SlideShare ist ein Scribd-Unternehmen logo
1 von 8
Downloaden Sie, um offline zu lesen
H a y t he m J A M L I
Senior Planning Engineer and Cost Control
7 years of experience in Oil & gas and Petrochemical industries, Renewable Energy project
P l a n n i n g , Scheduler, Control, Real Manager and Field, Leader. I analyses, plan, organize, negotiate, direct, control,
manage and evaluate.
I am also responsible for: the procurement budget, its policy and strategy, its logistics, an organization, a region and, in
particular, to identify opportunities to improve operations.
With developed skills in Primavera P6 and good knowledge of National Electrical Codes.
S k ills & Ex pe rie n c e
Ex pe rie n c e
S e n i o r P l a n n i n g E n g i n e e r
Team Leader Renewable Energy Projects
E T E L E C / SOCOBAT / ETAP / ENI
Photovoltaic Plant installation GreenFields 10 Mega Watt
Renewable Energy Project
Duration: From 01/2019 till Today
• Planning, scheduling and monitoring of engineering, procurement and construction activities for major
EPCM and FEED projects in renewable energy project using Primavera P6.
• Preparation of Overall Project schedule for major EPIC projects carries out periodic updating, identify
critical areas and develop corrective actions.
• Preparation of manpower histograms and manpower deployment schedule for various EPIC and FEED
projects
• Preparation of S-curves and periodic updating
• Preparation of Deliverable plan for Engineering including detailed Document status register and Level
2 & 3 Primavera schedule
• Attend periodical progress meeting with the client, project team, subcontractors and vendors to discuss
project performance, deliverables status, progress status, areas o f concern & corrective action to be
taken
• Coordinate with various discipline leads for the submission of the deliverables as per schedule
• Ensure timely execution of the project and control of budgeted man-hours for the project
• Preparation of Tender Planning Package, with S-curve and Manpower Histograms
• Communicate with the team about the ongoing in the site.
• Tracking and recording updates and delays of site work progress obtained from the project team
using a scheduling tool Primavera P6.
• Compare the actual progress with baseline in order to provide guidance to the project team and
improve the accuracy of future estimates.
• Prepare weekly and monthly status reports including progress, labor & non-labor histograms and S-
curves.
• Performs other duties and responsibilities as may be assigned from time to time.
Technical Environment:
Primavera P6
Risk Analysis
Pack Microsoft Office
S e n i o r P l a n n i n g E n g i n e e r & C o s t C o n t r o l
P I R E C O / E T E L E C / A N S A L D O E N E R G I A / STEG
Oil & gas and Petrochemical industries, Gaz Turbines Constructions
Duration: From 11/2018 till Today
• Planning, scheduling and monitoring of engineering, procurement and construction activities for major
EPCM and FEED projects in Oil & gas and Petrochemical industries using Primavera P6/P3.
• Preparation of Overall Project schedule for major EPIC projects carries out periodic updating, identify
critical areas and develop corrective actions.
• Preparation of manpower histograms and manpower deployment schedule for various EPIC and FEED
projects
• Preparation of S-curves and periodic updating
• Preparation of Deliverable plan for Engineering including detailed Document status register and Level
2 & 3 Primavera schedule
• Attend periodical progress meeting with the client, project team, subcontractors and vendors to discuss
project performance, deliverables status, progress status, areas of concern & corrective action to be
taken
• Preparation of Level 3 Schedule for the EPC / FEED project proposals, identification & analysis of
critical paths, preparation of proposal exhibits, preparation of man power histograms and “S” curves and
coordination to prepare the proposal exhibits of all the packages of the proposal
• Coordinate with various discipline leads for the submission of the deliverables as per schedule
• Ensure timely execution of the project and control of budgeted man-hours for the project
• Preparation of Tender Planning Package, with S-curve and Manpower Histograms
• Identify critical areas of the project and ensure focus on the same
• Analyzing of productivities with reference to base line schedule
• Assist in the collection of the data required for engineering activities
• Daily monitoring of site activities including critical path highlighting delays and advising recovery
actions.
• Communicate with the team about the ongoing in the site.
• Tracking and recording updates and delays of site work progress obtained from the project team
using a scheduling tool (Primavera P6/MS Project).
• Compare the actual progress with baseline in order to provide guidance to the project team and
improve the accuracy of future estimates.
• Prepare weekly and monthly status reports including progress, labor & non-labor histograms and S-
curves.
• Performs other duties and responsibilities as may be assigned from time to time.
Technical Environment:
Primavera P6
Risk Analysis
PRINCE Cable Sections Calculation & monitoring
Pack Microsoft Office
T e a m L e a d e r / P r o j e c t P l a n n i n g E n g i n e e r a n d C o s t C o n t r o l l e r
S O G E L E C :
Projects: QATARI DIAR PROJECT / ANANTARA OASIS AND RESORT PROJECT
Duration: From 07/2016 till 10/2018 (28 Months)
Duties:
Prepared master schedule of project: All detailed from requirement client review to final reception
on site, Procurement material, Storage, Needs for execution work.
Prepared the detailed construction schedule submittals & transmittals’ logs, resource loading
table/charts, issue the two-week look-ahead schedule, attend the weekly progress meeting and
prepare the monthly progress report.
Monitor on site construction activities (Cable tray, EDB, Earthing & lightning protection, Cathodic
Protection System...etc.)
Preparing and Monitoring Progress Data:
-Prepare daily, weekly &monthly report for client as per reporting procedure
as Progress and actual situation for activities in the site production,
- Development and implementation of excel sheet calculates based on formulas generates
progress and curves.
- preparing manpower curve: manpower needed for each work, relying on the availability of
manpower and the forecast works and time schedule.
- Update 3-week schedule: Calculate Target, forecast and actual dates.
Procurement of necessary material to satisfied client order, with discussion of all purchase
details with suppliers (As quantities, prices, availability of material …)
Organize and insure imports with transporter as requested in date.
Manager of 18 technical storekeepers by Supervising the storage during all stages of the
acquisition to delivery, spread in three different sites (Italy, Tunisia, Tozeur).
Execution work management: planning of necessary and efficiencies activity according to
contractor’s needs, all by checking necessary operators and available material.
Implanted logistics indicator to oversee the challenges and always improve our services (internal
and external)
Provide an expertise and checks reviews of the different levels of the production to respect
confirmed order of Client.
Review, audit and approve the Actual, Planned and forecasted data coming from the storage
area, line production and quality supervisor.
Conceive and prepare a weekly and monthly project report to the Management.
Issue change order and follow the Integrated change control process in order to keep the
project on track and limit the deviations from the baseline
Review, check and approve the client order and all the updated following an important change order
approved.
• Project cost estimation .
