Data Centre Project




                                JISC
                  Greening ICT Programme (Phase II)



Data Centre Efficiency Improvements
                  &
       EU Code of Conduct
Data Centre Project




Imperial’s Data Centre Project

        •   Background
        •   Overview
        •   Approach
        •   Beneficial Project Outcomes



EU Code of Conduct

        • Background
        • Process and Timing
        • Our Experience
Data Centre Project



Background

• Imperial’s main Data Centre, hosts circa 2,500 servers

• It supports; Imperial College, Natural History Museum, Royal
  College of Music and Janet-LMN clients

• There are two server rooms which form the Data Centre both
  adapted to fit in a traditional 1960’s building.

• Room One has a high density CO2 cooling system while, Room Two
  has a traditional water chiller.

• The Data Centre’s annual consumption is circa:

          7,500,000 kWh        £500,000          4,000 tCO2
Data Centre Project



Overview

•   We obtained funding from JISC as part of their Greening ICT Programme
    (Phase II) to make improvements to the Data Centre efficiency and reduce
    energy consumption.

•   Phase II is specifically focussed on how estate departments can integrate
    with ICT to reduce carbon.

•   This project reflects many installations of its type, where Data Centre’s have
    evolved in existing space, rather than a bespoke build.

•   Room One       PUE = 1.32                  Room Two PUE = 1.52

•   The majority of our work has focussed on the least efficient Room Two.

•   We target a 5% reduction in carbon consumption (circa 200 tCO2).
Data Centre Project


Project Approach

•    Phase 1 – Definition, modelling & recommendations
              – Document current baseline
              – Use of thermal imaging and data logging
              – Model potential solutions and make recommendations

•    Phase 2 – Implementation recommendations & measure effectiveness
              – Anticipated implementations include
                           » Cold aisle containment
                           » Free cooling
                           » Elevated computer room temperatures etc
                           » Improved maintenance & cleaning regimes
              – Measure effectiveness of improvements

•    Phase 3 – Reporting & dissemination
              – Document analysis of outcomes and place in public domain
Data Centre Project


Data Centre Photos




        Original Cold Aisle   Cold Aisle With Containment
            (56 racks)
Data Centre Project



Beneficial Outcomes

Cold aisle containment; design of adaptive system complete, works awarded
                    • Projected savings: 14,482 kWh        8 tCO2 £1,138 per annum
                    • Increase chilled water temperature savings can result +2oC
                                           91,980 kWh     50 tCO2 £7,227 per annum

Free cooling; design of plant & controls completed, works awarded
                   • Projected savings: 200,424 kWh 109 tCO2 £15,747 per annum

Lighting; proposal to upgrade fittings and install new lighting controls developed, works
          complete.
                    • Projected savings: 52,976 kWh 29 tCO2 £4,162 per annum

Chiller; improved cleaning regime;
                    • Projected savings: 56,018 kWh        31 tCO2    £4,401 per annum

Total projected savings:                415,880 kWh     227 tCO2     £32,675 per annum
EU Code of Conduct - Experience




•   Condition to receive funding from JISC for Greening ICT Programme –
    Strand II: Estates Led projects

•   Time saver for PMs looking for a set of practices in one place

•   Realistic not over-ambitious or mandatory but requires substantial efforts to
    implement all practices – might look too much for HE

•   It is useful for the project team to read Best Practice guide before you
    embark on your project and committing to it.
EU Code of Conduct - Impact




                              Note:
EU Code of Conduct – Process and Timing


4 submissions:

• 28.02.2011 EU Code of Conduct v3.0.1 (to be reviewed for 2013)
-reviewed practices-

• 14.11.2011 application, submission of reporting form and meter readings
• 23.01.2012 feedback and re-submission of reporting form
• 24.02.2012 submission of meter readings for 2011
-identified areas of improvement and scoped to cover 16 practices and run the project

•   16.10.2012 submission of updated reporting form and meter readings for 2012
•   23.10.2012 received acceptance as EU CoC Participant

