SlideShare ist ein Scribd-Unternehmen logo
1 von 22
Downloaden Sie, um offline zu lesen
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
Taylor’s University Lakeside Campus
School of Architecture, Building, and Design
Bachelor of Quantity Surveying (Hons)
Management Science [MGT 60203]
A guide to
ZERHOLDINGS SDN. BHD.
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
ZERHOLDINGS BOARD OF DIRECTORS:
Chong Hui Xin 0319363
Kiing Kiu Chun 0318727
Maybelle Wang Sze Kher 0327553
Pang Khai Shuen 0318423
Wendy Teo Siew Yen 0328242
Yong Sing Yew 0318766
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
ZERHOLDINGS SDN. BHD.
Nature of Business:
Property Development
Capital:
10 Mil MYR
Location:
Subang Jaya
Vision:
To be a widely recognised property developer in Central Malaysia.
Mission:
1) To build a strong network within the industry.
2) To deliver high quality, cost effective projects on schedule
Long Term Goals:
1) To achieve a capital of 500 Million MYR within 15 years.
2) To collaborate with established companies to deliver construction projects.
3) To maintain a consistently good reputation.
Short Term Goals:
1) To minimise turnover rate.
2) To deliver 4 different properties within 10 years.
3) To provide adequate training to employees.
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
Contents:
1.0 Company Biodata
1.1 Overview
1.2 Vision & Mission
1.3 Long Term & Short Term Goals
2.0 Organisational Design
2.1 Organisational Structure
2.2 Organisational Culture
2.3 Manager Roles:
2.3.1 Top Managers
2.3.2 Middle Manager
2.3.3 Front-Line Managers
3.0 Training and Development Programmes
3.1 Apprenticeship Programme
3.2 Team-Building Boot Camp
3.3 Professional Talks
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
1.0 Company Biodata
1.1 Overview
Zerholdings Sdn. Bhd. is a property development company situated at Subang
Jaya, Malaysia with RM 10 million as capital. The vision of the company is to be a
widely recognised property developer in Central Malaysia. We want to ensure projects
to be well delivered with high satisfaction from the buyers by achieving the company’s
goals.
1.2 Vision & Mission
As it is our vision is to establish brand recognition, delivering high quality and
cost effective projects on schedule is also part of our missions. Efficient project
management is required to meet the mission. Works can be organized properly with
planned project schedule. By consistently checking on the project schedule to actual
progress on site, it can ensure the works to be done according to what it is planned.
With accordance to the project schedule, the person in charged can estimate the time
to order the materials. With this, it can ensure the materials to deliver on time and
enable the work to be conducted smoothly. At the same time, quality control can also
be done by the project manager through the monitoring of works on site.
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
1.3 Long & Short Term Goals
The long term goal is for our company to achieve a capital of RM500 million
within 15 years. It can be achieved by establishing numerous projects with good
financial management. Through wide networking, we intent to collaborate with other
established companies to deliver construction projects. Being collaborated with stable
companies, we will be able to deliver projects that are satisfactory. It is also our goal
to maintain good reputation in this competitive industry through our well delivered
projects.
The short term goals include minimising turnover rate. It can be achieved by ensuring
a proper and comfortable working environment where they can foster personal growth.
Also, we aim to deliver 4 properties within 10 years to strengthen the foundation of our
business. Lastly, we will provide adequate training to our employees through different
methods and programmes that can help them to improve from different aspects, not
only on their professional knowledge, but also soft skills and critical thinking.
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
2.0 Organisational Design
2.1 Organisational Structure
Our company adopted the functional structure with a twist – the human
resources department is directly under the care of the Board of Directors, as well as
indirectly reporting to the General Manager. As our focus is to attract and retain young
talents in the industry, we believe that by doing so, we can effectively tweak our
strategies through the relevant department. Having this setting for the relevant
department also decreases the vertical distance in the hierarchy between the Board of
Directors and the employees, making top-down communication easier, besides putting
the Human Resources department in a position where it is not affected by and will not
affect other departments.
The main reason we utilised the functional department is the size of our company. We
do not have a large enough number of projects going on or such variety in the location
of the projects to prompt the use of the divisional structure, nor the complexity of
delegating company resources to use the matrix structure. Since we are a fresh
company, it is easier and more efficient to have a direct communication route between
employees and employers.
Our organisation is separated into 3 main structure, that is, the Project, Finance, and
Sales & Marketing department. These 3 departments fall under the control of the
General Manager. The departments heads need to coordinate their strategies to be in
lieu with the plans laid out by the General Manager.
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
BOARD
OF
DIRECTORS
HEAD OF
HUMAN RESOURCES
GENERAL
MANAGER
HEAD OF
FINANCIAL
DEPARTMENT
HEAD OF
PROJECT
DEPARTMENT
HEAD OF
MARKETING &
SALES
DEPARTMENT
ORGANISATIONAL CHART – ZERHOLDINGS
MARKETING
TEAM
SALES
TEAM
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
2.2 Organisational Culture
In Zerholdings, we seek to promote a strong relationship between employees.
We want our employees to feel comfortable in their working environment as we believe
that through this approach, the social barrier between department members can be
lowered, and thus increasing work productivity.
To achieve this, we provide open spaces in the office without restricted cubicles. This
includes open spaces for employees to socialise during non-working hours. This
physical setting encourages our employees to make decisions through discussions,
and it is therefore vital for them to be open to ideas. Also, our company will be having
weekly sports night, where employees can compete with one another. Through these
activities, our employees, especially newcomers, will get to know their colleagues
better, indirectly enhancing their working experience.
While providing a comfortable environment for our employees, at the same time we
want to be keeping a tab on their productivity level as well. To achieve this, we will give
incentives based on group achievements instead of the traditional individual
achievement. This way, every working team will constantly check on one another to
make sure everyone is one the same page. The Heads of Departments can also set
short term goals for employees, and monitor their progress from time to time.
With this open concept, we aim to flatten the organisational structure, and lowering
and even eliminating the communication barrier between department heads and the
team members. It is easier for employees to approach employers, and similarly it is
easier for employers to monitor employees. This facilitates communication between
these two parties and information can be passed on clearly and precisely.
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
2.3 Manager Roles
2.3.1 Top Managers’ Roles
As a top management of Zerholdings, 6 of us focus on provide governance
leadership and strategic planning for our company. We set objectives and try to devise
ways of achieving our targets. For example: We plan for our long-term goals and short-
term goals and develop key strategic actions that can help us achieve our goals. We
also the ones who need to identify accurately the resources needed and actions to be
taken to achieve objectives. For example: We need to make decisions on how many
plots of land we need to purchase and how to add value to these by developing it with
our limited capital. We also monitor how the activities that are developed and
implemented by middle management based on our objectives (whether it matches with
our mission or not).
We also design and manage a good organizational structure for our company to
achieve a strong team. As a directors of the company we are also responsible on
building and managing relationships and communication with partners, contractors,
clients and etc. We believe that building a strong network within the industry will prove
helpful to our company in our future project. Sometimes we may also take care of our
employees and give them enough space to share their ideas and opinions directly to
us as our working culture is to be family-friendly. We will also make sure the lower
management treat our employees fairly and equitably. We believe that employees are
the most important assets of our company.
As a summary, we are responsible on deciding the future and direction of the company.
We spending more time on planning, develop strategy and leading the management
team. We also focus more on development of our conceptual skills and human skills.