• Provide planning and cost controlling support for all projects which includes variation reporting,
monitoring of milestone progress to the preparation of customer billing processes, etc.
• Perform and manage project activity scheduling and monitoring
• Perform technical and commercial review of Tenders (Contractors & subcontractor’s quotations) for
the preparation of Service agreements
• Ensure effective project implementation and utilize productive reports from the creation of WBS with
the use of project management system to monitor the status of all purchases, invoicing and delivery up
to the closure of the project.
• Prepare monthly project report for the monitoring of the project activities on a daily basis and
register all issues relating to the project promptly to the project manager and management.
• Coordinate and work with the project management team to resolve project issues to ensure the
delivery/completion of the project work.
• Attend project meetings and discussions with the PMT and external clients
• Perform project costing related reporting to the team and management’s review on a monthly basis
to ensure that expenditures are kept within the project budget.
• Provide cost control and planning advice to the internal PMT team as and when required.
• Undertake any other ad-hoc duties as required.
Extension of time project analysis / reporting, negotiation with clients.
Defining Claims in Construction Contracts and Architects Agreements
Technical Environment:
Primavera P6
Risk Analysis
Sage X3
Pack Microsoft Office
M e c c a n i c a G M G r o u p e :
planning and L o g i s t i c s M a n a g e r
Project: PGM / Plasteknique / Meccanica GM
Project Packages: Automobile projects / Plastic injection / Assembly electronic
Duration: From 09/2013 till 07/2016 (35 Months)
Duties:
Procurement of necessary material to satisfied client order, with discussion of all purchase
details with suppliers (As quantities, prices, availability of material …)
Organize and insure imports with transporter as requested in date.
Manager of technical storekeepers by Supervising the storage during all stages of the
acquisition to delivery.
Production management: planning of production lines according to customer needs, all by
checking necessary operator.
Customer order delivery as confirmed.
Setting up quality system ISO 9001.
Implanted logistics indicator to oversee the challenges and always improve our services (internal
and external)
Provide an expertise and checks reviews of the different levels of the production to respect
confirmed order of Client.
Review, audit and approve the Actual, Planned and forecasted data coming from the storage
area, line production and quality supervisor.
Issue change order and follow the Integrated change control process in order to keep the
project on track and limit the deviations from the baseline
Review, check and approve the client order and all the updated following an important change
order approved.
Run the project review meetings with the Work Team.
Work in conjunction with all department heads to ensure maximum profitability
Provide critical assessment of all budgets and cost projections
Assess all incoming products, resources, and services to ensure the best price
Maintain vendor and service provider relationships
Remain acutely aware of market trends that could impact resource costs
Keep up to date on new vendors and possible cost-cutting partnerships
Analyze invoices to ensure correct products/services were received at expected cost
Collaborate with department heads to strategize ways to minimize waste
Demonstrate comprehensive understanding of interdependency of cost drivers
Understand the entire arc of the business and how productivity impacts profitability
Commit to maximizing efficiency at all levels without compromising quality
Develop and implement proactive solutions and cost-cutting measures
Present new strategies and assessments to stakeholders in a compelling fashion
Educate and persuade stakeholders to procure buy in and cooperation
Roll out clear cost-saving programs with timelines and assessment goals
Technical Environment:
SAGE ERP X3
MS Project
Pack Microsoft Office
EBM: P r o j e c t P l a n n i n g E n g i n e e r
Main Projects:
PROMED Residential and Commercial apartment IN GARDEN OF LAC
SIMPAR Residential and Commercial S apartment IN GARDEN OF CARTHAGE
COMIT HOTEL CORAIL ROYAL IN TABARKA
Duration: From 07/2012 till 09/21013 (15 Months)
Duties:
Coordinate a team of functional planners in order to build up an integrated asset plan.
Organise and chair regular meetings with the management Team in order to review and
approve plans.
Plan and schedules all Engineering activities, shutdowns and Major Maintenance Work.
Plans, schedules and provides work direction as required for the preparation of planning and
scheduling controls systems and other practices to give Engineering and Constructions supervisors
means to evaluate and improve the efficiency of their project execution.
Follow and Control EPC contracts in terms of planning and scheduling
Provides staff guidance to Engineering and Construction supervisors in one or more areas of
planning and scheduling expertise by analysing and evaluating all pertinent data.
Reviews work of scheduling analysts, check that reports and data developed are in
accordance with established methods and requirements, and makes recommendations for future
study or revisions.
Analyses major capital projects to plan the most effective execution sequences in light of
experience and current industry practice.
Discusses coordinates and resolves long term and short-term planning and scheduling problem
with personnel through the company and with contractor organization. Act as technical consultants
when required.
Assists in technical evaluation of contracts relative to their expertise in planning and scheduling
and analysis in details performance.
Evaluates the planning and scheduling information collected from Project Management teams
or contractors and advises management or exceptions to the plan and potentials corrective action
and / or impact to the project.
Provides staff assistance in the preparation and maintenance of the Asset Integrated Plan
information in support of the capital program planning efforts and / or other planning and
scheduling reports, procedures and services.
Reviews and evaluates the effectiveness and appropriateness of planning and scheduling
information collected from projects teams or contractors and advices of significant exceptions to
proposed and approve conditions and recommends corrective actions.
Technical Environment:
Primavera P5/P6, MS project
Pack Microsoft Office
SAGE X3
G ro upe PO U LI N A: E le c t ric a l E ng ine e r
E m b e d d e d s y s t e m Real-time monitoring for the proper functioning of egg incubators
Main Projects:
Design, development and validation system has real-time monitoring for the proper
functioning of Eggs incubators. Program-based micro-processor Pic 16F and Software
Programming of LABVIEW (followed and permanent control on a web page)
Duration: From 09/2011 till 06/2012 (10 Months)
Duties:
Concept of real-time system monitoring
Implementation a web page for permanent control of incubators Eggs in site of Poulina SFAX
Technical Environment:
AUTOCAD
Pack Microsoft Office
Visual basic
LabVIEW
C++
Skills :
COMPETENCIES
Oil and Gas projects
Project Management
Logistics Manager
Supply Chain
Purchase
Human Resource Management
Planning Management
Cost Management
Creating effective, informed and highly motivated teams focused on delivery
Comprehensive understanding of project management methodologies.
Accurately identifying clients’ key requirements,
Working with sponsors, stakeholders, and solution providers,
Concept Design
Quality Control

