Jack Oler 1

J
Jack Oler
POSITION Project Superintendent
YEARS 30
EXPERIENCE
RELEVANT
EXPERIENCE
Over thirty years of Industrial Construction experience with twenty years at
Supervisory level. Special expertise in process piping, mechanical instrumentation
and equipment installation. Specific project experience includes work in the pulp
and paper, chemical, nuclear, mining, auto manufacturing, waste water treatment,
and food facilities industries.
WORK EXPERIENCE
2008- Current THE ROBERTS COMPANY
Resolute Paper Grenada, MS
Project Superintendent for a Paper Mill Upgrade for Screening and Long Fiber
refining. Project included concrete, structural, process piping, electrical and
instrumentation modifications to an existing newsprint facility.
Odfjell Terminals Charleston Charleston, SC
Project Superintendent for a bulk liquid chemical distribution terminal. Responsible
for management and coordination of all onsite crafts and subcontractors. Peak man-
loading was 350. The project was constructed on a brownfield site that required
monitoring and handling of potentially contaminated soils and ground water. The
project featured 540,000 bbls of pressurized storage tanks, rail and truck
loading/unloading facilities and a deep sea ship berth that accommodates vessels to
650'. The work included 76,000 If of piling, 11,000 CY of structural concrete, 590
Tons of structural steel and 61,000 If of stainless steel piping systems.
Potash Corporation Aurora, NC
Project Superintendent for a Process Mill and Material Handling system.
Responsible for on site management of all direct hire labor and coordination of
owner and direct subcontractors.
The project included 4,000 CY of concrete, 33,000 feet of rubber lined piping,
1200 tons of structural steel, instrumentation and electrical work. The majority of
work was installed in an area less than 1 acre inside an existing operating MSHA
facility. Peak man loading 240.
Domtar/ Weyerhaeuser Industries Various Locations, NC
Shift Superintendent on Paper mill shutdowns and maintenance work.
Wllbara Chemical Wilmington, NC
Project Superintendent on a 575 TPD Sulfuric Acid Plant. Responsible for on
site management of all direct hire labor and equipment and coordination of
owner and direct subcontractors. Peak man loading 140.
The project comprised installation of 3, 500 CY of concrete, 35,000 ft. of pipe,
400 tons of structural steel. Refurbishing 35 year old equipment and assembly
of new converters. Installation of ductwork, pumps, vessels, and compressors.
Managed subcontractors installing rail spur, refractory, tank farm, cooling tower,
and site infrastructure.
Potash Corporation Aurora, NC
Construction Superintendent on a fast track mechanical I electrical contract,
peaking at 150 crafts. Responsible for on-site supervision of all piping crews.
The project comprised installation of 27,000 ft of pipe, 800 ton of structural steel,
pumps, vessels, ductwork, etc., on a 6/7 day week schedule. The project was
completed successfully, on budget and ahead of schedule.
2004-2008 INSTALL INC., Sanford, NC.
TOWNSEND FOODS Batesville, AR
Project Superintendent: 2 Million G. P.D. Biological Water Treatment facility
Hire and coordinate civil and electrical contractors. Self perform all process
piping and instrumentation.
CUMMINS Cookeville, TN
Project Superintendent: Relocate non woven line, dismantle equipment,
process piping associated platforms and duct and heat transfer systems from
Facility in Wisconsin. Reassemble and start up in Tennessee.
DUPONT Wilmington, NC
Project Superintendent: Retrofit new acid wash system in existing facility, demo
existing EQ. Installation of new equipment, all associated process piping and
instrumentation, electrical, mechanical, structural, steel, civil.
NISSAN Canton, MS
Project Superintendent: Auto Manufacturing Facility. Installation of all
associated equipment and conveying systems for the manufacturing of 2004-
2005 cars and trucks.
SUBARU Lafayette, IN
Project Superintendent: Auto Manufacturing Facility. Slat conveyor, Drop Lifter,
Panel carrier modification' s for new 2005 model vehicles.
1992-2003
SOUTHERN INDUSTRIAL CONSTRUCTORS INC. Raleigh, NC
Exxon Mobil L106 BOPP Film Line Shawnee, OK
Site Superintendent: New Film line installation. Responsible for installation of
