CIVIL TENDERS AND CONTRACTS
SS KALRA
Sr. Prof. (Civil Engineering)
National Academy of Indian Railways
August 17, 2015SPCE
1
CIVIL TENDERS
 Civil tenders usually refers to the process whereby
governments and other institutions invite bids for
Execution of projects/works that must be submitted
within a finite deadline.
August 17, 2015SPCE
2
CONTRACT
 A Defined Legal Relationship between tendering
authority and successful tenderer for execution of
work.
 Works contract
 Store contract
 Service contract
17-08-2015SPCE
TENDERER AND CONTRACTOR
 Tenderer is one who tenders bid in response
to invitation for tenders.
 A contractor is anyone you get in to work for
you who is not an employee.
17-08-2015SPCE
WHY TENDERING ?
 Fundamental Principle of Execution of Public
Works:
 Efficiency
 Economy
 Transparency
 Fair & Equitable treatment of tenderers
 Promotion of Competition
August 17, 2015SPCE
5
 Open Tenders
 Limited Tenders
 Special Limited Tenders
 Single tenders
August 17, 2015SPCE
6
TYPES OF TENDERS
1. LIMITED TENDERS FROM THE CONTRACTORS
BORNE ON THE APPROVED LIST ONLY.
2. NOTICE IN LOCAL NEWSPAPERS, DISPLAYED ON
NOTICE BOARDS AND PUT ON INTERNET.
3. RAILWAY MAY DECIDE CATEGORIES OF WORKS FOR
WHICH LIST OF APPROVED CONTRACTORS SHALL
BE MAINTAINED FOR EACH MONETARY SLAB.
LIMITED TENDER
(RB VIDE LETTER NO. 94/CEI/CI/4 DATED 17/10/2002)
August 17, 2015SPCE
7
1. SPECIAL LIMITED TENDER IN CONSULTATION WITH
FA & CAO IN FOLLOWING SITUATIONS:-
A WORKS OF SPECIALIZED NATURE (PHOD
APPROVAL)
B WORK OF URGENT NATURE (GM APPROVAL)
C CONSULTANCY WORKS (GM’S APPROVAL)
2. TENDERERS NEED NOT NECESSARILY TO BE BORNE
ON THE APPROVED LIST.
3. TO BE INVITED FROM SPECIALIZED AND REPUTED
CONTRACTORS
4. NO. OF TENDERERS MORE THAN SIX BUT NOT
(RB VIDE LETTER NO. 94/CEI/CT/4 DATED 17/10/2002)
SPECIAL LIMITED TENDER
August 17, 2015SPCE
8
SPECIAL LIMITED TENDER
CAO(C) WITH THE CONCURRENCE OF FA & CAO(C)
MAY INVITE SPECIAL LIMITED TENDER NOT ONLY FOR
SPECIALISED NATURE OF WORK BUT FOR ALL TYPES
OF WORKS DEPENDING UPON THE MERIT OF THE
CASE
(Rly Bd letter No.2007/CEI/CT/18 Dt.28-09-07)
August 17, 2015SPCE
9
 GM is empowered to award contracts on single tender
basis at present, but now CAO(C ) is also empowered to
float and finalize single tenders of value not more than
Rs. 2.0 crore each with personal concurrence of
FA&CAO, only for purpose of early completion of works
related with doubling and traffic facility.
(Rly. Board’s letter –2007/CCI/CT/18 Dated 7/3/2008)
SINGLE TENDER
August 17, 2015SPCE
10
TWO PACKET SYSTEM
Rly Bd letter No. 94/CEI/CT/04 DATED 17/10/02
 CAN BE ADOPTED FOR HIGHLY TECHNICAL WORKS WHERE
PARAMETERS NOT PRECISELY DEFINED OR SPECIALIZED
IN NATURE
Rly Bd letter No. 2007/CEI/CT/18 DATED 07/03/08
 RAILWAY MAY FOLLOW TWO PACKET SYSTEM INSTEAD OF
RESORTING TO SINGLE PACKET/ OPEN TENDER FOR HIGH
VALUE TENDERS
Rly Bd letter No. 2008/CE.1/CT/Con/7(PCE/GM) DT 15.12.08
 TWO-PACKET SYSTEM OF TENDERING MAY BE ADOPTED
WHEREVER CONSIDERED NECESSARY. THERE IS NO NEED
TO LINK THIS MODE OF TENDERING TO ANY FINANCIAL
August 17, 2015SPCE
11
R.B. LETTER NO. 94/CE-I/CT/4/PT. 17 DT. 13.8.12
1. TWO PACKETS SYSTEM FOR ALL WORKS REQUIRING
TECHNO-ECONOMIC EVALUATION
2. MANDATORY FOR ALL WORKS VALUING MORE THAN
10 CR. EXCEPT WHERE DECIDED BY EXECUTIVE NOT
BELOW THE RANK OF HAG WITH RECORDED
REASONS AND CONCURRENCE OF FA&CAO
3. FOR WORKS UPTO 10 CR. CAN BE ADOPTED BY
TENDER INVITING AUTHORITY WITH CONCURRENCE
OF ASSOCIATE FINANCE
August 17, 2015SPCE
12
Introduction of EPC Mode of
Contracting In Railways
13
NEED FOR EPC CONTRACT
 Conventional item-rate contracts are
generally prone to time & cost overrun due
to:
o Involvement of multiple agencies- generally a new
line/doubling project involves 15 to 20 different value
contracts
o Failure of even one contract delays the project
o Lack of flexibility in replacing failed agency on real
time basis
14
NEED FOR EPC CONTRACT
 In item-rate contract, allocation of construction
risks are largely to Authority , particularly the onus
of design which many times lead to
o Delays in design and drawings by the Authority
o Variation in items and quantities
 Considerable time of Project Engineers is
consumed in processing of:
o Variation in quantity of items which are quite frequent
o Introduction of NS items
o Variation in contract price
 More susceptible from vigilance point of view
15
OBJECTIVE OF EPC CONTRACT
 Implementation of project to specified standards with a
fair degree of certainty relating to time & cost while
transferring the construction risk to contractor.
 Awarding contract for a LS price ensures predictability
and financial discipline both for Government &
Contractor.
 Well defined system of obligation associated with
damages
 Assigning risk to the party who is in a better position to
mitigate it e.g. land, statutory clearances assigned to
Authority whereas design, site uncertainty, sub
contracting are assigned to contractor
16
PERCEIVED ADVANTAGE OF EPC
 Detailed initial planning before tendering-
