SlideShare a Scribd company logo
Suche senden
Hochladen
Einloggen
Registrieren
IRJET- Challenges in the Implementation of Smart City Projects in Bhopal
Melden
IRJET Journal
Folgen
Fast Track Publications
14. Jun 2019
•
0 gefällt mir
•
18 views
IRJET- Challenges in the Implementation of Smart City Projects in Bhopal
14. Jun 2019
•
0 gefällt mir
•
18 views
IRJET Journal
Folgen
Fast Track Publications
Melden
Ingenieurwesen
https://www.irjet.net/archives/V6/i4/IRJET-V6I488.pdf
IRJET- Challenges in the Implementation of Smart City Projects in Bhopal
1 von 3
Jetzt herunterladen
1
von
3
Recomendados
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET Journal
3 views
•
8 Folien
Assessing the performance of local contractors on government projects in the ...
Alexander Decker
440 views
•
15 Folien
Ppp
Surya C D
589 views
•
23 Folien
E&C Launch Presentation by Raj Kalady, PMI India
PMI Chennai Chapter
423 views
•
9 Folien
Overview Toolkt Pp Phwys Bsb Jun2010 C Queiroz V3
cesarqueiroz
360 views
•
24 Folien
Factor Affecting Construction Cost and Time in road project
IRJET Journal
217 views
•
3 Folien
Más contenido relacionado
Similar a IRJET- Challenges in the Implementation of Smart City Projects in Bhopal
Study of Different Public-Private Partnership (PPP) Model for the Road Infras...
IRJET Journal
72 views
•
4 Folien
Exploring the adoption of building information
eSAT Publishing House
506 views
•
12 Folien
IRJET- Significance of Public Private Partnerships in INDIA
IRJET Journal
20 views
•
6 Folien
A COMPARATIVE STUDY ON PPP AND BOT MODEL OF WORKING CAPITAL MANAGEMENT IN MET...
IRJET Journal
2 views
•
6 Folien
Exploring the adoption of building information modelling (bim) in the malaysi...
eSAT Journals
506 views
•
12 Folien
IRJET- Analysis of Affordable Urban Housing Projects of Bhopal
IRJET Journal
43 views
•
6 Folien
Similar a IRJET- Challenges in the Implementation of Smart City Projects in Bhopal
(20)
Study of Different Public-Private Partnership (PPP) Model for the Road Infras...
IRJET Journal
•
72 views
Exploring the adoption of building information
eSAT Publishing House
•
506 views
IRJET- Significance of Public Private Partnerships in INDIA
IRJET Journal
•
20 views
A COMPARATIVE STUDY ON PPP AND BOT MODEL OF WORKING CAPITAL MANAGEMENT IN MET...
IRJET Journal
•
2 views
Exploring the adoption of building information modelling (bim) in the malaysi...
eSAT Journals
•
506 views
IRJET- Analysis of Affordable Urban Housing Projects of Bhopal
IRJET Journal
•
43 views
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET Journal
•
88 views
Dzo Tour Presentation
Namgay Tshering
•
134 views
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET Journal
•
8 views
Exploring the Adoption of Building Information Modelling In India and Need Fo...
IRJET Journal
•
81 views
Critical review and analysis of Gujrera act [2016] and its implication and sa...
IRJET Journal
•
5 views
IRJET- Risk Management in BOT PNG Toll Plaza
IRJET Journal
•
24 views
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IRJET Journal
•
29 views
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET Journal
•
25 views
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET Journal
•
60 views
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET Journal
•
37 views
IRJET- Exploration of Business Opportunities for an Entrepreneur in Real Esta...
IRJET Journal
•
25 views
Smart republic 2018
Raghvendra Rajput
•
50 views
Public Private Partnership in Civil Engineering
vivatechijri
•
162 views
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET Journal
•
35 views
Más de IRJET Journal
SOIL STABILIZATION USING WASTE FIBER MATERIAL
IRJET Journal
6 views
•
7 Folien
Sol-gel auto-combustion produced gamma irradiated Ni1-xCdxFe2O4 nanoparticles...
IRJET Journal
3 views
•
7 Folien
Identification, Discrimination and Classification of Cotton Crop by Using Mul...
