Single Minute Exchange of Dies (SMED) concept
Akshay Hasabe1, Akshay Kakde2, Ashish Khandagle3 , Kiran Surve4, Asst. Prof. Pankaj Pardeshi5
1,2,3,4Students, Department of Mechanical Engineering, Dr. D. Y. Patil Institute of Technology, Pimpri, Pune, India.
5Assistant Professor, Department of Mechanical Engineering, Dr. D. Y. Patil Institute of Techology,Pimpri, Pune,
India.
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - To survive in cutthroat competition, industries
need to reduce production time and costs in order to improve
operating performanceandflexibility. SingleMinuteExchange
of Dies (SMED) mainly focuses on recognition of internal and
external activities. Accordingly, this article has as its main
objective to review the literature addressing this less studied
topic: SMED. This paper covers the literature review of SMED
tool and purpose of this literature review is to develop an
overview of the conceptual framework of SMED tool. The
various industrial applications and the existing articles
indicate the relevance of thetopicandmethodology. Flexibility
and responsiveness aremainpillarsofmanufacturing, whichis
operated by demands of greaterproductvarietyandimproved
quality.
Key Words: changeover reduction, SMED concept , FMEA
analysis , productivity Improvement, internal and
external functions, Quality Tools etc
1.INTRODUCTION
SMED was developed by Shigeo Shingo in 1950s Japan in
response to the emerging needs of increasingly smaller
production lot sizes required to meet the required flexibility
for customer demand. The study was originally developed
through the study of a die change process. Generally, SMED
aims to standardize and simplify the operations. By this
means, the need for special skilled workers is also
minimized. Since then, the ways to improve and support the
SMED technique are considered in the literature. The SMED
technique is used as an element of Total Productivity
Maintenance and “continuous improvement process” in
various studies to reach lean manufacturing .Describes lean
enablers which is based on the principles ofleanproduction.
Incorporated into an appropriate methodology, lean
enablers can be employed to design new factories or deduce
measures to improve existing factories.
1.1 SMED concept
Single Minute Exchange of Die (SMED) is one of the many
lean production methods for reducing waste in a
manufacturing process. It provides a rapid and efficientway
of converting a manufacturing process from running the
current product to running the next product. This rapid
changeover is key to reducing production lot sizes and
thereby improving flow. SMED is the term used to represent
the Single Minute Exchange of Die or setup time that can be
counted in a single digit of minutes. SMED is often used
interchangeably with “quick changeover”. SMED and quick
changeover are the practice of reducing the time it takes to
change a line or machine from running one product to the
next. The need for SMED and quick changeover programs is
more popular now than ever due to increased demand for
product variability, reduced product life cycles and theneed
to significantly reduce inventories. This rapid changeover is
key to reducing production lot sizes and thereby improving
flow. The phrase "single minute" does not mean that all
changeovers and startups should take only one minute, but
that they should take less than 10 minutes (in other words,
"single digit minute").
2. FOCUS ON SMED
The focus on the SMED applications for process industry
plants that produce materials like paints, paper products,
foods, beverages, personal care items and fiber, and apparel
rather than assembled products such as refrigerators, cell
phones, or automobiles. It is noted that changeover
complexity should be considered in addition to the
mechanical and electrical changes when changing to a
different productsincethese industriesoftenneedchemistry
and physics changes during the process is reaching
equilibrium on the new product and specified properties.
Describes the improvement of the quick changeoverprocess
of a painting line in a wooden framesfactory. Theapplication
presents the scheduling of the involved setup operations,
considering their duration, precedence relations and
resources' need, in order to achieve a reduced setup time.
The main focus of the project is to reduce the lead time in a
manufacturing process, by analyzing the cycle time for each
of the process and identifying the critical process in the
manufacturing line. Then identification of value added and
non-value added activities in process and to reduce non
value added activities to increase the productivity in it.
 To increase the productivity of the industry so that
the demands are met.
 To reduce the wastes leading to reduced
expenditure.
 To eliminate the bottlenecks in the production line.
 To increase the efficiencyoftheprocessbyreducing
the non-value added activities.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4666
3. OBJECTIVES of SMED:
 Study the process flow in the production line of a
manufacturing.
 Estimate the cycle time for each manufacturing
processes.
 Create the current state value stream map with the
cycle time.
 Find out the bottleneck in the current state value
stream map.
 Identifying the value added and non-value added
activities for the product.
 Apply lean tools to minimize non value added
activities.
