Start
Entdecken
Suche senden
Hochladen
Einloggen
Registrieren
Anzeige
Nächste SlideShare
A novel fuzzy rule based system for assessment of ground water potability: A ...
Wird geladen in ... 3
1
von
3
Top clipped slide
IRJET - To Study the Hurdles in Designing a Water Supply System for a City
14. Dec 2020
•
0 gefällt mir
0 gefällt mir
×
Sei der Erste, dem dies gefällt
Mehr anzeigen
•
4 Aufrufe
Aufrufe
×
Aufrufe insgesamt
0
Auf Slideshare
0
Aus Einbettungen
0
Anzahl der Einbettungen
0
Jetzt herunterladen
Downloaden Sie, um offline zu lesen
Melden
Ingenieurwesen
https://irjet.net/archives/V7/i3/IRJET-V7I3318.pdf
IRJET Journal
Folgen
Fast Track Publications
Anzeige
Anzeige
Anzeige
Recomendados
A novel fuzzy rule based system for assessment of ground water potability: A ...
IOSR Journals
405 Aufrufe
•
7 Folien
Water Resource Management Powerpoint Presentation Slides
SlideTeam
176 Aufrufe
•
74 Folien
IRJET- Train Impact Analysis on Prestressed Concrete Girder
IRJET Journal
58 Aufrufe
•
4 Folien
Issues and remedies of sewage treatment and disposal in islamabad, pakistan
Alexander Decker
1.2K Aufrufe
•
12 Folien
IRJET- Study of Conventional Drainage System
IRJET Journal
32 Aufrufe
•
3 Folien
Water audit in distribution network by establishing district metered area dma...
IAEME Publication
510 Aufrufe
•
8 Folien
Más contenido relacionado
Presentaciones para ti
(20)
Water Quality Assessment Powerpoint Presentation Slides
SlideTeam
•
1K Aufrufe
Smart technologies - sensors for improving Water Use Efficiency in Agriculture
Sai Bhaskar Reddy Nakka
•
289 Aufrufe
Sustainable Water Management Powerpoint Presentation Slides
SlideTeam
•
1.4K Aufrufe
IRJET- Review on Economical Water Treatment Plant
IRJET Journal
•
15 Aufrufe
PERUMIN 31: The Future of Water in The Mining Industry
PERUMIN - Convención Minera
•
2.4K Aufrufe
IRJET - Environmental Impact Assessment of Ground Water Quality around Ve...
IRJET Journal
•
22 Aufrufe
Natural Resource Management Of Water Powerpoint Presentation Slides
SlideTeam
•
132 Aufrufe
Development of Saline Water Desalination System
vivatechijri
•
32 Aufrufe
H013154651
IOSR Journals
•
111 Aufrufe
27 nov16 wu_as_need_for_institutional_strengthening
IWRS Society
•
212 Aufrufe
Waterqualmonitor
Stephen Siwila
•
717 Aufrufe
minimum flow- need & response
Deepak Upadhyay
•
144 Aufrufe
Water
Uzma Fathima
•
4K Aufrufe
Produced Water | Session IX - Hayes
atlanticcouncil
•
2.7K Aufrufe
WSSP-08 Complete Submission by ZWAI to Irish Water, April 2015
Jack O'Sullivan
•
399 Aufrufe
Issues and Problems of Groundwater Resources in Ethiopia: A Case from Dire Da...
Yohannes Mengesha, PhD Fellow
•
1.6K Aufrufe
IRJET- A Review of Hydrochemical Assessment and GIS Mapping of Groundwater in...