Automation system planning and coordination
Site Engineer
Supervisor
Intervention Areas
Oil and Gas
Renewable Energy
Automobile
Electronic
Construction
Industrial production (Plastic, Foundry, Food, industry ….)
Technical Skills & Software
ERP: SAGE X3.
Project planning Tools: Primavera P6, Risk Tool, Microsoft project.
PRINCE Cable management, Pack AutoCAD ( 3D, Navisworks .. )
Messenger system: LOTUS, MS exchange, Outlook
Programming: Visual basic, LabVIEW, C++
CAD-CAM: AUTOCAD, CATIA, SOLIDWORKS, AVERA; PDMS; CADWORX
Calculation & Simulation: ECODIAL, CALCULUX, ETAP V7, ABAQUS, Matlab, Home
Pack Microsoft Office
Ge n era l I nf o rma t io n
Nationality: Tunisian
Addressee: El Mourouj 1 Ben Arous Tunis
Age: 31 years
Cell Phone: +216 94 14 34 02
Email: jamli.haythem@gmail.com
Years of professional experience: +7 Years
Salary Expectations: Depends on Position and Package.
Notice period: Two week
Mobility: Tunisia + International
drive permit
Fo r ma ti o n s
2012 Engineering Degree « Electrical: Renewable Energy »
National School of Engineers of Sfax (ENIS) Specialty Renewable Energy
I took a cross-training in all aspects of the electrical systems, attend a good training of
renewable energy systems.
2006 Bachelor Diplôma « Technical Section »