 Create the future state value stream map and
compare the benefits.
4. PROCESS OF SMED
1. Observe the current methodology: Current
procedures generally recorded on video tape of all
the changeover process. It covers the complete
changeover from one model to another model.
2. Separate the Internal and External activities:
Internal activities are those that can only be
performed when the process is stopped, while
External activities can be done while the last batch
is being produced, or once the next batch has
started.
3. Stream line the process of changeover: For each
iteration of the above process, a substantial
improvement in set-up times shouldbeexpected,so
it may take several iterations to cross the ten
minute line.
4. Continuous Training: After the successful first
iteration of SMED application the prime
requirement becomes the training of all the
operator of the cell. Training has been given by cell
champion. See Figure 1.
Fig. 1 Representation of change over time
5. The Five S’s
The Five S’s are some rules for workplace organization
which aim to organize each worker’s work area for
maximum efficiency.
1. Sort – Sort what is needed and what is not needed
so that the things that are frequently needed are
available nearby and as easy to find as possible.
Things which are less often used or not needed
should be relocated or discarded.
2. Straighten – Arrange essential things in order for
easy access. The objective is to minimize the
amount of motion required in order for workers to
do their jobs.
3. Scrub or Shine – Keep machines and work areas
clean so as to eliminate problems associated with
un-cleanliness. In some industries, airborne dust is
among the causes of poor product surface or color
contamination. To be more aware of dust, some
companies paint their working places inlightcolors
and use a high level of lighting.
4. Stabilize or Standardize – Make the first 3 S’s a
routine practice by implementing clear procedures
for sorting, straightening and scrubbing.
5. Sustain – Promote, communicate and train in the 5
S’s to ensure that it is part of the company’s
corporate culture. This might include assigning a
team to be responsible for supervising compliance
with the 5 S’s.
6. SMED Terms
 Adjustment Waste: Any activitiesthatwouldcause
the machine to cycle in a sample or trial mode
which could create a part that must be inspected
and then possible scrappedorreworded(Rubrich&
Watson, 2004).
 Internal Setup: That part of the setup which must
be done while the machine is shut down, for
example, removing or attaching dies (Rubrich &
Watson, 2004).
 External Setup: That part of thesetupwhichcanbe
done while the machine is still running,for example,
preparing a die to be used for the next run (Rubrich
& Watson, 2004).
 Batch: A quantity of items that are processed
together (Marchwinski & Shook, 2003).
 Downtime: Production time lost due to planned
and unplanned stoppages. Planned downtime
includes scheduled stoppages for such activities as
shift start up, production meetings, changeovers to
produce other products and scheduled
maintenance. Unplanned downtime includes
stoppages for breakdowns, machine adjustments,
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4667
material shortages and absenteeism (Marchwinski
& Shook, 2003).
 Changeover: The process of switching from the
production of one product or part number to
another in a machine or a series of linked machines
by changing parts, dies, molds or fixtures, also
called a set-up. Changeover time is measured as the
time elapsed between the last piece in the run just
completed until the first good piece from the
process after the changeover (Marchwinski &
Shook, 2003).
 Die Set: This is the tooling that is removed and
replaced in a punch press during a changeover. A
die set consists of a set of male punches and female
dies which, when pressed together either creates a
hole in the work piece or forms the work piece
creating features desired by the customer.
 Waste: Any activity that consumes resources but
creates no value for the customer (Marchwinski &
Shook, 2003).
 Lean Production: A system of production that
makes and delivers just what is needed, justwhenit
is needed and just in the amount needed. Lean
manufacturing aims for the total elimination of all
waste to achieve the best possible quality, lowest
possible cost and use of resources, and the lowest
possible production and delivery lead times
(Marchwinski & Shook, 2003).
 Value Stream Map: A diagram that defines each
step of the material an information flow needed
from initial order of a good or service through
delivery (Marchwinski & Shook, 2003).
 Lot: A quantity of items that are processed together
(Krajewski & Ritzman, 2007).
 Value Added Activities: The time spent on
activities that add value to an item from the
customer's perspective. These are activities that
effectively change the form and function of a raw
material into a good or service that the customer is
willing to pay for (Marchwin ski & Shook, 2003).
 Non-Value Added Activities: The time spent on
activities that add costs but novaluetoanitemfrom
the customer's perspective. Theseareactivitiesthat
the customer is generally not willing to pay for
(Marchwinski & Shook, 2003).
 Shingo, Shigeo (1909-1990): A consultant to
Toyota who made key contributions to the
development of the Toyota Production System,