IRJET Journal
•
34 Aufrufe
Georgia Water Conservation by Alice Miller Keyes, GA EPD
Confluence Conference
•
855 Aufrufe
EPA Water Conference 2021 Posters
Environmental Protection Agency, Ireland
•
1.1K Aufrufe
Academia session: John Chilton, International Association of Hydrogeologists,...
water-decade
•
692 Aufrufe
Similar a IRJET - To Study the Hurdles in Designing a Water Supply System for a City
(20)
Study of parameters requiried for quanitification of
eSAT Publishing House
•
267 Aufrufe
DISASTER MANAGEMENT OF FLOOD AND ITS RETAINING TECHNIQUES
IRJET Journal
•
3 Aufrufe
IRJET- Rainwater Harvesting System
IRJET Journal
•
41 Aufrufe
Calculation of Leakage Water and Forecast Actual Water Delivery in Town Drink...
Editor IJCATR
•
507 Aufrufe
Calculation of Leakage Water and Forecast Actual Water Delivery in Town Drink...
Editor IJCATR
•
284 Aufrufe
ANALYSIS OF WATER LOGGING AT SJCET CAMPUS AND ITS REMEDIAL MEASURES
IRJET Journal
•
2 Aufrufe
IRJET - Study About Flood Control by Underground Water Tank in Bori Gosavi Vi...
IRJET Journal
•
13 Aufrufe
Utilization of Existing Water Sources for Irrigation Purposes-Case Study of K...
IRJET Journal
•
4 Aufrufe
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCAD
IAEME Publication
•
59 Aufrufe
THE DESALINATION UNITS
IRJET Journal
•
3 Aufrufe
Storm Water Drain Network System in Bengaluru
IRJET Journal
•
69 Aufrufe
Water Supply Measurement and Management System Based on IoT with Water Leakag...
IRJET Journal
•
2 Aufrufe
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIA
IRJET Journal
•
3 Aufrufe
Real Time Water Quality Monitoring and Management System
IRJET Journal
•
4 Aufrufe
Environmental Impact Assessment in Water Resources Projects
National Institute of Technology Hamirpur
•
20.2K Aufrufe
Soil Biotechnology to Treat Nazafgarh Drain Water before Disposal into River ...
civej
•
156 Aufrufe
ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJI
IRJET Journal
•
14 Aufrufe
SOIL BIOTECHNOLOGY TO TREAT NAZAFGARH DRAIN WATER BEFORE DISPOSAL INTO RIVER ...
civej
•
10 Aufrufe
SOIL BIOTECHNOLOGY TO TREAT NAZAFGARH DRAIN WATER BEFORE DISPOSAL INTO RIVER ...
civejjour
•
21 Aufrufe
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
India-EU Water Partnership
•
268 Aufrufe
Anzeige
Más de IRJET Journal
(20)
AN INVESTIGATION ON THE EFFICACY OF MARBLE DUST POWDER FOR STRENGTHENING THE ...
IRJET Journal
•
26 Aufrufe
A Survey on Person Detection for Social Distancing and Safety Violation Alert...
IRJET Journal
•
8 Aufrufe
Thermal Analysis and Design Optimization of Solar Chimney using CFD
IRJET Journal
•
7 Aufrufe
Common Skin Disease Diagnosis and Prediction: A Review
IRJET Journal
•
42 Aufrufe
A STUDY ON TWITTER SENTIMENT ANALYSIS USING DEEP LEARNING
IRJET Journal
•
22 Aufrufe
Band structure of metallic single-walled carbon nanotubes
IRJET Journal
•
5 Aufrufe
IoT Based Assistive Glove for Visually Impaired People
IRJET Journal
•
10 Aufrufe
A SUPERVISED MACHINE LEARNING APPROACH USING K-NEAREST NEIGHBOR ALGORITHM TO ...
IRJET Journal
•
3 Aufrufe
An Overview of Traffic Accident Detection System using IoT
IRJET Journal
•
5 Aufrufe
Artificial Neural Network: A brief study
IRJET Journal
•
4 Aufrufe
Review Paper on Performance Analysis of LPG Refrigerator
IRJET Journal
•
6 Aufrufe
WOLBACHIA PIPIENTIS AND VARROA DESTRUCTOR MITE INFESTATION RATES OF NATIVE VE...