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
2.3.2 Middle Manager’s Roles
Our general manager will focus on developing and implementing activities,
coordinating activities of first-line manager and allocating resources. As a general
manager, he needs to put plans from the top management into action. He needs to
develop and implement activities that matches with the objectives and which can be
used to achieve our goals. Our general manager will assign the tasks that needs to be
done and groups them into different department. For example: As we are a new
company, we will need a lot of advertisement. The general manager will pass this
idea/task to the marketing department and make sure they carry out the activities. They
may also set deadlines on the implemented tasks to make sure everything is on
schedule.
As a general manager, he takes responsible on requesting resources and the
allocation of resources. He will make sure our company’s resources are effectively
used. For example: He will decide how much funds are needed for the marketing
department for them to carry out the advertisement for our company. Our general
manager is also responsible on coordinating activities of first-line manager make sure
they understand everything and assigning the right activities to the employees. The
general manager of our company also gather information of recent performance and
compare it with present performance to the pre-establish standard. With this
information they can determine whether a modification is needed or not to meet our
company goal.
Last but not least, our general manager also responsible in establishing a good
communication network and patterns within the company to make sure every
department coordinating well. As a general manager of our company, conceptual skills
and human skills are equally important in order to be able to see the organization as a
whole and know how to affect and leads other departments as well.
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
2.3.3 Front-line Managers’ Roles
First-line managers set short term goals and distributes tasks to employees.
He then supervises the process of carrying out the tasks to make sure the goals set
are attainable. They need to have the right technical skills to do their job properly,
however human skills are also needed by these managers to lead their employees.
Project Team
The Project Team is the group responsible for planning and work out the project.
The member of project team consists of Project Manager, In house Quantity Surveyor,
Architect, Engineer, Landscape Surveyor, etc. Project Teams are in charge for the
communication of relevant and important information relative to the development,
carrying and ongoing activities of a project.
Objectives of project team
1) Specification of project objectives and plans including designing, budgeting,
scheduling, setting project performance requirements.
2) Apply of various operation through proper coordination and design, control of
planning, estimating, contracting and construction in the construction process.
3) Development of efficient communications and mechanisms for resolving conflicts
that happened during the project.
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
Head of Project Team/Project Manager
The Head of Project Team’s role is to make sure that team can achieve all the relevant
goals. He acts as the most important person throughout the whole construction
lifecycle as the project team is responsible for the inception, feasibility studies, design,
procurement up to the completion of a project. The head of project team will work
closely with the Superintending Officer during the whole construction process.
The project manager carries a lot of responsibilities. During the pre-tender stage,
planning & scheduling of a project is one of the most important roles of the head of
project team as he need to plan the build process and to ensure the project is
completed on time. The project manager also needs to arrange and lead on regular
team meetings with other members of the project team.
Besides that, the project manager has to coordinate with the General Manager to
ensure company resources are adequately distributed in project activities. He also has
to collaborate with other Department heads, for instance the sales and marketing head
to ensure that what is advertised is the same as what the customers are getting. This
is vital to enhance the company’s reputation among potential property buyers.
During the construction stage, he has to keep an eye on the construction progress,
whether it adheres to the quality requirements set by the project team and whether it
is on schedule.
Financial Department
The financial department is the group responsible for monitoring the company’s
profitability, while ensuring timely and accurate financial reporting and making sure
that the company has established and maintains an effective set of internal accounting
controls. The member of accounting team will be certified accountants. The accounting
team is also responsible for monitoring and accurately report company profitability.
They are also responsible in distributing the salary to employees and controlling the
inflow and outflow of cash in every department. The head of financial department
monitors the members in the team to ensure the smoothness of operations.
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
Sales & Marketing Department
The marketing team is the group responsible to create customers and generate income
for the company. The marketing team works to promote and establish the properties
our company offers. The aim of the marketing team is to generate revenue and to
attract customers, all marketing team activities are aimed at broadening the customer
base and finding opportunities that would create more revenue to our company. The
sales team provides feedback to the marketing team based on customers’ opinions.
They are the first line of contact between the customers and the company. They have
to synergise with the marketing team to effectively gain buyers for the company.
Human Resources Department
The human resources department is the most critical department to ensure our
company hires the right people and how we increase their values in the company. We
are looking for employees that can adapt to our company’s culture and are willing to
be part of the team. This department has to set certain criteria to be used while hiring
new employees, besides being clear on exactly what kind of employees the company
needs. This is exactly the reason why this department reports directly to the Board of
Directors, and indirectly to the General Manager.’
The human resources department is also responsible in conducting training and
development programs for our employees. The training has to be suitable and
beneficial to our employee’s future performance in the company. They are also in
charge of the welfare of employees. All information about the employees and be
reported to the Board of Directors, thus giving us first-hand information on the
wellbeing of our employees.
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
3.0 Training and Development
3.1 Apprenticeship Programme
Majority of the young people graduate from their alma mater accoutered with
book-learned knowledge and eagerness. Zerholdings Sdn. Bhd., have targeted to
support the employees to comprehend and thrive on the job. Through the in-house
apprenticeship programme, personnel will be able to acquire and polish their
knowledge and skills to steer and flourish in the company.
As Zerholdings Bhd. is a development company, it is vital for the personnel to be armed
with the right key skill such as communication, problem solving and teamwork. For
instance, apprenticeship programme can be utilized by the Human Resource (HR)
department in the company. The head of HR department shall identify the specific and
satisfactory training and development needed by the personnel in the company
through job analysis and deliberations with the other heads of department. From the
job analysis, HR department will be able to develop relevant and effective induction
programmes that will be well-rounded for all the subordinates to shape them to be
more of a people person and enhance their key skill. Personnel will be under the
guidance of their seniors alongside professional advice fused with organization
experience to meet daily responsibilities and also assist them to establish a strategy
to achieve their career and company’s goals.
It is normally skill-based learning programme which involves learning processes that
depend upon knowledge. Employees will be designated to learn through various
activities as well as attending classes of related technical instruction which give them
an overall understanding of the theoretical aspects of their work. Through one of the
various activities provided, the apprentices will be branched into different groups to
work together with employees from different departments and paired with senior
personnel to assist them to polish on their key skill. During the early stages of an
apprenticeship, the senior personnel may guide their subordinates by showing them
some simple tasks. These activities will also help the apprentices to solve specific
training problems as groups. For example, in-house project team members such as