especially quick changeovers, SMED and
standardized work (Marchwinski & Shook, 2003).
the target of reducing changeover times to a single
digit, or less than 10 minutes (Marchwinski &
Shook, 2003)
 Punch Press: A machine tool used to work
materials (typically steel) by changing the shape of
the raw material. Material shapeischangedthrough
application of direct pressure which forces the
material to change shape. The function of thepunch
press is to hold the die set and apply the motionand
pressure required to perform value added
operations to raw materials.
 Setup Waste, Internal: Alignment activities
required to remove and install tools, for example,
the time associated with using a fork truck to
maneuver the old tool out and the new tool in while
setting up a press (Rubrich & Watson, 2004).
 Setup: The process of switching from the
production of one product or part number to
another in a machine or a series of linked machines
by changing parts, dies, molds or fixtures, also
called a set-up. Changeover time is measured as the
time elapsed between the last piece in the run just
completed until the first good piece from the
process after the changeover (Marchwinski &
Shook, 2003).
 Setup Waste, External: Activities such as
searching, locating or moving jigs, tools, bolts,
clamps, fasteners, gauges or instructions in the
setup area (Rubrich & Watson, 2003).
7. SMED Implementation in CNC machine Fixture
In CNC machine comparison between old fixture and new
fixture after the implementing of SMED concept.
Fig 2. CNC machine
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4668
.
Fig 3. Fixture mount on CNC machine
Fig 4. Old fixture
8. APPLICATION of SMED
This application aims to optimize machine utilization,
enabling small lot sizes, reducingproductiontimes,reducing
the time that machine does not operate. Also, shortening
preparation and machine adjustment times and reducing
stocks. The facility in concern manufactures Styrofoam
products that are used to support mainly for refrigerators
during packing and handling. The injection presses in the
facility are also capable of producing other products by
utilizing the dies that are designed for automotive parts and
construction sites. High product variation forces the
company to make changeovers frequently.
1. Analyzing setup time
A video recorder was used to analyze how setup tasks are
executed in the current case. Then, based on the activities,
total time is analyzed. A pie chart is drawn where the
percent of task times are stated in Fig. 5.
Fig.5. Current percent of setup steps
2. Eliminating inefficient time
Eliminating the time that may be wasted during searching
required equipment’s is important. Therefore, a list of
materials and equipment’s that is being used during setupis
made. Also, forms are designed to enable that they are
available and properly working when needed.
3. Standardization
In the final step, the improvementstudieswere reported and
checklists were formed. The causes for recursive activities
were determined as much as possible and act plans to
eliminate them were provided. Finally, the setup tasks will
no longer be unpredictable time delays by use of the precise
time records. Therefore, better planning activities will lead
to better customersatisfaction.Theeducationandskill levels
of the workers are also an important issue that needs to be
considered during standardization.
9. CONCLUSION
In this study, SMED methodology was applied to prepare an
optimal standard procedure for changeover operations on
defined machine. Ergonomics and safety issues were also
taken into consideration during setups. Since an ergonomic
workplace makes operations easierfortheoperators,simple
however crucial changes are suggested. One of the major
problems more setup time was identified and then study
about the fixture design. Literature survey related to single
minute exchange of dies (SMED) was carried out.
Further studies in the facility may include 5S and Kaizen
studies for internal setup. Alternative ways to shorten
internal setups can be searched in detail. In order to
eliminate adjustment steps, trial and errors should be
minimized. Settings must be used forchangeoveroperations
instead of adjustments. Therefore, a design of experiments
study can be done to determine parameters of the machine.
It should be kept in mind that successful implementation of
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4669
new production methods requires sustainability and
permanent solutions and the key of sustainability is the
standardization of that optimal solution.
REFERENCES
1. Berna Ulutas, “An application of SMED
Methodology”, International Journal of Industrial
and Manufacturing Engineering, 5, (2011), 1194-
1197.
2. Arun Abraham,Ganpathi K.N., Kailash Motwani,
“Setup time reduction through SMED techniqueina
stamping production line”, SASTECH journal, 11,
(2012), 47-52.
3. Mukesh Desai, A.M.Rawani, “Productivity
improvement of automobile industry by using
SMED”, ARPN Journal of Engineering and applied
science, 12, (2017), 2615-2629.
4. N.P.Maniar, D.P.Vakharia,“DesignandDevelopment
of Rotary Fixture for CNC”, International Journal of
Engineering a Science Invention ,1, (2012), 32-43.
5. K.M.Viramgama, R.D.Makhawana, “A Study on
Design of Fixture for Valve Body for CNC Machine”,
International Journal of Advance Engineering and
Research Development, 1, (2014), 42-46.