IRJET Journal
•
5 Aufrufe
Survey on Automatic Kidney Lesion Detection using Deep Learning
IRJET Journal
•
3 Aufrufe
A Review on Safety Management System in School Bus
IRJET Journal
•
10 Aufrufe
Design and Validation of a Light Vehicle Tubular Space Frame Chassis
IRJET Journal
•
7 Aufrufe
SMART BLIND STICK USING VOICE MODULE
IRJET Journal
•
12 Aufrufe
AUTOMATIC HYPODERMIC INFUSION REGULATOR
IRJET Journal
•
7 Aufrufe
Mobile Application of Pet Adoption System
IRJET Journal
•
11 Aufrufe
Literature Survey on “Crowdfunding Using Blockchain”
IRJET Journal
•
8 Aufrufe
Pricing Optimization using Machine Learning
IRJET Journal
•
11 Aufrufe
Último
(20)
Tunnel Drainage and Ventilation.pptx
SachinGunjal13
•
0 Aufrufe
CEM_Unit-II_Lecture Notes.pdf
AnujaJape2
•
0 Aufrufe
presentation on May 26 2023.pptx
Leahcim Nolyab
•
0 Aufrufe
3. NHA XUONG 60X105M.pdf
Nphu2
•
0 Aufrufe
APPGECET 2016 EC.pdf
SubramanyamAvvaru
•
0 Aufrufe
Automatic-Number-Plate.ppsx
SURAJRAUT44
•
0 Aufrufe
3 Sensing and Sensors.ppt
Abhishek597701
•
0 Aufrufe
【本科生、研究生】英国提兹塞德大学毕业证文凭购买指南
sutseu
•
0 Aufrufe
AL_all.ppt
ssuser15077b
•
0 Aufrufe
Alcohol_Phenol_and_Ether_Answer_Key (1).pdf
Vishal544031
•
0 Aufrufe
Diamond DV20 Katana Airplane Flight Manual.pdf
TahirSadikovi
•
0 Aufrufe
Thermalpptx
PrithwishKrSutradhar1
•
0 Aufrufe
如何办理一份高仿纽约州立大学阿尔巴尼分校毕业证成绩单?
aazepp
•
0 Aufrufe
Biotech -validation.ppt
ssusera7f12d
•
0 Aufrufe
CEM_Unit-I_Lecture Notes.pdf
AnujaJape2
•
0 Aufrufe
如何办理一份高仿普林斯顿大学毕业证成绩单?
aazepp
•
0 Aufrufe
Sunum Smal.pdf
ssusera7f12d
•
0 Aufrufe
DSMM UNIT-III.ppt
MonikaChiraniya
•
0 Aufrufe
Curvas de oommen.pdf
yoch4
•
0 Aufrufe
2020ceb005 POTNURU SAIDEEPAK (THEODOLITE TRAVERSING).pdf
HeyYou84
•
0 Aufrufe
Anzeige
IRJET - To Study the Hurdles in Designing a Water Supply System for a City
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 03 | Mar 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1694 To study the hurdles in designing a water supply system for a city Tejas Bhangale1, Pankaj Attarde2, 1Student, Dept. of Civil Engg., SSGB College, Bhusaval 2Second Associate Prof., Dept. of Civil Engg, SSGB College, Bhusaval ----------------------------------------------------------------------***--------------------------------------------------------------------- Abstract – Water supply system has been a key concern for any country since a lot of time now. While many of the countries in the world have successfully tackled water scarcity, India remains quite passive in its approach towards providing ample amount of water to its huge population. The study has been focused on studying the processed involved in water supply system and its difficulties. A successful completion of water supply project will require overcoming difficulties arrived in every phase of the project like planning, execution and quality control. Key Words: Water scarcity, Water Supply System 1. INTRODUCTION India, often called as a land of people, is fighting its way up in the leading countries ladder day by day. But the lack of basic infrastructure and awareness has led India to fight with many basic issues live poverty, hunger and water scarcity. A country with 1.3 billion people and that too more than 70% living in the urban areas has to deal with a tremendous load on its basic infrastructures like transport, housing and water supply. Day by day, the weathering patterns are changing and India is facing two extremes of rainfall throughout the country: the northern half is dealing with flood situation and the southern half with drought. So, in these changing patterns, it is our duty to be responsible and to use the water carefully. At the same time, it is mandatory to install water supply grids across countries as well as better water supply systems in the urban area. 1.1 Problem Statement & Scope of the Study According to a survey conducted by World Bank Group, around 90% of the urban population have access to drinking water but only for few hours a day or periodically in a week. SVery few cities in India have 24 hours 7 Days a week running water. The water received is lacking the important treatment most of the times. So it is a challenge for us to design a full proof action plan for using the available water resources sensibly. The current study has been focused on studying various processes involved in construction of water supply system and also the setbacks experienced in the execution of the same. The literature will be studied for important parameters related to water scarcity and available water resources in India. A small city of Jalgaon is taken up for case study which has recently taken an initiative called “Amrut Yojna” aimed at providing fresh and clean water 24 x 7. The Water distribution system for the city will be studied in the future. 