could describe the strategy depending on the organization. 38. Which of the following is not a cost relevant to aggregate production planning? A. Basic production costs. B. Quantity discounts. C. Cost associated with changes in the production rate. D. Inventory holding costs. 39. Which MRP system input element specifies how many and when the firm plans to build each end item? A. Master Production schedule. B. Bill of Material. C. Inventory records file. D. Capacity Planning. 40. Which of the following most closely describes net material requirements? A. gross requirements-on hand-planned order receipts. B. gross requirements-on-hand+ planned order receipts. C. gross requirements-planned order receipts. D. gross requirements-planned order releases. 41. Which of the following is not an advantage of MRP? A. Reduced idle time. B. Reduced inventory. C. Reduced sales price. D. MRP is flexible-easy to veer away from the schedule is need arises. 42. The steps to determining capacity requirements include: A. Using decision trees to evaluate capacity alternatives
  • 10. B. Calculating equipment and labor requirements to meet product line forecasts C. Projecting labor and equipment availabilities over the planning horizon D. B and C 43. Service capacity A. is highly time and location dependent B. is subject to less volatile demand fluctuations C. utilization directly impacts service quality D. A and C