Weitere ähnliche Inhalte

Was ist angesagt?

IRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET Journal
 
Report on JIT , for Projects and Seminars
Report on JIT , for Projects and SeminarsReport on JIT , for Projects and Seminars
Report on JIT , for Projects and Seminarsomkar jagtap
 
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...IRJET Journal
 
Jit ppt with case study
Jit ppt with case studyJit ppt with case study
Jit ppt with case studyomkar jagtap
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET Journal
 
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...IRJET Journal
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining CellIRJET Journal
 
Just in Time System: A Study and Review
Just in Time System: A Study and ReviewJust in Time System: A Study and Review
Just in Time System: A Study and Reviewvivatechijri
 
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing IndustryIRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing IndustryIRJET Journal
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET Journal
 
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing UnitImplementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing UnitIRJET Journal
 
A036501014
A036501014A036501014
A036501014theijes
 
Implementation of Lean Manufacturing Principles in Foundries
Implementation of Lean Manufacturing Principles in FoundriesImplementation of Lean Manufacturing Principles in Foundries
Implementation of Lean Manufacturing Principles in FoundriesIJMER
 
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...Journal For Research
 
IRJET- Applications of Lean Six Sigma
IRJET-  	  Applications of Lean Six SigmaIRJET-  	  Applications of Lean Six Sigma
IRJET- Applications of Lean Six SigmaIRJET Journal
 
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET Journal
 
A throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsmA throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsmSourav Kumar
 

Was ist angesagt? (20)

IRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in Company
 
synopsis
synopsissynopsis
synopsis
 
Report on JIT , for Projects and Seminars
Report on JIT , for Projects and SeminarsReport on JIT , for Projects and Seminars
Report on JIT , for Projects and Seminars
 
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
 
Lean construction
Lean constructionLean construction
Lean construction
 
Jit ppt with case study
Jit ppt with case studyJit ppt with case study
Jit ppt with case study
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
 
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
 
Just in Time System: A Study and Review
Just in Time System: A Study and ReviewJust in Time System: A Study and Review
Just in Time System: A Study and Review
 
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing IndustryIRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
 