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
the architect, engineer and quantity surveying will be able to work together and be able
to conduct meetings with contractors where the team members will be able to deliver
good explanation on any disputes that arose.
Senior employees can share their own experiences with the apprentices which will
help them to learn from mistakes of others. Apprentices can get some critical insights
to the company and understanding the events going on around which allows them to
recognize opportunities and fend off career limiting mistakes. Apprentices will also be
able to leverage some of their academic knowledge in the real world setting. With the
guidance of senior employees, they will seize exposure to areas of the company they
normally may not experience and gaining the capabilities desired to perform duties to
the required standards.
Apprenticeship is a win-win training programme for both the personnel and employers
where the personnel acquire helpful experience that will make them more ambitious in
their job while employers gain a skilled workforce that is trained to the company’s
standards.
3.2 Team-Building Boot Camp
The team building boot camp is one of the benefits that Zerholdings provide for
our employees. Participating employees will have an opportunity to go through the
intense and arduous indoor and outdoor training sessions to improve their soft-skills
while completing challenges in a fun and competitive way. Through this programme,
our employees will be developed both physically and mentally, thus achieving the
positive results desired by our company. Zerholdings is working with Fish Camp
learning and Warrior leadership & team building to make this boot camp a reality.
This training camp will be held twice a year, and all employees especially new-comers
are encouraged to join as we are offering this programme to increase the effectiveness
of every individual while working in a team. The programme will arrange different
department employees into a team to train their leadership, communication skills,
problem solving and etc. While the camp is ongoing, managers can detect apathy in
employees and the lack of involvement, permanent conflicts between team members
among other problems that might hinder their future performance in the company. The
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
workshop is separated into indoors and outdoors. Indoor activities include
brainstorming while outdoors features hiking and camps. For an example of indoor
activity, we will prepare an inspiration deck to participate to look beyond industry
borders. Each team will get 2-3 different cases, they need to communicate and write
down all different elements that they think is inspiring or innovative. Next, they will look
for opportunities on how to translate these insights to a new product or service idea. In
the end, participate will receive feedback on each member. For the outdoor activity,
we aim to give our employees an opportunity to experience the nature. Through this
camp, our final motive is to bring our employees through the Forming, Storming,
Norming, Performing process as soon as possible. Once this is achieved, our
employees will be able to realise their full potential.
Learning Outcomes
 Ability to lead and manage oneself in becoming a highly effective person.
 Able to develop fundamental leadership skills to lead and manage individuals in a
team.
 Able to be the leader of leaders.
 Able to lead business functions as well as people to achieve overall business goals.
Trainer Profiles
Theophilus Wong
12 years experience
 B.Eng, 1st Class (UK), M.Sc. (UK) and Ph.D in Management (pursuing) PBS, UPM
 Formerly Senior Manager of Mind Resource Asia Pte Ltd (AUS) & General Manager of Local Consulting Firm
 Master Trainer for DISC Insights, Institute of Motivational Living Inc. USA
 Master Trainer for Workplace Big Five, Centre of Applied Cognitive Studies, USA
 Accredited Belbin Team Roles, Belbin UK
 Accredited Competency Professional, ILM UK
 Accredited Team Management System, TMS AUS
 Certified Habitudes Trainer, Growing Leaders, USA
 Certified Strong Interest Inventory, MBTI Trust USA
 Certified Coaching & Mentoring Professional, ITD M’sia
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
 Certified Behavioural & Career Consultant, IML Inc USA
 Certified Saville Wave Consultant, Saville International UK
 Certified Facilitator – The Five Behavior of A Cohesive Team, USA
 Certified Facilitator – Discovery Learning Inc. USA
 Certificate in HR Transformation & O.D. Penn State U (USA)
 Member of Chartered Institute of Personnel Development, UK
 Member of American Talent Development, USA
 Member of International Coaching Federation, ICF USA
 PSMB Certified Trainer
Charis Yong
15 years experience
 Bachelor of Business Administration (Hons)
 Certified in the Myers-Briggs Type Indicator (MBTI)
 PPA Profiling for DISC, Thomas International
 Certified Saville Wave Consultant, Saville International UK
 Harrison Assessments Practitioner, and Certified Neuro-Linguistic Programming (NLP) Practitioner
 Certified Associate Coach by ICF-ACSTH Associate Certified Coach Program
 Certified Professional Trainer (CPT) by Malaysian Institute of Management and Certified PSMB Trainer
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
3.3 Professional Talks
Zerholdings Sdn. Bhd. aims to attract young talents into the company who can
continuously sharpen their skills as providing adequate training to the employees to
equip themselves is one of the short term goals listed. The company wants the
employees to get involved in as many professional talks as possible to expose them
to different knowledge related to the construction. The talk could be held outside the
company where various speakers who have experiences in the construction industry
are invited over to share their knowledge and know-how to the younger generation.
For example, a talk series on Construction Industry Payment and Adjudication Act will
be beneficiary to the Quantity Surveyors (QS) in our company. Payment issue shall
always be resolved and keep to a minimum to maintain good reputation of the company.
It is insufficient for in house QS to be familiar with the payment process only. They
should also be acquainted with the methods to handle disputes related to payment
issue, where it can lead to arbitration if not solved properly. Thus, thorough
understanding of the adjudication rules is crucial.
The talk is conducted by Professor Datuk Sundra Rajoo, Director of Kuala Lumpur
Regional Centre for Arbitration (KLRCA) and also the Past President of the Asia-Pacific
Regional Arbitration Grouping (APRAG). He is experienced in contractual payment
and arbitration matter as he serves on the panel of many international arbitral
institutions and organizations. Our company will be sending 2 senior QS
representatives to attend the talk. The talk covers the Construction Industry Payment
and Adjudication Act (CIPAA) regulations and the KLRCA Adjudication Rules. At the
end of the talk, there will be Q&A session for participants to clarify their uncertainties
on payment related issues. By attending the mentioned talk, participated employees
are expected to be equipped with better ability to solve the matters related to payment
and arbitration.
After attending the talk, the 2 participants are to write a reflective journal that reflects
what they have learned. A reflective report not only encourages participants to recall
what knowledge they have gained, but also encourages them to apply their
understanding into the real practice when they face payment issues. Also, the
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
participants are to share what they have gained through the talk to their colleagues.
By doing so, it benefits the other employees who could not join the talk.
In today’s industry, more firms are arising where capable and competent employees
are ever-increasing at the same time. Therefore, by participating the professional talks,
employees are expected to improve their knowledge or catch up with all kind of new
technology or method that are introduced into the industry to keep up to pace. This will
lower the risk of company being substituted by the emerging firms. Also, the employees
should be able to relate pros and cons of any related matter and evaluate what impact
it brings to the company.
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
References:
Fish camp learning. Our Team. (Hitting the headlines article) [online]. Retrieved June 23th, 2016
http://www.fishcamp.com.my/about_team.html
Fish camp learning. What sets us apart. (Hitting the headlines article) [online]. Retrieved June 23th,
2016 http://www.fishcamp.com.my/index.html
Hridayinee, H. (2013) .5 Life Lessons We Can Learn From Nature. (Hitting the headlines article)
[online] (Updated on 29 May 2013). Retrieved June 20th, 2016
http://www.jewelsofhappiness.com/5-life-lessons-we-can-learn-from-nature/
ZERHOLDINGS SDN. BHD.
TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203
Bibliography:
Apprenticeship programs information guide. (n.d.). Retrieved June 15th, 2016, from CA gov:
http://www.dir.ca.gov/databases/das/descOfAppr.html
Horwath, J. (n.d.). Management Laboratory. Retrieved June 15th, 2016, from SANS Technology
Institute: http://www.sans.edu/research/management-laboratory/article/horwath-421-leader

