Migra&ng	
  from	
  a	
  physical	
  to	
  a	
  
hosted	
  Data	
  Centre-­‐	
  
Experiences	
  of	
  a	
  small	
  
University	
  
Peter	
  Newton	
  –	
  UCA	
  
Paul	
  Hopkins	
  –	
  HE-­‐Shared	
  Services	
  
University	
  for	
  the	
  Crea&ve	
  Arts	
  
Formed	
  in	
  2005	
  by	
  merging	
  2	
  colleges	
  of	
  Art	
  &	
  Design	
  in	
  Surrey	
  with	
  	
  
3	
  colleges	
  in	
  Kent.	
  
	
  
7,000	
  students	
  spread	
  across	
  5	
  campuses	
  –	
  130	
  miles	
  apart	
  
	
  
Turnover	
  £60million	
  p.a.	
  	
  –	
  	
  IT	
  Budget	
  (£4.5M)	
  	
  
	
  
Supported	
  by	
  an	
  IT	
  team	
  of	
  28	
  –	
  with	
  	
  
•  Technical,	
  Applica&ons	
  Team	
  based	
  in	
  Maidstone	
  
•  Business	
  Development	
  and	
  Administra&on	
  in	
  Farnham	
  
•  2nd	
  Line	
  Support	
  	
  at	
  each	
  other	
  campus	
  
Technically,	
  the	
  Kent	
  Campuses	
  are	
  connected	
  via	
  KPSN	
  	
  and	
  the	
  	
  
Surrey	
  Campuses	
  linked	
  directly	
  to	
  JANET	
  …	
  but	
  all	
  with	
  minimal	
  	
  
network	
  resilience…	
  
	
  
UCA	
  Campuses	
  2010	
  
Maidstone	
  Farnham	
   Canterbury	
  
Rochester	
  
Epsom	
  
UCA	
  Environment	
  -­‐	
  July	
  2010	
  
Maidstone	
  
Current	
  DC	
  
Farnham	
  
Canterbury	
  
Rochester	
  
Epsom	
  
	
  
	
  JANET	
  
	
  
KentMAN	
  due	
  to	
  be	
  KPSN	
  in	
  2012	
  
In	
  2011,	
  UCA	
  agreed	
  plans	
  to	
  vacate	
  the	
  Maidstone	
  campus	
  
by	
  summer	
  2014.	
  	
  
	
  
Hence	
  a	
  need	
  to	
  examine	
  	
  
	
  
•  where	
  the	
  Data	
  Centre	
  should	
  move	
  to;	
  	
  
	
  
•  the	
  future	
  of	
  the	
  Technical	
  and	
  	
  Applica&ons	
  teams;	
  and	
  
	
  
•  how	
  to	
  minimise	
  risk	
  to	
  UCA	
  during	
  this	
  transi&on	
  
	
  
	
  
…whilst	
  there	
  are	
  seismic	
  changes	
  occurring	
  in	
  Higher	
  
Educa&on,	
  IT	
  technologies	
  and	
  student	
  expecta&ons!	
  
	
  
Maidstone	
  Closure	
  –	
  	
  Announced	
  2011	
  
What	
  choices	
  are	
  realis&c?	
  
And	
  what	
  do	
  we	
  need	
  to	
  do	
  about	
  our	
  network?	
  
• Build	
  a	
  new	
  DC	
  /	
  DR	
  at	
  Campus	
  
• Implement	
  Cloud	
  as	
  a	
  solu&on	
  
• Commercial	
  Datacentre	
  Solu&on	
  
• H.E.	
  Datacentre	
  Solu&on	
  
Technical	
  Considera&ons	
  
There	
  was	
  a	
  possible	
  DR	
  or	
  DC	
  loca&on	
  in	
  EPSOM	
  	
  
Issue	
  1	
  :	
  	
  	
  Weak	
  DR	
  Environment	
  
Issue	
  2:	
   	
  No	
  space	
  for	
  a	
  Data	
  Centre	
  
Issue	
  3: 	
  Hidden	
  higher	
  expenditure	
  in	
  the	
  Opera&ng	
  Costs	
  
	
  
Build	
  a	
  new	
  Datacentre	
  on	
  another	
  campus	
  
Issue	
  1:	
   	
  Disadvantages	
  at	
  all	
  other	
  sites	
  
Issue	
  2:	
   	
  In	
  a	
  rapidly	
  changing	
  HE	
  environment,	
  would	
  a	
  future	
  merger	
  or	
  reduc&on	
  of	
  
another	
  campus	
  happen	
  within	
  10	
  years?	
  
	
  
Rent	
  space	
  in	
  a	
  commercial	
  or	
  another	
  university	
  data	
  centre?	
  
Issue	
  1:	
   	
  Finding	
  a	
  cost-­‐effec&ve	
  data	
  centre	
  provider	
  
Issue	
  2:	
   	
  What	
  would	
  the	
  ideal	
  solu&on	
  be	
  for	
  a	
  DR	
  centre	
  –	
  in-­‐house	
  or	
  not?	
  
	
  
Cloud	
  
Issue	
  1:	
  	
   	
  A	
  DC	
  s&ll	
  required	
  at	
  our	
  Root	
  Technical	
  Level	
  
Issue	
  2: 	
  Timescales	
  dependent	
  on	
  expenditure	
  
	
  
…	
  and	
  how	
  do	
  you	
  develop	
  a	
  low-­‐risk	
  plan	
  to	
  move	
  everything	
  from	
  in-­‐house	
  to	
  
out-­‐of-­‐house?	
  