Joined document 24_5
Joined document 24_5Joined document 24_5
Joined document 24_5
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
 
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing UnitImplementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
 
A036501014
A036501014A036501014
A036501014
 
Implementation of Lean Manufacturing Principles in Foundries
Implementation of Lean Manufacturing Principles in FoundriesImplementation of Lean Manufacturing Principles in Foundries
Implementation of Lean Manufacturing Principles in Foundries
 
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
 
IRJET- Applications of Lean Six Sigma
IRJET-  	  Applications of Lean Six SigmaIRJET-  	  Applications of Lean Six Sigma
IRJET- Applications of Lean Six Sigma
 
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
 
A throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsmA throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsm
 

Ähnlich wie IRJET- Single Minute Exchange of Dies (SMED) Concept

PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRYPRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRYIRJET Journal
 
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESSIMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESSIRJET Journal
 
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...IRJET Journal
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryIRJET Journal
 
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET Journal
 
IRJET-Methodology for Modular Fixturing System
IRJET-Methodology for Modular Fixturing SystemIRJET-Methodology for Modular Fixturing System
IRJET-Methodology for Modular Fixturing SystemIRJET Journal
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleIAEME Publication
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleIAEME Publication
 
Implementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case StudyImplementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case StudyIRJET Journal
 
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall ProductivityIRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall ProductivityIRJET Journal
 
Overall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsOverall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsIRJET Journal
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryijmech
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET Journal
 
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workloadeSAT Publishing House
 
Submission of mba spring 2012
Submission of mba spring 2012Submission of mba spring 2012
Submission of mba spring 2012Shraddha Singh
 
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringIJECSJournal
 
Concurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & SustainabilityConcurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & SustainabilityIRJET Journal
 
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyProductivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyIRJET Journal
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...IRJET Journal
 

Ähnlich wie IRJET- Single Minute Exchange of Dies (SMED) Concept (20)

PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRYPRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
 
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESSIMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
 
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
 
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
 
IRJET-Methodology for Modular Fixturing System
IRJET-Methodology for Modular Fixturing SystemIRJET-Methodology for Modular Fixturing System
IRJET-Methodology for Modular Fixturing System
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principle
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principle
 
Implementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case StudyImplementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case Study
 
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall ProductivityIRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall Productivity
 
Overall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsOverall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction Equipments
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industry
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
 
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload
 
Submission of mba spring 2012
Submission of mba spring 2012Submission of mba spring 2012
Submission of mba spring 2012
 
B44090512
B44090512B44090512
B44090512
 
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
 
Concurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & SustainabilityConcurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & Sustainability
 
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyProductivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
 

Mehr von IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

Mehr von IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Kürzlich hochgeladen

Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfNainaShrivastava14
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming languageSmritiSharma901052
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 

Kürzlich hochgeladen (20)

Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming language
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 