resin storage vessels, blowers, cyclones, extruders and other process
equipment, including 26,000 ft. of resin and utility piping to an aggressive
schedule. Responsible for start up coordination with owner representatives and
equipment vendor personnel.
Iluka Resources Emporia, VA
Site Superintendent: A fast track grass roots mining project. Responsible for
purchase and installation of 17,000 ft. of HOPE pipe. Various rubber
lined C.S. pipe spools and all associated valves & hardware. 6000 ft.
of yard piping to and from in field mining unit and associated holding
ponds. The remainder as process pipe between various cyclones,
spiral concentrators, energy dissipaters, pumps and collection
sumps, in a multi-level building.
International Paper Roanoke
Rapid, NC Project Superintendent: Cluster Rule Project. Scope of
work included civil, mechanical, electrical, and piping, as well as the
erection of C-line evaporator vessels pumps, phosphoric acid tank,
pumps, turpentine tank & pumps, and all associated piping for each
system. Also installation of 7 new aerator's in existing settling
ponds.
Andrizt Wood Procurement
Monroeville, AI Project Superintendent: Erection of new power feed,
incline conveyor's to and from 100' Debarking Drum including
discharge gate. Assembly and installation of new 14' diameter
chipper disk and drive motor, with all associated platforms and
walkway APRs. 3000' Trans. Conveyor's & Tower's. Set & Aligned Tire
drives, installed all belts and trained all conveyors.
Willam ette/We yerhae user Industries Inc.
Oxnard, CA
Project Superintendent: Mechanical and Piping. Installation of 1400
ton-a-day repulper including all associated steel structures, pipe
bridge, all associated equipment and piping appr. 10, 000' of large
bore piping 5,000' small bore.
Willam ette/We yerhae user Industries Inc.
Johnsonburg, PA Project Superintendent: Mechanical, Piping,
Instrumentation. Rebuild of 1st & 2nd press section's on #5 paper
machine and related process systems. Performed pre-shutdown
planning, scheduling and prep. For a 35 day around the clock
shutdown installed new 1st & 2nd Shoe press. Installed new drives
on 1st and 2nd Dryer sections installed new felt stretch systems on 3rd and
4th section. Upgraded steam and condensate system. Remove old reel
and installed new, upgraded hydraulic/lube oil systems.
Willam ette/We yerhae user Industries Inc. Hawesville, KY
Project Superintendent: Installation of piping and mechanical systems for
a $600 million dollar expansion and modernization of a paper mill
complex. The project scope included installation of 850 ton a day
fine paper machine, continuous kaymr digester/pressurized pulp
washing system, Clo2 plant, new lime kiln, recovery boiler, hog fuel
boiler, major woodyard expansion. Approximately 250,000' of large
bore piping and 200,000' small bore.
Willamette/Weyerhaeuser Industries Inc. Johnsonburg,
PA Mechanical & Civil Superintendent: Scopes included three
existing paper machine rebuilds including stock prep, refiners,
cleaners, two coal pulverized boiler's converted from # 165 to
#1,250 steam. Installation of new paper machine #1250, recovery
boiler, lime kiln, digester, bleach plant, CL02 plant, woodyard, 70
MW turbine generator, state of the art waste water plant. All
associated piping approximately 450,000' including
underground.
1978-1991 FLUOR DANIEL CONSTRUCTION Greenville, SC
Proctor& Gamble Cincinnati, OH
General Foreman: Scopes included Bar soap and powder soap facilities upgrade,
piping, mechanical instrumentation. Various extruders', silo's 1600' pipe
bridge, all associated piping & tubing to process equipment.
Federal Paper Board
Augusta, GA. Instrumentation Foreman: (Mechanical) installation of all
tubing associated with two recovery boiler's lime kiln, kaymr digester and
Bleach Plant.
Proctor & Gamble Mahoopany, PA
Instrumentation fitter for upgrades on tissue and diaper lines.
Hammer Mill Paper Co. Selma, AI
Pipe fitter for new Recovery Boiler, Lime Kiln, Pulp Mill
Kansas Power- Wolfe Creek Generating Station Burlington, KS
Pipe fitter for new Nuclear Power Plant
Hammer Mill Paper Co. Selma, AI
Pipe fitter for new lime kiln, recovery boiler, turbine generator, bleach plant and
paper machine.