Authority is required to specify its requirement
only, without detailed design.
 Effective project management- less no. of
contracts to mange.
 Engagement of professionally managed
agencies.
 Minimum variation orders.
 Milestone based payments.
17
PROJECT SCOPE NEEDS TO BE
SPECIFIED VERY CAREFULLY
AND SHOULD BE EXHAUSTIVE
18
• Approval of Competent Authority (CA) for tendering
• Issue of Tender Notice/NIT
• Pre-bid conference, if any.
• Preparation of Comparative Statement(CS) and
Briefing Note(BN)
• Vetting of CS
• Nomination of Tender Committee(TC)
• Deliberation of tenders by TC and
Recommendations
• Acceptance of Tender Accepting Authority (TAA)
• Issue of Acceptance Letter (LOA)
• Signing of Contract Agreement (CA)
August 17, 2015SPCE
19
TENDERING PROCESS
NOTICE INVITING TENDERS (NIT)
 Name of office inviting tenders
 Name & scope of work.
 Tender value
 Time period of completion.
 Details of earnest money.
 Date of Commencement of sale of Tender Documents.
 Time and date for receipt of tenders
 Time and date for opening of tenders.
 Validity of the tenders.
 Accessibility of full set of tender documents including
drawings.
PUBLICATION OF TENDER
(Rly Bd letter no. 2008/RS(G)/779/2 Dt 07/11/08)
 WHILE PUBLISHING THE TENDER IN NEWPAPER
FOR WIDE PUBLICATION, CPRO MUST ENSURE
THAT THE TENDER NOTICE HAS ALREADY BEEN
UPLOADED ON THE WEBSITE BY TAKING
CERTIFICATE FROM THE EXECUTIVE.
 ANY OPEN TENDER NOT HAVING TOKEN OF
CONFIRMATION (IN THE FORM OF RECORD OF
INTERNET UPLOADING) WILL BE TREATED AS
INADEQUATELY ADVERTISED TENDER.
August 17, 2015SPCE
21
Sl
.
COST OF TENDER COST
1. For works costing up to Rs.5 L 1000/-
2. For works costing above Rs.5 L and up to Rs.20
L
2000/-
3. For works costing above Rs.20 L and up to Rs.50
L
3000/-
4. For works costing above Rs.50 L and up to Rs.2
cr
5000/-
5. For works costing above Rs. 2 cr. and up to
Rs.50 cr
10000/-
6. For works costing above Rs.50 cr. 25000/-
August 17, 2015SPCE
22
COST OF TENDER FORMS.
(i) IF ANY PLAN/DRAWING IS ATTACHED WITH THE TENDER
FORM, Rs.200/- PER PLAN/DRAWING WILL BE LEVIED
EXTRA.
(ii) IF ANY TENDER FORM SENT BY REGD. POST, ADDITIONAL
POSTAL EXPENSES @ Rs.500/- PER TENDER FORM WILL
BE CHARGED.
 CASH IN FORM OF MONEY RECEIPT
 DEMAND DRAFT
THE OFFER WILL BE REJECTED INCASE NOT
ATTACHED WITH DD FOR DOWNLOADED FORM - A
CLAUSE SHOULD BE MADE IN THE TENDER
DOCUMENTS
August 17, 2015SPCE
23
MODES OF PAYMENT OF TENDER DOCUMENTS
DELAYED / LATE TENDERS
Delayed tenders i.e. Tenders received before the time of
opening but after the due date and time of receipt of tenders
should also be opened and dealt with in the same manner as
tenders received before due date and time.
Late tenders i.e. tenders received after the specified time of
opening should be opened by the concerned Branch officer
and marked distinctly preferably in red ink prominently on the
envelope as well as on the tender papers.
Suitable remark in regard to both delayed and late tenders
should be made both in the Tender Register as well as in the
comparative statements.
August 17, 2015SPCE
24
DEALING WITH DELAYED / LATE TENDERS
(I) NORMALLY NOT TO BE CONSIDERED AND
SUMMARILY REJECTED
(II) HOWEVER, IF IT IS CONSIDERABLE ADVANTAGE
TO DEAL WITH IT, THE PROPOSAL IS SENT TO RLY
BD WITH FA & CAO’S REMARKS AND GM’s
PERSONAL APPROVAL
(III) THE RAILWAY ADMINISTRATION SHOULD NOT
ENTER IN TO ANY DIALOGUE WITHOUT
OBTAINING RALWAY BOARD’s PRIOR CLEARENCE
August 17, 2015SPCE
25
(RB’s LETTER No.2003/PS(G)/77/5 DATED 06-02-04
1. Tender Committee (Rly. Board’s letter –2007/CCI/CT/18 Dated
7/3/2008)
• Two members tender committee for tenders of value of
Rs. 20.0 Lakhs and less – Two Members-one from
accounts and other from executive.
• Three member tender committee for tenders valuing more
than 20.0 Lakhs.
August 17, 2015SPCE
26
Sl Power of acceptance Accepting Authority
1 Up to Rs. 3 cr S. Grade/J.A. Grade
2 Above Rs. 3 cr and up to Rs. 12 cr S.A. Grade
3 Above Rs. 12 cr and up to Rs. 75
cr
H.A. Grade
4 Above Rs. 75 cr and up to Rs. 150
cr
General Manager
5 Up to Rs. 300 cr
( For National Projects of NE Region and
General Manager
2. Tender accepting Authority (Rly. Board’s letter –2007/CE-1/CT/13
Dated 27/8/2013)
AN UNDERTAKING BY TC
(RLY BD letter No. 2004/C-1/CVC1/18/ dt 12.01.06)
THE MEMBERS OF THE TENDER COMMITTEE SHOULD
GIVE AN UNDERTAKING AT THE APPROPRIATE TIME,
THAT
NONE OF THEM HAS ANY PERSONAL INTEREST IN
THE COMPANIES/AGENCIES PARTICIPATING IN THE
TENDER PROCESS
AND THAT ANY MEMBER HAVING INTEREST IN ANY
COMPANY SHOULD BE REFRAINED FROM
PARTICIPATING IN THE TENDER COMMITTEE.
August 17, 2015SPCE
27
August 17, 2015SPCE
28
Earnest Money Deposit (EMD)
2007/CEI/CT/18 DATED 28/09/07
Value of the work EMD
For works estimated to
cost up to Rs. 1 Cr.
2% of the estimated cost of
the work.
For works estimated to
cost more than Rs. 1
Cr.
Rs. 2 lacs plus ½% ( half
percent) of the excess of
estimated cost of work beyond
Rs. 1 Cr. subject to a maximum
of Rs. 1.0 Cr.
ELIGIBILITY CRITERIA
August 17, 2015SPCE
29
1 SHOULD HAVE PHYSICALLY