 Management	
  Considera&ons	
  
•  Moving	
  away	
  from	
  Kent	
  increases	
  likelihood	
  of	
  losing	
  key	
  
technical	
  staff	
  
	
  
•  Are	
  we	
  looking	
  at	
  fully	
  hosted,	
  IaaS,	
  PaaS	
  or	
  a	
  mix?	
  Or	
  is	
  there	
  a	
  
migra&on	
  route?	
  
	
  
•  How	
  do	
  you	
  find	
  a	
  commercial	
  vendor	
  who	
  understands	
  the	
  HE	
  
culture?	
  
	
  
•  If	
  staying	
  in	
  HE	
  sector,	
  how	
  do	
  you	
  get	
  a	
  good	
  service?	
  
•  How	
  do	
  we	
  get	
  our	
  Board	
  of	
  Governors	
  and	
  Exec	
  Board	
  to	
  agree	
  
to	
  our	
  chosen	
  route?	
  
Our	
  solu&on	
  and	
  route-­‐map	
  
1.  Standardize	
  applica&ons	
  to	
  support	
  virtualisa&on	
  backup,	
  
removing	
  hardware	
  dependence.	
  
2.  Re-­‐design	
  the	
  data	
  network	
  so	
  that	
  there	
  is	
  sufficient	
  
bandwidth	
  and	
  diverse	
  rou&ngs	
  into	
  each	
  campus	
  
3.  Iden&fy	
  possible	
  Commercial	
  and	
  in-­‐sector	
  service	
  suppliers	
  
4.  Brief	
  Execu&ve	
  and	
  also	
  Governors	
  early	
  to	
  get	
  their	
  advice	
  and	
  
commitment	
  to	
  the	
  route	
  forward	
  
5.  Prepare	
  an	
  environment	
  to	
  ENABLE	
  a	
  route	
  map	
  that	
  moves	
  
from	
  the	
  historic	
  physical	
  applica&on/server	
  environment;	
  
using	
  virtualisa&on	
  prepare	
  capability	
  for	
  migra&on	
  to	
  external	
  
IaaS,	
  to	
  PaaS	
  and	
  even	
  to	
  SaaS	
  
UCA	
  Planned	
  IT	
  Provision	
  -­‐	
  July	
  2014	
  
Maidstone	
  Studios	
  
Disaster	
  Recovery	
  
KPSN	
  
JANET	
  
Farnham	
  
Canterbury	
  
Rochester	
  
Epsom	
  
ULCC	
  	
  
Datacentre	
  
From	
  Physical	
  through	
  to	
  SaaS…	
  
Any-­‐Shore	
  
Virtualiza&on	
  
Unlinks	
  
Hosted	
  
Racks	
  
Located	
  in	
  
Vendor	
  
DC	
  
Near-­‐Shore	
  
Applica&on	
  in	
  
Vender	
  Server	
  
&	
  DC	
  
Far-­‐Shore	
  	
  
Our	
  Loca&on,	
  Rack,	
  	
  
Server,	
  Applica&on	
  
Progress	
  to	
  date	
  
1.  Exec	
  Board	
  and	
  Governors	
  are	
  fully	
  on	
  board	
  with	
  the	
  route	
  forward	
  
2.  We	
  have	
  virtualised	
  90%	
  of	
  our	
  applica&ons	
  –	
  except	
  for	
  Agresso	
  	
  
	
  and	
  Blackboard–	
  because	
  these	
  vendors	
  have	
  not	
  yet	
  agreed	
  
	
  that	
  they	
  can	
  support	
  fully	
  virtualised	
  applica&ons	
  
	
  
3.  We	
  have	
  developed	
  a	
  detailed	
  plan	
  –	
  and	
  contracted	
  with	
  ULCC	
  for	
  the	
  	
  
	
  hosted	
  Data	
  Centre	
  and	
  Maidstone	
  Studios	
  for	
  the	
  DR	
  centre	
  
4.	
  We	
  have	
  worked	
  with	
  JANET	
  to	
  ensure	
  that	
  ALL	
  of	
  our	
  network	
  connec&ons	
  
	
  	
  and	
  upgrades	
  will	
  be	
  available	
  on	
  &me	
  
	
  
5.	
  We	
  are	
  working	
  with	
  HP	
  to	
  deliver	
  the	
  	
  required	
  HP	
  hardware	
  	
  
	
  
	
  
…	
  and	
  are	
  busy	
  execu&ng	
  the	
  plan	
  …	
  So	
  how	
  did	
  we	
  select	
  our	
  partners?	
  	
  
What	
  is	
  our	
  view	
  of	
  the	
  state	
  of	
  the	
  market?	
  
	
  
	
  
Finding	
  an	
  In-­‐sector	
  Hos&ng	
  partner	
  
1.  We	
  wrote	
  to	
  all	
  UCISA	
  Directors	
  in	
  November	
  2012	
  to	
  ask	
  who	
  had	
  	
  
	
  recently	
  built	
  a	
  Data	
  Centre,	
  who	
  was	
  planning	
  to	
  do	
  so?	
  
	
  
2.	
  We	
  found	
  several	
  HEIs	
  who	
  were	
  keen	
  to	
  discuss	
  whether	
  we	
  	
  
	
  would	
  hire	
  racks	
  in	
  their	
  exis&ng	
  Data	
  Centres	
  
	
  
3.  We	
  discussed	
  some	
  anrac&ve	
  prices	
  (under	
  £12k	
  per	
  rack	
  per	
  year)	
  	
  
	
  but	
  we	
  were	
  worried	
  about	
  their	
  experience	
  of	
  providing	
  a	
  	
  
	
  hosted	
  service	
  etc.	
  