Weitere ähnliche Inhalte

Was ist angesagt?

HR RECRUITING Summer internship programme zinat
HR RECRUITING Summer internship programme  zinatHR RECRUITING Summer internship programme  zinat
HR RECRUITING Summer internship programme zinatZinat Jahan
 
Mba performance-management-ppt
Mba performance-management-pptMba performance-management-ppt
Mba performance-management-pptSushreeLalita
 
HR Department of METRO CASH & CARRY
HR Department of METRO CASH & CARRYHR Department of METRO CASH & CARRY
HR Department of METRO CASH & CARRYumair mohsin
 
1457593129phptRAdoN (2)
1457593129phptRAdoN (2)1457593129phptRAdoN (2)
1457593129phptRAdoN (2)Raman Preet
 
Recruitment and selection process in Tesco
Recruitment and selection process in Tesco Recruitment and selection process in Tesco
Recruitment and selection process in Tesco Dinushika Madhubhashini
 
A study on recruitment and selection process of
A study on recruitment and selection process ofA study on recruitment and selection process of
A study on recruitment and selection process ofKanagaraj Vvr
 
Hrm final project report
Hrm final project reportHrm final project report
Hrm final project reportRaj Rajaram
 
Project on recruitment and selection process
Project on recruitment and selection processProject on recruitment and selection process
Project on recruitment and selection processankit kumar
 
Recruitment & Selection process in Tesco
Recruitment & Selection process   in TescoRecruitment & Selection process   in Tesco
Recruitment & Selection process in TescoDinushika Madhubhashini
 
Project report on recruitment and selection at cmpdi
Project report on recruitment and selection at cmpdiProject report on recruitment and selection at cmpdi
Project report on recruitment and selection at cmpdiKumari Pswn
 
Rcruitment & selection
Rcruitment & selectionRcruitment & selection
Rcruitment & selectionankush bathla
 
Talent mnagement- MBA(HR) project
Talent mnagement- MBA(HR) projectTalent mnagement- MBA(HR) project
Talent mnagement- MBA(HR) projectAmol30586
 
SIP PROJECT REPORT
SIP PROJECT REPORTSIP PROJECT REPORT
SIP PROJECT REPORTekta chawla
 
MBA (IT) SIP Report on RIInfotech
MBA (IT) SIP Report on RIInfotechMBA (IT) SIP Report on RIInfotech
MBA (IT) SIP Report on RIInfotechDinesh Jogdand
 
Training & Consultancy CV.
Training & Consultancy CV.Training & Consultancy CV.
Training & Consultancy CV.JAMAL HAJEER
 

Was ist angesagt? (20)

HR RECRUITING Summer internship programme zinat
HR RECRUITING Summer internship programme  zinatHR RECRUITING Summer internship programme  zinat
HR RECRUITING Summer internship programme zinat
 
Mba performance-management-ppt
Mba performance-management-pptMba performance-management-ppt
Mba performance-management-ppt
 
HR Department of METRO CASH & CARRY
HR Department of METRO CASH & CARRYHR Department of METRO CASH & CARRY
HR Department of METRO CASH & CARRY
 
CV-AKC
CV-AKCCV-AKC
CV-AKC
 
1457593129phptRAdoN (2)
1457593129phptRAdoN (2)1457593129phptRAdoN (2)
1457593129phptRAdoN (2)
 
Recruitment and selection process in Tesco
Recruitment and selection process in Tesco Recruitment and selection process in Tesco
Recruitment and selection process in Tesco
 
Rohini Deokar_HCM
Rohini Deokar_HCMRohini Deokar_HCM
Rohini Deokar_HCM
 
A study on recruitment and selection process of
A study on recruitment and selection process ofA study on recruitment and selection process of
A study on recruitment and selection process of
 
Dreamcast property
Dreamcast propertyDreamcast property
Dreamcast property
 
Hrm final project report
Hrm final project reportHrm final project report
Hrm final project report
 
Project on recruitment and selection process
Project on recruitment and selection processProject on recruitment and selection process
Project on recruitment and selection process
 
Recruitment & Selection process in Tesco
Recruitment & Selection process   in TescoRecruitment & Selection process   in Tesco
Recruitment & Selection process in Tesco
 
Mishari Felemban C.V
Mishari Felemban C.VMishari Felemban C.V
Mishari Felemban C.V
 
Project report on recruitment and selection at cmpdi
Project report on recruitment and selection at cmpdiProject report on recruitment and selection at cmpdi
Project report on recruitment and selection at cmpdi
 
Rcruitment & selection
Rcruitment & selectionRcruitment & selection
Rcruitment & selection
 
Talent mnagement- MBA(HR) project
Talent mnagement- MBA(HR) projectTalent mnagement- MBA(HR) project
Talent mnagement- MBA(HR) project
 
SIP PROJECT REPORT
SIP PROJECT REPORTSIP PROJECT REPORT
SIP PROJECT REPORT
 
MBA (IT) SIP Report on RIInfotech
MBA (IT) SIP Report on RIInfotechMBA (IT) SIP Report on RIInfotech
MBA (IT) SIP Report on RIInfotech
 
Training & Consultancy CV.
Training & Consultancy CV.Training & Consultancy CV.
Training & Consultancy CV.
 
Hr planning
Hr planningHr planning
Hr planning
 

Andere mochten auch

M3 Lecture 2 notes casement windows
M3 Lecture 2 notes casement windowsM3 Lecture 2 notes casement windows
M3 Lecture 2 notes casement windowsEst
 
M3 Assignment cover
M3 Assignment cover M3 Assignment cover
M3 Assignment cover Est
 
CSCM group project aug 2016
CSCM group project aug 2016CSCM group project aug 2016
CSCM group project aug 2016Est
 
M3 Lecture 8 specification
M3 Lecture 8 specificationM3 Lecture 8 specification
M3 Lecture 8 specificationEst
 
M3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notesM3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notesEst
 
Measurment 3 (qsb 60304) module outline - 28 march 2016
Measurment 3 (qsb 60304)   module outline - 28 march 2016Measurment 3 (qsb 60304)   module outline - 28 march 2016
Measurment 3 (qsb 60304) module outline - 28 march 2016Est
 
M3 Lecture 4 seeding and turfing
M3 Lecture 4 seeding and turfingM3 Lecture 4 seeding and turfing
M3 Lecture 4 seeding and turfingEst
 
M3 Seeding and turfing a
M3 Seeding and turfing aM3 Seeding and turfing a
M3 Seeding and turfing aEst
 
M3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium doorM3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium doorEst
 
M3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windowsM3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windowsEst
 
M3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel doorM3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel doorEst
 
M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel strutureEst
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof coveringEst
 
M3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 anM3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 anEst
 
M3 EG BQ for timber panel door
M3 EG BQ for timber panel doorM3 EG BQ for timber panel door
M3 EG BQ for timber panel doorEst
 
M3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answerM3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answerEst
 
M3 EG BQ metal frame door
M3 EG BQ metal frame doorM3 EG BQ metal frame door
M3 EG BQ metal frame doorEst
 
M3 Lecture 11 provisional sum prime cost sum
M3 Lecture 11 provisional sum  prime cost sumM3 Lecture 11 provisional sum  prime cost sum
M3 Lecture 11 provisional sum prime cost sumEst
 
M3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred windowM3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred windowEst
 
M3 Fencing gates
M3 Fencing gatesM3 Fencing gates
M3 Fencing gatesEst
 

Andere mochten auch (20)

M3 Lecture 2 notes casement windows
M3 Lecture 2 notes casement windowsM3 Lecture 2 notes casement windows
M3 Lecture 2 notes casement windows
 
M3 Assignment cover
M3 Assignment cover M3 Assignment cover
M3 Assignment cover
 
CSCM group project aug 2016
CSCM group project aug 2016CSCM group project aug 2016
CSCM group project aug 2016
 