COMPLETED WITH IN THE
QUALIFYING PERIOD i.e. LAST
THREE FINANCIAL AND
CURRENT FINANCIAL YEAR
AT LEAST ONE
SIMILAR NATURE OF
WORK FOR A MIN.
VALUE OF 35% OF NIT
COST
2 TOTAL AMOUNT RECEIVED
DURING THE LAST THREE
AND CURRENT FINANCIAL
YEAR
SHOULD BE OF
AMOUNT OF 150% OF
NIT COST.
( Rly. Board vide letter No. 94/CEI/CI/4 dated 23/11/2006)
RLY. BOARD VIDE LETTER NO. 94/CEI/CI/4 DT. 23/11/2006
i. SIMILAR NATURE OF WORK PHYSICALLY
COMPLETED WITH IN THE QUALIFYING
PERIOD i.e. LAST THREE FINANCIAL AND
CURRENT FINANCIAL YEAR (EVEN THOUGH
THE WORK MIGHT HAVE COMMENCED
BEFORE THE QUALIFYING PERIOD) SHOULD
ONLY BE CONSIDERED.
ii. THE TOTAL VALUE OF SIMILAR NATURE OF
WORK COMPLETED DURING THE
QUALIFYING PERIOD AND NOT THE
PAYMENTS RECEIVED WITHIN THE PERIOD
ALONE, SHOULD BE CONSIDERED.
iii. a) IN CASE, FINAL BILL NOT PASSED AND
FINAL MEASUREMENT NOT RECORDED -
PAID AMOUNT INCLUDING STATUTORY
DEDUCTION TO BE CONSIDERED
b) IF FINAL MEASUREMENT RECORDED AND
COMPLETED WITH NEGATIVE VARIATION -
PAID AMOUNT INCLUDING STATUTORY
DEDUCTION TO BE CONSIDERED.
c) IF FINAL MEASUREMENT RECORDED AND
WORK COMPLETED WITH POSITIVE
VARIATION BUT VARIATION NOT
SANCTIONED – ORIGINAL CONTRACT
VALUE OR LAST SANCTIONED AGREEMENT
VALUE WHICHEVER IS LOWER TO BE
CONSIDERED
iv IN CASE OF COMPOSITE WORKS – SEPARATE
COMPLETED WORKS OF REQD VALUE TO BE
CONSIDERED
v SIMILAR NATURE OF WORKS TO BE DEFINED
BY PHOD ON OPEN LINE AND NOMINATED
CE/CSTE/CEE ON CONSTRUCTION
ORGANISATION AND TO BE INDICATED IN NIT
IN CASE OF ANY DEVIATION/MODIFICATION,
PRIOR APPROVAL OF COMPETENT
AUTHORITY SHOULD BE OBTAINED
RLY BD’ LETTER NO.2008/CE1/CT/CON/7/PCE/GM DT 15.12.08
 THE EXISTING MIN TENDER VALUE LIMIT OF Rs. 10
LAKH FOR INCORPORATING ELIGIBITY CRITERIA IS
INCREASED TO Rs. 20 LAKH
August 17, 2015SPCE
33
• IT HAS BEEN FURTHER INCREASED TO Rs. 50 LAKH
RLY BD’ LETTER NO.2007/CE1/CT/18 Pt.XII DT 31.12.10
August 17, 2015SPCE
34
CLUBBING OF WORKS
Rly Bd’s L. No. 2013/CE-I/CT/O/34/SI dt. 18-03-2014
While clubbing various works to enable proper contract
monitoring/management; two aspects i.e. type of works to be
clubbed together in one tender and optimum value of the big
tender to attract reasonable competitiveness, should be taken
into account.
Accordingly, zonal works and sanctioned works shall normally
not be clubbed in a tender so as to affect reasonable
competition in tendering. Also miscellaneous and varying
nature of works should not be clubbed together which may
affect booking of expenditure and drawl of completion reports
NEGOTIATION
1. L1 IS DEFINED AS THE LOWEST WHICH IS VALID,
ELIGIBLE AND TECHNICALLY ACCEPTABLE
TENDERER
2. NEGOTIATION SHOULD BE HELD WITH L1 ONLY
August 17, 2015SPCE
35
Rly Bd LETTER 90/CEI/07/I/P/dt. 10-07-2002)
COUNTER OFFER
RLY BOARD LETTER NO. 94/CEI/CT/4 DT 17.10.2002
IN CASES WHERE THE OVERALL VALUE OF L1 IS NOT
UNREASONABLY HIGH BUT RATES OF CERTAIN ITEMS
OR TOTAL VALUE FOR A SCHEDULE HAPPEN TO BE
HIGHER THAN THOSE QUOTED BY OTHER TENDERERS
OR HIGHER THAN LARs, METHOD OF COUTER OFFER
MAY BE ADOPTED
BUT IT IS NOT SUBSTITUE/ IN LIEU OF NEGOTIATION
August 17, 2015SPCE
36
SECURITY DEPOSIT
(RLY.BD LETTER No.2003/CEI/CT/4/PtI Dt.12/16-05-2005)
a) S.D. SHOULD BE 5% OF THE CONTRACT VALUE
b) RATE OF RECOVERY SHOULD BE @ 10% OF BILL
AMOUNT
c) S.D. TO BE RECOVERED FROM RUNNING BILLS OF THE
CONTRACT ONLY
d) S.D. WILL BE RETURNED WITH THE APPROVAL OF CA,
AFTER THE MAINTENANCE PERIOD OF THE WORKS IS
OVER,
(RLY BOARD LETTER NO. 2007/CEI/CT/18 DT 07.03.08)
a) AFTER THE WORK IS PHYSICALLY COMPLETED, SD
RECOVERED FROM THE R/BILLS CAN BE RETURNED IN
LIEU OF FDR OF EQUIVALENT AMOUNT
August 17, 2015
37
August 17, 2015SPCE
38
PERFORMANCE GUARANTEE (PG)
2003/CEI/CT/4/PT DATED 16/05/06 MODIFIED VIDE LETTER
200/CEI/CT/18 DATED 28/09/07
 THE SUCCESSFUL BIDDER TO GIVE PG @ 5% OF
CONTRCT VALUE
 SHALL BE SUBMITTED BEFORE SIGNING CONTRACT
AGREEMENT
 SHALL BE IN FORM OF BG, FDR ETC.
 CAN BE RELEASED AFTER SUCCESSFUL COMPLETION
OF WORK
 NO ADDITIONAL PG FOR VARIATION UPTO 25%
 FAILED CONTRACTOR/ ALL PARTENERS OF JV ARE
DEBARRED IN RETENDER FOR BALANCE WORK
QUOTATIONS
(Rly Bd letter No. 2007/CEI/13/PT Dt 05/03/09)
 Invited from well experienced contractors, not necessarily
borne on approved list.
 A register showing the full details to be maintained and sent to
Associate Finance while seeking concurrence.
August 17, 2015SPCE
39
AUTHORITY FINANCIAL LIMIT ANNUAL CEILING
Sr. Scale 1.0 lakhs 5.0 lakhs
JAG 2.0 lakhs 20.0 lakhs
SAG 4.0 lakhs 40.0 lakhs
NORMALLY THE POWERS TO
DISPENSE WITH CALLING OF
TENDERS SHOULD BE EXCERCISED
SPARINGLY. THE CIRCUMSTANCES
UNDER WHICH QUOTATIONS HAVE TO
BE CALLED SHOULD BE SPELT OUT
August 17, 2015SPCE
40
REVIVAL OF TERMINATED CONTRACT
(BOARD LETTER NO 9/CEI/CT/C1/7 Dt. 24/05/01)
 IT IS STIPULATED THAT ONCE THE FORMAL
NOTICE OF TERMINATION HAS BEEN ISSUED,
REVIVAL OF THE CONTRACT EVEN IF ON THE
SAME TERMS AND CONDITIONS, IS POSSIBLE
ONLY AS A SINGLE TENDER REQUIRING THE
GM’S PRIOR APPROVAL
August 17, 2015SPCE
41
August 17, 2015SPCE
42
Thanks