	
  
5.	
  We	
  looked	
  at	
  ULCC	
  –	
  and	
  were	
  very	
  impressed	
  by	
  their	
  set-­‐up.	
  They	
  
• 	
   Matched	
  commercial	
  vendors	
  in	
  environment	
  	
  
• 	
   Understood	
  the	
  HE	
  culture	
  
• 	
   Very	
  cost-­‐efficient	
  
• 	
   Future	
  benefits	
  for	
  IaaS,	
  PaaS	
  
• 	
   Poten&al	
  for	
  managed	
  services	
  (Unit4	
  Finances,	
  Moodle	
  etc.)	
  
Finding	
  a	
  Commercial	
  	
  Hos&ng	
  partner	
  
1.  We	
  did	
  not	
  wish	
  to	
  write	
  or	
  conduct	
  a	
  full	
  OJEU	
  Tender	
  –	
  hence	
  we	
  were	
  	
  
	
  restricted	
  to	
  using	
  Government	
  frameworks	
  or	
  the	
  JANET	
  Brokerage	
  	
  
	
  framework	
  if	
  we	
  wanted	
  	
  a	
  full	
  Data	
  Centre,	
  mul&-­‐year	
  Agreement	
  
	
  
2.	
  The	
  G-­‐Cloud	
  had	
  very	
  many	
  poten&al	
  vendors	
  but	
  the	
  focus	
  was	
  on	
  virtualiza&on	
  	
  
	
  but	
  our	
  priority	
  was	
  having	
  no	
  physical	
  hardware	
  at	
  Maidstone	
  by	
  July	
  2014.	
  
	
  	
  
3.	
  We	
  began	
  discussions	
  with	
  a	
  company	
  on	
  the	
  JANET	
  Brokerage	
  but	
  found	
  that	
  their	
  	
  
	
  costs	
  were	
  way	
  in	
  excess	
  of	
  what	
  we	
  could	
  afford	
  (>£20k/year	
  per	
  rack)	
  
	
  
Overall,	
  we	
  were	
  not	
  happy	
  with	
  the	
  choice	
  of	
  Commercial	
  vendors	
  –	
  and	
  felt	
  that	
  we	
  
did	
  not	
  have	
  the	
  experience	
  (or	
  inclina&on!)	
  to	
  teach	
  them	
  how	
  to	
  work	
  within	
  HE	
  
	
  
4.  Finally	
  we	
  found	
  a	
  poten&al	
  vendor	
  (Maidstone	
  Studios)	
  close	
  to	
  our	
  home,	
  who	
  	
  
•  	
   already	
  had	
  a	
  business	
  rela&onship	
  with	
  UCA	
  –	
  	
  
•  	
   have	
  an	
  Award	
  wining	
  Data	
  Centre	
  
•  	
   Understood	
  the	
  HE	
  culture	
  (-­‐	
  already	
  hos&ng	
  UCA	
  Broadcast	
  Media	
  Courses)	
  
•  	
   are	
  very	
  cost-­‐efficient	
  
So…	
  Who	
  did	
  we	
  choose…	
  and	
  why?	
  
1.  JANET	
  to	
  provide	
  our	
  Data	
  Network	
  –	
  cost	
  effec&ve	
  and	
  responsive	
  
2.	
  HP	
  to	
  provide	
  the	
  servers	
  for	
  our	
  DR	
  site	
  –	
  they	
  already	
  provide	
  the	
  servers	
  for	
  
	
  our	
  current	
  environment,	
  worked	
  closely	
  with	
  us	
  reviewing	
  our	
  server
	
  and	
  SAN	
  technical	
  solu&on	
  and	
  offering	
  to	
  support	
  during	
  installa&on.	
  
	
  
3.	
  Maidstone	
  Studios	
  to	
  provide	
  our	
  DR	
  environment	
  
	
  
4.	
  ULCC	
  to	
  provide	
  us	
  with	
  a	
  cost-­‐effec&ve	
  Data	
  Centre	
  racks	
  (5+	
  racks)	
  
	
  
5.	
  SYSPRO	
  to	
  support	
  and	
  implement	
  the	
  sorware	
  DR	
  solu&on	
  	
  
	
  
6.	
  Addi&onal	
  contractors	
  to	
  backfill	
  2	
  technical	
  roles	
  so	
  that	
  we	
  can	
  dedicate	
  our	
  
	
  key	
  technical	
  staff	
  to	
  focus	
  almost	
  solely	
  on	
  this	
  project	
  
	
  
We	
  have	
  kept	
  our	
  contracts	
  to	
  no	
  more	
  than	
  2	
  years	
  because	
  we	
  that	
  technology	
  
is	
  changing	
  con&nually.	
  	
  There	
  could	
  be	
  alterna&ves	
  in	
  the	
  near	
  future	
  and….	
  we	
  
might	
  want	
  to	
  move	
  from	
  IaaS	
  to	
  PaaS	
  (and	
  SaaS)	
  within	
  the	
  next	
  2-­‐3	
  years…	
  
So…How	
  are	
  we	
  doing	
  it?	
  
1.  Upgrade	
  our	
  network	
  environment	
  	
  &	
  implement	
  resilient	
  routes	
  for	
  all	
  campuses	
  
2.  Setup	
  HP	
  3PAR	
  SAN	
  &	
  Server	
  in	
  ULCC	
  (-­‐	
  Downsizing	
  to	
  an	
  es&mated	
  3	
  Racks)	
  
3.  Move	
  virtualised	
  systems	
  to	
  ULCC	
  shutng	
  down	
  Maidstone	
  servers	
  as	
  we	
  migrate	
  	
  
4.  We	
  will	
  install	
  the	
  DR	
  facility	
  in	
  Maidstone	
  Studios	
  and	
  test	
  thoroughly	
  
5.  We	
  will	
  select	
  a	
  ‘long	
  weekend’	
  and	
  fail	
  over	
  DR	
  
6.  We	
  will	
  physically	
  transport	
  our	
  remaining	
  servers	
  up	
  to	
  ULCC	
  (the	
  new	
  Data	
  	
  
	