La n g u a g e
Arabic Mother Tongue
French Fluent
English Fluent
Italian Very Good
Deutsh Basic

Weitere ähnliche Inhalte

Was ist angesagt?

Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...ijtsrd
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Aew Sanmai
 
Resume- 4 years exp
Resume- 4 years expResume- 4 years exp
Resume- 4 years expNaren Logi
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef samNermeen gerges
 
Lecture 8 monitoring & controlling (1)
Lecture 8  monitoring & controlling (1)Lecture 8  monitoring & controlling (1)
Lecture 8 monitoring & controlling (1)Nur Azwin
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CVSajith Nair
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne PearceSuzanne Pearce
 
B Nicholls resume 2016-07-17
B Nicholls resume   2016-07-17B Nicholls resume   2016-07-17
B Nicholls resume 2016-07-17Brian Nicholls
 
Brian Nicholls resume 2016-08-11
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11Brian Nicholls
 
Risk management plan tyre recycling plant
Risk management plan  tyre recycling plantRisk management plan  tyre recycling plant
Risk management plan tyre recycling plantabhishekthakur309
 
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11Robert (Bob) Owens
 
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)Benjan Amtipuesto
 
SamGhoshProjectmanagement7
SamGhoshProjectmanagement7SamGhoshProjectmanagement7
SamGhoshProjectmanagement7Sam Ghosh
 

Was ist angesagt? (20)

Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
 
Mervyn_Stephens CV
Mervyn_Stephens CVMervyn_Stephens CV
Mervyn_Stephens CV
 
CV - SimonV7
CV - SimonV7CV - SimonV7
CV - SimonV7
 
Resume- 4 years exp
Resume- 4 years expResume- 4 years exp
Resume- 4 years exp
 
Peter Khalil CV
Peter Khalil CVPeter Khalil CV
Peter Khalil CV
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef sam
 
Lecture 8 monitoring & controlling (1)
Lecture 8  monitoring & controlling (1)Lecture 8  monitoring & controlling (1)
Lecture 8 monitoring & controlling (1)
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
Updated CV
Updated CVUpdated CV
Updated CV
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne Pearce
 
B Nicholls resume 2016-07-17
B Nicholls resume   2016-07-17B Nicholls resume   2016-07-17
B Nicholls resume 2016-07-17
 
Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
 
Brian Nicholls resume 2016-08-11
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11
 
Methodologies of Project Progress Measurement
Methodologies of Project Progress MeasurementMethodologies of Project Progress Measurement
Methodologies of Project Progress Measurement
 
Risk management plan tyre recycling plant
Risk management plan  tyre recycling plantRisk management plan  tyre recycling plant
Risk management plan tyre recycling plant
 
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
 
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)
 
SamGhoshProjectmanagement7
SamGhoshProjectmanagement7SamGhoshProjectmanagement7
SamGhoshProjectmanagement7
 

Ähnlich wie Haythem jamli candidature cv

OLA CV doc NRx (1)
OLA CV doc NRx (1)OLA CV doc NRx (1)
OLA CV doc NRx (1)Saheed Taiwo
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanMohideen Sheik Asan
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CVkiran kumar Reddy
 
Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)Mujtaba Khan
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015Ismail Shaikh
 
2016 - Balaji Manivel - CV
2016 - Balaji Manivel - CV2016 - Balaji Manivel - CV
2016 - Balaji Manivel - CVBalaji Manivel
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerSankar Sundaram PMP
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineerSankar Sundaram PMP
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptpisal3
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Mostafa Sayed
 

Ähnlich wie Haythem jamli candidature cv (20)

OLA CV doc NRx (1)
OLA CV doc NRx (1)OLA CV doc NRx (1)
OLA CV doc NRx (1)
 
Nawaz Eng-OCT
Nawaz Eng-OCTNawaz Eng-OCT
Nawaz Eng-OCT
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CV
 