More Related Content

What's hot

Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Michael Audu
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contractssrinivas2036
 
Engineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsEngineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsNam N.N Tran M.Eng, PMP
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tenderingvvsasane
 
Contract & Tender Management
Contract & Tender ManagementContract & Tender Management
Contract & Tender ManagementAnand Subramaniam
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -artijagadish108
 
Construction Contracts: Basics of Contracts and Contract Administration
Construction Contracts:  Basics of Contracts and Contract AdministrationConstruction Contracts:  Basics of Contracts and Contract Administration
Construction Contracts: Basics of Contracts and Contract AdministrationGerald R. (Jerry) Genge
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variationVj NiroSh
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Mohd. Ikhwan
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-ContractsNikhil Kumar
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanAdrias TAN
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentationelliotfus
 
Classification of contracts
Classification of contractsClassification of contracts
Classification of contractsAnil Kumar(6)
 
Fidic contract
Fidic contract Fidic contract
Fidic contract Yash Patel
 

What's hot (20)

Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Strategies in building procurement (summarized)
Strategies in building procurement (summarized)
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
Notes unit 2A.ppt
Notes unit 2A.pptNotes unit 2A.ppt
Notes unit 2A.ppt
 
ACH 231 Lecture 07 (Contract Documents) Part 1
ACH 231 Lecture 07 (Contract Documents) Part 1ACH 231 Lecture 07 (Contract Documents) Part 1
ACH 231 Lecture 07 (Contract Documents) Part 1
 
Engineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsEngineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projects
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tendering
 
Contract & Tender Management
Contract & Tender ManagementContract & Tender Management
Contract & Tender Management
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
 
Construction Contracts: Basics of Contracts and Contract Administration
Construction Contracts:  Basics of Contracts and Contract AdministrationConstruction Contracts:  Basics of Contracts and Contract Administration
Construction Contracts: Basics of Contracts and Contract Administration
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Contracts
ContractsContracts
Contracts
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentation
 
Tender
TenderTender
Tender
 
Classification of contracts
Classification of contractsClassification of contracts
Classification of contracts
 
Fidic contract
Fidic contract Fidic contract
Fidic contract
 
Ppt on fidic claims
Ppt on fidic claimsPpt on fidic claims
Ppt on fidic claims
 

Viewers also liked

Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process
 
Cost Engineering for Tendering & Contracting
Cost Engineering for Tendering & ContractingCost Engineering for Tendering & Contracting
Cost Engineering for Tendering & ContractingMartin van Vliet
 
Estimation in Project Management
Estimation in Project ManagementEstimation in Project Management
Estimation in Project ManagementAnsar Gill
 
Mesurement presentation pavaruban
Mesurement presentation pavarubanMesurement presentation pavaruban
Mesurement presentation pavarubanthevaraja pavaruban
 
Proposal for Cartoon Network to launch a Music Album
Proposal for Cartoon Network to launch a Music AlbumProposal for Cartoon Network to launch a Music Album
Proposal for Cartoon Network to launch a Music AlbumShubham Khurana
 
Purchase procedure
Purchase procedurePurchase procedure
Purchase procedureMukut Deori
 
Purchase function and procurement procedure
Purchase function and procurement procedurePurchase function and procurement procedure
Purchase function and procurement procedureSoumya Pradip
 
Topik 3 sanitary pipework
Topik 3 sanitary pipeworkTopik 3 sanitary pipework
Topik 3 sanitary pipeworkInazarina Ady
 
Contract Management in Civil Engineering Works
Contract Management in Civil Engineering WorksContract Management in Civil Engineering Works
Contract Management in Civil Engineering WorksDr K M SONI
 
Tendering in construction introduction
Tendering in construction introductionTendering in construction introduction
Tendering in construction introductionDaniel Ross
 
Fundamental operations
Fundamental operationsFundamental operations
Fundamental operationssrinivas2036
 

Viewers also liked (20)

Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement Guide
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Cost Engineering for Tendering & Contracting
Cost Engineering for Tendering & ContractingCost Engineering for Tendering & Contracting
Cost Engineering for Tendering & Contracting
 
Tendering process cvc_guidelines
Tendering process cvc_guidelinesTendering process cvc_guidelines
Tendering process cvc_guidelines
 
Estimation in Project Management
Estimation in Project ManagementEstimation in Project Management
Estimation in Project Management
 
Mesurement presentation pavaruban
Mesurement presentation pavarubanMesurement presentation pavaruban
Mesurement presentation pavaruban
 
Purchase procedure
Purchase procedurePurchase procedure
Purchase procedure
 
Proposal for Cartoon Network to launch a Music Album
Proposal for Cartoon Network to launch a Music AlbumProposal for Cartoon Network to launch a Music Album
Proposal for Cartoon Network to launch a Music Album
 