  Centre),	
  bed	
  them	
  in	
  and	
  test	
  thoroughly	
  
	
  
5.	
  We	
  will	
  ‘fail	
  back’	
  our	
  services	
  from	
  DR	
  (Maidstone	
  Studios)	
  to	
  produc&on	
  (ULCC)	
  
	
  
6.	
  We	
  will	
  setup	
  a	
  de-­‐duplica&on	
  environment	
  at	
  Epsom	
  using	
  Tape	
  and	
  Cloud	
  as	
  Backup	
  
	
  
Cri&cally	
  we	
  have,	
  from	
  the	
  start,	
  involved	
  our	
  Execu&ve	
  Team,	
  Heads	
  of	
  Schools	
  	
  
	
  and	
  Deptment	
  Heads	
  to	
  understand	
  and	
  manage	
  their	
  	
  expecta&ons	
  on	
  	
  
	
  &me	
  to	
  restore,	
  data	
  recovery,	
  data	
  reten&on	
  and	
  all	
  things	
  OLAs	
  (SLAs)	
  
Cloud	
  Applica&on	
  as	
  
Service	
  /	
  
Infrastructure	
  
Cloud	
  Backup	
  
UCA	
  Poten&al	
  IT	
  Progress	
  Post	
  2014	
  
JANET	
  
Maidstone	
  Studios	
  
Disaster	
  Recovery	
  
ULCC	
  	
  
Datacentre	
  Core	
  
Epsom	
  
Tape	
  Management	
  
Cloud	
  Applica&on	
  as	
  
Service	
  /	
  
Infrastructure	
  
Cloud	
  Backup	
  
UCA	
  Cost	
  Reduc&on	
  Downsizing	
  
ULCC	
  	
  
Datacentre	
  Core	
  
Epsom	
  
Tape	
  Management	
  
On-­‐going	
  Cost	
  
Analysis	
  	
  into	
  
Migra&on	
  
Reduce	
  tape	
  
management	
  
Any	
  Ques&ons?	
  

Weitere ähnliche Inhalte

Andere mochten auch

Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...JISC's Green ICT Programme
 
Jisc con optimisation, improved sustainability across the estate through us...
Jisc   con optimisation, improved sustainability across the estate through us...Jisc   con optimisation, improved sustainability across the estate through us...
Jisc con optimisation, improved sustainability across the estate through us...JISC's Green ICT Programme
 
Video-Conferencing in the UK HE & FE Sectors - Research Findings
Video-Conferencing in the UK HE & FE Sectors - Research FindingsVideo-Conferencing in the UK HE & FE Sectors - Research Findings
Video-Conferencing in the UK HE & FE Sectors - Research FindingsJISC's Green ICT Programme
 
Ppt6 london - james harbridge ( intellect uk ) crc policy update
Ppt6   london - james harbridge ( intellect uk ) crc policy updatePpt6   london - james harbridge ( intellect uk ) crc policy update
Ppt6 london - james harbridge ( intellect uk ) crc policy updateJISC's Green ICT Programme
 
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...JISC's Green ICT Programme
 
Ppt1 london -simon allen ( concurrent thinking ) welcome
Ppt1   london -simon allen ( concurrent thinking ) welcomePpt1   london -simon allen ( concurrent thinking ) welcome
Ppt1 london -simon allen ( concurrent thinking ) welcomeJISC's Green ICT Programme
 
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3   london - sophia ( operation intelligence ) what is the eu code of conductPpt3   london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conductJISC's Green ICT Programme
 
The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs - The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs - JISC's Green ICT Programme
 
University Estate Management Systemsand Financial Management
University Estate Management Systemsand Financial ManagementUniversity Estate Management Systemsand Financial Management
University Estate Management Systemsand Financial ManagementJISC's Green ICT Programme
 
What does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find outWhat does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find outJISC's Green ICT Programme
 
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIsData Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIsJISC's Green ICT Programme
 
Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...JISC's Green ICT Programme
 
Better Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT SpendBetter Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT SpendJISC's Green ICT Programme
 
US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings JISC's Green ICT Programme
 
Data Center Migration
Data Center MigrationData Center Migration
Data Center MigrationThomas Martin
 

Andere mochten auch (20)

Into the clouds with surf
Into the clouds with surfInto the clouds with surf
Into the clouds with surf
 
Greening Events II
Greening Events IIGreening Events II
Greening Events II
 
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...
 
Jisc con optimisation, improved sustainability across the estate through us...
Jisc   con optimisation, improved sustainability across the estate through us...Jisc   con optimisation, improved sustainability across the estate through us...
Jisc con optimisation, improved sustainability across the estate through us...
 
Video-Conferencing in the UK HE & FE Sectors - Research Findings
Video-Conferencing in the UK HE & FE Sectors - Research FindingsVideo-Conferencing in the UK HE & FE Sectors - Research Findings
Video-Conferencing in the UK HE & FE Sectors - Research Findings
 
Cloud Adoption Toolkit
Cloud Adoption ToolkitCloud Adoption Toolkit
Cloud Adoption Toolkit
 
Ppt6 london - james harbridge ( intellect uk ) crc policy update
Ppt6   london - james harbridge ( intellect uk ) crc policy updatePpt6   london - james harbridge ( intellect uk ) crc policy update
Ppt6 london - james harbridge ( intellect uk ) crc policy update
 
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
 
Ppt1 london -simon allen ( concurrent thinking ) welcome
Ppt1   london -simon allen ( concurrent thinking ) welcomePpt1   london -simon allen ( concurrent thinking ) welcome
Ppt1 london -simon allen ( concurrent thinking ) welcome
 
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3   london - sophia ( operation intelligence ) what is the eu code of conductPpt3   london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conduct
 
The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs - The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs -
 
University Estate Management Systemsand Financial Management
University Estate Management Systemsand Financial ManagementUniversity Estate Management Systemsand Financial Management
University Estate Management Systemsand Financial Management
 
It integration for intelligent buildings
It integration for intelligent buildingsIt integration for intelligent buildings
It integration for intelligent buildings
 
What does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find outWhat does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find out
 
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIsData Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIs
 
Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...
 