Prashant Wani1
Prashant Wani1Prashant Wani1
Prashant Wani1
 
Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)
 
Primavera trainer
Primavera trainerPrimavera trainer
Primavera trainer
 
Business Case _ PM.pptx
Business Case _ PM.pptxBusiness Case _ PM.pptx
Business Case _ PM.pptx
 
Nawaz Eng-OCT
Nawaz Eng-OCTNawaz Eng-OCT
Nawaz Eng-OCT
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
2016 - Balaji Manivel - CV
2016 - Balaji Manivel - CV2016 - Balaji Manivel - CV
2016 - Balaji Manivel - CV
 
Igwebuike CV_Project Control Engineer
Igwebuike CV_Project Control EngineerIgwebuike CV_Project Control Engineer
Igwebuike CV_Project Control Engineer
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Roshanak Jalili CV
Roshanak Jalili CVRoshanak Jalili CV
Roshanak Jalili CV
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Sohaib_CV-
Sohaib_CV-Sohaib_CV-
Sohaib_CV-
 

Kürzlich hochgeladen

The relationship between iot and communication technology
The relationship between iot and communication technologyThe relationship between iot and communication technology
The relationship between iot and communication technologyabdulkadirmukarram03
 
UNIT4_ESD_wfffffggggggggggggith_ARM.pptx
UNIT4_ESD_wfffffggggggggggggith_ARM.pptxUNIT4_ESD_wfffffggggggggggggith_ARM.pptx
UNIT4_ESD_wfffffggggggggggggith_ARM.pptxrealme6igamerr
 
cloud computing notes for anna university syllabus
cloud computing notes for anna university syllabuscloud computing notes for anna university syllabus
cloud computing notes for anna university syllabusViolet Violet
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging systemgokuldongala
 
Nodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxNodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxwendy cai
 
Power System electrical and electronics .pptx
Power System electrical and electronics .pptxPower System electrical and electronics .pptx
Power System electrical and electronics .pptxMUKULKUMAR210
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS Bahzad5
 
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...amrabdallah9
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxLMW Machine Tool Division
 
Dev.bg DevOps March 2024 Monitoring & Logging
Dev.bg DevOps March 2024 Monitoring & LoggingDev.bg DevOps March 2024 Monitoring & Logging
Dev.bg DevOps March 2024 Monitoring & LoggingMarian Marinov
 
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdfSummer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdfNaveenVerma126
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsYusuf Yıldız
 
ChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai searchChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai searchrohitcse52
 
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Sean Meyn
 
Multicomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdfMulticomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdfGiovanaGhasary1
 
Gender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 ProjectGender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 Projectreemakb03
 
Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...Apollo Techno Industries Pvt Ltd
 

Kürzlich hochgeladen (20)

The relationship between iot and communication technology
The relationship between iot and communication technologyThe relationship between iot and communication technology
The relationship between iot and communication technology
 
Lecture 2 .pptx
Lecture 2                            .pptxLecture 2                            .pptx
Lecture 2 .pptx
 
UNIT4_ESD_wfffffggggggggggggith_ARM.pptx
UNIT4_ESD_wfffffggggggggggggith_ARM.pptxUNIT4_ESD_wfffffggggggggggggith_ARM.pptx
UNIT4_ESD_wfffffggggggggggggith_ARM.pptx
 
cloud computing notes for anna university syllabus
cloud computing notes for anna university syllabuscloud computing notes for anna university syllabus
cloud computing notes for anna university syllabus
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging system
 
Présentation IIRB 2024 Marine Cordonnier.pdf
Présentation IIRB 2024 Marine Cordonnier.pdfPrésentation IIRB 2024 Marine Cordonnier.pdf
Présentation IIRB 2024 Marine Cordonnier.pdf
 
Nodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxNodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptx
 
Power System electrical and electronics .pptx
Power System electrical and electronics .pptxPower System electrical and electronics .pptx
Power System electrical and electronics .pptx
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
 
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
 
計劃趕得上變化
計劃趕得上變化計劃趕得上變化
計劃趕得上變化
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
 
Dev.bg DevOps March 2024 Monitoring & Logging
Dev.bg DevOps March 2024 Monitoring & LoggingDev.bg DevOps March 2024 Monitoring & Logging
Dev.bg DevOps March 2024 Monitoring & Logging
 
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdfSummer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovations
 
ChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai searchChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai search
 
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
 
Multicomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdfMulticomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdf
 
Gender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 ProjectGender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 Project
 
Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...
 