Tender
TenderTender
Tender
 
Purchase procedure
Purchase procedurePurchase procedure
Purchase procedure
 
Project Estimation
Project EstimationProject Estimation
Project Estimation
 
Purchase function and procurement procedure
Purchase function and procurement procedurePurchase function and procurement procedure
Purchase function and procurement procedure
 
Topik 3 sanitary pipework
Topik 3 sanitary pipeworkTopik 3 sanitary pipework
Topik 3 sanitary pipework
 
Contract mgt stc
Contract mgt stcContract mgt stc
Contract mgt stc
 
Contract Management in Civil Engineering Works
Contract Management in Civil Engineering WorksContract Management in Civil Engineering Works
Contract Management in Civil Engineering Works
 
e-Procurement in Indian Government
e-Procurement in Indian Governmente-Procurement in Indian Government
e-Procurement in Indian Government
 
Love
LoveLove
Love
 
E Procurement
E ProcurementE Procurement
E Procurement
 
Tendering in construction introduction
Tendering in construction introductionTendering in construction introduction
Tendering in construction introduction
 
Fundamental operations
Fundamental operationsFundamental operations
Fundamental operations
 

Similar to Civil tenders and contracts spce

Types of tenders & stages for successful tendering
Types of tenders & stages for successful tenderingTypes of tenders & stages for successful tendering
Types of tenders & stages for successful tenderingAditya Sanyal
 
030 2008-02789 (1)
030 2008-02789 (1)030 2008-02789 (1)
030 2008-02789 (1)Raj kumar
 
Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftMuneesh Methwani
 
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...César del Riego y Fuentes
 
Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptxssuser4ae21a
 
Cattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docxCattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docxswarnavet05
 
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind SolarSummary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind SolarPratap Malempati
 
Procurement of works
Procurement of worksProcurement of works
Procurement of worksAyush Joshi
 
Ss 10 cost engineering management training- moustafa sec 5 part iii ch 2...
Ss 10   cost engineering management  training-   moustafa sec 5 part iii ch 2...Ss 10   cost engineering management  training-   moustafa sec 5 part iii ch 2...
Ss 10 cost engineering management training- moustafa sec 5 part iii ch 2...Moustafa Ismail Abu Dief
 
Rf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal powerRf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal powerPratap Malempati
 
Navi mumbai metro new
Navi mumbai metro newNavi mumbai metro new
Navi mumbai metro newRashid Kaskar
 
PPR Overview and Methods 1.ppt
PPR Overview and Methods 1.pptPPR Overview and Methods 1.ppt
PPR Overview and Methods 1.pptshantoru
 
Pest and rodent control in Railway Coaches
Pest and rodent control in Railway CoachesPest and rodent control in Railway Coaches
Pest and rodent control in Railway CoachesSrinivasaRao Guduru
 
Handbook on works contract management
Handbook on works contract managementHandbook on works contract management
Handbook on works contract managementSrinivasaRao Guduru
 

Similar to Civil tenders and contracts spce (20)

Types of tenders & stages for successful tendering
Types of tenders & stages for successful tenderingTypes of tenders & stages for successful tendering
Types of tenders & stages for successful tendering
 
Bid document reverse tendering
Bid document reverse tenderingBid document reverse tendering
Bid document reverse tendering
 
Tanmay presentation
Tanmay presentationTanmay presentation
Tanmay presentation
 
030 2008-02789 (1)
030 2008-02789 (1)030 2008-02789 (1)
030 2008-02789 (1)
 
Cm mitemrate ver270206
Cm mitemrate ver270206Cm mitemrate ver270206
Cm mitemrate ver270206
 
Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final Draft
 
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
 
Bihar rfp
Bihar rfpBihar rfp
Bihar rfp
 
Prebid-Part-1-C.pdf
Prebid-Part-1-C.pdfPrebid-Part-1-C.pdf
Prebid-Part-1-C.pdf
 
Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptx
 
Cattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docxCattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docx
 
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind SolarSummary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
 
Procurement of works
Procurement of worksProcurement of works
Procurement of works
 
Ss 10 cost engineering management training- moustafa sec 5 part iii ch 2...
Ss 10   cost engineering management  training-   moustafa sec 5 part iii ch 2...Ss 10   cost engineering management  training-   moustafa sec 5 part iii ch 2...
Ss 10 cost engineering management training- moustafa sec 5 part iii ch 2...
 
Final tender chp
Final tender chpFinal tender chp
Final tender chp
 
Rf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal powerRf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal power
 
Navi mumbai metro new
Navi mumbai metro newNavi mumbai metro new
Navi mumbai metro new
 
PPR Overview and Methods 1.ppt
PPR Overview and Methods 1.pptPPR Overview and Methods 1.ppt
PPR Overview and Methods 1.ppt
 
Pest and rodent control in Railway Coaches
Pest and rodent control in Railway CoachesPest and rodent control in Railway Coaches
Pest and rodent control in Railway Coaches
 
Handbook on works contract management
Handbook on works contract managementHandbook on works contract management
Handbook on works contract management
 

Recently uploaded

Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024ARCResearch
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...Suhani Kapoor
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...nservice241
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...tanu pandey
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxSwastiRanjanNayak
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Call Girls in Nagpur High Profile
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Roomishabajaj13
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...Suhani Kapoor
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up NumberMs Riya
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...aartirawatdelhi
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 

Recently uploaded (20)

Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
 
How to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the ThreatHow to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the Threat
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 