IRJET Journal
3 views
•
5 Folien
“Analysis of GDP, Unemployment and Inflation rates using mathematical formula...
IRJET Journal
2 views
•
11 Folien
MAXIMUM POWER POINT TRACKING BASED PHOTO VOLTAIC SYSTEM FOR SMART GRID INTEGR...
IRJET Journal
3 views
•
6 Folien
Performance Analysis of Aerodynamic Design for Wind Turbine Blade
IRJET Journal
3 views
•
5 Folien
Más de IRJET Journal
(20)
SOIL STABILIZATION USING WASTE FIBER MATERIAL
IRJET Journal
•
6 views
Sol-gel auto-combustion produced gamma irradiated Ni1-xCdxFe2O4 nanoparticles...
IRJET Journal
•
3 views
Identification, Discrimination and Classification of Cotton Crop by Using Mul...
IRJET Journal
•
3 views
“Analysis of GDP, Unemployment and Inflation rates using mathematical formula...
IRJET Journal
•
2 views
MAXIMUM POWER POINT TRACKING BASED PHOTO VOLTAIC SYSTEM FOR SMART GRID INTEGR...
IRJET Journal
•
3 views
Performance Analysis of Aerodynamic Design for Wind Turbine Blade
IRJET Journal
•
3 views
Heart Failure Prediction using Different Machine Learning Techniques
IRJET Journal
•
2 views
Experimental Investigation of Solar Hot Case Based on Photovoltaic Panel
IRJET Journal
•
2 views
Metro Development and Pedestrian Concerns
IRJET Journal
•
2 views
Mapping the Crashworthiness Domains: Investigations Based on Scientometric An...
IRJET Journal
•
2 views
Data Analytics and Artificial Intelligence in Healthcare Industry
IRJET Journal
•
2 views
DESIGN AND SIMULATION OF SOLAR BASED FAST CHARGING STATION FOR ELECTRIC VEHIC...
IRJET Journal
•
5 views
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
IRJET Journal
•
6 views
Development of Effective Tomato Package for Post-Harvest Preservation
IRJET Journal
•
2 views
“DYNAMIC ANALYSIS OF GRAVITY RETAINING WALL WITH SOIL STRUCTURE INTERACTION”
IRJET Journal
•
2 views
Understanding the Nature of Consciousness with AI
IRJET Journal
•
2 views
Augmented Reality App for Location based Exploration at JNTUK Kakinada
IRJET Journal
•
4 views
Smart Traffic Congestion Control System: Leveraging Machine Learning for Urba...
IRJET Journal
•
2 views
Enhancing Real Time Communication and Efficiency With Websocket
IRJET Journal
•
2 views
Textile Industrial Wastewater Treatability Studies by Soil Aquifer Treatment ...
IRJET Journal
•
2 views
Último
Master's Transcript Mohammad Mahdi Farshadian.pdf
Educational Group Mohammad Farshadian
34 views
•
2 Folien
Instruction Set : Computer Architecture
Ritwik Mishra
16 views
•
13 Folien
Dynamics (Hibbeler) (1).pdf
VEGACHRISTINEF
45 views
•
791 Folien
Airbus A320 Flight Crew Operating Manual.Part 1.pdf
TahirSadikovi
22 views
•
921 Folien
Unit 4 Food packaging materials and testing.pptx
Dr P DINESHKUMAR
17 views
•
55 Folien
Work Pattern Analysis with and without Site-specific Information in a Manufac...
Kurata Takeshi
35 views
•
20 Folien
Último
(20)
Master's Transcript Mohammad Mahdi Farshadian.pdf
Educational Group Mohammad Farshadian
•
34 views
Instruction Set : Computer Architecture
Ritwik Mishra
•
16 views
Dynamics (Hibbeler) (1).pdf
VEGACHRISTINEF
•
45 views
Airbus A320 Flight Crew Operating Manual.Part 1.pdf
TahirSadikovi
•
22 views
Unit 4 Food packaging materials and testing.pptx
Dr P DINESHKUMAR
•
17 views
Work Pattern Analysis with and without Site-specific Information in a Manufac...