1.2 Objectives of Study As discussed in the above paragraph, the paper study is limited to following objectives: To understand various process involved in designing a water treatment plant To study various setbacks and difficulties occurred in the project 2. Literature Review Water is a very dynamic resource which keep on fluctuating day by day and it becomes difficult to measure it in terms of time and space. However, roughly globally available water is shown in detail below which results in a simple fact that very few amounts of water (roughly 1% of total available water) can be used by human beings. The quantity available is still well enough for everyone if we are using it with proper distribution and sharing. (a) (b) Total Global Water Ocean Water (96.5%) Saline Groundwater (1%) Fresh Water (2.5%) Total Fresh Water Glaciers & Ice Caps (68.6%) Groundwater (30.1%) Surface Water (1.3%)
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 03 | Mar 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1695 (c) (Source – Water in Crisis : A Guide to World’s Fresh Water, Peter H. Gleick) Chart -1: Distribution of Water on Earth Water scarcity is troubling India for quite some time now but still we are very much behind in tackling it. In recent year, tow of the country’s oppositely faced cities faced a fate of Day Zero (A condition where no fresh water is available), Shimla and Bangaluru. One being the hottest of the tourists destination and another being the heart of the IT industry in India. Both the cities have experienced opposite weather conditions but yet their fate remains same. From a recent study carried out in NITI Aayog, it has been seen that more than 600 million people are suffering from extreme water stress, that’s around (50% of the total population). And more to that having 70% of supply water contaminated, India is shamefully taken place of 120 in a survey of 122 countries in water quality index [1]. With the water demand to be doubled by the year 2030, we need a better treatment and supply system for cities right now. Coming to the execution of the projects, delay I a common phenomenon in worldwide construction industry. A project must be completed within the time and resource limits planned for it. Any overrun in the quantity is set to reduce the efficiency and suitability of the project. A project is delayed by three reasons : 1)Improper decision making 2)Inefficiency of contractor & 3)Difficulties in execution[2]. Considering a water supply system project, the most important issue is the execution phase. Right from land acquisition to execution in very hard or very soft soils and dealing with the narrow roads and heavy traffic, every front of the project is suffered. The execution in some areas becomes very sensitive due to local residence influence, presence of existing underground utilities and again heavy traffic. So, the water supply system needs a proper project management approach which will not only establish healthy communication between decision making bodies and executing bodies but also it will help in increasing the overall efficiency of the project. 3. Water Supply System 3.1 Construction of Water Supply System (Source-https://alfacompbrasil.com/2019/04/18/ abastecimento-de-agua/) Fig -1: Layout of Water Supply System A water supply system mainly consists of Source, Treatment unit, Distribution network [2]. Various surface sources like rivers, dams, lake and some sub-surface sources like wells, aquifers are used for continuous supply of water into treatment unit. A treatment unit will further remove the floating impurities like debris, organic matter as well as dust and sand particles. Water will be then filtered out to remove microscopical impurities and then it will be disinfected to kill any present micro-organisms. Sometimes extra treatments of hardness removal or metal detection and other treatments can be applied based on the quality of water collected from source. The treated water is stored into various elevated storage reservoirs. These reservoirs will be transporting the water to extreme corners of the distribution grid. The distribution grid have lot of main and branch lines. The supply in an area can be controlled and water pressure will be maintained using valves attached to the main lines. For better performance of a water supply system it is very necessary to design each of the component with uttermost care and considerations. Various factors like leakage, theft and non- revenue water result in failure of a water supply system. 