Civil tenders and contracts spce

  • 1. CIVIL TENDERS AND CONTRACTS SS KALRA Sr. Prof. (Civil Engineering) National Academy of Indian Railways August 17, 2015SPCE 1
  • 2. CIVIL TENDERS  Civil tenders usually refers to the process whereby governments and other institutions invite bids for Execution of projects/works that must be submitted within a finite deadline. August 17, 2015SPCE 2
  • 3. CONTRACT  A Defined Legal Relationship between tendering authority and successful tenderer for execution of work.  Works contract  Store contract  Service contract 17-08-2015SPCE
  • 4. TENDERER AND CONTRACTOR  Tenderer is one who tenders bid in response to invitation for tenders.  A contractor is anyone you get in to work for you who is not an employee. 17-08-2015SPCE
  • 5. WHY TENDERING ?  Fundamental Principle of Execution of Public Works:  Efficiency  Economy  Transparency  Fair & Equitable treatment of tenderers  Promotion of Competition August 17, 2015SPCE 5
  • 6.  Open Tenders  Limited Tenders  Special Limited Tenders  Single tenders August 17, 2015SPCE 6 TYPES OF TENDERS
  • 7. 1. LIMITED TENDERS FROM THE CONTRACTORS BORNE ON THE APPROVED LIST ONLY. 2. NOTICE IN LOCAL NEWSPAPERS, DISPLAYED ON NOTICE BOARDS AND PUT ON INTERNET. 3. RAILWAY MAY DECIDE CATEGORIES OF WORKS FOR WHICH LIST OF APPROVED CONTRACTORS SHALL BE MAINTAINED FOR EACH MONETARY SLAB. LIMITED TENDER (RB VIDE LETTER NO. 94/CEI/CI/4 DATED 17/10/2002) August 17, 2015SPCE 7
  • 8. 1. SPECIAL LIMITED TENDER IN CONSULTATION WITH FA & CAO IN FOLLOWING SITUATIONS:- A WORKS OF SPECIALIZED NATURE (PHOD APPROVAL) B WORK OF URGENT NATURE (GM APPROVAL) C CONSULTANCY WORKS (GM’S APPROVAL) 2. TENDERERS NEED NOT NECESSARILY TO BE BORNE ON THE APPROVED LIST. 3. TO BE INVITED FROM SPECIALIZED AND REPUTED CONTRACTORS 4. NO. OF TENDERERS MORE THAN SIX BUT NOT (RB VIDE LETTER NO. 94/CEI/CT/4 DATED 17/10/2002) SPECIAL LIMITED TENDER August 17, 2015SPCE 8
  • 9. SPECIAL LIMITED TENDER CAO(C) WITH THE CONCURRENCE OF FA & CAO(C) MAY INVITE SPECIAL LIMITED TENDER NOT ONLY FOR SPECIALISED NATURE OF WORK BUT FOR ALL TYPES OF WORKS DEPENDING UPON THE MERIT OF THE CASE (Rly Bd letter No.2007/CEI/CT/18 Dt.28-09-07) August 17, 2015SPCE 9
  • 10.  GM is empowered to award contracts on single tender basis at present, but now CAO(C ) is also empowered to float and finalize single tenders of value not more than Rs. 2.0 crore each with personal concurrence of FA&CAO, only for purpose of early completion of works related with doubling and traffic facility. (Rly. Board’s letter –2007/CCI/CT/18 Dated 7/3/2008) SINGLE TENDER August 17, 2015SPCE 10
  • 11. TWO PACKET SYSTEM Rly Bd letter No. 94/CEI/CT/04 DATED 17/10/02  CAN BE ADOPTED FOR HIGHLY TECHNICAL WORKS WHERE PARAMETERS NOT PRECISELY DEFINED OR SPECIALIZED IN NATURE Rly Bd letter No. 2007/CEI/CT/18 DATED 07/03/08  RAILWAY MAY FOLLOW TWO PACKET SYSTEM INSTEAD OF RESORTING TO SINGLE PACKET/ OPEN TENDER FOR HIGH VALUE TENDERS Rly Bd letter No. 2008/CE.1/CT/Con/7(PCE/GM) DT 15.12.08  TWO-PACKET SYSTEM OF TENDERING MAY BE ADOPTED WHEREVER CONSIDERED NECESSARY. THERE IS NO NEED TO LINK THIS MODE OF TENDERING TO ANY FINANCIAL August 17, 2015SPCE 11
  • 12. R.B. LETTER NO. 94/CE-I/CT/4/PT. 17 DT. 13.8.12 1. TWO PACKETS SYSTEM FOR ALL WORKS REQUIRING TECHNO-ECONOMIC EVALUATION 2. MANDATORY FOR ALL WORKS VALUING MORE THAN 10 CR. EXCEPT WHERE DECIDED BY EXECUTIVE NOT BELOW THE RANK OF HAG WITH RECORDED REASONS AND CONCURRENCE OF FA&CAO 3. FOR WORKS UPTO 10 CR. CAN BE ADOPTED BY TENDER INVITING AUTHORITY WITH CONCURRENCE OF ASSOCIATE FINANCE August 17, 2015SPCE 12
  • 13. Introduction of EPC Mode of Contracting In Railways 13
  • 14. NEED FOR EPC CONTRACT  Conventional item-rate contracts are generally prone to time & cost overrun due to: o Involvement of multiple agencies- generally a new line/doubling project involves 15 to 20 different value contracts o Failure of even one contract delays the project o Lack of flexibility in replacing failed agency on real time basis 14
  • 15. NEED FOR EPC CONTRACT  In item-rate contract, allocation of construction risks are largely to Authority , particularly the onus of design which many times lead to o Delays in design and drawings by the Authority o Variation in items and quantities  Considerable time of Project Engineers is consumed in processing of: o Variation in quantity of items which are quite frequent o Introduction of NS items o Variation in contract price  More susceptible from vigilance point of view 15
  • 16. OBJECTIVE OF EPC CONTRACT  Implementation of project to specified standards with a fair degree of certainty relating to time & cost while transferring the construction risk to contractor.  Awarding contract for a LS price ensures predictability and financial discipline both for Government & Contractor.  Well defined system of obligation associated with damages  Assigning risk to the party who is in a better position to mitigate it e.g. land, statutory clearances assigned to Authority whereas design, site uncertainty, sub contracting are assigned to contractor 16