M3 Lecture 8 specification
M3 Lecture 8 specificationM3 Lecture 8 specification
M3 Lecture 8 specification
 
M3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notesM3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notes
 
Measurment 3 (qsb 60304) module outline - 28 march 2016
Measurment 3 (qsb 60304)   module outline - 28 march 2016Measurment 3 (qsb 60304)   module outline - 28 march 2016
Measurment 3 (qsb 60304) module outline - 28 march 2016
 
M3 Lecture 4 seeding and turfing
M3 Lecture 4 seeding and turfingM3 Lecture 4 seeding and turfing
M3 Lecture 4 seeding and turfing
 
M3 Seeding and turfing a
M3 Seeding and turfing aM3 Seeding and turfing a
M3 Seeding and turfing a
 
M3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium doorM3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium door
 
M3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windowsM3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windows
 
M3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel doorM3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel door
 
M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel struture
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
M3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 anM3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 an
 
M3 EG BQ for timber panel door
M3 EG BQ for timber panel doorM3 EG BQ for timber panel door
M3 EG BQ for timber panel door
 
M3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answerM3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answer
 
M3 EG BQ metal frame door
M3 EG BQ metal frame doorM3 EG BQ metal frame door
M3 EG BQ metal frame door
 
M3 Lecture 11 provisional sum prime cost sum
M3 Lecture 11 provisional sum  prime cost sumM3 Lecture 11 provisional sum  prime cost sum
M3 Lecture 11 provisional sum prime cost sum
 
M3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred windowM3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred window
 
M3 Fencing gates
M3 Fencing gatesM3 Fencing gates
M3 Fencing gates
 

Ähnlich wie Guide to Zerholdings Sdn. Bhd

Management Science Report
Management Science ReportManagement Science Report
Management Science ReportDoreen Yeo
 
Management science
Management scienceManagement science
Management sciencekohwenqi
 
Management Science (Group Assignment) - Semester 3
Management Science (Group Assignment) - Semester 3Management Science (Group Assignment) - Semester 3
Management Science (Group Assignment) - Semester 3Yee Len Wan
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
ManagementscienceassignmentKailyn Lee
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
ManagementscienceassignmentShze Hwa Lee
 
Management science-group report
Management science-group reportManagement science-group report
Management science-group reportlohwenjun
 
Management science
Management scienceManagement science
Management scienceNicole Thain
 
Management science
Management scienceManagement science
Management scienceLin Hui
 
A Project On Human Resources Recruitment
A Project On  Human Resources RecruitmentA Project On  Human Resources Recruitment
A Project On Human Resources RecruitmentJackie Taylor
 
Human Resources Recruitment project balckbook.pdf
Human Resources Recruitment project balckbook.pdfHuman Resources Recruitment project balckbook.pdf
Human Resources Recruitment project balckbook.pdfVikas Gupta
 
Managementscienceassignment (2)
Managementscienceassignment (2)Managementscienceassignment (2)
Managementscienceassignment (2)tfkc1212
 
Become a Project Management Professional PMP UAE
 Become a Project Management Professional PMP UAE Become a Project Management Professional PMP UAE
Become a Project Management Professional PMP UAEBlue Ocean
 
Z & S Final Company profile
Z & S  Final Company profileZ & S  Final Company profile
Z & S Final Company profilebiswas sajib
 
Z&S final company profile
Z&S  final company profileZ&S  final company profile
Z&S final company profilebiswas sajib
 
Z & s final company profile
Z & s  final company profileZ & s  final company profile
Z & s final company profilebiswas sajib
 
Asas niaga company profile
Asas niaga company profileAsas niaga company profile
Asas niaga company profileasasniaga
 
Royal properties sdn bhd MS
Royal properties sdn bhd MSRoyal properties sdn bhd MS
Royal properties sdn bhd MSFelix Vong
 
Project management careers advice ebook
Project management careers advice ebookProject management careers advice ebook
Project management careers advice ebookSimon Buehring
 
EXECUTIVE EDUCATION PORTFOLIO BY MBSC, KSA
EXECUTIVE EDUCATION PORTFOLIO BY MBSC, KSAEXECUTIVE EDUCATION PORTFOLIO BY MBSC, KSA
EXECUTIVE EDUCATION PORTFOLIO BY MBSC, KSANamrita Gladys Khanna
 

Ähnlich wie Guide to Zerholdings Sdn. Bhd (20)

Management Science Report
Management Science ReportManagement Science Report
Management Science Report
 
Management science
Management scienceManagement science
Management science
 
Management Science (Group Assignment) - Semester 3
Management Science (Group Assignment) - Semester 3Management Science (Group Assignment) - Semester 3
Management Science (Group Assignment) - Semester 3
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
 
Management science-group report
Management science-group reportManagement science-group report
Management science-group report
 
Management science
Management scienceManagement science
Management science
 
Management science
Management scienceManagement science
Management science
 
A Project On Human Resources Recruitment
A Project On  Human Resources RecruitmentA Project On  Human Resources Recruitment
A Project On Human Resources Recruitment
 
Human Resources Recruitment project balckbook.pdf
Human Resources Recruitment project balckbook.pdfHuman Resources Recruitment project balckbook.pdf
Human Resources Recruitment project balckbook.pdf
 
Managementscienceassignment (2)
Managementscienceassignment (2)Managementscienceassignment (2)
Managementscienceassignment (2)
 
Become a Project Management Professional PMP UAE
 Become a Project Management Professional PMP UAE Become a Project Management Professional PMP UAE
Become a Project Management Professional PMP UAE
 
Z & S Final Company profile
Z & S  Final Company profileZ & S  Final Company profile
Z & S Final Company profile
 
Z&S final company profile
Z&S  final company profileZ&S  final company profile
Z&S final company profile
 
Z & s final company profile
Z & s  final company profileZ & s  final company profile
Z & s final company profile
 
Asas niaga company profile
Asas niaga company profileAsas niaga company profile
Asas niaga company profile
 
BBM Prospectus
BBM ProspectusBBM Prospectus
BBM Prospectus
 
Royal properties sdn bhd MS
Royal properties sdn bhd MSRoyal properties sdn bhd MS
Royal properties sdn bhd MS
 
Project management careers advice ebook
Project management careers advice ebookProject management careers advice ebook
Project management careers advice ebook
 
EXECUTIVE EDUCATION PORTFOLIO BY MBSC, KSA
EXECUTIVE EDUCATION PORTFOLIO BY MBSC, KSAEXECUTIVE EDUCATION PORTFOLIO BY MBSC, KSA
EXECUTIVE EDUCATION PORTFOLIO BY MBSC, KSA
 

Mehr von Jennifer Chong

Mehr von Jennifer Chong (19)

Building integration-of-solar-energy
Building integration-of-solar-energyBuilding integration-of-solar-energy
Building integration-of-solar-energy
 
Bs 1-buiding-integrated-solar-energy
Bs 1-buiding-integrated-solar-energyBs 1-buiding-integrated-solar-energy
Bs 1-buiding-integrated-solar-energy
 
Bq floor
Bq floorBq floor
Bq floor
 
Ct1 assignment
Ct1 assignmentCt1 assignment
Ct1 assignment
 
Roof
RoofRoof
Roof
 
psychology final project
psychology final projectpsychology final project
psychology final project
 
journal 2
journal 2journal 2
journal 2
 
journal 1
journal 1journal 1
journal 1
 
Circlessphere
CirclessphereCirclessphere
Circlessphere
 
Klcc park presentation part 2
Klcc park presentation part 2Klcc park presentation part 2
Klcc park presentation part 2
 