Kurata Takeshi
•
35 views
Cessna Model 406 Pilot Operating Handbook.pdf
TahirSadikovi
•
24 views
1st Ansys Technology Day in Athens,Agenda
SIMTEC Software and Services
•
113 views
CCS334 BIG DATA ANALYTICS Session 3 Distributed models.pptx
Asst.Prof. M.Gokilavani
•
25 views
Introduction to Data Science.pptx
Anusuya123
•
24 views
NCL PREVIOUS YEAR QUESTIONS.pdf
mining novel
•
17 views
ML in Astronomy - Workshop 1.pptx
AstronomyClubIITBHU
•
198 views
OpenOCD-K3
Nishanth Menon
•
44 views
VFD DRIVES TROUBLESHOOTING.pptx
CONTROLS SYSTEMS
•
17 views
Ansys Technology Day in Budapest, Agenda
SIMTEC Software and Services
•
185 views
North American YAT-28 Turbo Trojan.pdf
TahirSadikovi
•
16 views
Data Communication & Computer Networks
Sreedhar Chowdam
•
65 views
GOOGLE CLOUD STUDY JAM INFO : GDSC NIET
YashiGupta410690
•
82 views
CODING AND MARK-WPS Office.pptx
sri jayaram institute of engineering and technology
•
13 views
JSA-Piling or Concreting for Foundations & Building
Alvin160771
•
20 views
IRJET- Challenges in the Implementation of Smart City Projects in Bhopal
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 401 Challenges in the Implementation of Smart City Projects in Bhopal Shravya Rao MBA final Year Student of construction Management, Department of Project and construction management, MIT Art Design and Technology University, Pune, Maharashtra, India. Shravya.rao@outlook.com . ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract – This research project gives the study of the factors that are responsible for the delaying of the implementation of the smart city projects in Bhopal. The research project encompasses all the stakeholders involved in the smart city mission projects in Bhopal and tries to find out the risk factors that will majorly affect the delay in the implementation of the projects through the perspective of all the stakeholders. The research was carried out in Bhopal the respondents included government employees, private parties(buildersand contractors). The questionnaire was based on the success and risk factors in the implementation of the projects and then the co-relation was done on these factors, whichgavetherelationshipsamong success, and risk factors, which are significantly related. 1. INTRODUCTION India is trying to emulate the world’s trend in urbanization with the rapid growth in its economy and its growing population and increased the flux of people toward cities require services to enhance its cities. In this backdrop, the Government of India started contemplating to introduce a program,whichmayhelpthem initiate this process. In this concept, the Honorable Prime Minister of India launched the national flagshipmissions,the Smart City mission (SCM) on 25th June 2015. The objective of the mission was to provide core infrastructure and a decent quality of life to residents and provide smart solutions, which are clean and sustainable. Bhopal was selected in Phase-1 selection criteria in which first 20 cities were selected under SCM plan. After which the Government of Madhya PradeshformedtheBHOPALSMART CITY CORPORATION. SCM Bhopal has achieved the targets such as successfully implementing public bicycle sharing and development of Bhopal plus app but on many aspects and it islaggingbehind (especially when providing core infrastructure) in many other project implementation. The implementation of demonetization and GST have also played a significant role in which largely affected theprivate partners and created hindrance in the implementation process. The projects related toroadconstructionwaspushedbehind fifteen to twenty percent due to the removal of encroachment in order to acquire the land. 2. METHODOLOGY The questionnaire we prepared contains qualitative as well as for quantitating questions that will give data that will be analyzed to interpret the results. Through the questionnaire and surveys, we will aim to gain our responses from three stakeholders involved in smart city project – government employees, private builders andcitizensoftheBhopal.There is three sets of the questionnaire with respect to three stakeholders, which will help us gain the data to gauge the magnitude of variouschallenges.Thequestionnaireissentto the stakeholders using Google forms. 2.1 Aim: A Study on Challenges in the Implementation of Smart City Projects in Bhopal 2.2 Objectives: The purpose of the study is to identify the challenges that are impeding the implementation of Smart City projects in Bhopal. This study focuses on finding out the risk factors in the project from the stakeholder perspective, which results in delaying of the projects. The study aims to establish the relationship between various risk factors and how these risk factors can be mitigated at various levels to keep the projects on a scheduled timeline. 3. ANALYSIS AND RESULTS Co-relation of risk factors