Better Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT SpendBetter Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT Spend
 
Videoconferencing in Dutch Higher Education
Videoconferencing in Dutch Higher EducationVideoconferencing in Dutch Higher Education
Videoconferencing in Dutch Higher Education
 
US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings
 
Data Center Migration
Data Center MigrationData Center Migration
Data Center Migration
 

Ähnlich wie Migrating from a physical to a hosted Data Centre - Experiences of a small University

Data Centre Strategy Summit 2015 "Are you ready to embark on your Data Cent...
Data Centre Strategy Summit 2015   "Are you ready to embark on your Data Cent...Data Centre Strategy Summit 2015   "Are you ready to embark on your Data Cent...
Data Centre Strategy Summit 2015 "Are you ready to embark on your Data Cent...Gus Sabatino
 
Cyient-APAC FTTH Show Presentation_Kiran Solipuram
Cyient-APAC FTTH Show Presentation_Kiran SolipuramCyient-APAC FTTH Show Presentation_Kiran Solipuram
Cyient-APAC FTTH Show Presentation_Kiran SolipuramKiran Solipuram. DEP, CFHP
 
Exploring options to partners with & opertors challenges
Exploring options to partners with & opertors challengesExploring options to partners with & opertors challenges
Exploring options to partners with & opertors challengesVinod Sharma
 
SD-WAN: the Savings are in the Details
SD-WAN:  the Savings are in the DetailsSD-WAN:  the Savings are in the Details
SD-WAN: the Savings are in the Detailsbobnerz
 
Building your skills for a Cloud World
Building your skills for a Cloud WorldBuilding your skills for a Cloud World
Building your skills for a Cloud WorldChristian Verstraete
 
Cyient FTTH Presentation APAC FTTH Conference 2014
Cyient FTTH Presentation APAC FTTH Conference 2014Cyient FTTH Presentation APAC FTTH Conference 2014
Cyient FTTH Presentation APAC FTTH Conference 2014Kiran Solipuram. DEP, CFHP
 
Migrating Core Enterprise Applications to the Cloud
Migrating Core Enterprise Applications to the CloudMigrating Core Enterprise Applications to the Cloud
Migrating Core Enterprise Applications to the CloudRoger Valade
 
Keysource presentation The right approach to Data Centre Deployment. Computin...
Keysource presentation The right approach to Data Centre Deployment. Computin...Keysource presentation The right approach to Data Centre Deployment. Computin...
Keysource presentation The right approach to Data Centre Deployment. Computin...Keysource
 
basic introduction divided in chapters Understanding the RF Path.pdf
basic introduction divided in chapters Understanding the RF Path.pdfbasic introduction divided in chapters Understanding the RF Path.pdf
basic introduction divided in chapters Understanding the RF Path.pdfSteveMartinez57
 
Dave Jones, CIO at Cape Plc - Transition of Autonomous regional IT to Providi...
Dave Jones, CIO at Cape Plc - Transition of Autonomous regional IT to Providi...Dave Jones, CIO at Cape Plc - Transition of Autonomous regional IT to Providi...
Dave Jones, CIO at Cape Plc - Transition of Autonomous regional IT to Providi...Global Business Events
 
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...JISC's Green ICT Programme
 
Operator Focus Areas And Metanoia Inc Dec 2010
Operator Focus Areas And Metanoia Inc Dec 2010Operator Focus Areas And Metanoia Inc Dec 2010
Operator Focus Areas And Metanoia Inc Dec 2010Vishal Sharma, Ph.D.
 
Network Transformation Best Practices-Working.pptx
Network Transformation Best Practices-Working.pptxNetwork Transformation Best Practices-Working.pptx
Network Transformation Best Practices-Working.pptxAlan Percy
 
Network Transformation - Top 5 Best Practices
Network Transformation - Top 5 Best PracticesNetwork Transformation - Top 5 Best Practices
Network Transformation - Top 5 Best PracticesTelcoBridges Inc.
 
Mainstream Renewable Power: Strategic ICT Partnership Case Study
Mainstream Renewable Power: Strategic ICT Partnership Case StudyMainstream Renewable Power: Strategic ICT Partnership Case Study
Mainstream Renewable Power: Strategic ICT Partnership Case Studyeircom
 

Ähnlich wie Migrating from a physical to a hosted Data Centre - Experiences of a small University (20)

DR - CURRICULUM VITAE - Novemeber 2014
DR - CURRICULUM VITAE - Novemeber 2014DR - CURRICULUM VITAE - Novemeber 2014
DR - CURRICULUM VITAE - Novemeber 2014
 
Data Centre Strategy Summit 2015 "Are you ready to embark on your Data Cent...
Data Centre Strategy Summit 2015   "Are you ready to embark on your Data Cent...Data Centre Strategy Summit 2015   "Are you ready to embark on your Data Cent...
Data Centre Strategy Summit 2015 "Are you ready to embark on your Data Cent...
 