Historical background of the country
Historical background of the countryHistorical background of the country
Historical background of the country
 
accounting assignment
accounting assignmentaccounting assignment
accounting assignment
 
Economics final project
Economics final projectEconomics final project
Economics final project
 
final report.docx
final report.docxfinal report.docx
final report.docx
 
Final report
Final reportFinal report
Final report
 
china Presentation part 1
china Presentation part 1china Presentation part 1
china Presentation part 1
 
eng essay 2014.docx
eng essay 2014.docxeng essay 2014.docx
eng essay 2014.docx
 
eng essay 2014 (1).docx
eng essay 2014 (1).docxeng essay 2014 (1).docx
eng essay 2014 (1).docx
 
Eng essay 2014
Eng essay 2014Eng essay 2014
Eng essay 2014
 

Kürzlich hochgeladen

Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 

Kürzlich hochgeladen (20)

Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 

Guide to Zerholdings Sdn. Bhd

  • 1. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 Taylor’s University Lakeside Campus School of Architecture, Building, and Design Bachelor of Quantity Surveying (Hons) Management Science [MGT 60203] A guide to ZERHOLDINGS SDN. BHD.
  • 2. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 ZERHOLDINGS BOARD OF DIRECTORS: Chong Hui Xin 0319363 Kiing Kiu Chun 0318727 Maybelle Wang Sze Kher 0327553 Pang Khai Shuen 0318423 Wendy Teo Siew Yen 0328242 Yong Sing Yew 0318766
  • 3. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 ZERHOLDINGS SDN. BHD. Nature of Business: Property Development Capital: 10 Mil MYR Location: Subang Jaya Vision: To be a widely recognised property developer in Central Malaysia. Mission: 1) To build a strong network within the industry. 2) To deliver high quality, cost effective projects on schedule Long Term Goals: 1) To achieve a capital of 500 Million MYR within 15 years. 2) To collaborate with established companies to deliver construction projects. 3) To maintain a consistently good reputation. Short Term Goals: 1) To minimise turnover rate. 2) To deliver 4 different properties within 10 years. 3) To provide adequate training to employees.
  • 4. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 Contents: 1.0 Company Biodata 1.1 Overview 1.2 Vision & Mission 1.3 Long Term & Short Term Goals 2.0 Organisational Design 2.1 Organisational Structure 2.2 Organisational Culture 2.3 Manager Roles: 2.3.1 Top Managers 2.3.2 Middle Manager 2.3.3 Front-Line Managers 3.0 Training and Development Programmes 3.1 Apprenticeship Programme 3.2 Team-Building Boot Camp 3.3 Professional Talks
  • 5. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 1.0 Company Biodata 1.1 Overview Zerholdings Sdn. Bhd. is a property development company situated at Subang Jaya, Malaysia with RM 10 million as capital. The vision of the company is to be a widely recognised property developer in Central Malaysia. We want to ensure projects to be well delivered with high satisfaction from the buyers by achieving the company’s goals. 1.2 Vision & Mission As it is our vision is to establish brand recognition, delivering high quality and cost effective projects on schedule is also part of our missions. Efficient project management is required to meet the mission. Works can be organized properly with planned project schedule. By consistently checking on the project schedule to actual progress on site, it can ensure the works to be done according to what it is planned. With accordance to the project schedule, the person in charged can estimate the time to order the materials. With this, it can ensure the materials to deliver on time and enable the work to be conducted smoothly. At the same time, quality control can also be done by the project manager through the monitoring of works on site.
  • 6. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 1.3 Long & Short Term Goals The long term goal is for our company to achieve a capital of RM500 million within 15 years. It can be achieved by establishing numerous projects with good financial management. Through wide networking, we intent to collaborate with other established companies to deliver construction projects. Being collaborated with stable companies, we will be able to deliver projects that are satisfactory. It is also our goal to maintain good reputation in this competitive industry through our well delivered projects. The short term goals include minimising turnover rate. It can be achieved by ensuring a proper and comfortable working environment where they can foster personal growth. Also, we aim to deliver 4 properties within 10 years to strengthen the foundation of our business. Lastly, we will provide adequate training to our employees through different methods and programmes that can help them to improve from different aspects, not only on their professional knowledge, but also soft skills and critical thinking.
  • 7. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 2.0 Organisational Design 2.1 Organisational Structure Our company adopted the functional structure with a twist – the human resources department is directly under the care of the Board of Directors, as well as indirectly reporting to the General Manager. As our focus is to attract and retain young talents in the industry, we believe that by doing so, we can effectively tweak our strategies through the relevant department. Having this setting for the relevant department also decreases the vertical distance in the hierarchy between the Board of Directors and the employees, making top-down communication easier, besides putting the Human Resources department in a position where it is not affected by and will not affect other departments. The main reason we utilised the functional department is the size of our company. We do not have a large enough number of projects going on or such variety in the location of the projects to prompt the use of the divisional structure, nor the complexity of delegating company resources to use the matrix structure. Since we are a fresh company, it is easier and more efficient to have a direct communication route between employees and employers. Our organisation is separated into 3 main structure, that is, the Project, Finance, and Sales & Marketing department. These 3 departments fall under the control of the General Manager. The departments heads need to coordinate their strategies to be in lieu with the plans laid out by the General Manager.
  • 8. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 BOARD OF DIRECTORS HEAD OF HUMAN RESOURCES GENERAL MANAGER HEAD OF FINANCIAL DEPARTMENT HEAD OF PROJECT DEPARTMENT HEAD OF MARKETING & SALES DEPARTMENT ORGANISATIONAL CHART – ZERHOLDINGS MARKETING TEAM SALES TEAM
  • 9. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 2.2 Organisational Culture In Zerholdings, we seek to promote a strong relationship between employees. We want our employees to feel comfortable in their working environment as we believe that through this approach, the social barrier between department members can be lowered, and thus increasing work productivity. To achieve this, we provide open spaces in the office without restricted cubicles. This includes open spaces for employees to socialise during non-working hours. This physical setting encourages our employees to make decisions through discussions, and it is therefore vital for them to be open to ideas. Also, our company will be having weekly sports night, where employees can compete with one another. Through these activities, our employees, especially newcomers, will get to know their colleagues better, indirectly enhancing their working experience. While providing a comfortable environment for our employees, at the same time we want to be keeping a tab on their productivity level as well. To achieve this, we will give incentives based on group achievements instead of the traditional individual achievement. This way, every working team will constantly check on one another to make sure everyone is one the same page. The Heads of Departments can also set short term goals for employees, and monitor their progress from time to time. With this open concept, we aim to flatten the organisational structure, and lowering and even eliminating the communication barrier between department heads and the team members. It is easier for employees to approach employers, and similarly it is easier for employers to monitor employees. This facilitates communication between these two parties and information can be passed on clearly and precisely.
  • 10. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 2.3 Manager Roles 2.3.1 Top Managers’ Roles As a top management of Zerholdings, 6 of us focus on provide governance leadership and strategic planning for our company. We set objectives and try to devise ways of achieving our targets. For example: We plan for our long-term goals and short- term goals and develop key strategic actions that can help us achieve our goals. We also the ones who need to identify accurately the resources needed and actions to be taken to achieve objectives. For example: We need to make decisions on how many plots of land we need to purchase and how to add value to these by developing it with our limited capital. We also monitor how the activities that are developed and implemented by middle management based on our objectives (whether it matches with our mission or not). We also design and manage a good organizational structure for our company to achieve a strong team. As a directors of the company we are also responsible on building and managing relationships and communication with partners, contractors, clients and etc. We believe that building a strong network within the industry will prove helpful to our company in our future project. Sometimes we may also take care of our employees and give them enough space to share their ideas and opinions directly to us as our working culture is to be family-friendly. We will also make sure the lower management treat our employees fairly and equitably. We believe that employees are the most important assets of our company. As a summary, we are responsible on deciding the future and direction of the company. We spending more time on planning, develop strategy and leading the management team. We also focus more on development of our conceptual skills and human skills.