Imperial College London is 3rd UK HE member in Participant list (others are University
of Hertfordshire and University of Sheffield).
http://iet.jrc.ec.europa.eu/energyefficiency/organisation-list-short/ict_coc_dc_partner
EU Code of Conduct - Comments


Pragmatic approach
• Go through the practices with DC Manager, Estates, PM
• Describe actions you are taking or intending to take to implement practices and set a
   date
• Make use of Estates Building Management System (BMS)
• Some practices may become projects in their own right, like 4.4.1 Data management
   policy
• Some practices overlap or can be addressed at once: 4.2.4 Select efficient software
   4.2.5 Develop efficient software – Virtualisation
• Maintenance schedules

Involve and keep ICT director informed
• Funding (in case ICT provides funds) and commitment are important
• Some practices require resources and can be met in other ways or projects

Contact
Alex Yakimov, ICT, Technical Architecture Delivery Manager a.yakimov@imperial.ac.uk

Weitere ähnliche Inhalte

Was ist angesagt?

Powering Canadas Innovation Network
Powering  Canadas  Innovation  NetworkPowering  Canadas  Innovation  Network
Powering Canadas Innovation NetworkCANARIE Inc.
 
Quality and capacity expansion of thematic services in EOSC-SYNERGY
Quality and capacity expansion of thematic services in EOSC-SYNERGYQuality and capacity expansion of thematic services in EOSC-SYNERGY
Quality and capacity expansion of thematic services in EOSC-SYNERGYJisc
 
Jisc's new shared data centre
Jisc's new shared data centreJisc's new shared data centre
Jisc's new shared data centreJisc
 
Application of Assent in the safe - Networkshop44
Application of Assent in the safe -  Networkshop44Application of Assent in the safe -  Networkshop44
Application of Assent in the safe - Networkshop44Jisc
 
Open Science at the European Commission
Open Science at the European CommissionOpen Science at the European Commission
Open Science at the European CommissionCarl-Christian Buhr
 
SKA NZ R&D BeSTGRID Infrastructure
SKA NZ R&D BeSTGRID InfrastructureSKA NZ R&D BeSTGRID Infrastructure
SKA NZ R&D BeSTGRID InfrastructureNick Jones
 
The Cambridge Research Computing Service
The Cambridge Research Computing ServiceThe Cambridge Research Computing Service
The Cambridge Research Computing Serviceinside-BigData.com
 
Rob bristow sgl cardiff_2010
Rob bristow sgl cardiff_2010Rob bristow sgl cardiff_2010
Rob bristow sgl cardiff_2010Rob Bristow
 
How have we done?
How have we done?How have we done?
How have we done?Jisc
 
Rob Bristow EAUC Conference 23 03 10
Rob Bristow EAUC Conference 23 03 10Rob Bristow EAUC Conference 23 03 10
Rob Bristow EAUC Conference 23 03 10Rob Bristow
 
Implementing Open Access: Effective Management of Your Research Data
Implementing Open Access: Effective Management of Your Research DataImplementing Open Access: Effective Management of Your Research Data
Implementing Open Access: Effective Management of Your Research DataMartin Hamilton
 
Best Practices: Forest-Based Bioenergy and Rural Development. Case: Finnish B...
Best Practices: Forest-Based Bioenergy and Rural Development. Case: Finnish B...Best Practices: Forest-Based Bioenergy and Rural Development. Case: Finnish B...
Best Practices: Forest-Based Bioenergy and Rural Development. Case: Finnish B...TAPIO
 
UK Data Centre Capabilty Presentation Rev.A
UK Data Centre Capabilty Presentation Rev.AUK Data Centre Capabilty Presentation Rev.A
UK Data Centre Capabilty Presentation Rev.AGary Marshall
 
Making sense of open scholarly communications data - Jisc Digifest 2016
Making sense of open scholarly communications data - Jisc Digifest 2016Making sense of open scholarly communications data - Jisc Digifest 2016
Making sense of open scholarly communications data - Jisc Digifest 2016Jisc
 