3.2 Difficulties in construction of Water Supply System A water supply system must be constructed starting from outside of a city to its most interior areas. A city undergoing the changes or upgradation in the supply system has to face many issues like planning the work processes over large areas, diverging the mainline traffic, finishing up the excavation works in important areas and most important being the rectifying the errors in pipeline installations. Some of the important factors causing delay in construction of water supply system are highlighted and briefly summarised below. SurfaceWater Ice and Snow (73.1%) Lakes (20.1%) Soil Mositure (3.5%) Rivers (0.5%) Others (2.8%)
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 03 | Mar 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1696 Table -1: Factors causing Delay in Construction of Water Supply System Type of Difficulties Details Planning (Preconstruction) difficulties Land Acquisition Lack of Proper Planning & Project Management Studies Absence of healthy communication within the authorities Executional difficulties Diverging the traffic flow Excavation problems Disturbance to existing underground utilities Pipe & Joints Installation Restoration of roads Performance related difficulties Inadequate resource Lack of Motion Study Local Festivals & Events Post Construction difficulties Quality Checks Rectification of errors Planning Difficulties – Land is the most primary need for an infrastructure and any delay in land acquisition causes huge changes in project costs. Before commencing any project, it is advisable to study its parameters using project management analysis and at the same time the entire information must be properly transferred to respective departments. If failed to do so, the project will be adversely affected and there will be a lot on confusion considering the role and responsibilities of authorities. Executional Difficulties – When any construction project is to be started, the important factor is the ease of site clearance. Since, water supply system needs roads for construction, a huge challenge of diverging traffic arises in front of authorities. Effective measures must be taken so that construction activities will be least affected and people can communicate within the city without any hassle. Excavation of roads must be done with care so that the underground utilities like service cables and old pipelines must not be disturbed and damaged. Joints in pipes are the next hurdle which might induce problems of leakage in discharge and pressure. After pipes and joints are installed, all roads must be restored to proper conditions or else accidents and pollution will increase in the area. Restoration of roads takes large resources of time and labor which influences project costs. Performance Difficulties – Contractors play an important role in successful completion of project. However, negligence of a contractor towards project management analysis, resource allocations and motion studies result in delay in project construction. Use of equipment in installing water pipes or excavation are to be properly scheduled so that costs are minimized. Many a times, labor laws and some other factors like festivals, strikes and local events will delay the project. Post Construction Difficulties – After the construction is complete, several quality checks must be performed to check pressures and leakages. If any of the pipe connection fails, entire process must be repeated and it further delays the project. 4. CONCLUSION Water, being the most consumed material on earth, must be made available to everyone in ample quantity. In India, water availability is reducing day by day and hence we need an efficient water supply system in the country. The construction project is hugely affected by various factors like planning and execution related difficulties. All of them must be carefully analyzed and effectively tackled. The study will be further extended in applying project management for water supply system in Jalgaon city. REFERENCES 1) Rana, Mamta and Guleria, Vishal (2018): Water Scarcity in India: A Threat to Sustainable Management of Water. ESSENCE Int. J. Env. Rehab. Conserv. IX (1): 35—44. 2) A.K. Aaditya, D.A. Douglass, M. Bhattacharya, “Urban Infrastructure Development Works in India: Delay and Difficulties in Implementation with Reference to a Water Supply Project”, J. Inst. Eng. India Ser. A (September 2017) 98(3):349– 354
Anzeige