  • 11. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 2.3.2 Middle Manager’s Roles Our general manager will focus on developing and implementing activities, coordinating activities of first-line manager and allocating resources. As a general manager, he needs to put plans from the top management into action. He needs to develop and implement activities that matches with the objectives and which can be used to achieve our goals. Our general manager will assign the tasks that needs to be done and groups them into different department. For example: As we are a new company, we will need a lot of advertisement. The general manager will pass this idea/task to the marketing department and make sure they carry out the activities. They may also set deadlines on the implemented tasks to make sure everything is on schedule. As a general manager, he takes responsible on requesting resources and the allocation of resources. He will make sure our company’s resources are effectively used. For example: He will decide how much funds are needed for the marketing department for them to carry out the advertisement for our company. Our general manager is also responsible on coordinating activities of first-line manager make sure they understand everything and assigning the right activities to the employees. The general manager of our company also gather information of recent performance and compare it with present performance to the pre-establish standard. With this information they can determine whether a modification is needed or not to meet our company goal. Last but not least, our general manager also responsible in establishing a good communication network and patterns within the company to make sure every department coordinating well. As a general manager of our company, conceptual skills and human skills are equally important in order to be able to see the organization as a whole and know how to affect and leads other departments as well.
  • 12. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 2.3.3 Front-line Managers’ Roles First-line managers set short term goals and distributes tasks to employees. He then supervises the process of carrying out the tasks to make sure the goals set are attainable. They need to have the right technical skills to do their job properly, however human skills are also needed by these managers to lead their employees. Project Team The Project Team is the group responsible for planning and work out the project. The member of project team consists of Project Manager, In house Quantity Surveyor, Architect, Engineer, Landscape Surveyor, etc. Project Teams are in charge for the communication of relevant and important information relative to the development, carrying and ongoing activities of a project. Objectives of project team 1) Specification of project objectives and plans including designing, budgeting, scheduling, setting project performance requirements. 2) Apply of various operation through proper coordination and design, control of planning, estimating, contracting and construction in the construction process. 3) Development of efficient communications and mechanisms for resolving conflicts that happened during the project.
  • 13. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 Head of Project Team/Project Manager The Head of Project Team’s role is to make sure that team can achieve all the relevant goals. He acts as the most important person throughout the whole construction lifecycle as the project team is responsible for the inception, feasibility studies, design, procurement up to the completion of a project. The head of project team will work closely with the Superintending Officer during the whole construction process. The project manager carries a lot of responsibilities. During the pre-tender stage, planning & scheduling of a project is one of the most important roles of the head of project team as he need to plan the build process and to ensure the project is completed on time. The project manager also needs to arrange and lead on regular team meetings with other members of the project team. Besides that, the project manager has to coordinate with the General Manager to ensure company resources are adequately distributed in project activities. He also has to collaborate with other Department heads, for instance the sales and marketing head to ensure that what is advertised is the same as what the customers are getting. This is vital to enhance the company’s reputation among potential property buyers. During the construction stage, he has to keep an eye on the construction progress, whether it adheres to the quality requirements set by the project team and whether it is on schedule. Financial Department The financial department is the group responsible for monitoring the company’s profitability, while ensuring timely and accurate financial reporting and making sure that the company has established and maintains an effective set of internal accounting controls. The member of accounting team will be certified accountants. The accounting team is also responsible for monitoring and accurately report company profitability. They are also responsible in distributing the salary to employees and controlling the inflow and outflow of cash in every department. The head of financial department monitors the members in the team to ensure the smoothness of operations.
  • 14. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 Sales & Marketing Department The marketing team is the group responsible to create customers and generate income for the company. The marketing team works to promote and establish the properties our company offers. The aim of the marketing team is to generate revenue and to attract customers, all marketing team activities are aimed at broadening the customer base and finding opportunities that would create more revenue to our company. The sales team provides feedback to the marketing team based on customers’ opinions. They are the first line of contact between the customers and the company. They have to synergise with the marketing team to effectively gain buyers for the company. Human Resources Department The human resources department is the most critical department to ensure our company hires the right people and how we increase their values in the company. We are looking for employees that can adapt to our company’s culture and are willing to be part of the team. This department has to set certain criteria to be used while hiring new employees, besides being clear on exactly what kind of employees the company needs. This is exactly the reason why this department reports directly to the Board of Directors, and indirectly to the General Manager.’ The human resources department is also responsible in conducting training and development programs for our employees. The training has to be suitable and beneficial to our employee’s future performance in the company. They are also in charge of the welfare of employees. All information about the employees and be reported to the Board of Directors, thus giving us first-hand information on the wellbeing of our employees.
  • 15. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 3.0 Training and Development 3.1 Apprenticeship Programme Majority of the young people graduate from their alma mater accoutered with book-learned knowledge and eagerness. Zerholdings Sdn. Bhd., have targeted to support the employees to comprehend and thrive on the job. Through the in-house apprenticeship programme, personnel will be able to acquire and polish their knowledge and skills to steer and flourish in the company. As Zerholdings Bhd. is a development company, it is vital for the personnel to be armed with the right key skill such as communication, problem solving and teamwork. For instance, apprenticeship programme can be utilized by the Human Resource (HR) department in the company. The head of HR department shall identify the specific and satisfactory training and development needed by the personnel in the company through job analysis and deliberations with the other heads of department. From the job analysis, HR department will be able to develop relevant and effective induction programmes that will be well-rounded for all the subordinates to shape them to be more of a people person and enhance their key skill. Personnel will be under the guidance of their seniors alongside professional advice fused with organization experience to meet daily responsibilities and also assist them to establish a strategy to achieve their career and company’s goals. It is normally skill-based learning programme which involves learning processes that depend upon knowledge. Employees will be designated to learn through various activities as well as attending classes of related technical instruction which give them an overall understanding of the theoretical aspects of their work. Through one of the various activities provided, the apprentices will be branched into different groups to work together with employees from different departments and paired with senior personnel to assist them to polish on their key skill. During the early stages of an apprenticeship, the senior personnel may guide their subordinates by showing them some simple tasks. These activities will also help the apprentices to solve specific training problems as groups. For example, in-house project team members such as