Cyient-APAC FTTH Show Presentation_Kiran Solipuram
Cyient-APAC FTTH Show Presentation_Kiran SolipuramCyient-APAC FTTH Show Presentation_Kiran Solipuram
Cyient-APAC FTTH Show Presentation_Kiran Solipuram
 
Exploring options to partners with & opertors challenges
Exploring options to partners with & opertors challengesExploring options to partners with & opertors challenges
Exploring options to partners with & opertors challenges
 
SD-WAN: the Savings are in the Details
SD-WAN:  the Savings are in the DetailsSD-WAN:  the Savings are in the Details
SD-WAN: the Savings are in the Details
 
Telvent Big Data Approach and Case Studies
Telvent Big Data Approach and Case StudiesTelvent Big Data Approach and Case Studies
Telvent Big Data Approach and Case Studies
 
Building your skills for a Cloud World
Building your skills for a Cloud WorldBuilding your skills for a Cloud World
Building your skills for a Cloud World
 
Cyient FTTH Presentation APAC FTTH Conference 2014
Cyient FTTH Presentation APAC FTTH Conference 2014Cyient FTTH Presentation APAC FTTH Conference 2014
Cyient FTTH Presentation APAC FTTH Conference 2014
 
Migrating Core Enterprise Applications to the Cloud
Migrating Core Enterprise Applications to the CloudMigrating Core Enterprise Applications to the Cloud
Migrating Core Enterprise Applications to the Cloud
 
Keysource presentation The right approach to Data Centre Deployment. Computin...
Keysource presentation The right approach to Data Centre Deployment. Computin...Keysource presentation The right approach to Data Centre Deployment. Computin...
Keysource presentation The right approach to Data Centre Deployment. Computin...
 
sarahNet Ltd CV
sarahNet Ltd CVsarahNet Ltd CV
sarahNet Ltd CV
 
Admiral Group
Admiral GroupAdmiral Group
Admiral Group
 
basic introduction divided in chapters Understanding the RF Path.pdf
basic introduction divided in chapters Understanding the RF Path.pdfbasic introduction divided in chapters Understanding the RF Path.pdf
basic introduction divided in chapters Understanding the RF Path.pdf
 
Dave Jones, CIO at Cape Plc - Transition of Autonomous regional IT to Providi...
Dave Jones, CIO at Cape Plc - Transition of Autonomous regional IT to Providi...Dave Jones, CIO at Cape Plc - Transition of Autonomous regional IT to Providi...
Dave Jones, CIO at Cape Plc - Transition of Autonomous regional IT to Providi...
 
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
 
Operator Focus Areas And Metanoia Inc Dec 2010
Operator Focus Areas And Metanoia Inc Dec 2010Operator Focus Areas And Metanoia Inc Dec 2010
Operator Focus Areas And Metanoia Inc Dec 2010
 
Network Transformation Best Practices-Working.pptx
Network Transformation Best Practices-Working.pptxNetwork Transformation Best Practices-Working.pptx
Network Transformation Best Practices-Working.pptx
 
Network Transformation - Top 5 Best Practices
Network Transformation - Top 5 Best PracticesNetwork Transformation - Top 5 Best Practices
Network Transformation - Top 5 Best Practices
 
BIO_Darren_DeMarino
BIO_Darren_DeMarinoBIO_Darren_DeMarino
BIO_Darren_DeMarino
 
Mainstream Renewable Power: Strategic ICT Partnership Case Study
Mainstream Renewable Power: Strategic ICT Partnership Case StudyMainstream Renewable Power: Strategic ICT Partnership Case Study
Mainstream Renewable Power: Strategic ICT Partnership Case Study
 

Mehr von JISC's Green ICT Programme

Understanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services ProjectUnderstanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services ProjectJISC's Green ICT Programme
 
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14CARBS Project Presentation - Jisc Cost of IT Services 10-02-14
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14JISC's Green ICT Programme
 
Energy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of CambridgeEnergy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of CambridgeJISC's Green ICT Programme
 
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activitiesUnderstanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activitiesJISC's Green ICT Programme
 
Ppt 1 le leeds - welcome alan real ( university of leeds )
Ppt 1 le   leeds - welcome alan real ( university of leeds )Ppt 1 le   leeds - welcome alan real ( university of leeds )
Ppt 1 le leeds - welcome alan real ( university of leeds )JISC's Green ICT Programme
 
Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...
Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...
Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...JISC's Green ICT Programme
 
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...JISC's Green ICT Programme
 
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...JISC's Green ICT Programme
 
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...
Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...JISC's Green ICT Programme
 
University of Warwick Video Conferencing Service
University of Warwick Video Conferencing ServiceUniversity of Warwick Video Conferencing Service
University of Warwick Video Conferencing ServiceJISC's Green ICT Programme
 

Mehr von JISC's Green ICT Programme (13)

Understanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services ProjectUnderstanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services Project
 
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14CARBS Project Presentation - Jisc Cost of IT Services 10-02-14
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14
 
Energy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of CambridgeEnergy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of Cambridge
 
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activitiesUnderstanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
 
Ppt 1 le leeds - welcome alan real ( university of leeds )
Ppt 1 le   leeds - welcome alan real ( university of leeds )Ppt 1 le   leeds - welcome alan real ( university of leeds )
Ppt 1 le leeds - welcome alan real ( university of leeds )
 
Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...
Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...
Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...
 
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...
 
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
 
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...
Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...
 