  • 17. PERCEIVED ADVANTAGE OF EPC  Detailed initial planning before tendering- Authority is required to specify its requirement only, without detailed design.  Effective project management- less no. of contracts to mange.  Engagement of professionally managed agencies.  Minimum variation orders.  Milestone based payments. 17
  • 18. PROJECT SCOPE NEEDS TO BE SPECIFIED VERY CAREFULLY AND SHOULD BE EXHAUSTIVE 18
  • 19. • Approval of Competent Authority (CA) for tendering • Issue of Tender Notice/NIT • Pre-bid conference, if any. • Preparation of Comparative Statement(CS) and Briefing Note(BN) • Vetting of CS • Nomination of Tender Committee(TC) • Deliberation of tenders by TC and Recommendations • Acceptance of Tender Accepting Authority (TAA) • Issue of Acceptance Letter (LOA) • Signing of Contract Agreement (CA) August 17, 2015SPCE 19 TENDERING PROCESS
  • 20. NOTICE INVITING TENDERS (NIT)  Name of office inviting tenders  Name & scope of work.  Tender value  Time period of completion.  Details of earnest money.  Date of Commencement of sale of Tender Documents.  Time and date for receipt of tenders  Time and date for opening of tenders.  Validity of the tenders.  Accessibility of full set of tender documents including drawings.
  • 21. PUBLICATION OF TENDER (Rly Bd letter no. 2008/RS(G)/779/2 Dt 07/11/08)  WHILE PUBLISHING THE TENDER IN NEWPAPER FOR WIDE PUBLICATION, CPRO MUST ENSURE THAT THE TENDER NOTICE HAS ALREADY BEEN UPLOADED ON THE WEBSITE BY TAKING CERTIFICATE FROM THE EXECUTIVE.  ANY OPEN TENDER NOT HAVING TOKEN OF CONFIRMATION (IN THE FORM OF RECORD OF INTERNET UPLOADING) WILL BE TREATED AS INADEQUATELY ADVERTISED TENDER. August 17, 2015SPCE 21
  • 22. Sl . COST OF TENDER COST 1. For works costing up to Rs.5 L 1000/- 2. For works costing above Rs.5 L and up to Rs.20 L 2000/- 3. For works costing above Rs.20 L and up to Rs.50 L 3000/- 4. For works costing above Rs.50 L and up to Rs.2 cr 5000/- 5. For works costing above Rs. 2 cr. and up to Rs.50 cr 10000/- 6. For works costing above Rs.50 cr. 25000/- August 17, 2015SPCE 22 COST OF TENDER FORMS. (i) IF ANY PLAN/DRAWING IS ATTACHED WITH THE TENDER FORM, Rs.200/- PER PLAN/DRAWING WILL BE LEVIED EXTRA. (ii) IF ANY TENDER FORM SENT BY REGD. POST, ADDITIONAL POSTAL EXPENSES @ Rs.500/- PER TENDER FORM WILL BE CHARGED.
  • 23.  CASH IN FORM OF MONEY RECEIPT  DEMAND DRAFT THE OFFER WILL BE REJECTED INCASE NOT ATTACHED WITH DD FOR DOWNLOADED FORM - A CLAUSE SHOULD BE MADE IN THE TENDER DOCUMENTS August 17, 2015SPCE 23 MODES OF PAYMENT OF TENDER DOCUMENTS
  • 24. DELAYED / LATE TENDERS Delayed tenders i.e. Tenders received before the time of opening but after the due date and time of receipt of tenders should also be opened and dealt with in the same manner as tenders received before due date and time. Late tenders i.e. tenders received after the specified time of opening should be opened by the concerned Branch officer and marked distinctly preferably in red ink prominently on the envelope as well as on the tender papers. Suitable remark in regard to both delayed and late tenders should be made both in the Tender Register as well as in the comparative statements. August 17, 2015SPCE 24
  • 25. DEALING WITH DELAYED / LATE TENDERS (I) NORMALLY NOT TO BE CONSIDERED AND SUMMARILY REJECTED (II) HOWEVER, IF IT IS CONSIDERABLE ADVANTAGE TO DEAL WITH IT, THE PROPOSAL IS SENT TO RLY BD WITH FA & CAO’S REMARKS AND GM’s PERSONAL APPROVAL (III) THE RAILWAY ADMINISTRATION SHOULD NOT ENTER IN TO ANY DIALOGUE WITHOUT OBTAINING RALWAY BOARD’s PRIOR CLEARENCE August 17, 2015SPCE 25 (RB’s LETTER No.2003/PS(G)/77/5 DATED 06-02-04
  • 26. 1. Tender Committee (Rly. Board’s letter –2007/CCI/CT/18 Dated 7/3/2008) • Two members tender committee for tenders of value of Rs. 20.0 Lakhs and less – Two Members-one from accounts and other from executive. • Three member tender committee for tenders valuing more than 20.0 Lakhs. August 17, 2015SPCE 26 Sl Power of acceptance Accepting Authority 1 Up to Rs. 3 cr S. Grade/J.A. Grade 2 Above Rs. 3 cr and up to Rs. 12 cr S.A. Grade 3 Above Rs. 12 cr and up to Rs. 75 cr H.A. Grade 4 Above Rs. 75 cr and up to Rs. 150 cr General Manager 5 Up to Rs. 300 cr ( For National Projects of NE Region and General Manager 2. Tender accepting Authority (Rly. Board’s letter –2007/CE-1/CT/13 Dated 27/8/2013)
  • 27. AN UNDERTAKING BY TC (RLY BD letter No. 2004/C-1/CVC1/18/ dt 12.01.06) THE MEMBERS OF THE TENDER COMMITTEE SHOULD GIVE AN UNDERTAKING AT THE APPROPRIATE TIME, THAT NONE OF THEM HAS ANY PERSONAL INTEREST IN THE COMPANIES/AGENCIES PARTICIPATING IN THE TENDER PROCESS AND THAT ANY MEMBER HAVING INTEREST IN ANY COMPANY SHOULD BE REFRAINED FROM PARTICIPATING IN THE TENDER COMMITTEE. August 17, 2015SPCE 27
  • 28. August 17, 2015SPCE 28 Earnest Money Deposit (EMD) 2007/CEI/CT/18 DATED 28/09/07 Value of the work EMD For works estimated to cost up to Rs. 1 Cr. 2% of the estimated cost of the work. For works estimated to cost more than Rs. 1 Cr. Rs. 2 lacs plus ½% ( half percent) of the excess of estimated cost of work beyond Rs. 1 Cr. subject to a maximum of Rs. 1.0 Cr.