IRJET- Single Minute Exchange of Dies (SMED) Concept

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4665 Single Minute Exchange of Dies (SMED) concept Akshay Hasabe1, Akshay Kakde2, Ashish Khandagle3 , Kiran Surve4, Asst. Prof. Pankaj Pardeshi5 1,2,3,4Students, Department of Mechanical Engineering, Dr. D. Y. Patil Institute of Technology, Pimpri, Pune, India. 5Assistant Professor, Department of Mechanical Engineering, Dr. D. Y. Patil Institute of Techology,Pimpri, Pune, India. ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - To survive in cutthroat competition, industries need to reduce production time and costs in order to improve operating performanceandflexibility. SingleMinuteExchange of Dies (SMED) mainly focuses on recognition of internal and external activities. Accordingly, this article has as its main objective to review the literature addressing this less studied topic: SMED. This paper covers the literature review of SMED tool and purpose of this literature review is to develop an overview of the conceptual framework of SMED tool. The various industrial applications and the existing articles indicate the relevance of thetopicandmethodology. Flexibility and responsiveness aremainpillarsofmanufacturing, whichis operated by demands of greaterproductvarietyandimproved quality. Key Words: changeover reduction, SMED concept , FMEA analysis , productivity Improvement, internal and external functions, Quality Tools etc 1.INTRODUCTION SMED was developed by Shigeo Shingo in 1950s Japan in response to the emerging needs of increasingly smaller production lot sizes required to meet the required flexibility for customer demand. The study was originally developed through the study of a die change process. Generally, SMED aims to standardize and simplify the operations. By this means, the need for special skilled workers is also minimized. Since then, the ways to improve and support the SMED technique are considered in the literature. The SMED technique is used as an element of Total Productivity Maintenance and “continuous improvement process” in various studies to reach lean manufacturing .Describes lean enablers which is based on the principles ofleanproduction. Incorporated into an appropriate methodology, lean enablers can be employed to design new factories or deduce measures to improve existing factories. 1.1 SMED concept Single Minute Exchange of Die (SMED) is one of the many lean production methods for reducing waste in a manufacturing process. It provides a rapid and efficientway of converting a manufacturing process from running the current product to running the next product. This rapid changeover is key to reducing production lot sizes and thereby improving flow. SMED is the term used to represent the Single Minute Exchange of Die or setup time that can be counted in a single digit of minutes. SMED is often used interchangeably with “quick changeover”. SMED and quick changeover are the practice of reducing the time it takes to change a line or machine from running one product to the next. The need for SMED and quick changeover programs is more popular now than ever due to increased demand for product variability, reduced product life cycles and theneed to significantly reduce inventories. This rapid changeover is key to reducing production lot sizes and thereby improving flow. The phrase "single minute" does not mean that all changeovers and startups should take only one minute, but that they should take less than 10 minutes (in other words, "single digit minute"). 2. FOCUS ON SMED The focus on the SMED applications for process industry plants that produce materials like paints, paper products, foods, beverages, personal care items and fiber, and apparel rather than assembled products such as refrigerators, cell phones, or automobiles. It is noted that changeover complexity should be considered in addition to the mechanical and electrical changes when changing to a different productsincethese industriesoftenneedchemistry and physics changes during the process is reaching equilibrium on the new product and specified properties. Describes the improvement of the quick changeoverprocess of a painting line in a wooden framesfactory. Theapplication presents the scheduling of the involved setup operations, considering their duration, precedence relations and resources' need, in order to achieve a reduced setup time. The main focus of the project is to reduce the lead time in a manufacturing process, by analyzing the cycle time for each of the process and identifying the critical process in the manufacturing line. Then identification of value added and non-value added activities in process and to reduce non value added activities to increase the productivity in it.  To increase the productivity of the industry so that the demands are met.  To reduce the wastes leading to reduced expenditure.  To eliminate the bottlenecks in the production line.  To increase the efficiencyoftheprocessbyreducing the non-value added activities.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4666 3. OBJECTIVES of SMED:  Study the process flow in the production line of a manufacturing.  Estimate the cycle time for each manufacturing processes.  Create the current state value stream map with the cycle time.  Find out the bottleneck in the current state value stream map.  Identifying the value added and non-value added activities for the product.  