1BBOX Value Proposition Presentation
1BBOX Value Proposition Presentation1BBOX Value Proposition Presentation
1BBOX Value Proposition PresentationBrad Foster
 
Data accessibility and the role of informatics in predicting the biosphere
Data accessibility and the role of informatics in predicting the biosphereData accessibility and the role of informatics in predicting the biosphere
Data accessibility and the role of informatics in predicting the biosphereAlex Hardisty
 

Was ist angesagt? (20)

Powering Canadas Innovation Network
Powering  Canadas  Innovation  NetworkPowering  Canadas  Innovation  Network
Powering Canadas Innovation Network
 
Quality and capacity expansion of thematic services in EOSC-SYNERGY
Quality and capacity expansion of thematic services in EOSC-SYNERGYQuality and capacity expansion of thematic services in EOSC-SYNERGY
Quality and capacity expansion of thematic services in EOSC-SYNERGY
 
Jisc's new shared data centre
Jisc's new shared data centreJisc's new shared data centre
Jisc's new shared data centre
 
Application of Assent in the safe - Networkshop44
Application of Assent in the safe -  Networkshop44Application of Assent in the safe -  Networkshop44
Application of Assent in the safe - Networkshop44
 
Open Science at the European Commission
Open Science at the European CommissionOpen Science at the European Commission
Open Science at the European Commission
 
SKA NZ R&D BeSTGRID Infrastructure
SKA NZ R&D BeSTGRID InfrastructureSKA NZ R&D BeSTGRID Infrastructure
SKA NZ R&D BeSTGRID Infrastructure
 
RDM initiatives
RDM initiativesRDM initiatives
RDM initiatives
 
The Cambridge Research Computing Service
The Cambridge Research Computing ServiceThe Cambridge Research Computing Service
The Cambridge Research Computing Service
 
Rob bristow sgl cardiff_2010
Rob bristow sgl cardiff_2010Rob bristow sgl cardiff_2010
Rob bristow sgl cardiff_2010
 
How have we done?
How have we done?How have we done?
How have we done?
 
Rob Bristow EAUC Conference 23 03 10
Rob Bristow EAUC Conference 23 03 10Rob Bristow EAUC Conference 23 03 10
Rob Bristow EAUC Conference 23 03 10
 
ELIXIR-UK
ELIXIR-UKELIXIR-UK
ELIXIR-UK
 
Implementing Open Access: Effective Management of Your Research Data
Implementing Open Access: Effective Management of Your Research DataImplementing Open Access: Effective Management of Your Research Data
Implementing Open Access: Effective Management of Your Research Data
 
Session IV Rajiv Garg
Session IV Rajiv GargSession IV Rajiv Garg
Session IV Rajiv Garg
 
Best Practices: Forest-Based Bioenergy and Rural Development. Case: Finnish B...
Best Practices: Forest-Based Bioenergy and Rural Development. Case: Finnish B...Best Practices: Forest-Based Bioenergy and Rural Development. Case: Finnish B...
Best Practices: Forest-Based Bioenergy and Rural Development. Case: Finnish B...
 
Os presentation v2
Os presentation v2Os presentation v2
Os presentation v2
 
UK Data Centre Capabilty Presentation Rev.A
UK Data Centre Capabilty Presentation Rev.AUK Data Centre Capabilty Presentation Rev.A
UK Data Centre Capabilty Presentation Rev.A
 
Making sense of open scholarly communications data - Jisc Digifest 2016
Making sense of open scholarly communications data - Jisc Digifest 2016Making sense of open scholarly communications data - Jisc Digifest 2016
Making sense of open scholarly communications data - Jisc Digifest 2016
 
1BBOX Value Proposition Presentation
1BBOX Value Proposition Presentation1BBOX Value Proposition Presentation
1BBOX Value Proposition Presentation
 
Data accessibility and the role of informatics in predicting the biosphere
Data accessibility and the role of informatics in predicting the biosphereData accessibility and the role of informatics in predicting the biosphere
Data accessibility and the role of informatics in predicting the biosphere
 