Recomendados

My Current resume 2016 von
My Current resume 2016My Current resume 2016
My Current resume 2016Michael Duffy
350 views5 Folien
Yasser Hatem CV von
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CVYaser Hatem
575 views4 Folien
John P Henderson Resume- Jan 2016PDF von
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P. Henderson
1.3K views6 Folien
Cv english von
Cv englishCv english
Cv englishJerson Rodriguez Aular
167 views6 Folien
Cv of mr.Jefferson Tomas Tulabot von
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotJefferson Tomas Tulabot
266 views7 Folien

Más contenido relacionado

Was ist angesagt?

Surajit cv.doc von
Surajit cv.docSurajit cv.doc
Surajit cv.docsurajit das
243 views8 Folien
Resume 1 von
Resume 1 Resume 1
Resume 1 Tommy Hogan
24 views3 Folien
PROJECT-Details_Attach_B_Jim Benge 6-14 von
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14Jim Benge
2K views99 Folien
2010 Visual Resume - Robert Tonn von
2010 Visual Resume - Robert Tonn2010 Visual Resume - Robert Tonn
2010 Visual Resume - Robert Tonnroberttonn
1.8K views32 Folien
number 1. pro cv von
number 1. pro cvnumber 1. pro cv
number 1. pro cvDave Chase
294 views4 Folien
Vause Wayne - 6829 von
Vause Wayne - 6829Vause Wayne - 6829
Vause Wayne - 6829wayne vause
311 views8 Folien

Was ist angesagt?(20)

PROJECT-Details_Attach_B_Jim Benge 6-14 von Jim Benge
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14
Jim Benge2K views
2010 Visual Resume - Robert Tonn von roberttonn
2010 Visual Resume - Robert Tonn2010 Visual Resume - Robert Tonn
2010 Visual Resume - Robert Tonn
roberttonn1.8K views
number 1. pro cv von Dave Chase
number 1. pro cvnumber 1. pro cv
number 1. pro cv
Dave Chase294 views
Vause Wayne - 6829 von wayne vause
Vause Wayne - 6829Vause Wayne - 6829
Vause Wayne - 6829
wayne vause311 views
TED_BEERY_RESUME von Ted Beery
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUME
Ted Beery234 views
Jvs resume' word chronological format r5tasks von John V. Sandbothe
Jvs  resume' word chronological format r5tasksJvs  resume' word chronological format r5tasks
Jvs resume' word chronological format r5tasks
John V. Sandbothe161 views
KPH- 4-2-15 resume-v2 von kim himel
KPH- 4-2-15 resume-v2KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2
kim himel520 views
Benoit Giroux - CV2015 English Linkedin no page 6 von Benoit Giroux
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux197 views
Neil Curra Resume. von Neil Curra
Neil Curra Resume.Neil Curra Resume.
Neil Curra Resume.
Neil Curra401 views
Leisa Boos Resume 2016doc von Leisa B
Leisa Boos  Resume 2016docLeisa Boos  Resume 2016doc
Leisa Boos Resume 2016doc
Leisa B109 views
shane Reynolds - CV Worley Parsons von Shane Reynolds
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsons
Shane Reynolds1.7K views
Kevin J Hill S3 von Kevin Hill
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3
Kevin Hill188 views

Destacado

CV of Venetia Munasar von
CV of Venetia MunasarCV of Venetia Munasar
CV of Venetia MunasarVenetia Munasar
187 views7 Folien
ShruthiNayak von
ShruthiNayakShruthiNayak
ShruthiNayakShruthi Nayak
1.2K views2 Folien
lupes resume 2015 von
lupes resume 2015lupes resume 2015
lupes resume 2015Lupe Lares
378 views4 Folien
prhresumew von
prhresumewprhresumew
prhresumewSteven Schwartz
411 views2 Folien
navia cv von
navia cvnavia cv
navia cvNavia Jonkers
175 views4 Folien
16150_Vyučny_list von
16150_Vyučny_list16150_Vyučny_list
16150_Vyučny_listTomas Smutny
189 views4 Folien

Similar a Jack Oler 1

SCOTT RESUME von
SCOTT RESUMESCOTT RESUME
SCOTT RESUMEScott Loewen
167 views7 Folien
KDK RES 2016 Sunoco von
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 SunocoKarl Keller
117 views3 Folien
Barker.R.CV. von
Barker.R.CV.Barker.R.CV.
Barker.R.CV.Richard Barker
178 views6 Folien
Richard Martinez #1 PDF von
Richard Martinez #1 PDFRichard Martinez #1 PDF
Richard Martinez #1 PDFRichard Martinez
376 views4 Folien
Current Public Resume von
Current Public ResumeCurrent Public Resume
Current Public ResumeLee Riopel
417 views8 Folien
Donnie Belloit_Reume von
Donnie Belloit_ReumeDonnie Belloit_Reume
Donnie Belloit_ReumeDonnie Belloit
317 views3 Folien

Similar a Jack Oler 1(20)