Haythem jamli candidature cv

  • 1. H a y t he m J A M L I Senior Planning Engineer and Cost Control 7 years of experience in Oil & gas and Petrochemical industries, Renewable Energy project P l a n n i n g , Scheduler, Control, Real Manager and Field, Leader. I analyses, plan, organize, negotiate, direct, control, manage and evaluate. I am also responsible for: the procurement budget, its policy and strategy, its logistics, an organization, a region and, in particular, to identify opportunities to improve operations. With developed skills in Primavera P6 and good knowledge of National Electrical Codes. S k ills & Ex pe rie n c e Ex pe rie n c e S e n i o r P l a n n i n g E n g i n e e r Team Leader Renewable Energy Projects E T E L E C / SOCOBAT / ETAP / ENI Photovoltaic Plant installation GreenFields 10 Mega Watt Renewable Energy Project Duration: From 01/2019 till Today • Planning, scheduling and monitoring of engineering, procurement and construction activities for major EPCM and FEED projects in renewable energy project using Primavera P6. • Preparation of Overall Project schedule for major EPIC projects carries out periodic updating, identify critical areas and develop corrective actions. • Preparation of manpower histograms and manpower deployment schedule for various EPIC and FEED projects • Preparation of S-curves and periodic updating • Preparation of Deliverable plan for Engineering including detailed Document status register and Level 2 & 3 Primavera schedule • Attend periodical progress meeting with the client, project team, subcontractors and vendors to discuss project performance, deliverables status, progress status, areas o f concern & corrective action to be taken • Coordinate with various discipline leads for the submission of the deliverables as per schedule • Ensure timely execution of the project and control of budgeted man-hours for the project • Preparation of Tender Planning Package, with S-curve and Manpower Histograms • Communicate with the team about the ongoing in the site. • Tracking and recording updates and delays of site work progress obtained from the project team using a scheduling tool Primavera P6. • Compare the actual progress with baseline in order to provide guidance to the project team and improve the accuracy of future estimates.
  • 2. • Prepare weekly and monthly status reports including progress, labor & non-labor histograms and S- curves. • Performs other duties and responsibilities as may be assigned from time to time. Technical Environment: Primavera P6 Risk Analysis Pack Microsoft Office S e n i o r P l a n n i n g E n g i n e e r & C o s t C o n t r o l P I R E C O / E T E L E C / A N S A L D O E N E R G I A / STEG Oil & gas and Petrochemical industries, Gaz Turbines Constructions Duration: From 11/2018 till Today • Planning, scheduling and monitoring of engineering, procurement and construction activities for major EPCM and FEED projects in Oil & gas and Petrochemical industries using Primavera P6/P3. • Preparation of Overall Project schedule for major EPIC projects carries out periodic updating, identify critical areas and develop corrective actions. • Preparation of manpower histograms and manpower deployment schedule for various EPIC and FEED projects • Preparation of S-curves and periodic updating • Preparation of Deliverable plan for Engineering including detailed Document status register and Level 2 & 3 Primavera schedule • Attend periodical progress meeting with the client, project team, subcontractors and vendors to discuss project performance, deliverables status, progress status, areas of concern & corrective action to be taken • Preparation of Level 3 Schedule for the EPC / FEED project proposals, identification & analysis of critical paths, preparation of proposal exhibits, preparation of man power histograms and “S” curves and coordination to prepare the proposal exhibits of all the packages of the proposal • Coordinate with various discipline leads for the submission of the deliverables as per schedule • Ensure timely execution of the project and control of budgeted man-hours for the project • Preparation of Tender Planning Package, with S-curve and Manpower Histograms • Identify critical areas of the project and ensure focus on the same • Analyzing of productivities with reference to base line schedule • Assist in the collection of the data required for engineering activities • Daily monitoring of site activities including critical path highlighting delays and advising recovery actions. • Communicate with the team about the ongoing in the site. • Tracking and recording updates and delays of site work progress obtained from the project team using a scheduling tool (Primavera P6/MS Project). • Compare the actual progress with baseline in order to provide guidance to the project team and improve the accuracy of future estimates.