Andere mochten auch

Your Code of Conduct: Data Compliance for Charities
Your Code of Conduct: Data Compliance for CharitiesYour Code of Conduct: Data Compliance for Charities
Your Code of Conduct: Data Compliance for CharitiesCommunicator
 
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...JISC's Green ICT Programme
 
MiM Employment Report 2012, London Business School
MiM Employment Report 2012, London Business SchoolMiM Employment Report 2012, London Business School
MiM Employment Report 2012, London Business SchoolLondon Business School
 
MBA Employment report 2013 - London Business School
MBA Employment report 2013 - London  Business SchoolMBA Employment report 2013 - London  Business School
MBA Employment report 2013 - London Business SchoolLondon Business School
 
SK Telecom - Smart Class Story
SK Telecom - Smart Class StorySK Telecom - Smart Class Story
SK Telecom - Smart Class Storysksmartclass
 
Transferring Software Testing and Analytics Tools to Practice
Transferring Software Testing and Analytics Tools to PracticeTransferring Software Testing and Analytics Tools to Practice
Transferring Software Testing and Analytics Tools to PracticeTao Xie
 
2015 FOSScon NAVER OSS Governance
2015 FOSScon NAVER OSS Governance2015 FOSScon NAVER OSS Governance
2015 FOSScon NAVER OSS GovernanceNAVER Engineering
 
AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)
AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)
AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)Amazon Web Services Korea
 
International Business Strategy of IKEA
International Business Strategy of IKEAInternational Business Strategy of IKEA
International Business Strategy of IKEASungwhan Kim
 
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...Probir Bidhan
 
The Great State of Design with CSS Grid Layout and Friends
The Great State of Design with CSS Grid Layout and FriendsThe Great State of Design with CSS Grid Layout and Friends
The Great State of Design with CSS Grid Layout and FriendsStacy Kvernmo
 

Andere mochten auch (11)

Your Code of Conduct: Data Compliance for Charities
Your Code of Conduct: Data Compliance for CharitiesYour Code of Conduct: Data Compliance for Charities
Your Code of Conduct: Data Compliance for Charities
 
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
 
MiM Employment Report 2012, London Business School
MiM Employment Report 2012, London Business SchoolMiM Employment Report 2012, London Business School
MiM Employment Report 2012, London Business School
 
MBA Employment report 2013 - London Business School
MBA Employment report 2013 - London  Business SchoolMBA Employment report 2013 - London  Business School
MBA Employment report 2013 - London Business School
 
SK Telecom - Smart Class Story
SK Telecom - Smart Class StorySK Telecom - Smart Class Story
SK Telecom - Smart Class Story
 
Transferring Software Testing and Analytics Tools to Practice
Transferring Software Testing and Analytics Tools to PracticeTransferring Software Testing and Analytics Tools to Practice
Transferring Software Testing and Analytics Tools to Practice
 
2015 FOSScon NAVER OSS Governance
2015 FOSScon NAVER OSS Governance2015 FOSScon NAVER OSS Governance
2015 FOSScon NAVER OSS Governance
 
AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)
AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)
AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)
 
International Business Strategy of IKEA
International Business Strategy of IKEAInternational Business Strategy of IKEA
International Business Strategy of IKEA
 
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
 
The Great State of Design with CSS Grid Layout and Friends
The Great State of Design with CSS Grid Layout and FriendsThe Great State of Design with CSS Grid Layout and Friends
The Great State of Design with CSS Grid Layout and Friends
 

Ähnlich wie Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data centre efficiency improvements eu code of conduct

Energy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of CambridgeEnergy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of CambridgeJISC's Green ICT Programme
 
Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designSustainableEnergyAut
 
Energy auditing and energy efficiency indicators
Energy auditing and energy efficiency indicatorsEnergy auditing and energy efficiency indicators
Energy auditing and energy efficiency indicatorsCETN
 
Paul Southall's CP2 Presentation
Paul Southall's CP2 PresentationPaul Southall's CP2 Presentation
Paul Southall's CP2 PresentationSimon Owen FIRP
 