Apply lean tools to minimize non value added activities.  Create the future state value stream map and compare the benefits. 4. PROCESS OF SMED 1. Observe the current methodology: Current procedures generally recorded on video tape of all the changeover process. It covers the complete changeover from one model to another model. 2. Separate the Internal and External activities: Internal activities are those that can only be performed when the process is stopped, while External activities can be done while the last batch is being produced, or once the next batch has started. 3. Stream line the process of changeover: For each iteration of the above process, a substantial improvement in set-up times shouldbeexpected,so it may take several iterations to cross the ten minute line. 4. Continuous Training: After the successful first iteration of SMED application the prime requirement becomes the training of all the operator of the cell. Training has been given by cell champion. See Figure 1. Fig. 1 Representation of change over time 5. The Five S’s The Five S’s are some rules for workplace organization which aim to organize each worker’s work area for maximum efficiency. 1. Sort – Sort what is needed and what is not needed so that the things that are frequently needed are available nearby and as easy to find as possible. Things which are less often used or not needed should be relocated or discarded. 2. Straighten – Arrange essential things in order for easy access. The objective is to minimize the amount of motion required in order for workers to do their jobs. 3. Scrub or Shine – Keep machines and work areas clean so as to eliminate problems associated with un-cleanliness. In some industries, airborne dust is among the causes of poor product surface or color contamination. To be more aware of dust, some companies paint their working places inlightcolors and use a high level of lighting. 4. Stabilize or Standardize – Make the first 3 S’s a routine practice by implementing clear procedures for sorting, straightening and scrubbing. 5. Sustain – Promote, communicate and train in the 5 S’s to ensure that it is part of the company’s corporate culture. This might include assigning a team to be responsible for supervising compliance with the 5 S’s. 6. SMED Terms  Adjustment Waste: Any activitiesthatwouldcause the machine to cycle in a sample or trial mode which could create a part that must be inspected and then possible scrappedorreworded(Rubrich& Watson, 2004).  Internal Setup: That part of the setup which must be done while the machine is shut down, for example, removing or attaching dies (Rubrich & Watson, 2004).  External Setup: That part of thesetupwhichcanbe done while the machine is still running,for example, preparing a die to be used for the next run (Rubrich & Watson, 2004).  Batch: A quantity of items that are processed together (Marchwinski & Shook, 2003).  Downtime: Production time lost due to planned and unplanned stoppages. Planned downtime includes scheduled stoppages for such activities as shift start up, production meetings, changeovers to produce other products and scheduled maintenance. Unplanned downtime includes stoppages for breakdowns, machine adjustments,
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4667 material shortages and absenteeism (Marchwinski & Shook, 2003).  Changeover: The process of switching from the production of one product or part number to another in a machine or a series of linked machines by changing parts, dies, molds or fixtures, also called a set-up. Changeover time is measured as the time elapsed between the last piece in the run just completed until the first good piece from the process after the changeover (Marchwinski & Shook, 2003).  Die Set: This is the tooling that is removed and replaced in a punch press during a changeover. A die set consists of a set of male punches and female dies which, when pressed together either creates a hole in the work piece or forms the work piece creating features desired by the customer.  Waste: Any activity that consumes resources but creates no value for the customer (Marchwinski & Shook, 2003).  Lean Production: A system of production that makes and delivers just what is needed, justwhenit is needed and just in the amount needed. Lean manufacturing aims for the total elimination of all waste to achieve the best possible quality, lowest possible cost and use of resources, and the lowest possible production and delivery lead times (Marchwinski & Shook, 2003).  Value Stream Map: A diagram that defines each step of the material an information flow needed from initial order of a good or service through delivery (Marchwinski & Shook, 2003).  Lot: A quantity of items that are processed together (Krajewski & Ritzman, 2007).  Value Added Activities: The time spent on activities that add value to an item from the customer's perspective. These are activities that effectively change the form and function of a raw material into a good or service that the customer is willing to pay for (Marchwin ski & Shook, 2003).  Non-Value Added Activities: The time spent on activities that add costs but novaluetoanitemfrom the customer's perspective. Theseareactivitiesthat the customer is generally not willing to pay for (Marchwinski & Shook, 2003).  