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 402 Challenges-when projects are not in sync with timeline Success Factors - when projects are in sync with the timelines 4. RECOMMENDATIONS Recommendations Smart City Mission projectsshallhave a definite policy structure with respect to tendering process, solution availability, and post-implementation audit there should be a paradigm shiftinthepolicymakingprocessbythe government in order to have an efficient implementation of the projects 1- There should be strict timelines given to the states by the central government in order to complete the projects 2- State level smart city corporations shall not absorb employees from other departments of state government related to BMC, city planning, and urban development department, fresh employees shall be hired through tendering process with the optimum technical knowledge with respect to projects and shall be given implementation powers 3- Solution availability shall not be a tender driven process rather it should be a clearance driven process 4- Models shall be defined for the construction along with a 10% overlay of financial overlay or budget shall be fixed and then call for the tender. 5- The fallback arrangement is a policy-driven matter a contingency plan shall be a part of the policy. 6- The government should try to minimize the risks of the private parties, which will influence more private parties to join the projects hence more funds. 7- The post-implementation audit has to be the third party, which is independent of the government. Ex- NHAI quality control consultant is a third party in their every project who is independent of the implementing body. CONCLUSIONS Major Findings 1. Clear cut lack of a precise master plan and lack of technical know-how, the government staff of BMC (Bhopal Municipal Corporation) and of the city planning department have been absorbed by the Bhopal smartcitycorporation ltd there is hardly any input from outside. 2. Without a precise master plan,planningandexecution are taking a toll, with right master plan proper budgets can be formed and on the basis of that funds can be transferred at the right time without any frequent changes in it. 3. Lack of awareness among the citizens and lack of awareness among their representatives to support the area of their constituencyfortheredevelopment.SivajiNagar was selected first for Area Based Development (ABD) but due to lack of support from people of the area, T.T Nagar was selected for ABD plan, which delayed the process. 4. The major projects that need to be implemented first are delayed due to change of area because even if the land acquisition is permitted by the government-achieving Right of way (ROW) especially the removal of encroachmenttakes a lot of time and at times it escalates political pressures. 5. There are no set guidelines by the GOI for the completion of the projects even when the money will be allocated to the states for the coming 5 years. 6. In many projects, the consultants are hired from outside to enhance the planning process but the implementation power is exercised by the BMC with the same staff that lacks technical expertise. 7. The post-implementation audit of the government shall be in such a way that it ensures the end-user, unlike the audits that have beenmadeinSwachBharatAbhiyaanwhere toilets were made in the tune of thousands withoutensuring any proper end – use. 8 The risk factors according to the private parties are a. Financial and partnership b. Governance c. Clearances d. Building permits Out of these risk factors, financial andpartnership riskswere found to be on the higher side. While the clearances and building permits posted a little risk. 9 Success factors a. Timely execution b. Significant occupancy
3.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 403 The success of timely execution of the project isfoundout be very low whereas the success of significant occupancy is very high 10 Considering the ratings received for risks and success factors the Availability of funds is greatly affected and more than 50 % of the surveyors rated the availability of funds on the lower side. REFERENCES [1] Daewoo Nam and Theresa A. Pardo Center for Technology in Government University at Albany, State University of New York, U. S. [2] http://smartcities.gov.in/content/ [3] https://cio.economictimes.indiatimes.com/news/in ternet-of-things/hpe-to-help-bhopal-smartcity- development-corporation-for-its-cloud-based-iccc- in-madhya-pradesh/61359562 [4] https://cio.economictimes.indiatimes.com/news/in ternet-of-things/hpe-to-help-bhopal-smartcity- development-corporation-for-its-cloud-based-iccc- in-madhya-pradesh/61359562 [5] https://www.hindustantimes.com/bhopal/work- on-smart-city-projects-in-first-list-moves-at-asnail- s-pace-in-mp/story- hYbvB3MGuy2Tbpwl7CepkL.html [6] http://indianexpress.com/article/india/bhopal- 500-gps-enabled-german-bicycles-50-stationsin- citys-smart-project-4488527/ [7] http://smartbhopal.city/project Author Miss Shravya Rao Student of MBA in construction Management MIT Art Design & Technology University Pune.