Show and Tell - Heat.pdf
Show and Tell - Heat.pdfShow and Tell - Heat.pdf
Show and Tell - Heat.pdfSIFOfgem
 
Solar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda CayónSolar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda CayónASCAME
 
Heat Networks Code of Practice
Heat Networks Code of PracticeHeat Networks Code of Practice
Heat Networks Code of PracticeSimon Owen FIRP
 
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...
Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...JISC's Green ICT Programme
 
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Morgan
 
Data centre networking
Data centre networkingData centre networking
Data centre networkingJisc
 
NZC - Olgyay Scaling
NZC - Olgyay ScalingNZC - Olgyay Scaling
NZC - Olgyay ScalingWRONG PERSON
 
Energy Sustainability on Campus
Energy Sustainability on CampusEnergy Sustainability on Campus
Energy Sustainability on CampusPulse Energy
 
Baf 2013 abc of jv3_ken thomson
Baf 2013 abc of jv3_ken thomsonBaf 2013 abc of jv3_ken thomson
Baf 2013 abc of jv3_ken thomsonKen Thomson
 
Controlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processControlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processShanti Pless
 

Ähnlich wie Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data centre efficiency improvements eu code of conduct (20)

Energy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of CambridgeEnergy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of Cambridge
 
Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre design
 
Energy auditing and energy efficiency indicators
Energy auditing and energy efficiency indicatorsEnergy auditing and energy efficiency indicators
Energy auditing and energy efficiency indicators
 
AESP_Spring
AESP_SpringAESP_Spring
AESP_Spring
 
Paul Southall's CP2 Presentation
Paul Southall's CP2 PresentationPaul Southall's CP2 Presentation
Paul Southall's CP2 Presentation
 
Show and Tell - Heat.pdf
Show and Tell - Heat.pdfShow and Tell - Heat.pdf
Show and Tell - Heat.pdf
 
Solar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda CayónSolar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda Cayón
 
Heat Networks Code of Practice
Heat Networks Code of PracticeHeat Networks Code of Practice
Heat Networks Code of Practice
 
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...
Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...
 
Greening ict programme meeting slides2
Greening ict programme meeting slides2Greening ict programme meeting slides2
Greening ict programme meeting slides2
 
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
 
Data centre networking
Data centre networkingData centre networking
Data centre networking
 
Energy in Schools by John Dolan
Energy in Schools by John DolanEnergy in Schools by John Dolan
Energy in Schools by John Dolan
 
slides
slidesslides
slides
 
Callide oxyfuel project update
Callide oxyfuel project updateCallide oxyfuel project update
Callide oxyfuel project update
 
federal reserve.
federal reserve.federal reserve.
federal reserve.
 
NZC - Olgyay Scaling
NZC - Olgyay ScalingNZC - Olgyay Scaling
NZC - Olgyay Scaling
 
Energy Sustainability on Campus
Energy Sustainability on CampusEnergy Sustainability on Campus
Energy Sustainability on Campus
 
Baf 2013 abc of jv3_ken thomson
Baf 2013 abc of jv3_ken thomsonBaf 2013 abc of jv3_ken thomson
Baf 2013 abc of jv3_ken thomson
 
Controlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processControlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build process
 

Mehr von JISC's Green ICT Programme

What does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find outWhat does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find outJISC's Green ICT Programme
 
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIsData Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIsJISC's Green ICT Programme
 
Better Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT SpendBetter Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT SpendJISC's Green ICT Programme
 
Understanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services ProjectUnderstanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services ProjectJISC's Green ICT Programme
 
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14CARBS Project Presentation - Jisc Cost of IT Services 10-02-14
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14JISC's Green ICT Programme
 
Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...JISC's Green ICT Programme
 
US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings JISC's Green ICT Programme
 
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...Migrating from a physical to a hosted Data Centre - Experiences of a small Un...
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...JISC's Green ICT Programme
 
The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs - The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs - JISC's Green ICT Programme
 
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...JISC's Green ICT Programme
 