  • 3. • Prepare weekly and monthly status reports including progress, labor & non-labor histograms and S- curves. • Performs other duties and responsibilities as may be assigned from time to time. Technical Environment: Primavera P6 Risk Analysis PRINCE Cable Sections Calculation & monitoring Pack Microsoft Office T e a m L e a d e r / P r o j e c t P l a n n i n g E n g i n e e r a n d C o s t C o n t r o l l e r S O G E L E C : Projects: QATARI DIAR PROJECT / ANANTARA OASIS AND RESORT PROJECT Duration: From 07/2016 till 10/2018 (28 Months) Duties: Prepared master schedule of project: All detailed from requirement client review to final reception on site, Procurement material, Storage, Needs for execution work. Prepared the detailed construction schedule submittals & transmittals’ logs, resource loading table/charts, issue the two-week look-ahead schedule, attend the weekly progress meeting and prepare the monthly progress report. Monitor on site construction activities (Cable tray, EDB, Earthing & lightning protection, Cathodic Protection System...etc.) Preparing and Monitoring Progress Data: -Prepare daily, weekly &monthly report for client as per reporting procedure as Progress and actual situation for activities in the site production, - Development and implementation of excel sheet calculates based on formulas generates progress and curves. - preparing manpower curve: manpower needed for each work, relying on the availability of manpower and the forecast works and time schedule. - Update 3-week schedule: Calculate Target, forecast and actual dates. Procurement of necessary material to satisfied client order, with discussion of all purchase details with suppliers (As quantities, prices, availability of material …) Organize and insure imports with transporter as requested in date. Manager of 18 technical storekeepers by Supervising the storage during all stages of the acquisition to delivery, spread in three different sites (Italy, Tunisia, Tozeur). Execution work management: planning of necessary and efficiencies activity according to contractor’s needs, all by checking necessary operators and available material.
  • 4. Implanted logistics indicator to oversee the challenges and always improve our services (internal and external) Provide an expertise and checks reviews of the different levels of the production to respect confirmed order of Client. Review, audit and approve the Actual, Planned and forecasted data coming from the storage area, line production and quality supervisor. Conceive and prepare a weekly and monthly project report to the Management. Issue change order and follow the Integrated change control process in order to keep the project on track and limit the deviations from the baseline Review, check and approve the client order and all the updated following an important change order approved. • Project cost estimation . • Provide planning and cost controlling support for all projects which includes variation reporting, monitoring of milestone progress to the preparation of customer billing processes, etc. • Perform and manage project activity scheduling and monitoring • Perform technical and commercial review of Tenders (Contractors & subcontractor’s quotations) for the preparation of Service agreements • Ensure effective project implementation and utilize productive reports from the creation of WBS with the use of project management system to monitor the status of all purchases, invoicing and delivery up to the closure of the project. • Prepare monthly project report for the monitoring of the project activities on a daily basis and register all issues relating to the project promptly to the project manager and management. • Coordinate and work with the project management team to resolve project issues to ensure the delivery/completion of the project work. • Attend project meetings and discussions with the PMT and external clients • Perform project costing related reporting to the team and management’s review on a monthly basis to ensure that expenditures are kept within the project budget. • Provide cost control and planning advice to the internal PMT team as and when required. • Undertake any other ad-hoc duties as required. Extension of time project analysis / reporting, negotiation with clients. Defining Claims in Construction Contracts and Architects Agreements Technical Environment: Primavera P6 Risk Analysis Sage X3 Pack Microsoft Office M e c c a n i c a G M G r o u p e :
  • 5. planning and L o g i s t i c s M a n a g e r Project: PGM / Plasteknique / Meccanica GM Project Packages: Automobile projects / Plastic injection / Assembly electronic Duration: From 09/2013 till 07/2016 (35 Months) Duties: Procurement of necessary material to satisfied client order, with discussion of all purchase details with suppliers (As quantities, prices, availability of material …) Organize and insure imports with transporter as requested in date. Manager of technical storekeepers by Supervising the storage during all stages of the acquisition to delivery. Production management: planning of production lines according to customer needs, all by checking necessary operator. Customer order delivery as confirmed. Setting up quality system ISO 9001. Implanted logistics indicator to oversee the challenges and always improve our services (internal and external) Provide an expertise and checks reviews of the different levels of the production to respect confirmed order of Client. Review, audit and approve the Actual, Planned and forecasted data coming from the storage area, line production and quality supervisor. Issue change order and follow the Integrated change control process in order to keep the project on track and limit the deviations from the baseline Review, check and approve the client order and all the updated following an important change order approved. Run the project review meetings with the Work Team. Work in conjunction with all department heads to ensure maximum profitability Provide critical assessment of all budgets and cost projections Assess all incoming products, resources, and services to ensure the best price Maintain vendor and service provider relationships Remain acutely aware of market trends that could impact resource costs Keep up to date on new vendors and possible cost-cutting partnerships Analyze invoices to ensure correct products/services were received at expected cost Collaborate with department heads to strategize ways to minimize waste Demonstrate comprehensive understanding of interdependency of cost drivers Understand the entire arc of the business and how productivity impacts profitability Commit to maximizing efficiency at all levels without compromising quality