KDK RES 2016 Sunoco von Karl Keller
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
Karl Keller117 views
Current Public Resume von Lee Riopel
Current Public ResumeCurrent Public Resume
Current Public Resume
Lee Riopel417 views
19-07-06 Scheme Description details von Aonghus Murray
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
Aonghus Murray385 views
MW Project Experience Updated 7-24-16 von Mark Williams
MW Project Experience Updated 7-24-16MW Project Experience Updated 7-24-16
MW Project Experience Updated 7-24-16
Mark Williams258 views
Ruben J Quartana(September 2016)(2) von Ruben Quartana
Ruben J Quartana(September 2016)(2)Ruben J Quartana(September 2016)(2)
Ruben J Quartana(September 2016)(2)
Ruben Quartana174 views
JOE FAIN RESUME 8-8-15 von Joe Fain
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
Joe Fain471 views
UU_Davyhulme_Modernisation_2016 von Charlie Bell
UU_Davyhulme_Modernisation_2016UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016
Charlie Bell94 views
Chuck Shealy ud.resume von Chuck Shealy
Chuck Shealy ud.resumeChuck Shealy ud.resume
Chuck Shealy ud.resume
Chuck Shealy249 views

Jack Oler 1

  • 1. Jack Oler POSITION Project Superintendent YEARS 30 EXPERIENCE RELEVANT EXPERIENCE Over thirty years of Industrial Construction experience with twenty years at Supervisory level. Special expertise in process piping, mechanical instrumentation and equipment installation. Specific project experience includes work in the pulp and paper, chemical, nuclear, mining, auto manufacturing, waste water treatment, and food facilities industries. WORK EXPERIENCE 2008- Current THE ROBERTS COMPANY Resolute Paper Grenada, MS Project Superintendent for a Paper Mill Upgrade for Screening and Long Fiber refining. Project included concrete, structural, process piping, electrical and instrumentation modifications to an existing newsprint facility. Odfjell Terminals Charleston Charleston, SC Project Superintendent for a bulk liquid chemical distribution terminal. Responsible for management and coordination of all onsite crafts and subcontractors. Peak man- loading was 350. The project was constructed on a brownfield site that required monitoring and handling of potentially contaminated soils and ground water. The project featured 540,000 bbls of pressurized storage tanks, rail and truck loading/unloading facilities and a deep sea ship berth that accommodates vessels to 650'. The work included 76,000 If of piling, 11,000 CY of structural concrete, 590 Tons of structural steel and 61,000 If of stainless steel piping systems. Potash Corporation Aurora, NC Project Superintendent for a Process Mill and Material Handling system. Responsible for on site management of all direct hire labor and coordination of owner and direct subcontractors. The project included 4,000 CY of concrete, 33,000 feet of rubber lined piping, 1200 tons of structural steel, instrumentation and electrical work. The majority of work was installed in an area less than 1 acre inside an existing operating MSHA facility. Peak man loading 240. Domtar/ Weyerhaeuser Industries Various Locations, NC Shift Superintendent on Paper mill shutdowns and maintenance work.
  • 2. Wllbara Chemical Wilmington, NC Project Superintendent on a 575 TPD Sulfuric Acid Plant. Responsible for on site management of all direct hire labor and equipment and coordination of owner and direct subcontractors. Peak man loading 140. The project comprised installation of 3, 500 CY of concrete, 35,000 ft. of pipe, 400 tons of structural steel. Refurbishing 35 year old equipment and assembly of new converters. Installation of ductwork, pumps, vessels, and compressors. Managed subcontractors installing rail spur, refractory, tank farm, cooling tower, and site infrastructure. Potash Corporation Aurora, NC Construction Superintendent on a fast track mechanical I electrical contract, peaking at 150 crafts. Responsible for on-site supervision of all piping crews. The project comprised installation of 27,000 ft of pipe, 800 ton of structural steel, pumps, vessels, ductwork, etc., on a 6/7 day week schedule. The project was completed successfully, on budget and ahead of schedule. 2004-2008 INSTALL INC., Sanford, NC. TOWNSEND FOODS Batesville, AR Project Superintendent: 2 Million G. P.D. Biological Water Treatment facility Hire and coordinate civil and electrical contractors. Self perform all process piping and instrumentation. CUMMINS Cookeville, TN Project Superintendent: Relocate non woven line, dismantle equipment, process piping associated platforms and duct and heat transfer systems from Facility in Wisconsin. Reassemble and start up in Tennessee. DUPONT Wilmington, NC Project Superintendent: Retrofit new acid wash system in existing facility, demo existing EQ. Installation of new equipment, all associated process piping and instrumentation, electrical, mechanical, structural, steel, civil. NISSAN Canton, MS Project Superintendent: Auto Manufacturing Facility. Installation of all associated equipment and conveying systems for the manufacturing of 2004- 2005 cars and trucks. SUBARU Lafayette, IN Project Superintendent: Auto Manufacturing Facility. Slat conveyor, Drop Lifter, Panel carrier modification' s for new 2005 model vehicles. 