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activitiesUnderstanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activitiesJISC's Green ICT Programme
 
Ppt 1 le leeds - welcome alan real ( university of leeds )
Ppt 1 le   leeds - welcome alan real ( university of leeds )Ppt 1 le   leeds - welcome alan real ( university of leeds )
Ppt 1 le leeds - welcome alan real ( university of leeds )JISC's Green ICT Programme
 
Ppt6 london - james harbridge ( intellect uk ) crc policy update
Ppt6   london - james harbridge ( intellect uk ) crc policy updatePpt6   london - james harbridge ( intellect uk ) crc policy update
Ppt6 london - james harbridge ( intellect uk ) crc policy updateJISC's Green ICT Programme
 
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...JISC's Green ICT Programme
 
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...JISC's Green ICT Programme
 
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3   london - sophia ( operation intelligence ) what is the eu code of conductPpt3   london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conductJISC's Green ICT Programme
 
Ppt1 london -simon allen ( concurrent thinking ) welcome
Ppt1   london -simon allen ( concurrent thinking ) welcomePpt1   london -simon allen ( concurrent thinking ) welcome
Ppt1 london -simon allen ( concurrent thinking ) welcomeJISC's Green ICT Programme
 
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...JISC's Green ICT Programme
 
University of Warwick Video Conferencing Service
University of Warwick Video Conferencing ServiceUniversity of Warwick Video Conferencing Service
University of Warwick Video Conferencing ServiceJISC's Green ICT Programme
 

Mehr von JISC's Green ICT Programme (20)

What does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find outWhat does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find out
 
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIsData Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIs
 
Better Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT SpendBetter Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT Spend
 
Understanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services ProjectUnderstanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services Project
 
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14CARBS Project Presentation - Jisc Cost of IT Services 10-02-14
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14
 
Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...
 
US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings
 
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...Migrating from a physical to a hosted Data Centre - Experiences of a small Un...
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...
 
The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs - The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs -
 
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
 
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activitiesUnderstanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
 
Ppt 1 le leeds - welcome alan real ( university of leeds )
Ppt 1 le   leeds - welcome alan real ( university of leeds )Ppt 1 le   leeds - welcome alan real ( university of leeds )
Ppt 1 le leeds - welcome alan real ( university of leeds )
 
Ppt6 london - james harbridge ( intellect uk ) crc policy update
Ppt6   london - james harbridge ( intellect uk ) crc policy updatePpt6   london - james harbridge ( intellect uk ) crc policy update
Ppt6 london - james harbridge ( intellect uk ) crc policy update
 
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...
 
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...
 
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3   london - sophia ( operation intelligence ) what is the eu code of conductPpt3   london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conduct
 
Ppt1 london -simon allen ( concurrent thinking ) welcome
Ppt1   london -simon allen ( concurrent thinking ) welcomePpt1   london -simon allen ( concurrent thinking ) welcome
Ppt1 london -simon allen ( concurrent thinking ) welcome
 
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
 
Videoconferencing in Dutch Higher Education
Videoconferencing in Dutch Higher EducationVideoconferencing in Dutch Higher Education
Videoconferencing in Dutch Higher Education
 
University of Warwick Video Conferencing Service
University of Warwick Video Conferencing ServiceUniversity of Warwick Video Conferencing Service
University of Warwick Video Conferencing Service
 

Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data centre efficiency improvements eu code of conduct