University of Warwick Video Conferencing Service
University of Warwick Video Conferencing ServiceUniversity of Warwick Video Conferencing Service
University of Warwick Video Conferencing Service
 
Brokerage presentation dec_susteit
Brokerage presentation dec_susteitBrokerage presentation dec_susteit
Brokerage presentation dec_susteit
 
Jisc cloud conf 12th dec 2011 hopkins
Jisc cloud conf 12th dec 2011 hopkinsJisc cloud conf 12th dec 2011 hopkins
Jisc cloud conf 12th dec 2011 hopkins
 
Helass project overview and lessons v1.0
Helass project overview and lessons v1.0Helass project overview and lessons v1.0
Helass project overview and lessons v1.0
 

Kürzlich hochgeladen

4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 

Kürzlich hochgeladen (20)

4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 

Migrating from a physical to a hosted Data Centre - Experiences of a small University

  • 1. Migra&ng  from  a  physical  to  a   hosted  Data  Centre-­‐   Experiences  of  a  small   University   Peter  Newton  –  UCA   Paul  Hopkins  –  HE-­‐Shared  Services  
  • 2. University  for  the  Crea&ve  Arts   Formed  in  2005  by  merging  2  colleges  of  Art  &  Design  in  Surrey  with     3  colleges  in  Kent.     7,000  students  spread  across  5  campuses  –  130  miles  apart     Turnover  £60million  p.a.    –    IT  Budget  (£4.5M)       Supported  by  an  IT  team  of  28  –  with     •  Technical,  Applica&ons  Team  based  in  Maidstone   •  Business  Development  and  Administra&on  in  Farnham   •  2nd  Line  Support    at  each  other  campus   Technically,  the  Kent  Campuses  are  connected  via  KPSN    and  the     Surrey  Campuses  linked  directly  to  JANET  …  but  all  with  minimal     network  resilience…    
  • 3. UCA  Campuses  2010   Maidstone  Farnham   Canterbury   Rochester   Epsom  
  • 4. UCA  Environment  -­‐  July  2010   Maidstone   Current  DC   Farnham   Canterbury   Rochester   Epsom      JANET     KentMAN  due  to  be  KPSN  in  2012  
  • 5. In  2011,  UCA  agreed  plans  to  vacate  the  Maidstone  campus   by  summer  2014.       Hence  a  need  to  examine       •  where  the  Data  Centre  should  move  to;       •  the  future  of  the  Technical  and    Applica&ons  teams;  and     •  how  to  minimise  risk  to  UCA  during  this  transi&on       …whilst  there  are  seismic  changes  occurring  in  Higher   Educa&on,  IT  technologies  and  student  expecta&ons!     Maidstone  Closure  –    Announced  2011  
  • 6. What  choices  are  realis&c?   And  what  do  we  need  to  do  about  our  network?   • Build  a  new  DC  /  DR  at  Campus   • Implement  Cloud  as  a  solu&on   • Commercial  Datacentre  Solu&on   • H.E.  Datacentre  Solu&on  
  • 7. Technical  Considera&ons   There  was  a  possible  DR  or  DC  loca&on  in  EPSOM     Issue  1  :      Weak  DR  Environment   Issue  2:    No  space  for  a  Data  Centre   Issue  3:  Hidden  higher  expenditure  in  the  Opera&ng  Costs     Build  a  new  Datacentre  on  another  campus   Issue  1:    Disadvantages  at  all  other  sites   Issue  2:    In  a  rapidly  changing  HE  environment,  would  a  future  merger  or  reduc&on  of   another  campus  happen  within  10  years?     Rent  space  in  a  commercial  or  another  university  data  centre?   Issue  1:    Finding  a  cost-­‐effec&ve  data  centre  provider   Issue  2:    What  would  the  ideal  solu&on  be  for  a  DR  centre  –  in-­‐house  or  not?     Cloud   Issue  1:      A  DC  s&ll  required  at  our  Root  Technical  Level   Issue  2:  Timescales  dependent  on  expenditure     …  and  how  do  you  develop  a  low-­‐risk  plan  to  move  everything  from  in-­‐house  to   out-­‐of-­‐house?  
  • 8.  Management  Considera&ons   •  Moving  away  from  Kent  increases  likelihood  of  losing  key   technical  staff     •  Are  we  looking  at  fully  hosted,  IaaS,  PaaS  or  a  mix?  Or  is  there  a   migra&on  route?     •  How  do  you  find  a  commercial  vendor  who  understands  the  HE   culture?     •  If  staying  in  HE  sector,  how  do  you  get  a  good  service?   •  How  do  we  get  our  Board  of  Governors  and  Exec  Board  to  agree   to  our  chosen  route?  
  • 9. Our  solu&on  and  route-­‐map   1.  Standardize  applica&ons  to  support  virtualisa&on  backup,   removing  hardware  dependence.   2.  Re-­‐design  the  data  network  so  that  there  is  sufficient   bandwidth  and  diverse  rou&ngs  into  each  campus   3.  Iden&fy  possible  Commercial  and  in-­‐sector  service  suppliers   4.  Brief  Execu&ve  and  also  Governors  early  to  get  their  advice  and   commitment  to  the  route  forward   5.  Prepare  an  environment  to  ENABLE  a  route  map  that  moves   from  the  historic  physical  applica&on/server  environment;   using  virtualisa&on  prepare  capability  for  migra&on  to  external   IaaS,  to  PaaS  and  even  to  SaaS  
  • 10. UCA  Planned  IT  Provision  -­‐  July  2014   Maidstone  Studios   Disaster  Recovery   KPSN   JANET   Farnham   Canterbury   Rochester   Epsom   ULCC     Datacentre  
  • 11. From  Physical  through  to  SaaS…   Any-­‐Shore   Virtualiza&on   Unlinks   Hosted   Racks   Located  in   Vendor   DC   Near-­‐Shore   Applica&on  in   Vender  Server   &  DC   Far-­‐Shore     Our  Loca&on,  Rack,     Server,  Applica&on  