  • 16. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 the architect, engineer and quantity surveying will be able to work together and be able to conduct meetings with contractors where the team members will be able to deliver good explanation on any disputes that arose. Senior employees can share their own experiences with the apprentices which will help them to learn from mistakes of others. Apprentices can get some critical insights to the company and understanding the events going on around which allows them to recognize opportunities and fend off career limiting mistakes. Apprentices will also be able to leverage some of their academic knowledge in the real world setting. With the guidance of senior employees, they will seize exposure to areas of the company they normally may not experience and gaining the capabilities desired to perform duties to the required standards. Apprenticeship is a win-win training programme for both the personnel and employers where the personnel acquire helpful experience that will make them more ambitious in their job while employers gain a skilled workforce that is trained to the company’s standards. 3.2 Team-Building Boot Camp The team building boot camp is one of the benefits that Zerholdings provide for our employees. Participating employees will have an opportunity to go through the intense and arduous indoor and outdoor training sessions to improve their soft-skills while completing challenges in a fun and competitive way. Through this programme, our employees will be developed both physically and mentally, thus achieving the positive results desired by our company. Zerholdings is working with Fish Camp learning and Warrior leadership & team building to make this boot camp a reality. This training camp will be held twice a year, and all employees especially new-comers are encouraged to join as we are offering this programme to increase the effectiveness of every individual while working in a team. The programme will arrange different department employees into a team to train their leadership, communication skills, problem solving and etc. While the camp is ongoing, managers can detect apathy in employees and the lack of involvement, permanent conflicts between team members among other problems that might hinder their future performance in the company. The
  • 17. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 workshop is separated into indoors and outdoors. Indoor activities include brainstorming while outdoors features hiking and camps. For an example of indoor activity, we will prepare an inspiration deck to participate to look beyond industry borders. Each team will get 2-3 different cases, they need to communicate and write down all different elements that they think is inspiring or innovative. Next, they will look for opportunities on how to translate these insights to a new product or service idea. In the end, participate will receive feedback on each member. For the outdoor activity, we aim to give our employees an opportunity to experience the nature. Through this camp, our final motive is to bring our employees through the Forming, Storming, Norming, Performing process as soon as possible. Once this is achieved, our employees will be able to realise their full potential. Learning Outcomes  Ability to lead and manage oneself in becoming a highly effective person.  Able to develop fundamental leadership skills to lead and manage individuals in a team.  Able to be the leader of leaders.  Able to lead business functions as well as people to achieve overall business goals. Trainer Profiles Theophilus Wong 12 years experience  B.Eng, 1st Class (UK), M.Sc. (UK) and Ph.D in Management (pursuing) PBS, UPM  Formerly Senior Manager of Mind Resource Asia Pte Ltd (AUS) & General Manager of Local Consulting Firm  Master Trainer for DISC Insights, Institute of Motivational Living Inc. USA  Master Trainer for Workplace Big Five, Centre of Applied Cognitive Studies, USA  Accredited Belbin Team Roles, Belbin UK  Accredited Competency Professional, ILM UK  Accredited Team Management System, TMS AUS  Certified Habitudes Trainer, Growing Leaders, USA  Certified Strong Interest Inventory, MBTI Trust USA  Certified Coaching & Mentoring Professional, ITD M’sia
  • 18. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203  Certified Behavioural & Career Consultant, IML Inc USA  Certified Saville Wave Consultant, Saville International UK  Certified Facilitator – The Five Behavior of A Cohesive Team, USA  Certified Facilitator – Discovery Learning Inc. USA  Certificate in HR Transformation & O.D. Penn State U (USA)  Member of Chartered Institute of Personnel Development, UK  Member of American Talent Development, USA  Member of International Coaching Federation, ICF USA  PSMB Certified Trainer Charis Yong 15 years experience  Bachelor of Business Administration (Hons)  Certified in the Myers-Briggs Type Indicator (MBTI)  PPA Profiling for DISC, Thomas International  Certified Saville Wave Consultant, Saville International UK  Harrison Assessments Practitioner, and Certified Neuro-Linguistic Programming (NLP) Practitioner  Certified Associate Coach by ICF-ACSTH Associate Certified Coach Program  Certified Professional Trainer (CPT) by Malaysian Institute of Management and Certified PSMB Trainer
  • 19. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 3.3 Professional Talks Zerholdings Sdn. Bhd. aims to attract young talents into the company who can continuously sharpen their skills as providing adequate training to the employees to equip themselves is one of the short term goals listed. The company wants the employees to get involved in as many professional talks as possible to expose them to different knowledge related to the construction. The talk could be held outside the company where various speakers who have experiences in the construction industry are invited over to share their knowledge and know-how to the younger generation. For example, a talk series on Construction Industry Payment and Adjudication Act will be beneficiary to the Quantity Surveyors (QS) in our company. Payment issue shall always be resolved and keep to a minimum to maintain good reputation of the company. It is insufficient for in house QS to be familiar with the payment process only. They should also be acquainted with the methods to handle disputes related to payment issue, where it can lead to arbitration if not solved properly. Thus, thorough understanding of the adjudication rules is crucial. The talk is conducted by Professor Datuk Sundra Rajoo, Director of Kuala Lumpur Regional Centre for Arbitration (KLRCA) and also the Past President of the Asia-Pacific Regional Arbitration Grouping (APRAG). He is experienced in contractual payment and arbitration matter as he serves on the panel of many international arbitral institutions and organizations. Our company will be sending 2 senior QS representatives to attend the talk. The talk covers the Construction Industry Payment and Adjudication Act (CIPAA) regulations and the KLRCA Adjudication Rules. At the end of the talk, there will be Q&A session for participants to clarify their uncertainties on payment related issues. By attending the mentioned talk, participated employees are expected to be equipped with better ability to solve the matters related to payment and arbitration. After attending the talk, the 2 participants are to write a reflective journal that reflects what they have learned. A reflective report not only encourages participants to recall what knowledge they have gained, but also encourages them to apply their understanding into the real practice when they face payment issues. Also, the
  • 20. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 participants are to share what they have gained through the talk to their colleagues. By doing so, it benefits the other employees who could not join the talk. In today’s industry, more firms are arising where capable and competent employees are ever-increasing at the same time. Therefore, by participating the professional talks, employees are expected to improve their knowledge or catch up with all kind of new technology or method that are introduced into the industry to keep up to pace. This will lower the risk of company being substituted by the emerging firms. Also, the employees should be able to relate pros and cons of any related matter and evaluate what impact it brings to the company.
  • 21. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 References: Fish camp learning. Our Team. (Hitting the headlines article) [online]. Retrieved June 23th, 2016 http://www.fishcamp.com.my/about_team.html Fish camp learning. What sets us apart. (Hitting the headlines article) [online]. Retrieved June 23th, 2016 http://www.fishcamp.com.my/index.html Hridayinee, H. (2013) .5 Life Lessons We Can Learn From Nature. (Hitting the headlines article) [online] (Updated on 29 May 2013). Retrieved June 20th, 2016 http://www.jewelsofhappiness.com/5-life-lessons-we-can-learn-from-nature/
  • 22. ZERHOLDINGS SDN. BHD. TAYLOR’S UNIVERSITY | SABD | BQS | MANAGEMENT SCIENCE | MGT 60203 Bibliography: Apprenticeship programs information guide. (n.d.). Retrieved June 15th, 2016, from CA gov: http://www.dir.ca.gov/databases/das/descOfAppr.html Horwath, J. (n.d.). Management Laboratory. Retrieved June 15th, 2016, from SANS Technology Institute: http://www.sans.edu/research/management-laboratory/article/horwath-421-leader