  • 1. Data Centre Project JISC Greening ICT Programme (Phase II) Data Centre Efficiency Improvements & EU Code of Conduct
  • 2. Data Centre Project Imperial’s Data Centre Project • Background • Overview • Approach • Beneficial Project Outcomes EU Code of Conduct • Background • Process and Timing • Our Experience
  • 3. Data Centre Project Background • Imperial’s main Data Centre, hosts circa 2,500 servers • It supports; Imperial College, Natural History Museum, Royal College of Music and Janet-LMN clients • There are two server rooms which form the Data Centre both adapted to fit in a traditional 1960’s building. • Room One has a high density CO2 cooling system while, Room Two has a traditional water chiller. • The Data Centre’s annual consumption is circa: 7,500,000 kWh £500,000 4,000 tCO2
  • 4. Data Centre Project Overview • We obtained funding from JISC as part of their Greening ICT Programme (Phase II) to make improvements to the Data Centre efficiency and reduce energy consumption. • Phase II is specifically focussed on how estate departments can integrate with ICT to reduce carbon. • This project reflects many installations of its type, where Data Centre’s have evolved in existing space, rather than a bespoke build. • Room One PUE = 1.32 Room Two PUE = 1.52 • The majority of our work has focussed on the least efficient Room Two. • We target a 5% reduction in carbon consumption (circa 200 tCO2).
  • 5. Data Centre Project Project Approach • Phase 1 – Definition, modelling & recommendations – Document current baseline – Use of thermal imaging and data logging – Model potential solutions and make recommendations • Phase 2 – Implementation recommendations & measure effectiveness – Anticipated implementations include » Cold aisle containment » Free cooling » Elevated computer room temperatures etc » Improved maintenance & cleaning regimes – Measure effectiveness of improvements • Phase 3 – Reporting & dissemination – Document analysis of outcomes and place in public domain
  • 6. Data Centre Project Data Centre Photos Original Cold Aisle Cold Aisle With Containment (56 racks)
  • 7. Data Centre Project Beneficial Outcomes Cold aisle containment; design of adaptive system complete, works awarded • Projected savings: 14,482 kWh 8 tCO2 £1,138 per annum • Increase chilled water temperature savings can result +2oC 91,980 kWh 50 tCO2 £7,227 per annum Free cooling; design of plant & controls completed, works awarded • Projected savings: 200,424 kWh 109 tCO2 £15,747 per annum Lighting; proposal to upgrade fittings and install new lighting controls developed, works complete. • Projected savings: 52,976 kWh 29 tCO2 £4,162 per annum Chiller; improved cleaning regime; • Projected savings: 56,018 kWh 31 tCO2 £4,401 per annum Total projected savings: 415,880 kWh 227 tCO2 £32,675 per annum
  • 8. EU Code of Conduct - Experience • Condition to receive funding from JISC for Greening ICT Programme – Strand II: Estates Led projects • Time saver for PMs looking for a set of practices in one place • Realistic not over-ambitious or mandatory but requires substantial efforts to implement all practices – might look too much for HE • It is useful for the project team to read Best Practice guide before you embark on your project and committing to it.
  • 9. EU Code of Conduct - Impact Note:
  • 10. EU Code of Conduct – Process and Timing 4 submissions: • 28.02.2011 EU Code of Conduct v3.0.1 (to be reviewed for 2013) -reviewed practices- • 14.11.2011 application, submission of reporting form and meter readings • 23.01.2012 feedback and re-submission of reporting form • 24.02.2012 submission of meter readings for 2011 -identified areas of improvement and scoped to cover 16 practices and run the project • 16.10.2012 submission of updated reporting form and meter readings for 2012 • 23.10.2012 received acceptance as EU CoC Participant Imperial College London is 3rd UK HE member in Participant list (others are University of Hertfordshire and University of Sheffield). http://iet.jrc.ec.europa.eu/energyefficiency/organisation-list-short/ict_coc_dc_partner
  • 11. EU Code of Conduct - Comments Pragmatic approach • Go through the practices with DC Manager, Estates, PM • Describe actions you are taking or intending to take to implement practices and set a date • Make use of Estates Building Management System (BMS) • Some practices may become projects in their own right, like 4.4.1 Data management policy • Some practices overlap or can be addressed at once: 4.2.4 Select efficient software 4.2.5 Develop efficient software – Virtualisation • Maintenance schedules Involve and keep ICT director informed • Funding (in case ICT provides funds) and commitment are important • Some practices require resources and can be met in other ways or projects Contact Alex Yakimov, ICT, Technical Architecture Delivery Manager a.yakimov@imperial.ac.uk