  • 12. Progress  to  date   1.  Exec  Board  and  Governors  are  fully  on  board  with  the  route  forward   2.  We  have  virtualised  90%  of  our  applica&ons  –  except  for  Agresso      and  Blackboard–  because  these  vendors  have  not  yet  agreed    that  they  can  support  fully  virtualised  applica&ons     3.  We  have  developed  a  detailed  plan  –  and  contracted  with  ULCC  for  the      hosted  Data  Centre  and  Maidstone  Studios  for  the  DR  centre   4.  We  have  worked  with  JANET  to  ensure  that  ALL  of  our  network  connec&ons      and  upgrades  will  be  available  on  &me     5.  We  are  working  with  HP  to  deliver  the    required  HP  hardware         …  and  are  busy  execu&ng  the  plan  …  So  how  did  we  select  our  partners?     What  is  our  view  of  the  state  of  the  market?      
  • 13. Finding  an  In-­‐sector  Hos&ng  partner   1.  We  wrote  to  all  UCISA  Directors  in  November  2012  to  ask  who  had      recently  built  a  Data  Centre,  who  was  planning  to  do  so?     2.  We  found  several  HEIs  who  were  keen  to  discuss  whether  we      would  hire  racks  in  their  exis&ng  Data  Centres     3.  We  discussed  some  anrac&ve  prices  (under  £12k  per  rack  per  year)      but  we  were  worried  about  their  experience  of  providing  a      hosted  service  etc.     5.  We  looked  at  ULCC  –  and  were  very  impressed  by  their  set-­‐up.  They   •    Matched  commercial  vendors  in  environment     •    Understood  the  HE  culture   •    Very  cost-­‐efficient   •    Future  benefits  for  IaaS,  PaaS   •    Poten&al  for  managed  services  (Unit4  Finances,  Moodle  etc.)  
  • 14. Finding  a  Commercial    Hos&ng  partner   1.  We  did  not  wish  to  write  or  conduct  a  full  OJEU  Tender  –  hence  we  were      restricted  to  using  Government  frameworks  or  the  JANET  Brokerage      framework  if  we  wanted    a  full  Data  Centre,  mul&-­‐year  Agreement     2.  The  G-­‐Cloud  had  very  many  poten&al  vendors  but  the  focus  was  on  virtualiza&on      but  our  priority  was  having  no  physical  hardware  at  Maidstone  by  July  2014.       3.  We  began  discussions  with  a  company  on  the  JANET  Brokerage  but  found  that  their      costs  were  way  in  excess  of  what  we  could  afford  (>£20k/year  per  rack)     Overall,  we  were  not  happy  with  the  choice  of  Commercial  vendors  –  and  felt  that  we   did  not  have  the  experience  (or  inclina&on!)  to  teach  them  how  to  work  within  HE     4.  Finally  we  found  a  poten&al  vendor  (Maidstone  Studios)  close  to  our  home,  who     •    already  had  a  business  rela&onship  with  UCA  –     •    have  an  Award  wining  Data  Centre   •    Understood  the  HE  culture  (-­‐  already  hos&ng  UCA  Broadcast  Media  Courses)   •    are  very  cost-­‐efficient  
  • 15. So…  Who  did  we  choose…  and  why?   1.  JANET  to  provide  our  Data  Network  –  cost  effec&ve  and  responsive   2.  HP  to  provide  the  servers  for  our  DR  site  –  they  already  provide  the  servers  for    our  current  environment,  worked  closely  with  us  reviewing  our  server  and  SAN  technical  solu&on  and  offering  to  support  during  installa&on.     3.  Maidstone  Studios  to  provide  our  DR  environment     4.  ULCC  to  provide  us  with  a  cost-­‐effec&ve  Data  Centre  racks  (5+  racks)     5.  SYSPRO  to  support  and  implement  the  sorware  DR  solu&on       6.  Addi&onal  contractors  to  backfill  2  technical  roles  so  that  we  can  dedicate  our    key  technical  staff  to  focus  almost  solely  on  this  project     We  have  kept  our  contracts  to  no  more  than  2  years  because  we  that  technology   is  changing  con&nually.    There  could  be  alterna&ves  in  the  near  future  and….  we   might  want  to  move  from  IaaS  to  PaaS  (and  SaaS)  within  the  next  2-­‐3  years…  
  • 16. So…How  are  we  doing  it?   1.  Upgrade  our  network  environment    &  implement  resilient  routes  for  all  campuses   2.  Setup  HP  3PAR  SAN  &  Server  in  ULCC  (-­‐  Downsizing  to  an  es&mated  3  Racks)   3.  Move  virtualised  systems  to  ULCC  shutng  down  Maidstone  servers  as  we  migrate     4.  We  will  install  the  DR  facility  in  Maidstone  Studios  and  test  thoroughly   5.  We  will  select  a  ‘long  weekend’  and  fail  over  DR   6.  We  will  physically  transport  our  remaining  servers  up  to  ULCC  (the  new  Data      Centre),  bed  them  in  and  test  thoroughly     5.  We  will  ‘fail  back’  our  services  from  DR  (Maidstone  Studios)  to  produc&on  (ULCC)     6.  We  will  setup  a  de-­‐duplica&on  environment  at  Epsom  using  Tape  and  Cloud  as  Backup     Cri&cally  we  have,  from  the  start,  involved  our  Execu&ve  Team,  Heads  of  Schools      and  Deptment  Heads  to  understand  and  manage  their    expecta&ons  on      &me  to  restore,  data  recovery,  data  reten&on  and  all  things  OLAs  (SLAs)  
  • 17. Cloud  Applica&on  as   Service  /   Infrastructure   Cloud  Backup   UCA  Poten&al  IT  Progress  Post  2014   JANET   Maidstone  Studios   Disaster  Recovery   ULCC     Datacentre  Core   Epsom   Tape  Management  
  • 18. Cloud  Applica&on  as   Service  /   Infrastructure   Cloud  Backup   UCA  Cost  Reduc&on  Downsizing   ULCC     Datacentre  Core   Epsom   Tape  Management   On-­‐going  Cost   Analysis    into   Migra&on   Reduce  tape   management