1992-2003 SOUTHERN INDUSTRIAL CONSTRUCTORS INC. Raleigh, NC Exxon Mobil L106 BOPP Film Line Shawnee, OK Site Superintendent: New Film line installation. Responsible for installation of resin storage vessels, blowers, cyclones, extruders and other process equipment, including 26,000 ft. of resin and utility piping to an aggressive schedule. Responsible for start up coordination with owner representatives and equipment vendor personnel.
  • 3. Iluka Resources Emporia, VA Site Superintendent: A fast track grass roots mining project. Responsible for purchase and installation of 17,000 ft. of HOPE pipe. Various rubber lined C.S. pipe spools and all associated valves & hardware. 6000 ft. of yard piping to and from in field mining unit and associated holding ponds. The remainder as process pipe between various cyclones, spiral concentrators, energy dissipaters, pumps and collection sumps, in a multi-level building. International Paper Roanoke Rapid, NC Project Superintendent: Cluster Rule Project. Scope of work included civil, mechanical, electrical, and piping, as well as the erection of C-line evaporator vessels pumps, phosphoric acid tank, pumps, turpentine tank & pumps, and all associated piping for each system. Also installation of 7 new aerator's in existing settling ponds. Andrizt Wood Procurement Monroeville, AI Project Superintendent: Erection of new power feed, incline conveyor's to and from 100' Debarking Drum including discharge gate. Assembly and installation of new 14' diameter chipper disk and drive motor, with all associated platforms and walkway APRs. 3000' Trans. Conveyor's & Tower's. Set & Aligned Tire drives, installed all belts and trained all conveyors. Willam ette/We yerhae user Industries Inc. Oxnard, CA Project Superintendent: Mechanical and Piping. Installation of 1400 ton-a-day repulper including all associated steel structures, pipe bridge, all associated equipment and piping appr. 10, 000' of large bore piping 5,000' small bore. Willam ette/We yerhae user Industries Inc. Johnsonburg, PA Project Superintendent: Mechanical, Piping, Instrumentation. Rebuild of 1st & 2nd press section's on #5 paper machine and related process systems. Performed pre-shutdown planning, scheduling and prep. For a 35 day around the clock shutdown installed new 1st & 2nd Shoe press. Installed new drives on 1st and 2nd Dryer sections installed new felt stretch systems on 3rd and 4th section. Upgraded steam and condensate system. Remove old reel and installed new, upgraded hydraulic/lube oil systems. Willam ette/We yerhae user Industries Inc. Hawesville, KY Project Superintendent: Installation of piping and mechanical systems for a $600 million dollar expansion and modernization of a paper mill complex. The project scope included installation of 850 ton a day fine paper machine, continuous kaymr digester/pressurized pulp washing system, Clo2 plant, new lime kiln, recovery boiler, hog fuel boiler, major woodyard expansion. Approximately 250,000' of large bore piping and 200,000' small bore.
  • 4. Willamette/Weyerhaeuser Industries Inc. Johnsonburg, PA Mechanical & Civil Superintendent: Scopes included three existing paper machine rebuilds including stock prep, refiners, cleaners, two coal pulverized boiler's converted from # 165 to #1,250 steam. Installation of new paper machine #1250, recovery boiler, lime kiln, digester, bleach plant, CL02 plant, woodyard, 70 MW turbine generator, state of the art waste water plant. All associated piping approximately 450,000' including underground. 1978-1991 FLUOR DANIEL CONSTRUCTION Greenville, SC Proctor& Gamble Cincinnati, OH General Foreman: Scopes included Bar soap and powder soap facilities upgrade, piping, mechanical instrumentation. Various extruders', silo's 1600' pipe bridge, all associated piping & tubing to process equipment. Federal Paper Board Augusta, GA. Instrumentation Foreman: (Mechanical) installation of all tubing associated with two recovery boiler's lime kiln, kaymr digester and Bleach Plant. Proctor & Gamble Mahoopany, PA Instrumentation fitter for upgrades on tissue and diaper lines. Hammer Mill Paper Co. Selma, AI Pipe fitter for new Recovery Boiler, Lime Kiln, Pulp Mill Kansas Power- Wolfe Creek Generating Station Burlington, KS Pipe fitter for new Nuclear Power Plant Hammer Mill Paper Co. Selma, AI Pipe fitter for new lime kiln, recovery boiler, turbine generator, bleach plant and paper machine.