  • 29. ELIGIBILITY CRITERIA August 17, 2015SPCE 29 1 SHOULD HAVE PHYSICALLY COMPLETED WITH IN THE QUALIFYING PERIOD i.e. LAST THREE FINANCIAL AND CURRENT FINANCIAL YEAR AT LEAST ONE SIMILAR NATURE OF WORK FOR A MIN. VALUE OF 35% OF NIT COST 2 TOTAL AMOUNT RECEIVED DURING THE LAST THREE AND CURRENT FINANCIAL YEAR SHOULD BE OF AMOUNT OF 150% OF NIT COST. ( Rly. Board vide letter No. 94/CEI/CI/4 dated 23/11/2006)
  • 30. RLY. BOARD VIDE LETTER NO. 94/CEI/CI/4 DT. 23/11/2006 i. SIMILAR NATURE OF WORK PHYSICALLY COMPLETED WITH IN THE QUALIFYING PERIOD i.e. LAST THREE FINANCIAL AND CURRENT FINANCIAL YEAR (EVEN THOUGH THE WORK MIGHT HAVE COMMENCED BEFORE THE QUALIFYING PERIOD) SHOULD ONLY BE CONSIDERED. ii. THE TOTAL VALUE OF SIMILAR NATURE OF WORK COMPLETED DURING THE QUALIFYING PERIOD AND NOT THE PAYMENTS RECEIVED WITHIN THE PERIOD ALONE, SHOULD BE CONSIDERED.
  • 31. iii. a) IN CASE, FINAL BILL NOT PASSED AND FINAL MEASUREMENT NOT RECORDED - PAID AMOUNT INCLUDING STATUTORY DEDUCTION TO BE CONSIDERED b) IF FINAL MEASUREMENT RECORDED AND COMPLETED WITH NEGATIVE VARIATION - PAID AMOUNT INCLUDING STATUTORY DEDUCTION TO BE CONSIDERED. c) IF FINAL MEASUREMENT RECORDED AND WORK COMPLETED WITH POSITIVE VARIATION BUT VARIATION NOT SANCTIONED – ORIGINAL CONTRACT VALUE OR LAST SANCTIONED AGREEMENT VALUE WHICHEVER IS LOWER TO BE CONSIDERED
  • 32. iv IN CASE OF COMPOSITE WORKS – SEPARATE COMPLETED WORKS OF REQD VALUE TO BE CONSIDERED v SIMILAR NATURE OF WORKS TO BE DEFINED BY PHOD ON OPEN LINE AND NOMINATED CE/CSTE/CEE ON CONSTRUCTION ORGANISATION AND TO BE INDICATED IN NIT IN CASE OF ANY DEVIATION/MODIFICATION, PRIOR APPROVAL OF COMPETENT AUTHORITY SHOULD BE OBTAINED
  • 33. RLY BD’ LETTER NO.2008/CE1/CT/CON/7/PCE/GM DT 15.12.08  THE EXISTING MIN TENDER VALUE LIMIT OF Rs. 10 LAKH FOR INCORPORATING ELIGIBITY CRITERIA IS INCREASED TO Rs. 20 LAKH August 17, 2015SPCE 33 • IT HAS BEEN FURTHER INCREASED TO Rs. 50 LAKH RLY BD’ LETTER NO.2007/CE1/CT/18 Pt.XII DT 31.12.10
  • 34. August 17, 2015SPCE 34 CLUBBING OF WORKS Rly Bd’s L. No. 2013/CE-I/CT/O/34/SI dt. 18-03-2014 While clubbing various works to enable proper contract monitoring/management; two aspects i.e. type of works to be clubbed together in one tender and optimum value of the big tender to attract reasonable competitiveness, should be taken into account. Accordingly, zonal works and sanctioned works shall normally not be clubbed in a tender so as to affect reasonable competition in tendering. Also miscellaneous and varying nature of works should not be clubbed together which may affect booking of expenditure and drawl of completion reports
  • 35. NEGOTIATION 1. L1 IS DEFINED AS THE LOWEST WHICH IS VALID, ELIGIBLE AND TECHNICALLY ACCEPTABLE TENDERER 2. NEGOTIATION SHOULD BE HELD WITH L1 ONLY August 17, 2015SPCE 35 Rly Bd LETTER 90/CEI/07/I/P/dt. 10-07-2002)
  • 36. COUNTER OFFER RLY BOARD LETTER NO. 94/CEI/CT/4 DT 17.10.2002 IN CASES WHERE THE OVERALL VALUE OF L1 IS NOT UNREASONABLY HIGH BUT RATES OF CERTAIN ITEMS OR TOTAL VALUE FOR A SCHEDULE HAPPEN TO BE HIGHER THAN THOSE QUOTED BY OTHER TENDERERS OR HIGHER THAN LARs, METHOD OF COUTER OFFER MAY BE ADOPTED BUT IT IS NOT SUBSTITUE/ IN LIEU OF NEGOTIATION August 17, 2015SPCE 36
  • 37. SECURITY DEPOSIT (RLY.BD LETTER No.2003/CEI/CT/4/PtI Dt.12/16-05-2005) a) S.D. SHOULD BE 5% OF THE CONTRACT VALUE b) RATE OF RECOVERY SHOULD BE @ 10% OF BILL AMOUNT c) S.D. TO BE RECOVERED FROM RUNNING BILLS OF THE CONTRACT ONLY d) S.D. WILL BE RETURNED WITH THE APPROVAL OF CA, AFTER THE MAINTENANCE PERIOD OF THE WORKS IS OVER, (RLY BOARD LETTER NO. 2007/CEI/CT/18 DT 07.03.08) a) AFTER THE WORK IS PHYSICALLY COMPLETED, SD RECOVERED FROM THE R/BILLS CAN BE RETURNED IN LIEU OF FDR OF EQUIVALENT AMOUNT August 17, 2015 37
  • 38. August 17, 2015SPCE 38 PERFORMANCE GUARANTEE (PG) 2003/CEI/CT/4/PT DATED 16/05/06 MODIFIED VIDE LETTER 200/CEI/CT/18 DATED 28/09/07  THE SUCCESSFUL BIDDER TO GIVE PG @ 5% OF CONTRCT VALUE  SHALL BE SUBMITTED BEFORE SIGNING CONTRACT AGREEMENT  SHALL BE IN FORM OF BG, FDR ETC.  CAN BE RELEASED AFTER SUCCESSFUL COMPLETION OF WORK  NO ADDITIONAL PG FOR VARIATION UPTO 25%  FAILED CONTRACTOR/ ALL PARTENERS OF JV ARE DEBARRED IN RETENDER FOR BALANCE WORK
  • 39. QUOTATIONS (Rly Bd letter No. 2007/CEI/13/PT Dt 05/03/09)  Invited from well experienced contractors, not necessarily borne on approved list.  A register showing the full details to be maintained and sent to Associate Finance while seeking concurrence. August 17, 2015SPCE 39 AUTHORITY FINANCIAL LIMIT ANNUAL CEILING Sr. Scale 1.0 lakhs 5.0 lakhs JAG 2.0 lakhs 20.0 lakhs SAG 4.0 lakhs 40.0 lakhs
  • 40. NORMALLY THE POWERS TO DISPENSE WITH CALLING OF TENDERS SHOULD BE EXCERCISED SPARINGLY. THE CIRCUMSTANCES UNDER WHICH QUOTATIONS HAVE TO BE CALLED SHOULD BE SPELT OUT August 17, 2015SPCE 40
  • 41. REVIVAL OF TERMINATED CONTRACT (BOARD LETTER NO 9/CEI/CT/C1/7 Dt. 24/05/01)  IT IS STIPULATED THAT ONCE THE FORMAL NOTICE OF TERMINATION HAS BEEN ISSUED, REVIVAL OF THE CONTRACT EVEN IF ON THE SAME TERMS AND CONDITIONS, IS POSSIBLE ONLY AS A SINGLE TENDER REQUIRING THE GM’S PRIOR APPROVAL August 17, 2015SPCE 41