Shingo, Shigeo (1909-1990): A consultant to Toyota who made key contributions to the development of the Toyota Production System, especially quick changeovers, SMED and standardized work (Marchwinski & Shook, 2003). the target of reducing changeover times to a single digit, or less than 10 minutes (Marchwinski & Shook, 2003)  Punch Press: A machine tool used to work materials (typically steel) by changing the shape of the raw material. Material shapeischangedthrough application of direct pressure which forces the material to change shape. The function of thepunch press is to hold the die set and apply the motionand pressure required to perform value added operations to raw materials.  Setup Waste, Internal: Alignment activities required to remove and install tools, for example, the time associated with using a fork truck to maneuver the old tool out and the new tool in while setting up a press (Rubrich & Watson, 2004).  Setup: The process of switching from the production of one product or part number to another in a machine or a series of linked machines by changing parts, dies, molds or fixtures, also called a set-up. Changeover time is measured as the time elapsed between the last piece in the run just completed until the first good piece from the process after the changeover (Marchwinski & Shook, 2003).  Setup Waste, External: Activities such as searching, locating or moving jigs, tools, bolts, clamps, fasteners, gauges or instructions in the setup area (Rubrich & Watson, 2003). 7. SMED Implementation in CNC machine Fixture In CNC machine comparison between old fixture and new fixture after the implementing of SMED concept. Fig 2. CNC machine
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4668 . Fig 3. Fixture mount on CNC machine Fig 4. Old fixture 8. APPLICATION of SMED This application aims to optimize machine utilization, enabling small lot sizes, reducingproductiontimes,reducing the time that machine does not operate. Also, shortening preparation and machine adjustment times and reducing stocks. The facility in concern manufactures Styrofoam products that are used to support mainly for refrigerators during packing and handling. The injection presses in the facility are also capable of producing other products by utilizing the dies that are designed for automotive parts and construction sites. High product variation forces the company to make changeovers frequently. 1. Analyzing setup time A video recorder was used to analyze how setup tasks are executed in the current case. Then, based on the activities, total time is analyzed. A pie chart is drawn where the percent of task times are stated in Fig. 5. Fig.5. Current percent of setup steps 2. Eliminating inefficient time Eliminating the time that may be wasted during searching required equipment’s is important. Therefore, a list of materials and equipment’s that is being used during setupis made. Also, forms are designed to enable that they are available and properly working when needed. 3. Standardization In the final step, the improvementstudieswere reported and checklists were formed. The causes for recursive activities were determined as much as possible and act plans to eliminate them were provided. Finally, the setup tasks will no longer be unpredictable time delays by use of the precise time records. Therefore, better planning activities will lead to better customersatisfaction.Theeducationandskill levels of the workers are also an important issue that needs to be considered during standardization. 9. CONCLUSION In this study, SMED methodology was applied to prepare an optimal standard procedure for changeover operations on defined machine. Ergonomics and safety issues were also taken into consideration during setups. Since an ergonomic workplace makes operations easierfortheoperators,simple however crucial changes are suggested. One of the major problems more setup time was identified and then study about the fixture design. Literature survey related to single minute exchange of dies (SMED) was carried out. Further studies in the facility may include 5S and Kaizen studies for internal setup. Alternative ways to shorten internal setups can be searched in detail. In order to eliminate adjustment steps, trial and errors should be minimized. Settings must be used forchangeoveroperations instead of adjustments. Therefore, a design of experiments study can be done to determine parameters of the machine. It should be kept in mind that successful implementation of
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4669 new production methods requires sustainability and permanent solutions and the key of sustainability is the standardization of that optimal solution. REFERENCES 1. Berna Ulutas, “An application of SMED Methodology”, International Journal of Industrial and Manufacturing Engineering, 5, (2011), 1194- 1197. 2. Arun Abraham,Ganpathi K.N., Kailash Motwani, “Setup time reduction through SMED techniqueina stamping production line”, SASTECH journal, 11, (2012), 47-52. 3. Mukesh Desai, A.M.Rawani, “Productivity improvement of automobile industry by using SMED”, ARPN Journal of Engineering and applied science, 12, (2017), 2615-2629. 4. N.P.Maniar, D.P.Vakharia,“DesignandDevelopment of Rotary Fixture for CNC”, International Journal of Engineering a Science Invention ,1, (2012), 32-43. 5. K.M.Viramgama, R.D.Makhawana, “A Study on Design of Fixture for Valve Body for CNC Machine”, International Journal of Advance Engineering and Research Development, 1, (2014), 42-46.