  • 6. Develop and implement proactive solutions and cost-cutting measures Present new strategies and assessments to stakeholders in a compelling fashion Educate and persuade stakeholders to procure buy in and cooperation Roll out clear cost-saving programs with timelines and assessment goals Technical Environment: SAGE ERP X3 MS Project Pack Microsoft Office EBM: P r o j e c t P l a n n i n g E n g i n e e r Main Projects: PROMED Residential and Commercial apartment IN GARDEN OF LAC SIMPAR Residential and Commercial S apartment IN GARDEN OF CARTHAGE COMIT HOTEL CORAIL ROYAL IN TABARKA Duration: From 07/2012 till 09/21013 (15 Months) Duties: Coordinate a team of functional planners in order to build up an integrated asset plan. Organise and chair regular meetings with the management Team in order to review and approve plans. Plan and schedules all Engineering activities, shutdowns and Major Maintenance Work. Plans, schedules and provides work direction as required for the preparation of planning and scheduling controls systems and other practices to give Engineering and Constructions supervisors means to evaluate and improve the efficiency of their project execution. Follow and Control EPC contracts in terms of planning and scheduling Provides staff guidance to Engineering and Construction supervisors in one or more areas of planning and scheduling expertise by analysing and evaluating all pertinent data. Reviews work of scheduling analysts, check that reports and data developed are in accordance with established methods and requirements, and makes recommendations for future study or revisions. Analyses major capital projects to plan the most effective execution sequences in light of experience and current industry practice. Discusses coordinates and resolves long term and short-term planning and scheduling problem with personnel through the company and with contractor organization. Act as technical consultants when required. Assists in technical evaluation of contracts relative to their expertise in planning and scheduling and analysis in details performance. Evaluates the planning and scheduling information collected from Project Management teams or contractors and advises management or exceptions to the plan and potentials corrective action and / or impact to the project. Provides staff assistance in the preparation and maintenance of the Asset Integrated Plan information in support of the capital program planning efforts and / or other planning and scheduling reports, procedures and services. Reviews and evaluates the effectiveness and appropriateness of planning and scheduling information collected from projects teams or contractors and advices of significant exceptions to proposed and approve conditions and recommends corrective actions.
  • 7. Technical Environment: Primavera P5/P6, MS project Pack Microsoft Office SAGE X3 G ro upe PO U LI N A: E le c t ric a l E ng ine e r E m b e d d e d s y s t e m Real-time monitoring for the proper functioning of egg incubators Main Projects: Design, development and validation system has real-time monitoring for the proper functioning of Eggs incubators. Program-based micro-processor Pic 16F and Software Programming of LABVIEW (followed and permanent control on a web page) Duration: From 09/2011 till 06/2012 (10 Months) Duties: Concept of real-time system monitoring Implementation a web page for permanent control of incubators Eggs in site of Poulina SFAX Technical Environment: AUTOCAD Pack Microsoft Office Visual basic LabVIEW C++ Skills : COMPETENCIES Oil and Gas projects Project Management Logistics Manager Supply Chain Purchase Human Resource Management Planning Management Cost Management Creating effective, informed and highly motivated teams focused on delivery Comprehensive understanding of project management methodologies. Accurately identifying clients’ key requirements, Working with sponsors, stakeholders, and solution providers, Concept Design Quality Control
  • 8.  Automation system planning and coordination Site Engineer Supervisor Intervention Areas Oil and Gas Renewable Energy Automobile Electronic Construction Industrial production (Plastic, Foundry, Food, industry ….) Technical Skills & Software ERP: SAGE X3. Project planning Tools: Primavera P6, Risk Tool, Microsoft project. PRINCE Cable management, Pack AutoCAD ( 3D, Navisworks .. ) Messenger system: LOTUS, MS exchange, Outlook Programming: Visual basic, LabVIEW, C++ CAD-CAM: AUTOCAD, CATIA, SOLIDWORKS, AVERA; PDMS; CADWORX Calculation & Simulation: ECODIAL, CALCULUX, ETAP V7, ABAQUS, Matlab, Home Pack Microsoft Office Ge n era l I nf o rma t io n Nationality: Tunisian Addressee: El Mourouj 1 Ben Arous Tunis Age: 31 years Cell Phone: +216 94 14 34 02 Email: jamli.haythem@gmail.com Years of professional experience: +7 Years Salary Expectations: Depends on Position and Package. Notice period: Two week Mobility: Tunisia + International drive permit Fo r ma ti o n s 2012 Engineering Degree « Electrical: Renewable Energy » National School of Engineers of Sfax (ENIS) Specialty Renewable Energy I took a cross-training in all aspects of the electrical systems, attend a good training of renewable energy systems. 2006 Bachelor Diplôma « Technical Section »  La n g u a g e Arabic Mother Tongue French Fluent English Fluent Italian Very Good Deutsh Basic